You are on page 1of 7

Revision Summary

Project: Shuqaiq Steam Power Plant


Doc. No. / Rev. No. / Title: S-00-BYF-E-17-V101-001 / Rev. 2/ Single Line Diagram For Tanks

No. Before Revision After Revision Reasons Remarks

Refer to Revision mark “2” on the drawing:


1 S-00-BYF-E-17-V101-001 (sh 1 - 6) As per internal design review.
- Remote monitoring cable added.

2 -

3 -

4 -

5 -

1/1

You might also like