PLAN/PRJ UNIT PHASE DIS SER.NO. REV.NO. Page 3 OF 4
PROCESS DATA SHEET FOR TYPE
GAS OIL STORAGE TANK
1159 11 EB PR DS 0003 D
25 18290 53640
26 Outlet Nozzle to bottom (Centre lin mm 780
27 Insulation No
28 Shell Roof/Bottom Others
29 Material (Note1) CS CS CS
33 Notes
34 1- It should be confirmed by Mechanical Dep.
35 2-Deleted
36 3- Based on site condition, minimum absolute Temperature= -23
37 4- Nozzle data should be finalized in detail engineering
39 5- For more detail , Mechanical Datasheet should be considered. It will be finalized in Detail Enginnering.
40 6-Outtlet flow rate is considered based on max. flow rate from CHESHME SHOUR pump station to PALANG ABAD pump station.
41
42
PROJECT:TEHRAN BY - PASS PIPELINE & RELEVANT FACILITIES
(PRELIMINARY STUDY & BASIC DESIGN)
N.I.O.E.C I.O.P.T.C
CON. NO : 1159/EB-GN/DBS- BD01-00 WBS Code: 1.4.3.2.2.1.1.4.3
DOC.
PLAN/PRJ UNIT PHASE DIS SER.NO. REV.NO. Page 4 OF 4
PROCESS DATA SHEET FOR TYPE
GAS OIL STORAGE TANK
1159 11 EB PR DS 0003 D
11 CN6, CN7 1 8" Level Tasmitter / Indicator (Still well should be considered)