Professional Documents
Culture Documents
PHASE 1:
Categorise the SPIR into discipline wise to begin with checking and
verification
Check, scrutinize and analyze SPIR for completeness as per attributes listed
in template.
Review all spare parts in SPIR with adequate information, such as (Tag no,
Part description, Material construction, Original Equipment Manufacturer,
Model, Serial, OEM part number, Recommended Quantity, type of spares
recommended, criticality and Price etc.)
Communicate and discuss with client focal point to get the appropriate
vendor drawings and manuals if required
Review the existing stocks and identify obsolete items for write off
Update comments from client and submit next Rev of SPIR for approval
PHASE 2
Review SPIR and remove duplicate items to ensure the new spare item which
has to be catalogued may available in existing stock items
If any new spare item which has been identified in phase 1 already available,
grasp SAP number and any standard codes and enrich into SPIR
If any items have been identified as a new to catalogue, ensure that the
availability of all the mandatory details atleast; Clarifications have to be sent
once again with the appropriate attributed template details to the customers
to fulfill MDRM codification requirements
Execute the catalogue and codification by discipline wise in SAP as per the
big rules of MDRM.
Submit the enriched SPIR templates with SAP codes to the client for review &
approval.
Update comments from client and submit next Rev of SPIR for approval
2. INPUTS REQUIRED
Client templates
Client guidelines and procedures for Bill of Materials (BOM) and SPIR
Client guidelines and procedures for cataloging and SAP coding
AS BUILT drawings
PEFS/UEFS/SLD/FG layout/vendor P&ID drawings
Data sheets/OEM manual
Cross sectional drawings/Parts list drawings
Existing database from SAP
Existing BOM/spare parts data
Equipment List
SAP remote access
MDRM remote access
3. DELIVERABLES
4. COST ESTIMATE
Total cost () –
Payment Terms:
This estimate is prepared based scope mentioned at the time of preparation of this estimation.
Anything above shall be considered as additional scope.
Client to provide all documents & SPIR at the beginning of the project
Client shall provide documents/drawings in Electronic format with OCR capability
(editable/searchable format) of all Approved for Construction (AFC) or As-built drawings before the
project starts.