You are on page 1of 20

Version Date Total pages

2010-09 September-01-2010 20

Installation Process

page 1
Version Date Total pages
2010-09 September-01-2010 20

1 Deck part

1. Cutting the deck


2. Installed Hook-ring

2 Reinforce a chassis frame

3 Assemble a Rear outrigger

4 P.T.O & Pump part


1. Assemble PTO & Pump
2. Air Circuit

5 Installed crane & deck

6 Piping
1. Pump
2. Rear outrigger

7 Installation of accelerator cable


1. Mechanical Engine
2. Electronic Engine

page 2
Installation Process
Version Date Total pages
Deck part – Cutting the deck 2010-09 September-01-2010 20

Remove the U-
U-bolt from Mark the cutting point
chassis : Refer to cutting table
Separate the deck from chassis

Separate the
loadrest

Cutting the deck Mark the cutting point

page 3
Installation Process
Version Date Total pages
Deck part – Cutting the deck 2010-09 September-01-2010 20

Cutting the loadrest in


Cutting the side panel order to avoid interference

Assemble the ladder Assemble the side panel

Assemble the loadrest

page 4
Installation Process
Version Date Total pages
Deck part – Installed Hook-ring 2010-09 September-01-2010 20

Fix the U-
U-bolt on the deck that
located at the tip of boom head

Complete the installation


of Hook-
Hook-ring

page 5
Installation Process
Version Date Total pages
Reinforce a chassis frame 2010-09 September-01-2010 20

Detach a battery box

Detach a fuel tank


from chassis

Detach an air tank

Mark the hole of interference with Fix the reinforced plate


bolt & rivet of chassis after decide position

page 6
Installation Process
Version Date Total pages
Reinforce a chassis frame 2010-09 September-01-2010 20

Make the hole at Note:


marking position 1. Welding Bead – 40 mm
2. Welding pitch – 100 mm

After fix the reinforced plate,


progress the welding

Weld the flat bar behind Painting again after welding


reinforced plate

Assemble a battery box

page 7
Installation Process
Version Date Total pages
Reinforce a chassis frame 2010-09 September-01-2010 20

Assemble a Fuel tank Assemble an air tank

Attach the stopper in order to


prevent sliding of sub frame (spacer)

Reinforce the chassis at


center between front I-
I-bolt Decide the position of I-
I-bolt in
and rear I-
I-bolt order to install a crane body

page 8
Installation Process
Version Date Total pages
Reinforce a chassis frame 2010-09 September-01-2010 20

Assemble the cross-


cross-member in Assemble the mounting bracket in Attach the stopper in order to
order to fix the sub frame order to fix the sub frame prevent sliding of crane

page 9
Installation Process
Version Date Total pages
Assemble a Rear outrigger 2010-09 September-01-2010 20

Decide suitable position


of rear outrigger

Fix the outrigger by I-


I-bolt

Attach the clamp for


piping of rear outrigger

Assemble the set plate


by cut sub frame

page 10
Installation Process
Version Date Total pages
P.T.O & Pump part 2010-09 September-01-2010 20

(Assemble PTO & Pump)

Detach PTO cover of transmission

Hydraulic Pump Connection position of PTO

Connection port P.T.O


with air tank

Assemble a gasket

page 11
Installation Process
Version Date Total pages
P.T.O & Pump part 2010-09 September-01-2010 20

(Assemble PTO & Pump)

Assembly position with Pump Connection port Grease this point before assembly
with air tank

Pump Bracket Magnetic Valve Propeller Shaft

Decide suitable position to


Connect with Pump Connect with PTO
attach the pump bracket

page 12
Installation Process
Version Date Total pages
P.T.O & Pump part 2010-09 September-01-2010 20

(Assemble PTO & Pump)

Assemble the pump bracket Assemble the magnetic


: Welding or Bolting : Refer to Air circuit
Note:
1. Gap of shaft – 15~20
15~20 mm
2. Shaft angle – within 10 degree

PTO Switch

Connect air hose between


PTO and Magnetic valve
: Refer to Air circuit

page 13
Installation Process
Version Date Total pages
P.T.O & Pump part– Air Circuit 2010-09 September-01-2010 20

№ CODE Parts name Q’ty Remark

1 A56169 P,T,O 1

2 B96109 P,T,O Switching unit 1

3 A56260 Propeller shaft 1 L1130

4 4002153 Hex. Bolt 8 M8xP1.25xL30

5 4211010 Spring washer 8 M8

6 4101211 Hex. Nut 8 M8xP1.25

7 A56121 Pump Flange 1

8 J16121 Pump Bracket 1

9 4002206 Hex. Bolt 4 M12xP1.75xL40

10 4101213 Hex. Nut 4 M12xP1.75

11 4211012 Spring washer 4 M12

12 A Hyd. Pump 1 B

13 4300119 Spring Pin 1 Ф 8 x L20

14 4002235 Hex. Bolt 4 M14xP2.0xL40

15 4101214 Hex. Nut 4 M14xP2.0

16 4211013 Spring washer 4 M14

page 14
Installation Process
Version Date Total pages
Installed Crane & Deck 2010-09 September-01-2010 20

Put the crane on the sub frame (spacer)

Check whether the crane is situated


horizontally (if not, use the flat bar) Attach the stopper in
front of crane body

Stopper

Fix the crane by I-


I-Bolt
Assemble the outrigger
and connect the hose

page 15
Installation Process
Version Date Total pages
Installed Crane & Deck 2010-09 September-01-2010 20

Cutting the main-


main-room of deck in order
to avoid interference with sub frame Attach the plate in order to prevent
Assemble the deck-
deck-bracket transformation when assemble the U- U-bolt
(Keep horizontality)

Assemble the U-
U-bolt
Assemble the Boom-
Boom-pin
Check whether the deck is situated
horizontally (if not, use the flat bar)

page 16
Installation Process
Version Date Total pages
Installed Crane & Deck 2010-09 September-01-2010 20

Assemble the Bearing-


Bearing-Nut Assemble the
Derrick-
Derrick-Pin

Assemble the hose of


telescopic cylinder

Fix the socket


Assemble the Hook Assemble the wire rope

page 17
Installation Process
Version Date Total pages
Piping - Pump 2010-09 September-01-2010 20

OUT-line of pump
IN-
IN-line of pump

The IN-
IN-line of pump connects
to oil tank of crane body

The Out-
Out-line of pump connects
to out-
out-line of diverter valve

page 18
Installation Process
Version Date Total pages
Piping – Rear outrigger 2010-09 September-01-2010 20

Pipe bending

Attach the adapter after


The hoses connect to the pipe of R/O cutting the sub frame

Piping of expand cylinder

Piping of jack cylinder

page 19
Installation Process
Version Date Total pages
Installation of accelerator cable 2010-09 September-01-2010 20

Mechanical
Mechanical Engine
Engine

On the opposite side of cable


connects with plunger of engine

The cable connects with


accelerator lever of crane

Electronic
Electronic Engine
Engine
Connect the cable after make
a hole under the pedal

Bolting the bracket on accelerator


pedal to connect the cable

page 20

You might also like