You are on page 1of 4

FEASIBILITY STUDY

SEI (Design Input Verification)

PART NAME :- BOTTOM CAP PART NO. :-1501500100

CUSTOMER : PV CLEAN MOBILITY TECHNOLOGIES PVT.LTD. DATE:- 28.07.2021

M/C. Name & No. :AS PER LIST

Operator & Inspector Name :AS PER LIST


Feasibile
S.No. Characterstics Specification Checking Method Reason if not Feasibile
Yes No
1 DIA 8.2±0.1 DMM ü

2 CONCENTRICITY 0.1 DAIL WITH V-BLOCK ü

3 DIM 5±0.1 DVC ü

4 FLATNESS 0.1 DAIL WITH V-BLOCK ü

5 OD 10.21/10.23 MM ü

6 CONCENTRICITY 0.05 DAIL WITH V-BLOCK ü

7 ID 6±0.1 DVC ü

8 CONCENTRICITY 0.1 DAIL WITH V-BLOCK ü

9 DIM 3.6±0.1 PP ü

10 RADIUS R0.2 PP ü

11 RADIUS R MAX 0.1 PP ü

12 CHAMFER 0.2×30° PP ü

13 CHAMFER 1×15° PP ü

14 DIA 9.90/10.00 MM ü

15 DIM 2.3±0.1 PP ü

16 CHAMFER 0.2 PP ü

PART SHOULD BE FREE FROM


17 APPEARENCE FLASHES & OTHER MOULDING VISUALLY ü
DEFECTS

18 MATERIAL BRASS (IS - 319 - GR - I) SUPPLIER/THIRD PARTY ü

1 mg MAX
19 MILLIPORE VALUES MAXIMUM PARTICLE SIZE :- 500 SUPPLIER/THIRD PARTY ü
MICROMETER

20 SURFACE TREATMENT GLOSSY FINISH SUPPLIER/THIRD PARTY ü

21 COMPONENT MASS 0.5 g WEIGHING SCALE ü


Feasible (if Feasible then Write Yes) : YES

Not Feasible (Give Your Comments) :


Sign. CFT Members :
1. Mr. PARAMVIR SINGH 6. Mr. VINAY SINGH
2. Mr. PRAKASH TRIPATHI 7. Mr. CHAND RAM
4. Mr. BANWARI SINGH 8. Mr.
5. Mr. RAJGIR 9. Mr.
DOC No:-SEI/PD/F-02A
Rev. No. : 00
Eff. Date : 01.10.2018

Remarks

You might also like