CLAIMS CN112427790A

1.
13 A method for flash butt welding of steel bars for construction engineering, which is characterized in that it
comprises the following steps:
15 Step 1: Preliminary stage: Use electrostatic spraying process to spray appropriate amount of alloy powder on

the connecting ends of two steel bars to form an alloy layer;


17 Step 2: Preheating stage: heating the connecting ends of the two steel bars sprayed with alloy layer respectively

through resistance heating;


19 Step 3: Flash butt welding stage: By applying voltage to the two steel bars and applying top force to the two steel

bars at the same time, the two steel bars to be connected move closer to each other until they are in contact
with each other and the short-circuit current flows. The ends of the steel bars to be connected are heated to
gradually melt, and the two steel bars are fused together at the same time when the contact surface of the two
steel bars flashes.

2.
27 The method for flash butt welding of steel bars for construction projects according to claim 1, wherein the alloy
material in step one is Ni-based alloy powder or stainless steel alloy powder.

3.
32 The method for flash butt welding of reinforcing steel bars for construction projects according to claim 1,
characterized in that: in the preheating stage of step 2, the surface temperature of the two steel bars to be
connected after heating is 100-150°C.

4.
22-09-2021 1
38 The method for flash butt welding of reinforcing steel bars for construction engineering according to claim 1,
wherein the preheating stage in step 2 lasts not less than 15 minutes.

5.
43 The method for flash butt welding of reinforcing steel bars for construction projects according to claim 1,
characterized in that: in the flash butt welding stage of step 3, the speed at which the ends of the two steel bars
to be connected move toward each other is 2.1 mm/s ~2.8mm/s.

6.
49 The method for flash butt welding of reinforcing steel bars for construction engineering according to claim 1,
characterized in that: the length of the alloy layer in step 1 is set, and in the flash butt welding stage of step 3, the
flash margin is m, then l The relationship between m and m is as follows: (lm)/2≥10mm.

7.
55 The method for flash butt welding of reinforcing steel bars for construction engineering according to claim 6,
characterized in that: in the flash butt welding stage of step 3, the flash margin is 10mm-60mm.

8.
60 A method for flash butt welding of steel bars for construction engineering according to claim 6, wherein the
length of the alloy layer in step one is 20-70 mm.

9.
65 The method for flash butt welding of steel bars for construction projects according to claim 1, wherein the
thickness of the alloy layer in step one is 0.3-2.0 mm.