You are on page 1of 4

EOT ON-BOARD

End of Train Device


Train integrity monitoring solution Menu

Certifying that all the wagons are properly coupled

A freight train can have hundreds of wagons and


kilometres of length. So, ensuring the train
integrity of such extensive compositions is a
complex task but crucial when it comes to
security.

Than, for certifying the integrity of trains and


address fundamental information ART designed its
End of Train (EOT) device , a equipment that must
be installed on the last wagon.

Metal EOT

alta-rt.com | alta@alta-rt.com 1/4


EOT ON-BOARD
End of Train Device
Train integrity monitoring solution Menu

The EOT device provides the following


functionalities
Equipment with low
• Train integrity monitoring
energy use
• Break pipe pressure monitoring
• Emergency braking application from the last wagon EOT’s electronic circuit and battery are
• Train size accuracy measurement powered by a small air amount from the
general train pipe. This eliminates
• Last wagon movement information
downtime and delays due to battery
• GPS and GPRS tracking information discharge, enabling longer trips
without recharging.
Plastic EOT

EOT communicates via UHF, with the Communication Module and the
Locomotive Cab Unit. Both equipment complies with the American Association
of Railroads (ARR) for train device.

alta-rt.com | alta@alta-rt.com 2/4


EOT ON-BOARD
End of Train Device
Train integrity monitoring solution Menu

Features

PRODUCTIVITY
• Reduces trains braking curve with application
from the rear end

SAFETY
• Back Room capacity for real time
monitoring and remote location

Metal EOT

alta-rt.com | alta@alta-rt.com 3/4


EOT ON-BOARD
End of Train Device
Train integrity monitoring solution Menu

Technical Specification

Connectors Standard Military Power 12,8VDC/GEP – Electro - Pneumatic


Generator
Communication 1x UHF Radio 450 – 470MHz
1x GPS MTBF (component based) 40,000h
1x GPRS (under consult)
Operating Temperature -25 ~ 60ºC (-40 ~ 70ºC)
Connects to OBC - On Board Computer (Storage)
MCF - Communication Module
Operating Humidity 10 ~ 90% (5 ~ 95%)
LCU – Locomotive Cabin Unit (Storage)

Actuators 1x Emergency Valve Air Consumption 85 L/min (3ft3) @90PSI

Coupler For AAR Type ECoupler (plastic IP66 (electronic and Battery block)
Ingress Protection
and metal)
For SA3 Coupler (metal)
For Norwegian Coupler (metal) Dimensions (mm) 278 W x 597 H x 153 D (including handle
*Other models available for and without coupler)
consult
Display Weight 8,5 kg (plastic) 12,6 kg (metal)
3x Display 7 segments (SSD)
Voltage Standards that guided IEC61373 – Railway Application - Equipment Used
development on Rolling Stock - Shock and vibration tests
Lead Acid 12V – 2.9A/H IEC60571 - Railway applications - Electronic
equipment used on rolling stock

alta-rt.com | alta@alta-rt.com 4/4

You might also like