This program will provide basic overview of all aspects of Structure &
Infrastructure Planning from Civil Engineer’s prospective
Mar 2010 2
STRUCTURE & INFRASTRUCTURE PLANNING
Contents
Introduction
Overview of Civil engineering and facts
Project initiation, Professional Responsibility & Hierarchy
Challenge Faced By Engineers
Structure Plan
Brief discussion on Importance of Structure Plan
Role of Engineer
Infrastructure Plan
Engineer’s Responsibility, Approach & Methodology for infra & services
Planning for ultimate and phase development
Future Challenge
Dealing with new requirements & compliances
Q&A
Mar 2010 3
Introduction
INTRODUCTION STRUCTURE & INFRASTRUCTURE PLANNING
Overview
Civil engineering is a professional engineering discipline that deals with
the design, construction and maintenance of the physical and naturally
built environment.
FACTS
Mar 2010 5
INTRODUCTION STRUCTURE & INFRASTRUCTURE PLANNING
CIVIL ENGINEERS
Mar 2010 6
INTRODUCTION STRUCTURE & INFRASTRUCTURE PLANNING
CIVIL ENGINEERS
Knowledgeable in less subjects but an expert But, the Project Manager / Decision Maker
Of that subject(s) come under this category
Mar 2010 7
INTRODUCTION STRUCTURE & INFRASTRUCTURE PLANNING
Project Initiation
• Appreciate project
Mar 2010 8
INTRODUCTION STRUCTURE & INFRASTRUCTURE PLANNING
Mar 2010 9
INTRODUCTION STRUCTURE & INFRASTRUCTURE PLANNING
PMC
SPECIALISTS (SP)
MasterplanStage
Design & Implementation Stage
Mar 2010 11
INTRODUCTION STRUCTURE & INFRASTRUCTURE PLANNING
Development Order
Landuse Table
Mar 2010 12
INTRODUCTION STRUCTURE & INFRASTRUCTURE PLANNING
Structure Plan
Structure Plan
Structure Plan
Structure Plan
Engineer’s Responsibility
• Engineer to advise on all aspects of engineering
Design Stage
Tender Stage
Construction Stage
Mar 2010 21
B PLANNING APPROACH STRUCTURE & INFRASTRUCTURE PLANNING
Engineer’s Tasks
Desktop Study
Preliminary Design
Detail Design
Construction Supervision
Mar 2010 22
B PLANNING APPROACH STRUCTURE & INFRASTRUCTURE PLANNING
Engineer’s Tasks
A. DESKTOP STUDY
• To Understand scope of works
Mar 2010 23
B PLANNING APPROACH STRUCTURE & INFRASTRUCTURE PLANNING
B. PRELIMINARY DESIGN
Mar 2010 24
B PLANNING APPROACH STRUCTURE & INFRASTRUCTURE PLANNING
C. DETAIL DESIGN
Mar 2010 25
B PLANNING APPROACH STRUCTURE & INFRASTRUCTURE PLANNING
D. CONSTRUCTION STAGE
• To supervise construction
Mar 2010 26
Infrastructure Planning
INFRASTRUCTURE STRUCTURE & INFRASTRUCTURE PLANNING
A. Engineering Work
Earthworks
B. Infrastructure
Roads
Water Supply
Drainage
Sewerage
Solid Waste
Power Supply
Telecommunication Not Civil but M&E
Structures are part of Civil Engineering and existed in
Infrastructures and buildings works
Mar 2010 28
1 Earthworks
1 EARTHWORKS STRUCTURE & INFRASTRUCTURE PLANNING
Earthworks
Mar 2010 30
1 EARTHWORKS STRUCTURE & INFRASTRUCTURE PLANNING
Aim
Earthworks are crucial for all land development
• To have platform levels above Highest Flood Level
Mar 2010 31
1 EARTHWORKS STRUCTURE & INFRASTRUCTURE PLANNING
Proposed Masterplan On
Topography / Survey Map
Project’s boundary
Mar 2010 32
1 EARTHWORKS STRUCTURE & INFRASTRUCTURE PLANNING
Platform Levels
Max.
Proposed Platform Level Formation
Min.
Freeboard = +1m
Highest Flood Level
Water body
Mar 2010 33
1 EARTHWORKS STRUCTURE & INFRASTRUCTURE PLANNING
Overall
Total Cut: 200 million cu.m. A
Cut & Fill Total Req’d Fill: 155 million cu.m. B
A + B - C
LEGEND
Cut Area
Fill Area
Mar 2010 34
1 EARTHWORKS STRUCTURE & INFRASTRUCTURE PLANNING
Principle
• Too much fill material - Difficult to obtain borrow source & Cost
Mar 2010 35
1 EARTHWORKS STRUCTURE & INFRASTRUCTURE PLANNING
Overall
Total Cut: 62.5 million cu.m.
Total Fill: 19.2 million cu.m.
Project brief
To carry out earthwork construction works to
form platform levels
Programme
To be developed in year 2011
Proposed Implementation Agency :
Developer
Mar 2010 36
1 EARTHWORKS STRUCTURE & INFRASTRUCTURE PLANNING
Typical Earthworks
Mar 2010 37
2 Roads
2 ROADS STRUCTURE & INFRASTRUCTURE PLANNING
Roads
Definition:
Context:
Jurisdiction:
Mar 2010 39
2 ROADS STRUCTURE & INFRASTRUCTURE PLANNING
Aim
Proper roads networks enhance the development success
• To establish roads hierarchy
Mar 2010 40
To Cherating / 2 ROADS STRUCTURE & INFRASTRUCTURE PLANNING
Kertih
Existing Road On
Proposed Masterplan
Layout
Timur
Sg. Ular
Interchange
FR3
LEGEND
Existing Road
Jabor – Jerangau
Gebeng Interchange
Interchange Expressway
Jabor Port Area
Interchange
To Kuantan
To Kuala Lumpur
Mar 2010 41
Future connection
To FR3 near Cherating
To Cherating / 2 ROADS STRUCTURE & INFRASTRUCTURE PLANNING
Kertih
Integration of
Existing And
Proposed Road
Network
FR3
Timur
Sg. Ular
Interchange
FR3 LEGEND
Existing Road
Proposed Road
Jabor – Jerangau Expressway
Gebeng Interchange
Interchange
Jabor
Interchange
To Kuantan
To Kuala Lumpur
Mar 2010 42
To FR3 near
Cherating
To Cherating /
Kertih
2 ROADS STRUCTURE & INFRASTRUCTURE PLANNING
Road Hierarchy
• Primary Road :
Connect Development to External Road
FR3 LEGEND
Primary Road
Secondary Road
Gebeng
Jabor – Jerangau Expressway
Interchange
Interchange
Jabor
Interchange
To Kuantan
To Kuala Lumpur
Mar 2010 43
Higher speed limit
compared to urban 2 ROADS STRUCTURE & INFRASTRUCTURE PLANNING
Sg. Ular
Interchange
FR3
by Developer
by Developer / Implementing Body
Gebeng Jabor – Jerangau
Interchange Interchange
Existing roads
Jabor
Expressway
Interchange
Mar 2010 46
2 ROADS STRUCTURE & INFRASTRUCTURE PLANNING
Water Supply
Definition:
Context:
Jurisdiction:
Watershed State
Impounding Reservoirs State
Rivers State
Water Supply System SPAN, State Water Providers
Mar 2010 49
3 WATER SUPPLY STRUCTURE & INFRASTRUCTURE PLANNING
Aim
Shortage of Water Supply leads to crisis
• To provide ultimate water demand
Mar 2010 50
3 WATER SUPPLY STRUCTURE & INFRASTRUCTURE PLANNING
Water Supply
LEGEND
Main Pipelines (primary) System
Main Reticulation (Secondary)
External Storage (Primary) (Ultimate)
R7
R5
Timur
R6
6
R4
5
R2
R9 3
R8 1
R1 2
4
R3
To Cherating
Phase 1A
(2011-2015)
Project Description
R7 Pipeline from Semambu TW to R1,
Balancing Tank (R1) Stage 1, Service
Tanks R3, R4, R5 and R7, Main
R5 Pipelines & Main Reticulation Pipelines.
Timur
Project Brief
• To meet water demand & Storage
for Phase 1A.
R4
• 1800mm dia new pipeline, 10m
wide reserve from WTP to
Development.
Project Description
R3 R12
• Duration - 9 month (Land
Acquisition) and 4 years
(Construction)
Jabor LEGEND
Interchange Level 1 (Main Pipeline)
From Water Level 2 (Main Reticulation)
To Kuala Lumpur Level 1 (Storage Tank)
Treatment Plant Existing Tank
Existing Pipelines Mar 2010 53
3 WATER SUPPLY STRUCTURE & INFRASTRUCTURE PLANNING
Mar 2010 54
4 Drainage
4 DRAINAGE STRUCTURE & INFRASTRUCTURE PLANNING
Drainage
Definition:
Jurisdiction:
Mar 2010 56
4 DRAINAGE STRUCTURE & INFRASTRUCTURE PLANNING
Aim
Proper Drainage System guarantee safety of lives & property
• To provide development free from flood
Mar 2010 57
4 DRAINAGE STRUCTURE & INFRASTRUCTURE PLANNING
Mar 2010 58
4 DRAINAGE STRUCTURE & INFRASTRUCTURE PLANNING
- Sg. Balok
- Sg. Ular
- Sg. Pengorak
- Sg. Baging.
Jabor
Interchange
Mar 2010 59
4 DRAINAGE STRUCTURE & INFRASTRUCTURE PLANNING
Integration of Existing
And Proposed
Sg. Baging
Drainage System
Sg. Ular
Timur
LEGEND
Existing Rivers And Drains
Proposed Drainage System
Proposed Detention Pond
Jabor
Interchange
Drainage reserve area Existing Drain (Upgrade)
Mar 2010 60
4 DRAINAGE STRUCTURE & INFRASTRUCTURE PLANNING
Drainage System
POND 10 (Ultimate)
Sg. Baging
POND 9
POND 12 • Off main drain using berms
for maintenance
POND 11
POND 8
LEGEND
Main Drain (Primary)
POND 6
Main Drain (Secondary)
Detention Pond (Primary)
Jabor
Interchange Existing Drain (Upgrade)
Mar 2010 61
4 DRAINAGE STRUCTURE & INFRASTRUCTURE PLANNING
Drainage Phase 1A
(2011 - 2015)
Sg. Baging
POND 1
phase 1A.
Project Brief
• To provide drainage
system to JPS guidelines
POND 4 • Land acquisition ≈ 96 Ha
POND 5
Programme
• To be developed in year
2011
• Construction Duration 49
Months
POND 6
Jabor LEGEND
Interchange Main Drain (Primary)
To Kuala Lumpur
Main Drain (Secondary)
Detention Pond (Primary) Mar 2010 63
4 DRAINAGE STRUCTURE & INFRASTRUCTURE PLANNING
Mar 2010 64
5Sewerage
5 SEWERAGE STRUCTURE & INFRASTRUCTURE PLANNING
Sewerage
Gravity flow
Mar 2010 66
5 SEWERAGE STRUCTURE & INFRASTRUCTURE PLANNING
Aim
Proper Sewerage System leads to clean & fresh environment
• To provide centralised and sustainable sewerage
system
Old System
Individual Septic Tank
Mar 2010 68
5 SEWERAGE STRUCTURE & INFRASTRUCTURE PLANNING
Source : IWK
Mar 2010 69
5 SEWERAGE STRUCTURE & INFRASTRUCTURE PLANNING
Treatment Process
Source : IWK
Mar 2010 70
To Cherating
5 SEWERAGE STRUCTURE & INFRASTRUCTURE PLANNING
Sewerage
Masterplan
LS1
(Ultimate)
LS2
LS5
• Total Demand approximate 365,000
PE
STP2
Objectives
LS6
LS7
To avoid environmental degradation
STP3 To centralize system
Sewerage to suit
Development Phases
Phase 1A
LS5 • 20 km Pipelines
• 3 STP (Modular construction)
• STP1 – 46,000PE x 2
STP2
• STP2 – 42,500PE x 1
• STP3 – 25,000PE x 1
Mar 2010 73
6 Solid Waste
6 SOLID WASTE STRUCTURE & INFRASTRUCTURE PLANNING
Solid Waste
Solid wastes are defined as wastes arising from human and animal
activities that are normally solid and unwanted
Mar 2010 75
6 SOLID WASTE STRUCTURE & INFRASTRUCTURE PLANNING
Aim
• Reuse in their current forms the materials recovered from the waste stream
Mar 2010 76
6 SOLID WASTE STRUCTURE & INFRASTRUCTURE PLANNING
Solid Waste
Existing Situation
• 13 ha. existing Municipal Landfill
Jabor –Jerangau.
LPT2
• Serves Kuantan Area (un-scheduled
waste)
• Scheduled waste transfer to Bt.
Nenas
Existing landfill
Jalan Jabor Future Situation
Jerangau
• New centralised disposal site at
Pulau Manis
Jabor – Jerangau
Interchange
Jabor
Interchange
Mar 2010 77
Proposed Centralised
Solid Waste Disposal
(Jerantut)
6 SOLID WASTE STRUCTURE & INFRASTRUCTURE PLANNING
Solid Waste
Proposed Centralised
Solid Waste Disposal
(Pulau Manis)
Proposed Centralised
Solid Waste Disposal
(Raub)
Proposed Centralised
Solid Waste Disposal
(Temerloh)
Mar 2010 79
6 SOLID WASTE STRUCTURE & INFRASTRUCTURE PLANNING
• Oil Waste
• Alkaline Waste
• Acid Waste
• Solvent Waste
• Paint Waste
• Metal Hydroxide Sludge
• Spent Photographic Waste
• Used Containers (Plastic & Metal)
• E-Waste
• Solder Dross
A subsidiary of
In planning
LEGEND
1 Gebeng Industrial 275kV Substation
Jabor – Jerangau
Jabor Interchange
Interchange
2 Gebeng 132kV Substation
STP2
3 Sg Gelang 132kV Substation
To Kuala Lumpur
Mar 2010 83
7 POWER SUPPLY STRUCTURE & INFRASTRUCTURE PLANNING
SS9
Distribution of Sub-Stations
And Coverage Areas
SS1
SS2
LPT2 SS8
SS3
SS12 SS11
SS5
SS10
SS7
SS6
OVERALL PHASE
SS2
SS1 Construction of ;
SG. ULAR I/C
6 numbers of 132/33/11kV Substation
SS3
3 km of 132kV Transmission Line
Project Brief
SS5 To facilitate distribution of electricity
To meet eventual electrical demand
SS7
Programme
SS6 2009 to 2020
Proposed 132 kV
line
Jabor
Interchange
To Kuala Lumpur
Mar 2010 85
8 Telecommunication
To Cherating
8 TELECOMMUNICATION STRUCTURE & INFRASTRUCTURE PLANNING
Existing
Telecommunication On
Masterplan Layout
Timur
Jabor – Jerangau
Interchange
LEGEND
Jabor
Interchange
EXISTING MAIN TRUNC ROUTING
To Kuala Lumpur
Mar 2010 87
To Cherating
8 TELECOMMUNICATION STRUCTURE & INFRASTRUCTURE PLANNING
Telecommunication
Phase 1A
Project Description
Rerouting of the Telecommunication
Main Trunk from FR3
Timur
Programme
2018 to 2019
Jabor – Jerangau
Interchange
LEGEND
Jabor
Interchange PROPOSED RELOCATION OF
MAIN TRUNK ROUTE
To Kuala Lumpur
Mar 2010 88
8 Typical Telecommunication Tower
TELECOMMUNICATION STRUCTURE & INFRASTRUCTURE PLANNING
Mar 2010 89
9
Services Coordination
To Cherating
9 SERVICE COORDINATION STRUCTURE & INFRASTRUCTURE PLANNING
Services Coordination
On Masterplan Layout
Sg. Baging
R7
POND 1
Phase 1A
Sg. Ular
LS3
R5 POND 2
POND 3
STP1
SS1 SS2
S2
LS5
R4
SS5
STP2
POND 4
POND 5 ESS
SS7 ESS
R1
SS6 STP3
R3 ESS
POND 6
Structure & Infrastructure planning
Jabor
Interchange
crucial for sustainable development
Mar 2010 91
9 SERVICE COORDINATION STRUCTURE & INFRASTRUCTURE PLANNING
Mar 2010 92
10
Future Challenge
10 LATEST REQUIREMENT STRUCTURE & INFRASTRUCTURE PLANNING
• Infiltration Drainage
• Solar panel
• Broadband Technology
Mar 2010 94
Thank You
Terima Kasih
Questions & Answers