CT VT Calculations r1
CT VT Calculations r1
Action - 1 : Approved
This document has been reviewed as noted with regard to general conformity
with the Contract specifications and requirements. The Vendor / Contractor is
responsible for correctness of design calculation and details. Approval of this
document does not relieve the Vendor / Contractor of his responsibility in
carrying out the work correctly and fulfilling the complete requirements of the
contract nor does it limit the purchaser's rights under the contract.
FI Letter Ref.No. Date
CNT 2310710001/E9/6263 dt 14.12.10
Signature Initials AE
DOCUMENT NO. :
CT & VT CALCULATIONS FOR PE-DC-348-510-E003
GENERATOR, GT AND UT METERING AND REV NO. : 01
PROTECTION DATE : 28/10/10
SHEET : 1 of 16
1.0 SCOPE :
This document covers the following :
CT parameters calculations for :-
CTs of Generator Neutral & Line side.
CTs on GT HV side having interface with GRP.
CTs on GT HV neutral side.
CTs on GT LV side.
CTs on UT HV side.
CTs on UT LV neutral side.
CTs on UT LV side having interface with GRP.
VT parameters calculations for :-
VTs on Generator line side.
IVT parameters calculations for
Generator Inter turn fault relay (64GlT)
110 V AC auxiliary supply to 20 Hz Generator
3.0 LEGEND :
CT : Current transformer
I : Relay rated current
IVT : Interposing voltage transformer
Ie : Excitation current
If : CT secondary current corresponding to fault current
L : Length of cable between CT and relay
RL : One way lead resistance between CT and relay
Rct : Resistance of secondary winding of main CT
Vk : Knee point voltage
VT : Voltage transformer
DOCUMENT NO. :
CT & VT CALCULATIONS FOR PE-DC-348-510-E003
GENERATOR, GT AND UT METERING AND REV NO. : 01
PROTECTION DATE : 28/10/10
SHEET : 2 of 16
Voltage variation : ± 5%
Rated power factor : 0.85 LAG
Hence CT ratio for CTs located on generator neutral side and phase side
for protection, metering, load transducers and AVR is selected as 22000/5 A
DOCUMENT NO. :
CT & VT CALCULATIONS FOR PE-DC-348-510-E003
GENERATOR, GT AND UT METERING AND REV NO. : 01
PROTECTION DATE : 28/10/10
SHEET : 3 of 16
For the purpose of calculation, distance from GRP to Gen Busduct CTs marshalling box, L is taken as
175M
Lead Resistance, RL = 8.87 x 0.175
= 1.55 ohm
Hence ,
Lead Burden = 52 x 1.55 VA
= 38.8 VA
Lead Burden (for 2 cores) = 19.4 VA
CT 1 :
Vk 50I (Rct + 2 RL)
Ie 0.03 I at Vk/2
I = 5A
Vk 50 x 5 (Rct + 2 x 1.55 /2)
[2 cores of 2.5mm2 cable]
Vk 250Rct + 387.5 V
Ie 150mA at Vk/2
CT 2 :
Source of burden Burden (in VA)
Ammeter (*) 3.0
Wattmeter (*) 5.0
VARmeter (*) 5.0
PFmeter (*) 5.0
KWHmeter (*) 5.0
Load Transducer 0.5
Lead burden [2 cores of 2.5 mm² cable] 19.4
Total Burden 42.9
CT 3 & CT 4 :
600 1000
Maximum through fault current of generator =
3 21 0.85 0.178 0.85
= 128270.3 A
128270.3 5
If =
21000
= 30.54 A
Vk 5If (Rct + 2 RL)
Vk 5 x 30.54 (Rct + 2 x 1.55/2)
[2 cores of 2.5 mm2 cable]
Vk 152.7Rct + 236.685 V
Ie 0.03 I at Vk/2
I = 5A
Ie 150mA at Vk/2
DOCUMENT NO. :
CT & VT CALCULATIONS FOR PE-DC-348-510-E003
GENERATOR, GT AND UT METERING AND REV NO. : 01
PROTECTION DATE : 28/10/10
SHEET : 5 of 16
CT 9:
PARAMETER TO BE FINALISED LATER AFTER RECEIPT OF NGR RATING FROM CUSTOMER.
5.1.2 CTs ON GEN. PHASE SIDE
CT 5 : For composite generator protection relay ‘GR1’
CT 6 : For composite generator protection relay ‘GR2’
CT 7 : For Load transducer, Load shedding relay and AVR
CT 8 : For ‘Metering’, Load transducer & AVR.
CT 5/CT 6 :
Particulars shall be similar to CT 3/CT 4
CT 7 :
Source of burden Burden (in VA)
AVR 20.0
Load transducer 0.5
Load shedding relay 0.85
Lead burden [2 cores of 2.5 mm² cable] 19.4
Total burden 40.75
SELECTED PARAMETERS FOR CT 7 :
CT RATIO : 22000/5 A
ACCURACY CLASS : 0.2
BURDEN : 60 VA
I.S.F. : ≤ 5.0
DOCUMENT NO. :
CT & VT CALCULATIONS FOR PE-DC-348-510-E003
GENERATOR, GT AND UT METERING AND REV NO. : 01
PROTECTION DATE : 28/10/10
SHEET : 6 of 16
CT 8 :
Source of burden Burden (in VA)
MWH/MVARH meter 1.0
Current transducer (3 Nos.) 0.2 x 3 =0.6
Watt transducer (1 Nos.) 0.5
VAR transducer (1 Nos.) 0.5
PF transducer 0.6
Load transducer 0.5
AVR 20.0
Lead burden [2 cores of 2.5 mm² cable] 19.4
Total Burden 43.1
CT10/ CT11 :
Vk 50I (Rct + 2 RL)
DOCUMENT NO. :
CT & VT CALCULATIONS FOR PE-DC-348-510-E003
GENERATOR, GT AND UT METERING AND REV NO. : 01
PROTECTION DATE : 28/10/10
SHEET : 7 of 16
Ie 0.03 I at Vk/2
I = 5A
Vk 50 x 5 (Rct + 2 x 2.04 /2)
[2 cores of 2.5mm2 cable]
Vk 250Rct + 510 V
Ie 150mA at Vk/2
SELECTED PARAMETERS FOR CT 10/ CT11 :
CT RATIO : 12500/5 A
ACCURACY CLASS : PS
KNEE POINT VOLTAGE : 250Rct + 550 V
MAGNETISING CURRENT : 150 mA at Vk/2
Ie 0.03 I at Vk/2
CT sec. current , I = 1A
Ie 30mA at Vk/2
CT 13 :
Vk 50I (Rct + 2 RL)
Ie 0.03 I at Vk/2
I = 5A
Vk 50 x 5 (Rct + 2 x 2.04 /2)
2
[2 cores of 2.5mm cable]
Vk 250Rct + 510 V
DOCUMENT NO. :
CT & VT CALCULATIONS FOR PE-DC-348-510-E003
GENERATOR, GT AND UT METERING AND REV NO. : 01
PROTECTION DATE : 28/10/10
SHEET : 9 of 16
Ie 150mA at Vk/2
CT17A/ CT17B :
21000 110
VT ratio : V
3 3
VT 1:
Source of burden Burden (in VA)
60VT1 11.0
AVR 20.0
Frequency transducer 3.00
Load transducer 0.13
Load shedding relay 2.1
GR1 0.3
Total Burden 36.53
Lead burden is negligible for VT
VT 2 :
Source of burden Burden (in VA)
60VT2 11.0
AVR 20.0
Load transducer 0.125
Voltage transducer for incoming voltage(*) 0.22
Frequency transducer for incoming 3.0
frequency(*)
Synchroscope(*) 6.0
GR2 0.3
Total Burden 40.645
Lead burden is negligible for VT
* synchronising equipment
SELECTED PARAMETERS FOR VT 2 :
21000 110
VT RATIO : V
3 3
ACCURACY CLASS : 0.5/3P
BURDEN : 100 VA
VT 3:
DOCUMENT NO. :
CT & VT CALCULATIONS FOR PE-DC-348-510-E003
GENERATOR, GT AND UT METERING AND REV NO. : 01
PROTECTION DATE : 28/10/10
SHEET : 15 of 16
IVT1
Primary connection : Star
Secondary connection : Open delta
Under fault condition, 64GIT should get no voltage. NGT secondary and open delta
secondary of IVT1should give equal and opposite voltages.
NGT ratio is 21kV/240V, i.e. it gives an output of 240/√3 for a single line to earth
fault. to get 240 /√3 V, IVT1 secondary rating shall be (240 /√3) / 3 V.
IVT 2 :
Primary connection : Star
Secondary connection : star
415
Primary voltage : V
3
110
Secondary voltage : V
3
415 110
IVT ratio : /
3 3
Source of burden Burden (in VA)
20 Hz Generator 45.0
Total Burden 45.0