Content
1 操作者人身安全类注意事项说明 ......................................................... 1
Notice for operators’ personal safety ................................................... 1
2 结构原理 ............................................................................. 2
Structure and working principle .......................................................... 2
2.1 总体概述 ....................................................................... 2
Summary .............................................................................. 2
2.2 结构及特点(本机外形及参数见附图 1 和参数表 1) .................................. 2
Structure and features ............................................................... 2
3 安装 ................................................................................. 8
Installation ............................................................................. 8
3.1 运输与贮存 ..................................................................... 8
Transportation and storage ........................................................... 8
3.2 开箱与检查 ..................................................................... 8
Package opening and checking ......................................................... 8
3.3 吊挂装置 ....................................................................... 9
Suspension device .................................................................... 9
3.4 设备及行走装置(见附表 3)安装要求............................................. 10
Installation of main frame and traveling trolley (re. parameter form 3) ............. 10
3.5 安装程序 ...................................................................... 16
Installation procedures ............................................................. 16
3.6 配电柜安装 .................................................................... 17
Control cabinet installation ........................................................ 17
4 调试、试运行 ........................................................................ 17
Commissioning ........................................................................... 17
4.1 手动除铁器安装后的调整检查、试运行(RCY-P 型) ................................. 17
The commissioning of manual-discharging magnetic separator after installation (model RCY-P)
.................................................................................... 17
4.2 带式除铁器安装后的调整检查、试运行(RCY-PⅡ、C、Q 型) ......................... 18
The commissioning of belt magnetic separator after installation (RCY-PII, RCY-C, RCY-Q)
.................................................................................... 18
4.3 常见故障分析 .................................................................. 22
Common trouble analysis ............................................................. 22
5 运行注意事项 ........................................................................ 23
Notices for operation ................................................................... 23
6 设备保养、维护 ...................................................................... 24
Maintenance of the equipment ............................................................ 24
7 参数页、附图 ........................................................................ 26
ATTACHED PAGES AND ATTACHED DRAWING ..................................................... 26
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
1 操作者人身安全类注意事项说明
Notice for operators’ personal safety
※为了确保您的人身、设备及财产安全,在使用除铁器之前,应确保除铁器皮带电机与供电电源之间连线
有保护性开关,以免除铁器故障时事故扩大。
To secure personal and property in safe, please erect protective switch on connection between
除铁器能产生非常强的磁场。因此所有接近此设备的工作人员必须知晓其潜在的危险性,切不可掉以轻心。
磁场主要集中在除铁器底部,但除铁器四周会有部分弱磁场。特此制订如下安全守则:
Magnetic separators can form very strong magnetic field, so care must be exercised and the potential
danger should be known by the workers at all times while working around the machine. The magnetic
field is concentrated underside the separator, while weak magnetic force is available around.
1) 磁场会使心脏起博器受到严重损坏。带有心脏起搏器的人应在确知磁场对起搏器无影响的前提下才能接近
设备。如果情况不明,应在磁场完全消失后再接近设备。
Magnetic field will damage the pacemaker severely. People with pacemaker can’t get close to the
equipment unless magnetic field is affect less. If the situation is not clear, he shouldn’t get
2) 请不要在磁场附近使用铁制工具或器件,特别是带尖角的器具。
Don’t use iron appliance or tools near the magnetic field, especially the appliance with sharp
ends.
3) 请不要携带磁存储传媒物如计算机磁盘、磁带及信用卡等接近设备,因为磁场会抹掉其上信息,使其无法
使用。
Don’t take magnetic memory carriers close to the equipment, such as magnetic disk, tape, credit
1
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
card and so on, for magnetic field may delete the information stored in them and make them useless.
4) 请不要在磁场附近携带手表或配有电源的工具,磁场会对其磁化。
Don’t take your watch or the appliance with power supply close to the equipment for magnetic
2 结构原理
Structure and working principle
2.1 总体概述
Summary
备适用于除铁要求不高的带式输送机上除铁;超强设备(即 T1、T2、T3)是针对一些特殊场合(如料层厚、带
速高、夹杂较大或很细小铁件)分成三个等级进行设计的。
Attractive force can only happens on ferrous materials in the non-equal magnetic field. The attractive
force (F) is proportional directly to the product of the magnetic intensity (H) and the magnetic
gradient ( H/ L). We consider both of the two parameters above-mentioned important in our design.
The technical standards all meet the requirements in JB/T8711-1998. The standard models are suitable
for removing iron from low speed conveyor; Super-strong models (T1, T2, and T3) are specially designed
according to some special working conditions with thick material, high conveyor speed, big or very
tiny iron.
本系列机型除铁器具有独特设计的磁路,将磁力线更多地集中在除铁器的下方;这种磁路不但具有很高的磁场
梯度,而且在额定悬挂高度上也有很高的磁场强度。即使在同等磁场强度条件下比较,其磁系的磁场梯度也更
With special magnetic circuit design, the magnetic curves can be fully concentrated under our
equipments. This kind of equipment has high magnetic gradient and also high magnetic intensity at
2
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
rated height. Even at the same magnetic intensity, the magnetic gradient of this kind of equipment
is superior. Ferrous iron in different shapes, from 0.1kg to 35kg in weight can be caught.
3
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
各型号的结构及特点见下表:
Please refer to the following form for more information about permanent magnetic separators:
可实现连续吸铁、弃铁。皮带具有自动纠偏功能,低噪音。
运行可靠,维护简单。 适用于各行业输料除铁。
RCY-C Continuous collecting and discharging, reliable For a large range of industrial
operation, easy maintenance, low noise, automatic fields.
rectification of the belt
采用凯装皮带,滚筒下移,减少杂铁对皮带的冲击,可实
现连续吸铁、弃铁。皮带具有自动纠偏功能,低噪音。运 钢渣除铁专用。
行可靠,维护简单。 Specially for collecting steel scrap
RCYK-C
Steel cladded belt, continuous collecting and with sharp ends
discharging; low noise; reliable operation and easy
maintenance; automatic rectification of belt
4
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
Item 结构简图 特点 适用场合
Model Outline drawing Features Application
结构紧凑,占用空间小;可实现连续吸铁、弃铁。皮带具
有自动纠偏功能,低噪音。运行可靠,维护简单。 适用于空间狭小的地方选用;各行业输
Compact structure, small volume; continuous 料除铁。
RCY-PⅡ
collecting and discharging; reliable operation and For small working place; for
easy maintenance; automatic rectification of belt. various industrial fields
皮带采用阻燃橡胶,减速电机隔爆
可实现连续吸铁、弃铁。皮带具有自动纠偏功能,低噪音。 适用于含有甲烷成分的爆炸性气体的场
运行可靠,维护简单。 所。
RCYD-C Inflaming retarding belt , explosion-proof motor, For working sites with explosive gas
continuous collecting and discharging; reliable around
operation and easy maintenance; automatic
rectification of belt.
5
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
Item 结构简图 特点 适用场合
Model Outline drawing Features Application
结构紧凑,占用空间小;皮带采用阻燃橡胶,减速电机隔
爆可实现连续吸铁、弃铁。运行可靠,维护简单。 适用于空间狭小的地方;适用于含有甲
RCYD-PⅡ
Compact structure, small volume; Inflaming 烷成分的爆炸性气体的场所。For small
(Explosion-pr
retarding belt , explosion-proof motor, continuous working place and with explosive gas
oof type)
collecting and discharging; reliable operation and around.
easy maintenance.
结构紧凑,占用空间小,重量轻;皮带具有自动纠偏功能,
低噪音。运行可靠,维护简单。
适用于空间狭小的地方选用;各行业输
Compact structure, small volume, light weight,
料除铁。
RCY-Q continuous collecting and discharging; reliable
For small working sites; for various
operation and easy maintenance; automatic
fields.
rectification of belt.
6
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
Item 结构简图 特点 适用场合
Model Outline drawing Features Application
适用于带宽 1 米以下输料机,物料薄,
含杂铁少的情况使用。
For belt conveyor
RCY-P 结构简单,运行可靠,经济实惠。
with belt width
Simple structure, reliable operation, power-saving.
narrower than 1m, for thin material
layer and little iron tramp
included.
7
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
名词解释
Term explanation:
1) 手动卸铁:是通过人工控制卸铁手并驱动来实现除铁器吸铁与弃铁的过程。
2) 自动卸铁(带式):由磁系与机架、卸铁皮带及主、从动滚筒、托辊、电动减速机组等共同组成,电
机与减速机联成一体,它是通过链条、链轮驱动皮带及其刮板作循环卸铁运动,实现自动卸铁。又称
带式除铁器。
Automatic discharge (belt) means the separator composes of magnetic system, supporting frame,
belt, main drum, secondary drum, supporting pulley and electric reducer. The driver and the
reducer are combined. Automatic discharge realizes by driving the belt running through the
chain, chain gear driving belt and the scraper. It can also be called belt magnetic separator.
3 安装
Installation
3.1 运输与贮存
Transportation and storage
1) 除铁器要包装运输,且通风防雨
2) 除铁器的贮存要在通风、干燥的库房内
3.2 开箱与检查
Package opening and checking
1) 检查设备是否完好无损,电缆线是否有损伤。
2) 随机附带的文件有
a) 产品装箱单
8
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
Packing list
b) 产品合格证
Certificate of quality
c) 配套件的合格证及说明书
d) 产品说明书
Instruction manual
e) 公司有关的技术服务、信息反馈方面的技术资料
3.3 吊挂装置
Suspension device
1) 适用于主机的吊挂装置见参数页表 2
Suspension device for the main body (re. attached parameter chart 2 )
9
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
备注 Note:
1) 两组吊具之间夹角不得大于 60 度
The angle between two suspension devices must be less than 60°.
2) 如现场吊挂空间不足,您可以选择卸扣与(螺旋扣、锚链、钢丝绳、钢拉杆)任意一种组合安装
If the suspension space is limited, shackle can be assembled with any of the following:
3.4.1 手动除铁器安装要求(RCY-P 型)
1) 在输送机中部位置安装:除铁器应安装在皮带机某个中段位置,须选择一段长 10 米左右,宽度能放下两个
弃铁车,且能随时不妨碍搬运的宽度,除铁器无任何障碍物,其额定悬挂高度≤H(见参数页)。行走小车
轨道方向要与输送机方向垂直。
Cross-belt installation: The separator is installed above the middle of belt conveyor, where the
width of the working space is about 10m to ensure the equipment can move freely. No barriers around,
rated suspension height ≤H (re .attached parameter page). The direction of the rails must be
10
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
conveyor
2) 在 输 送 机 机 头 位 置 安 装 : 除 铁 器 应 选 择 安 装 在 皮 带 输 送 机 头 的 斜 上 方 。 额 定 悬
挂高度≤H(见参数页) ,倾角α=15O-30O。行走小车轨道安装在输送机正上方且与输送机方向相同。
Overhead installation: The separator is installed above the head of the belt conveyor. The rated
installed right above the conveyor and its direction must be the same to the direction of the
11
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
提示 Note:
1) 根据输料皮带速度,物料性质等因素,高度可以做适当调整。若条件允许,悬挂高度< H(见参数页)除铁
效果会更好。
The suspended height can be adjusted according to the conveyor speed and material character. Better
collecting results can be realized at the lower suspension height lower than H (re. attached
parameter page).
Make the space between trolley wheels and rail 3mm-4mm by adjusting the filler pieces before
installation.
3~4mm
12
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
3.4.2 带式除铁器安装要求(RCY-PⅡ、C、Q 型)
在输送机中部位置安装:除铁器应安装在皮带机某个中段位置,须选择一段长 10 米左右,宽度能放下两个弃铁
车,且能随时不妨碍搬运的宽度,空中能行走,除铁器无任何障碍物,其额定悬挂高度≤H(见参数页)。
The separator is installed above the middle of belt conveyor, where the width of the working space
is about 10m to ensure the equipment can move freely. No barriers around, rated suspension height
a 图所视固定吊装方式:不需安装轨道,可吊装在天棚上或吊装在工字钢梁上。4 个吊点间距要与除铁器吊耳间
距相同,这样有利于吊耳受力均匀。
The installation mode in Drawing a: the rails are not needed. The separator can be suspended on the
ceiling or on the beam. The distances between the four suspension points must be the same to that
between the four lifting lugs, thus lifting lugs could get homogeneous stress.
b、c 图所视单轨行走小车吊挂方式:为了除铁器维护方便,我们也可以选用行走小车进行吊装;行走小车轨道
与皮带机垂直安装。
The installation mode in drawing b and c: for easy maintenance of the magnetic separator, traveling
trolley can be used; the rail should be installed vertically to the conveyor belt.
13
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
除铁器应选择安装在皮带输送机头的斜上方。额定悬挂高度≤H(见参数页) ,倾角α=15O~30O。
The magnetic separator is installed above the head of the conveyor. The rated suspension height ≤
d 图所视固定吊装方式:不需安装轨道,可吊装在天棚上或吊装在工字钢梁上。4 个吊点间距要与除铁器吊耳间
距相同,这样有利于吊耳受力均匀。
The installation mode in Drawing d: the rails are not needed. The separator can be suspended on the
ceiling or on the beam. The distances between the four suspension points must be the same to that
between the four lifting lugs, thus lifting lugs could get homogeneous stress.
e、f 图所视单轨行走小车吊挂方式:为了除铁器维护方便,我们也可以选用行走小车进行吊装;行走小车轨道
与皮带机垂直安装。
The installation mode in drawing e and f: for easy maintenance of the magnetic separator, traveling
trolley can be used; the rail should be installed vertically to the conveyor belt.
14
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
提示 Note:
1) 当带式除铁器安装在输送带中部时,若输送带有倾角,吊装时除铁器电机应靠近低位,且除铁器倾角不得大
于 5°(见下图)。
If the belt magnetic separator is installed horizontally and an obliquity of conveyor is available,
the driver end should be in the same direction to the lower end of the conveyor, and the obliquity
2) 根据输料皮带速度,物料性质等因素,高度可以做适当调整。若条件允许,悬挂高度< H(见参数页)除铁
效果会更好。
15
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
The suspension height can be adjusted according to the conveyor belt speed and the material
character. Better collecting results can be realized when the suspension height < H (re. Attached
parameter page)
3) 如原现场条件为双轨或由于设备较大(10 吨以上)也可选用双轨组合行走小车,轨道方向与以上所述带式
除铁器安装要求相同。如下
If double rails are used or the equipment is comparatively heavy (heavier than 10 tons), double-rail
with trolley can be used. The installation direction of the rails should be the same to the
installation requirements of the belt magnetic separator above mentioned. The drawings are as
follows:
3.5 安装程序
Installation procedures
1) 选址
2) 安装工字梁轨道,且轨道端头要求留够除铁器行走的位置。设备两侧要留有 2 米左右安装与维护空间,
前后要有足够的卸铁空间。
Install rails. The length at the end of the rail must be long enough for the separator move.
Keep 2m space of either side of separator for installation and maintenance, and also enough
3) 在工字钢轨道上安装行走装置(或安装固定吊具装置)
。
16
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
4) 在轨道上安装手拉葫芦作为起吊工具。
5) 用钢丝绳扣、手拉葫芦起吊除铁器至一定高度
Lift the separator to the proper height with steel rope and manual lifter.
6) 用吊挂装置将除铁器与行走小车或固定吊点连接起来,按高度=H(见参数页)定位。若条件允许,高度
<H(见参数页)除铁效果会更好。
Connect the separator and the traveling trolley or the fixed suspension points. Place it at
the height of H (re. attached parameter page). Better collecting results can be realized if
3.6 配电柜安装
Control cabinet installation
1) 配电柜的位置按现场空间条件选定,要求其不受风雨侵蚀,确保配电柜的安全使用,操作方便。
The installation place of the control cabinet is subject to the condition of the working spot.
2) 将除铁器延伸出来的电缆与配电柜连接上;电源至配电柜之间的电缆,由现场自定。
Connect the cable extended from the separator with the control cabinet.The cable length between
the power supply and the control cabinet depends on working spot.
4 调试、试运行
Commissioning
4.1 手动除铁器安装后的调整检查、试运行(RCY-P 型)
The commissioning of manual-discharging magnetic separator after installation
(model RCY-P)
1) 对吊挂装置两端连接的可靠性进行检查。
17
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
Check the reliabilities of the connection on both ends of the suspension device.
2) 除铁器的悬吊高度初定为高度≤H(见参数页)的调整测量(按安装图示测量),若倾斜安装使用,除了
测高度≤H(见参数页)尺寸外,还要检测倾角α=15°~30°
Measure and adjust the suspension height (no higher than H; re. Attached parameter page). If
3) 注意观察除铁器整机运行状况及吸、弃铁能力。可以人为的向被输物料内投入不同重量、不同形状的杂
铁,检测主机吸、弃铁能力及除净率,必要时对吊高或倾角应做调整。(试验时不可投入过重、过尖锐
的杂铁。)
Observe the working situation of the equipment and its catching and discharging ability. Put
some different shapes of ferrous scraps into the material if necessary to test the separator.
Adjust the suspension height and obliquity if necessary. (Don’t put too heavy or sharp iron
tramps)
4) 连续试生产运行 24 小时之内不出现问题便可投入正式生产运行。
If no problems are found within 24 hours during commissioning, normal operation can be started.
4.2 带式除铁器安装后的调整检查、试运行(RCY-PⅡ、C、Q 型)
The commissioning of belt magnetic separator after installation (RCY-PII, RCY-C,
RCY-Q)
1) 对吊挂装置两端连接的可靠性进行检查。试运行时若设备有摆动可在水平方向上做 4 个支点。
Check the reliabilities of the connection on both ends of the suspension devices. Four supporting
2) 除铁器的悬吊高度初定为高度≤H(见参数页)的调整测量(按安装图示测量),若倾斜安装使用,除了测
高度≤H(见参数页)尺寸外,还要检测倾角α=15°~30°
Measure and adjust the suspension height (no higher than H; re. Attached parameter page). If incline
3) 如水平安装,除铁器下部卸铁皮带工作面尽量保持与输料皮带平行的测量。
If cross-belt installed, measure whether the undersurface of magnetic separator parallels with
4) 如倾斜安装尽量使大皮带的卸料机头物料抛出的最高点对准磁系中心。
18
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
If overhead installation, the highest point the material reaches should aim at the center of the
magnetic system.
5) 如果设置了声光报警系统,可以人为制造一点小麻烦,来验证声光报警是否正确。
If acousto-optic warning system is used, some problems can be produced deliberately for checking
if it is effective.
6) 除铁器通电试运行,是否平稳可靠、皮带是否跑偏、空载试运时间应不低于 2 小时。观察运行一切正常后,
方可投入生产试运行。
Run Separator to see if the separator runs reliably and stably, if departure of the belt exists.
The unloading running time should be not shorter than 2 hours. The equipment can’t be put into
7) 注意观察除铁器整机运行状况及吸、弃铁能力。可以人为的向被输物料内投入不同重量、不同形状的杂铁,
检测主机吸、弃铁能力及除净率,必要时对吊高或倾角应做调整。(试验时不可投入过重、过尖锐的杂铁。
)
Observe the working situation of the equipment and its attracting and discharging ability. Put
some different shapes of ferrous scraps into the material if necessary to check the separator.
Adjust the suspension height and obliquity if necessary. (Don’t put too heavy or sharp iron tramps)
8) 注意观察皮带负荷运行时是否跑偏、减速机是否渗漏油。
Check whether or not the departure of the belt exists during running under load, and whether oil
9) 连续试生产运行 24 小时之内不出现问题便可投入正式生产运行。
If no problems are found within 24 hours during commissioning, the equipment can be put into normal
operation.
10) 带式除铁器禁止带负荷起动,应先起动除铁器,后开动输送皮带机。
Belt magnetic separators mustn’t be started if under load. Start the magnetic separator firstly
11) 检查连接件松紧情况,并以三个月为周期定期检查连接件是否紧固。
Check the connection parts. Check the connection conditions once for three months.
12) 对于带式除铁器皮带跑偏调整方法有如下说明:
首先调整托辊支座,如所有托辊支座均已调整到量,皮带仍继续跑偏则调整从动滚筒轴承座。即按图示观察方
向观察,皮带向某侧跑偏,则将托辊支座按图示调整方向调整。如皮带继续跑偏则按图示方向调整从动滚筒轴
19
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
承座。
Firstly, adjust the supporting base. If all the bases can’t be adjusted more, but the departure still
exists, then adjust the bearing base of the secondary drum. Re the drawing below:
向调整至适当位置,如该托辊支座已调整到量,则调整其它托辊支座直至皮带跑偏停止。如所有 4 个托辊
支座均已调整到量,皮带仍继续跑偏则需调整从动滚筒轴承座。将从动滚筒轴承座 1、2、中任意一个按图
a 中的调整方向调整至适当位置,如该从动滚筒轴承座已调整到量,则调整另一个从动滚筒轴承座直至皮
带跑偏停止。
Observe the separator as drawing A indicates, if the belt departs to the left, adjust the position
of the supporting rollers. If no more adjustment space is available but the departure still exists,
If it departs to the right as drawing b indicates, the adjustment method is opposite to (1).
(3) 皮带调整注意事项:
皮带调整停机过程中,不得踩踏皮带,否则会影响皮带调整效果。
如皮带向一侧跑偏很多,则可将电机三相进线中的任意两相调换,皮带则反方向运转就会向另一侧移动,
移动到除铁器中部时停机,再次调换电机任意两相,使皮带按正常方向运转,然后按皮带跑偏具体调整方
法调试。皮带跑偏止住后,皮带需在除铁器中部稳定运转 2 小时,运转期间应观察其运转状况如有跑偏现
象应及时调整。
Notice: when the belt is stopped for adjustment, don’t tread the belt. If the departure is large,
exchange any two phases of the driver and the belt will move to the opposite direction. As the
belt moves to the middle of the separator, stop running, then exchange any two phases of the driver,
the belt will run normally. If departure still exists, adjust it according to the methods mentioned
above.
When the departure is solved, let it run for 2 hours. Observe the running conditions and make
20
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
Drawing a Drawing b
Bearing base Departure Departure
for secondary direction of Bearing base forBearing base direction of
the belt secondary drum for secondary the belt Bearing base
drum No.1
No.2 drum No.1 for secondary
Adjustment direction Adjustment direction drum No.2
of secondary drum of secondary drum Adjustment direction Adjustment direction
of secondary drum
Supporting of the roller
Supporting base No.3 Supporting
Supporting
base No.1 base No.3
base No.1
Adjustment direction Adjustment direction
Adjustment direction of the roller of the roller
of the roller Adjustment direction
Supporting of the roller
Supporting
Belt moving direction base No.4 base No.4
Supporting Belt moving direction
Supporting
base No.2 Adjustment direction
of the roller
base No.2 Adjustment direction
of the roller
Adjustment direction Belt Adjustment direction Belt
of the roller
of the roller
Reducer Reducer
and motor and
motor
observing Observing
direction direction
21
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
4.3 常见故障分析
Common trouble analysis
22
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
5 运行注意事项
Notices for operation
1) 必须无负荷启动除铁器,即先启动除铁器的皮带,后开动输料皮带机.
Start the separator without load.(start the separator first, then start the material conveyor)
2) 磁系不允许拆卸,以免破坏磁系的整体性能.
3) 若在室外使用,建议搭棚遮盖。
4) 沿海或潮湿地区使用,安装完后吊具需要涂黄油防止腐蚀。
If used in coastal or damp area, the suspension device should be coated with solid lubricant to
avoid corrosion.
23
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
6 设备保养、维护
Maintenance of the equipment
1) 天减减速机内的润滑油或润滑脂要按照以下指定机型号添加(其它品牌减速电机见电机说明书)
,注意油、
脂不能混用:
The following lubricate oil or grease is for Brand Tianjin speed reducer (re the driver instruction
for the oil or grease of other brands). Lubricate oil and grease can’t be combined.
2) 要定期检查电缆线是否有损伤,连接端子是否有接触不良现象。
Check the terminal connection &check the cable worn out or not, exchange it periodically.
3) 连接件的连接是否可靠、安全,要定期维护。
24
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
部 位 油 脂 加 注 周 期
Part Lubricate oil/grease Lubrication period
主、从动滚筒两端轴承
钙基或钠基脂 5-6 月
Bearings on both ends of the primary
Calcium grease or Natrium grease 5-6 months
and the secondary drums
电动行走减速机 钙基或钠基脂 5-6 月
Speed reducer Calcium grease or Natrium grease 5-6 months
适用温度℃
部位 机型号 润滑油、脂号 适用地区
Adapted
Part Model Type of lubricate oil/grease Adapted area
temperature(℃)
00 减速机油脂
No.00 speed reducer grease
一般地区 Common
钙基或钠基脂
area
Calcium grease or Natrium -10 ~(60)110
润滑脂
4 grease
Lubricate
低温或一般地区
grease 通用锂基脂
-20 ~ 120 Low temperature
General Lithium grease
or common area
无水钙基脂 寒冷地区
-45 ~ 100
Anhydrous Calcium grease Cold area
国产
Made in 40(30) 低温地区
China -10 ~ 5 Low temperature
行星摆线针 area
ISO EP68
轮减速机 工业极压
齿轮油 国产
Planet
Industrial Made in 70 一般地区
cycloid 0 ~ 35
extremity China Common area
pin wheel
reducer press gearing ISO EP150
oil 国产
Made in 90 高温地区
5~6 30 ~ 50 High temperature
China
area
ISO EP220-460
普通工业
Common (SY1172-80) 一般地区
-8 ~ 170
industrial Common area
gearing oil
低凝工业
Low coagulate 68、100、150、220、320、460 寒冷地区
-50 ~ 100
industrial Cold area
gearing oil
1. 刚投入使用的新机,运转 2 周后更换新油,油污应冲净;
Change the oil after running 2 weeks if it is a new machine, and the grease dirt should
be washed down;
加注周期
2. 正常运转后,4~6 个月更换一次
Lubricate
4-6 months on working order;
period
3. 若环境温度较高,或潮湿度偏大,应适当缩短换油时间。
Shorten the lubrication period if the temperature condition is higher than usual or the
humidity is bigger than usual.
25
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
7 参数页、附图
ATTACHED PAGES AND ATTACHED DRAWING
RCYK-10T1 型设备外形图(附图 1)
GA Drawing of RCYK-10T1
表 1(主要技术特性)
26
Longi Magnet Co., Ltd
6, Wenhua Rd, Fushun Economic Development Area, China 113122
Phone:+86-24-56700058, 56700068 Fax: +86-24-56700017
Email: longi@ljmagnet.com Website: http://www.ljmagnet.com
表 2(吊挂装置)
27