Professional Documents
Culture Documents
Technical Powerpoint
• Energy efficient
– 9.5kW rated power consumption
(35C RAT, 11.1C DP, 35C Ambient, 20.8C SAT, 100% airflow, 65Hz compressor)
1. Temperatures change entering IT Equipment 1. Pressure changes inside the contained aisle
2. InRow temperature probes Sense changes and send signal to controller 2. Active Flow Controller senses pressure change.
3. Controller adjusts cooling capacity to balance with the heat load 3. Active Flow Controller adjusts cooling fans to balance with the IT airflow
4. Active Response Controls ensures IT equipment is kept at the proper 4. Active Response Controls ensures IT equipment is kept at the proper
temperature temperature
4. Relay board
5. Ground lug
9. Controller fuse
• Compressor Protection
• Low/High Suction Protection
• Pressure Equalization
• Oil Return
• Pump-down cycle
• Cooling Setpoint
• Controlled via Rack Inlet Temp Sensor (3 per unit)
• PID Controlled
Condensate Pump
• Standard filter
• 30% filters UL 900 Class I/II (Merv 8 / G4)
Condensate Drain
Quick Coupling Colder
• Hardwire connection
• On-site configurable
• Conduit routed directly through top or bottom of unit to main breaker
• Cover plates provided
Communication
Four types of standard communication provided below
• Front Display
• Each unit can be configured and operated via the display on the front door
• Network Card
• Each unit can be accessed via local network (Ethernet)
• Up to 12 units
• When the monitored input exceeds the unit threshold, an • Compressor (VFD)
alarm will occur. Temperature and Humidity
• Fan #n failure
• Communication failures : • Heater #n failure
• Internal (Network card and R2) • Filter sensor failure
• Humidifier • Humidifier alarms
• VFD
• Water detected
• Component failures :
• Temperature sensors
• Humidity sensors
• Pressure sensors
Agency Approvals and Marks
• CE (ACRD602, ACRD602P)
• EN60335-1, EN60335-2-40
• EN55022, EN55024
• IEC61000-3-2, IEC61000-3-3
• Service Offers*
• Assembly
• Start-Up
• Preventive Maintenance
• Advantage Plans
• Data Partition
• ACAC10010
Build Out Tools
Simulate your data center before you build
ISX Designer
EcoStream