You are on page 1of 1

BUILDING C

FIFTH FLOOR

Welding Welding Welding Welding Welding STAIRCASE


Booth 1 Booth 2 Booth 3 Booth 4 Booth 5
(2x 1.5 M) (2x 1.5 M) (2x 1.5 M) (2x 1.5 M) (2x 1.5 M)
EXIT TO 4TH FLOOR

TANK

WAY TO MATERIALS/PREPARATION

BLDG. D AREA (2X2 M)

WELDING
BOOTH 6
(2X1.5 M)
GRINDING GRINDING GRINDING
BOOTH 1 BOOTH 2 BOOTH 3
(2X1.5 M) (2X1.5 M) (2X1.5 M)

WELDING
(2X1.5 M)
BOOTH7
STAIRCASE BENCH WORK BENCH WORK
AREA 1 AREA 1
EXIT TO 4TH
(2X1.5 M) (2X1.5 M)
FLOOR

WELDING
BOOTH 8
(2X1.5 M)

Tool Room & S/M


Storage Area
ELECTRICAL
4x5
INSTALLATION AND
MAINTENANCE AREA
Wash Area /
Restroom
2.5 x 4

TOOL AREA

You might also like