You are on page 1of 2

Document No.

MPSD-READINGS- 01

Revision No. 00

Section INTEGRATED MANAGEMENT SYSTEM Effective Date 06.10.2017

Subject BOILER HOUSE COMBUSTION READINGS Page No. Page 1 of 2

ZPC MUNYATI POWER STATION

BOILER COMBUSTION AS AT 9:00 06/12/18

FURNACE TEMPERATURES
FRONT OBSERVATION DUMPING STEAM RUNNING
ARCH DOORS BARS FLOW HRS
boiler (kg/sec)
1 2 3 4 5 %CARBON
IN ASH
7 9.6 118.25
13 6.8 329.25
14 8.7 789.5
SPEC 600 1300 1300 700 500 <30 25.1

BOILER FINAL STEAM BOILER OUTLET BOILER OUTLET


TEMP (L) GAS (R) GAS
7 410 403 402
13 389 381 396
14 385 425 388
SPEC

Comments
- Expected output = 20MW
Document No. MPSD-READINGS- 01

Revision No. 00

Section INTEGRATED MANAGEMENT SYSTEM Effective Date 06.10.2017

Subject BOILER HOUSE COMBUSTION READINGS Page No. Page 2 of 2

STEAM TEMPERATURE STEAM TEMPERATURE STEAM FLOW


TURBINE AT STOP VALVE LEFT AT STOP VALVE RIGHT (KG/S)
(0C) (0C)
393 379 25.1
5