200
900
200
200
200
200
900
900
1,400
1,400
1,400
50mm dia Mild steel CHS top rail
1.5
1,500
1,500
1.5 1.5
STAIRCASE
pv
pv
pv
10 10
1.2 1.2 OFFICE 1.2
10
9 9
1,500
1.5 9
1,500
1,500
1.5 11
1.5 11
pv
EXISTING
11
pv
pv
8 8
1.5 8 1.5 12 1.5 12
12
7 7
800
800
800
13 13
13
6 6
6
STAFFROOM
14 14
1,100
1,100
1,100
14
5 5
7,200
7,200
7,200
5
7,200
7,000
7,000
7,000
7,000
7,000
7,000
15 15
15
1,500
4 4
1,500
1,500
4 16 16
1.5
16
3 1.5 3 1.5 3 1.5
pv
1.5
pv
1.2
pv
pv
10
1.2
17 17
pv
11
1.5 8
1.2 1.2
pv
12
17 7
ADMIN
pv
pv
2 2
13
1,500
1.5
6
1,500
1,500
14
2
1.5 1.5
5
15
4
18 18 1.5 3
16
pv
1.5 1.2
RECEPTION
pv
17
18 1.5 2
1 1
18
1
800
800
800
0.9
pv
1.5 2.4
pv
1.5
pv
400 1,500
pv
400 1,500
400 1,500
1,700
1,700
1,700
1.5
pv
1.2
0.9
1.5
0.9 0.9
pv
1.5
pv
1.5
pv
pv
2.4 1.5 2.4 1.5 2.4
pv
1.5
pv
pv
pv
1.5 1.2
pv
1.5
200
200
1.5
1.5 1.5
200
200
200
200
190 m2
0.9
pv
1.5 2.4
pv
1.5
300
300
300
100
200
200
200
200
200
200
1,300
1,300
PROPOSED NEW EXTENSION
gents
1,300
1,300
1,300
1,300
gents gents
800
800
800
wc
pv
wc wc
pv
pv
200
200
700
200
200
200
200
2,800
2,800
2,800
700
700
2,800
2,800
2,800
2,800
perforated perforated perforated
1,300
1,300
screen wall
1,300
1,300
1,300
1,300
screen wall screen wall
800
ladies
800
800
ladies ladies
pv
pv
pv
wc wc wc
200
200
200
100
800
200
200
10
12
13
14
15
16
17
18
800
800
11
200
200
200
200
1
1,300
1,300
1,300
EXISTING
200 200 200 ABLUTION BLOCK
50mm dia Mild steel CHS top rail
100mm thk 900mm low wall with
1,500
1.5
1,500
1,500
1.5 1.5
pv
pv
pv
1.2 1,500 1.2 1.2
1.5
1,500
1,500
1.5 1.5
L(- -)10 ELEVATION
pv
pv
pv
1.5 1.5 1.5
GATE
800
800
800
1,100
1,100
1,100
1,500
7,200
7,000
7,000
1,500
1,500
7,000
7,000
7,000
7,000
1.5 1.5 1.5
CLASSROOM COMPUTER LAB 01
pv
1.5
pv
pv
1.2 1.5 1.2 1.5 1.2
pv
pv
pv
1,500
1.5
HALL
1,500
1,500
1.5 1.5
800
800
800
32,000
32,000
32,000
32,000
32,000
Pitch 25 deg. IT4 Pitch 25 deg. IT4
1,500
1,500 roofing SHEETS on 38x38 timber battens on roofing SHEETS on 38x38 timber battens on
1,500
0.9 0.9 0.9 100x50 trussed rafter at max 600 c/c with 100x50 trussed rafter at max 600 c/c with
2,850
2,850
pv
1.5
pv
pv
2.4 1.5 2.4 1.5 2.4
100x50 purlins at 1000 c/c on 100x50 timber 100x50 purlins at 1000 c/c on 100x50 timber
pv
pv
pv
1.5 1.5 1.5
wall plate on 450x200 support R.C beam wall plate on 450x200 support R.C beam
3,800
3,800
3,800
800
800
800
+8.550 +8.550
200
200
200
200
200
200
pv
pv
pv
1,500
1,500
pv pv pv pv
pv
pv
2,850
2,850
PASSAGE
PASSAGE
PASSAGE
pv
800
pv
pv
800
800
1,500
1,500
1,500
CLASSROOM HALL +5.700 +5.700 Steel casement door to Steel casement door to
schedule schedule
150
150
1,500
1,500
1,500
ASSEMBLY HALL
21,800
21,800
21,800
7,200
7,000
7,000
7,000
7,000
7,000
7,000
1,100
1,100
1,100
pv
pv pv pv pv
pv
pv
300
300
800
800
800
pv
pv
pv
1,500
1,500
1,500
2,400
2,400
Risers=150mm Risers=150mm
1,500
1,500
1,500
+2.850 +2.850 Tread=300mm Tread=300mm
pv
pv
pv
150
150
pv pv pv pv
1,100
1,100
1,100
Steel casement window to schedule Steel casement window to schedule
3,100
3,100
3,100
200
200
200
200
200
200
2,700
2,700
pv
pv
pv
1,500
1,500
1,500
200 mm thick masonry wall with motar keying 200 mm thick masonry wall with motar keying
±0.000 ±0.000 and bagwash to client's approval and bagwash to client's approval
pv
pv
pv
Secretary
pv
meeting
800
pv
pv
800
800
pv pv pv pv
1,500
1,500
1,500
1,500
1,500
1,500
7,200
7,000
7,000
7,000
7,000
7,000
7,000
LIBRARY
1,100
1,100
1,100
CLASSROOM
pv
pv
pv
800
800
800
pv
pv
1,500
1,500
1,500
1,500
HEAD TEACHER
1,500
1,500
pv
pv
pv
1,300
1,300
1,300
800
800
800
200
200
200
200
200
200
10
12
13
14
15
16
17
18
11
FIRE ESCAPE
10
12
13
14
15
16
17
18
10
12
13
14
15
16
17
18
11
11
FIRE ESCAPE
9
1
FIRE ESCAPE
pv pv pv pv pv pv pv pv pv pv pv pv pv pv pv pv pv pv pv pv pv pv pv pv pv pv
pv pv pv pv pv pv pv pv pv pv pv pv
pv pv pv pv pv pv pv pv pv pv pv pv pv pv
pv pv pv pv pv pv pv pv pv pv pv pv
pv pv pv pv pv pv pv pv pv pv pv pv pv pv
NOTES SURFACE WATER upvc waste pipe to whb. all exposed to have all drains runs to be 100mm dia upvc drainage pipe FLASHING
DPC 100mm dia half round UPVC gutter to 75mm dia, anti-syphonic traps. provide cleaning eye at all with flexible jonts to be provided at junction of all roofs and wall
the damp proof course to be Bituminous felt UPVC downpipe change of direction all exposed waist to be UPVC.
pitchpolymer or similar provided on all walls, via 100mm dia UPVC drainage pipes MANHOLE
vent pipe should terminate 900mm above the ELECRICAL INSTALLATION No. REVISION APPROVAL DATE Date Project number Scale
PROJECT A3
placed minimum 150mm above the finished grond level with flexible joints lain to fall 1:40 laid on and new manholes not exceeding 900mm deep to be
head of any openings and fitted durable plastiic all electrical installation works are to comply with DEPARTMENT OF CIVIL & CONSTRUCTION ENGINEERING
surrounded by sand. 450x450mm min in 100mm solid blockwork on
vent crawl. all S&V connections to be with the specified requirements and should be carried out SCHOOL OF ENGINEERING
COLLEGE OF ARCHITECTURE & ENGINEERING DESIGN PROJECT 2019-08-19
Drawn by
R1 As indicated
LINTELS accordance withBS 5572 150mm mass concrete base with suitable manhole by a qualified electrician, providing requisite tests UNIVERSITY OF NAIROBI
DRAWING NUMBER STATUS
DESIGN
2019-12-23 14:14:40
SHEET M. MUNYUA
to be concrete of minimum grade C25 PLUMBING cover to BS 497. all manholes to be watertight certificates upon completion and installation. works
reinforcement in lintels to be as shown on lintel 40mm dia UPVC waist to shower, bath and sinks, FOUL DRAINAGE and rendered with waterproof cament and sand should also be carried out with accordance with the
P.O. BOX 30197 - 00100
NAIROBI ARCHITECTURAL DWGS Checked by
J.. WERO
R1-1 REV
schedule having a minimum concrete cover of 25mm 100mm dia UPVC waste pipes to wc, 32mm dia kitchen sinks to be connected to back inlet gulley. render externally approved code of practice