Professional Documents
Culture Documents
UC-DS-SEAM111EPLAN2B Page 1 of 4
Developer Document Reviewer Programmer
SEPT. 6, 2021
Student’s Name: Billyjean C. Premacio Date:
SEPT. 6, 2021
Instructor’s Name: Nelson C. Tambor Date:
This is intended for students who have taken Student-equipment
Pre-requisite:
and passed SEAM111_EPLAN2A ratio: ___ (as per current
Scope: This intended for week 3 prelim term CMO requirements)
Course Seam 111 – Ship, Ship Routines and Ship Construction
60 minutes
Duration (briefing 5 minutes, preparation 5 minutes, execution 45 minutes, debriefing 5
minutes)
Controlling the operation of the Ship and Care for Persons on Board at the
Function OPERATIONAL LEVEL
Marlin spike, 8mm wire rope, goggles, leather gloves, mallet or hammer, and
Equipment Needed twine rope
UC CONTROLLED DOCUMENT
The practical exercise shall be carried out and performed by trio in the
seamanship laboratory. The student must demonstrate the required exercise
Condition outcome according to performance standard within time prescribed.
To demonstrate the required outcome, the student must be able to perform the
criteria set out.
Scenario
Deck crew to make an eye splice of the 8mm wire rope using marlin spike
Description
Ship’s Particulars N/A
Not
Performance Standard Performance Criteria Done
Done
Measured a distance of approximately
45-50cm (for 8mm wire rope) from the
working end of the wire rope and
/
tightly seize the same.
1. Preparing wire rope for splicing Opened the rope as to separate the
individual strands, clean each strand /
with a cotton rag.
Seized the end of each strand with
/
twine
UC CONTROLLED DOCUMENT
Lifted 2 strands of the standing end
closest to the innermost strand
working end ① with spike and insert /
①*
Lifted 3 strands of the standing end
with spike and insert ② of working /
end, using same insertion point*
Turned the complete splice over in
order to insert a spike from the back /
side
Inserted the spike from the back side
and lifted 2 strands of standing end
and insert strand ③ of working end
/
using same insert point*
Lifted 1 strand of the standing end and
insert strand ④ of working end, using /
same insertion point*
Holding all 6 strands and the core, hit
the standing end with the spike to form /
2. Eye splicing the wire five stuck the eye
Released the core and hit the standing
end till the seize point of the working /
end touches the standing
Wind strand ④ on to the standing and
/
tucked the same five times
De-briefing
Discussion of the outcome of the exercise. As per de-briefing checklist.
UC CONTROLLED DOCUMENT
Condition to The student will re-do the exercise if the critical criteria marked (*) is not done. Student
proceed who performs correctly the exercise shall proceed to assessment 2.
BILLYJEAN C. PREMACIO
________________________________
Student’s Signature over Printed Name
Date: Sept. 8, 2021
Nelson C. Tambor
Instructor’s Signature over Printed Name
Date: Sept. 8, 2021
Note: Attached with this document are the procedures with pictures on how to splice a wire rope
UC CONTROLLED DOCUMENT