Professional Documents
Culture Documents
End of Well Report
End of Well Report
CONTENTS
1. WELL SUMMARY
2. TIME BREAKDOWN
4. TIME ANALYSIS
7. BIT RECORD
8. MATERIAL CONSUMPTION
9. WELL SCHEMATIC
SIGNATORIES
PREPARED BY :
DATE : _____________
APPROVED BY :
OPERATIONS MANAGER
DRILLING MANAGER
DATE : _____________
DATE : _____________
WELL PARAMETERS
WELL NAME /WELL TYPE : Hosan-1/Exploration Well
BLOCK / STATE : Block 8 / Blue Nile State
WELL CLASSIFICATION / AFE MANAGER : xxx
LATITUDE / LONGITUDE : 13ْ 26' 19.4" (13.43878 N) 34ْ 06' 28.4" (34.10789 E)
UTM ( ZONE 35 ) : 1485,929.58mN 619,933.78mE
SEISMIC LINE : SD8PC-2D-04-94
OBJECTIVE : Dinder-3 & Lower Dinder-2 Blue Nile
OFFSET WELL(S) : Dinder-1
MOVING DISTANCE : 2.8 km from TJ-11
CASING SCHEME : TYPE SIZE (in) DEPTH (mRKB) GRADE/WEIGHT (ppf) CONN.
CONDUCTOR : 20 18 X-52 94
SURFACE : 13.375 552 L-80 68 BT &C
INTERMEDIATE : 9.625 1735 L-80 47
PRODUCTION : BT &C
LINER :
PBTD : 2911
PERFORMANCE INDICATORS
PT 101 Moving In & Rigging Up 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 17.00 24.00 149.00
PT 102 Conductor 0.00
PT 103 Inspection & Modification 0.00
PT 104 Rigging Down & Moving Out 6.00 19.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 6.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 121.00
PT 201 Drilling & Deviation Survey 12.50 20.50 13.00 18.00 22.50 21.00 23.50 10.00 20.50 23.00 10.00 2.50 23.50 15.00 24.00 22.00 10.50 19.50 19.50 17.00 19.50 24.00 7.00 24.00 23.00 24.00 13.50 15.00 24.00 24.00 22.50 10.00 24.00 24.00 10.00 16.50 24.00 7.00 20.50 13.00 12.00 194.50
PT 202 Trips & Circulation 3.50 6.00 9.00 8.17 1.50 3.00 0.50 13.50 3.50 14.00 8.00 10.50 3.00 14.50 1.50 0.50 9.00 1.00 11.50 4.00 4.50 7.00 4.50 17.00 1.00 6.50 7.50 1.50 14.00 13.00 7.00 16.00 3.50 11.00 10.50 4.50 10.50 15.00 6.50 15.00 3.50 10.50 11.00 98.67
PT 203 Cementing, Grouting & WOC 14.00 4.50 4.00 20.50 7.00 1.00 14.00
PT 204 Run casing & Wellhead 5.00 10.00 3.00 14.00 18.00
PT 205 BOP equipment 7.50 4.00 9.00 1.50 6.00 7.50
PT 206 Abandonment 0.00
PT 207 Others 2.50 1.00 0.00
PT 301 Logging & RFT 5.00 2.00 16.00 13.50 21.00 6.50 1.50 19.50 13.50 9.00 17.50 9.00 64.00
Cement Log 0.00
PT 302 Coring 0.00
Scraper Run 5.50 0.00
Hole openning 22.00 15.00 10.83 47.83
Well Testing 0.00
0.00
DT 101 Wait on Location/ Road 4.00 4.00
DT 102 Wait on Truck 0.00
DT 103 Wait on Daylight 5.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 7.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 216.00
DT 104 Wait on Weather 0.00
DT 105 Wait on Other Dept. 0.00
DT 106 Wait on Order 0.00
DT 107 Wait on Supplies 0.00
DT 108 Wait on Other 0.00
DT 201 Rig Equipment 0.50 1.00 2.00 0.50 1.00 0.50 1.00 1.50
DT 202 Cementing 0.00
DT 203 Drillpipe, Drill Collar & HWDP 1.00 0.00
DT 204 Directional & Surveying Tools 0.00
DT 205 Jars & Shock Sub 0.00
DT 206 Excessive Reaming 0.00
DT 207 Stucked 0.00
DT 208 Loss Circulation 0.00
DT 209 Well Equipment 0.00
DT 210 Well Control 0.00
DT 211 Other 0.00
DT 301 Wireline Logging 0.00
DT 302 LWD 0.00
DT 303 Coring 0.00
DT 304 FRP while Evaluation 0.00
Sub Total 6.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 0.00 0.00 0.00 0.00 18.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 14.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 0.00 936.00
Productive sub total 6.00 19.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 17.00 24.00 20.00 24.00 24.00 2.00 9.00 13.17 24.00 0.00 0.00 0.00 0.00 18.00 24.00 24.00 24.00 23.50 24.00 23.00 24.00 24.00 24.00 24.00 24.00 24.00 14.00 24.00 24.00 24.00 24.00 22.00 23.50 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 23.00 23.50 24.00 23.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 23.00 24.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 0.00 666.67
Non productive sub total 0.00 5.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 7.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 0.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.50 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 0.00 221.50
Downtime/ Unplanned Activities
Downtime/ Unplanned Activities
Hole
Date
Depth
Phase Code Hour Cum Hour Cost Cum Cost Description
10-Nov-04 0 Moving In & Rigging Up 5.00 5.00 7,292 7,292 Wait on Dailylight
11-Nov-04 0 Moving In & Rigging Up 12.00 17.00 15,000 22,292 Wait on Dailylight
12-Nov-04 0 Moving In & Rigging Up 12.00 29.00 17,500 39,792 Wait on Dailylight
25-Jun-04 0 Moving In & Rigging Up 12.00 41.00 17,500 57,292 Wait on Dailylight
8-Jul-04 1450 Running 7" liner 2.00 43.00 6,250 63,542 POOH to check hanger
POOH, RIH for wiper
9-Jul-04 1450 Running 7" liner 15.00 58.00 52,292 115,834
trip
58.00 0 115,834
58.00 0 115,834
58.00 0 115,834
58.00 115,834
Time Analysis
Net
Details Interval UOM Start time Actual Days Cum NPT Actual Cum dptm
Days
Rig move 0 10 Nov 2004 18:00 20.73 20.73 1.70 19.03 19.03
Drill 12 1/4" hole 552 dptm 01 Dec 2004 11:30 -152.46 -131.73 -152.46 -133.43 -276.19
Logging surface hole 552 -131.73 0.00 -133.43
Run surf csg 552 dptm 02 Jul 2004 00:30 0.40 -131.33 0.40 -133.03 0.72
Cementing 552 dptm 02 Jul 2004 10:00 0.27 -131.06 0.27 -132.76 0.49
Cut csg, install wellhead & N/U BOP 552 02-Jul-04 1.44 -129.62 1.44 -131.32
Drilling prod hole to 2911m 2911 dptm 04 Jul 2004 03:00 1.58 -128.05 1.58 -129.75 0.54
Run prod hole log 2911 05 Jul 2004 16:50 2.83 -125.22 2.83 -126.92
Run csg 2911 dptm 08 Jul 2004 12:50 1.46 -123.76 0.00 1.46 -125.46 0.50
Cementing 2911 dptm 09 Jul 2004 23:50 1.54 -122.22 1.54 -123.92 0.53
Wellhead & Rig down 2911 11 Jul 2004 12:50 0.22 -122.00 0.22 -123.70 0.22
Rig Released 2911 11 Jul 2004 18:00
Drilling days (excl move & log) 2911 -145.56 -145.56 -145.56
#REF!
1.6 : CASING, CEMENTING & DRILLING MUD
CASING DATA
TYPE SIZE WEIGHT GRADE THREAD NO. OF JOINT DEPTH
LEAD SLURRY TAIL SLURRY LEAD SLURRY TAIL SLURRY LEAD SLURRY TAIL SLURRY