Dated 01-07-2020
DAILY REPORT
Overview:
Visited the power plant site and followed the operation and maintenance
activities performed during the day.
Operation Activities:
The complex was running on baseload with a combination of 2+1.
GT-1 startup demand is received by NPCC but due to the repairing work of
52G GCB, GT-1 is under forced shutdown now.
GT-2 is operating at baseload.
GT-3 is operating at baseload.
Weekly auxiliaries changeover of all the power plant was done by the
operation department. During the changeover no abnormality happened.
DAILY REPORT
Maintenance Activities:
During the day, visited the plant site area and closely observed the maintenance
activities performed by different departments. The maintenance activities
attended are listed below:
HRSG-2:
Seepage of water and steam observed from the de-superheating control valve of
HP main steam line at HRSG-2.
DAILY REPORT