You are on page 1of 16

Form TSP 5

SUB-REGIONAL TRANSPORT ENHANCEMENT PROJECT


STEP
TEST RESULTS SUMMARY ( MONTHLY )

SURFACE DRESSING 1ST COAT BY 20 MM CHIPPS


Road : Harkapur-Okhaldhunga Road

Contract No : STEP/NCB/HO-02

Contractor : Tundi Construction Pvt. Ltd.

Location / Chainage Length Area Initial Final Bit. Spraying Road Air Binder Meterial % Binder Application Rate Chippings
Weather
Lab. Ref. No. From To (m) (m2) Reading Reading Type Binder Temp. Temp. Bit. Kerosene by Dip Test by Tray Test Application
Date
Run Remarks
lits lits Temp.(oC) (oC) (oC) (Lit/m2) (Lit/m2) Rate

(Kg/m2)

8-Jul-14 1084/1 I 20+500 20+230 270 1494.5 5150 2875 80/100 PEN Sunny 170 31 24 95 5 1.379 1.393 25.12 Tawa Khola Chips

I 20+230 20+180 50 170 38 32 1.379


9-Jul-14 1086/2 2999.55 5812 1248 80/100 PEN Sunny 95 5 1.379 24.98 "
II 20+180 19+700 480 170 31 29 1.378

I 19+700 19+500 200 170 38 33 1.383


10-Jul-14 1088/3 2085.25 5275 2115 80/100 PEN Sunny 95 5 1.373 25.25 "
II 19+500 19+330 170 170 34 30 1.383

I 19+330 19+170 160 170 30 28 1.378


11-Jul-14 1090/4 3005.15 5050 516 80/100 PEN Sunny 95 5 1.367 24.15 Sunkoshi Chips
II 19+170 18+740 430 170 29 27 1.378

12-Jul-14 1093/5 I 18+740 18+430 310 1543.35 5400 3040 80/100 PEN Sunny 170 35 29 95 5 1.385 1.378 24.36 "

I 18+430 18+310 120 165 37 31 1.378

II 18+310 18+170 140 165 38 32 1.378


19-Jul-14 1098/6 3972.4 6270 400 80/100 PEN Sunny 95 5 1.343 24.05 "
III 18+170 17+980 190 165 36 32 1.378

IV 17+980 17+730 250 165 35 31 1.378

I 17+730 17+560 170 165 37 32 1.367

5-Aug-14 1133/7 II 17+560 17+380 180 3476.65 6250 992 80/100 PEN Sunny 165 37 31 95 5 1.375 1.364 24.26 "

III 17+380 17+000 380 165 36 31 1.373

I 17+000 16+530 470 170 40 32 1.341


31-Aug-14 1167/8 4383.4 8610 1960 80/100 PEN Sunny 95 5 1.374 23.80
II 16+530 16+090 440 170 38 31 1.346

I 16+090 15+720 370 175 43 31 1.378


1-Sep-14 1169/9 4348.7 8750 2110 80/100 PEN Sunny 95 5 1.379 23.41
II 15+720 15+300 420 175 41 31 1.367

I 15+300 14+900 400 165 41 32 1.389


2-Sep-14 1171/10 3856.95 8320 2470 80/100 PEN Sunny 95 5 1.379 23.66
II 14+900 14+580 320 165 40 31 1.372
Form TSP 5

Location / Chainage Length Area Initial Final Bit. Spraying Road Air Binder Meterial % Binder Application Rate Chippings
Weather
Lab. Ref. No. From To (m) (m2) Reading Reading Type Binder Temp. Temp. Bit. Kerosene by Dip Test by Tray Test Application
Date
Run Remarks
lits lits Temp.(oC) (oC) (oC) (Lit/m2) (Lit/m2) Rate

(Kg/m2)

I 14+580 14+060 520 170 34 32 1.361


18-Sep-14 1211/11 6151.25 10940 1555 80/100 PEN Sunny 95 5 1.382 23.44
II 14+030 13+390 640 170 36 33 1.367

I 13+390 13+050 340 180 41 39 1.379


19-Sep-14 1213/12 4532.8 9515 2620 80/100 PEN Sunny 95 5 1.369 23.50
II 12+950 12+400 550 180 42 40 1.374

I 11+790 11+390 400 170 38 32 1.378

25-Sep-14 1229/13 II 11+390 10+990 400 6309.3 10710 1130 80/100 PEN Sunny 170 37 31 95 5 1.376 1.372 23.48

III 10+990 10+680 310 170 37 31 1.367

I 10+680 10+280 400 170 38 32 1.374

26-Sep-14 1232/14 II 10+280 09+880 400 6389.1 10960 1250 80/100 PEN Sunny 170 38 31 95 5 1.377 1.390 23.49

III 09+880 09+500 380 170 37 31 1.336


Tawa Khola Katari 95 5 1.383 24.33
Instructed Rate
Sunkoshi River Harkapur 95 5 1.378 23.46

Prepared by Submitted by Checked by Verified by: Approved by

Lab. Technician Contractor .Lab. Technician Material Engineer Resident Engineer


Tundi Cons. Pvt. Ltd. Tundi Cons. Pvt. Ltd. ICT/FBC JV ICT/FBC JV ICT/FBC JV
Form F 2

Sub-Regional Transport Enhancement Project STEP


DAILY BITUMEN SPRAY CONTROL (TRAY TEST)

Run Time Temperature °C


Road : Harkapur-Okhaldhunga Road
Contract No : STEP/NCB/HO-02 Road Air Bit./ Prime
Contractor : Tundi Construction Pvt. Ltd. I 11:00 38 32 170
Test No. : 1232/14 II 12:00 38 31 170
Date of Test : 26/Sep/14 III 13:00 37 31 170
Weather : Sunny IV
Test Description : Surface Dressing 1st Coat V
Description of Binder: Bitumen 95 % Cutter 5% VI
Binder density at 150C :- 1.015 Reloaded VII
Instil Deep (Lit) 5680 5280 VIII
Final Deep (Lit.) 560 690
Consumed qty. (Lit.) 9710 4590
Area (m2) 6389.1
Volume Correction Factor 0.9060
Corrected Binder Spray Rate
1.377
by Deep stick (Lit.)

Chippin
Run Chainage Tray Tray + Wt. of Spray Average Specified
Area of Tray gs Spray
Tray No Weight Binder Binder Rate Spray Rate Rate Remarks
(m2) Rate
(g) Wt. (g) Spread (g) (Kg/m2) (lit/m2) (lit/m2)
(Kg/m2)
From To

1 1708 1837 129 0.09 1.433


1 10+680 10+280 1.374 1.378 23.49
2 1660 1782 122 0.09 1.356

3 1652 1778 126 0.09 1.400


2 10+280 9+880 1.390 1.378
4 1670 1798 128 0.09 1.422

5 1725 1849 124 0.09 1.378


3 9+880 9+500 1.336 1.378
6 1745 1865 120 0.09 1.333

Contractor Consultant

Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,


New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal

Tested by:………………….. Witnessed by:…………………………………………


Lab Technician Lab Technician

Recommended By:…… Verified by:………………………………………………


Contract Manager Material Engineer

Approved by:…………………………………………….
Resident Engineer
Form F 2

Sub-Regional Transport Enhancement Project STEP


DAILY BITUMEN SPRAY CONTROL (TRAY TEST)

Run Time Temperature °C


Road : Harkapur-Okhaldhunga Road
Contract No : STEP/NCB/HO-02 Road Air Bit./ Prime
Contractor : Tundi Construction Pvt. Ltd. I 11:00 38 32 170
Test No. : 1229/13 II 12:00 37 31 170
Date of Test : 25/Sep/14 III 13:00 37 31 170
Weather : Sunny IV
Test Description : Surface Dressing 1st Coat V
Description of Binder: Bitumen 95 % Cutter 5% VI
Binder density at 150C :- 1.015 Reloaded VII
Initial Dip (Lit) 5760 4950 VIII
Final Dip (Lit.) 480 650
Consumed qty. (Lit.) 9580 4300
Area (m2) 6309.3
Volume Correction Factor 0.9060
Corrected Binder Spray Rate
1.376
by Deep stick (Lit.)

Chippin
Run Chainage Tray Tray + Wt. of Spray Average Specified
Area of Tray gs Spray
Tray No Weight Binder Binder Rate Spray Rate Rate Remarks
(m2) Rate
(g) Wt. (g) Spread (g) (Kg/m2) (lit/m2) (lit/m2)
(Kg/m2)
From To

1 1700 1828 128 0.09 1.422


1 11+790 11+390 1.378 1.378 23.48
2 1655 1775 120 0.09 1.333

3 1660 1781 121 0.09 1.344


2 11+390 10+990 1.372 1.378
4 1680 1806 126 0.09 1.400

5 1730 1854 124 0.09 1.378


3 10+990 10+680 1.367 1.378
6 1725 1847 122 0.09 1.356

Contractor Consultant

Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,


New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal

Tested by:………………….. Witnessed by:…………………………………………


Lab Technician Lab Technician

Recommended By:…… Verified by:………………………………………………


Contract Manager Material Engineer

Approved by:…………………………………………….
Resident Engineer
Form F 2

Sub-Regional Transport Enhancement Project STEP


DAILY BITUMEN SPRAY CONTROL (TRAY TEST)

Run Time Temperature °C


Road : Harkapur-Okhaldhunga Road
Contract No : STEP/NCB/HO-02 Road Air Bit./ Prime
Contractor : Tundi Construction Pvt. Ltd. I 11:30 41 39 180
Test No. : 1213/12 II 1:30 42 40 180
Date of Test : 19/Sep/14 III
Weather : Sunny IV
Test Description : Surface Dressing 1st Coat V
Description of Binder: Bitumen 95 % Cutter 5% VI
Binder density at 150C :- 1.015 Reloaded VII
Instil Deep (Lit) 5720 3795 VIII
Final Deep (Lit.) 860 1760
Consumed qty. (Lit.) 6895 2035
Area (m2) 4532.8
Volume Correction Factor 0.9002
Corrected Binder Spray Rate
1.369
by Deep stick (Lit.)

Chippin
Run Chainage Tray Tray + Wt. of Spray Average Specified
Area of Tray gs Spray
Tray No Weight Binder Binder Rate Spray Rate Rate Remarks
(m2) Rate
(g) Wt. (g) Spread (g) (Kg/m2) (lit/m2) (lit/m2)
(Kg/m2)
From To

1 1710 1833 123 0.09 1.367


1 13+390 13+050 1.379 1.378 23.5
2 1648 1777 129 0.09 1.433

3 1660 1786 126 0.09 1.400


2 12+950 12+400 1.374 1.378
4 1648 1773 125 0.09 1.389

Contractor Consultant

Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,


New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal

Tested by:………………….. Witnessed by:…………………………………………


Lab Technician Lab Technician

Recommended By:…… Verified by:………………………………………………


Contract Manager Material Engineer

Approved by:…………………………………………….
Resident Engineer
Form F 2

Sub-Regional Transport Enhancement Project STEP


DAILY BITUMEN SPRAY CONTROL (TRAY TEST)

Run Time Temperature °C


Road : Harkapur-Okhaldhunga Road
Contract No : STEP/NCB/HO-02 Road Air Bit./ Prime
Contractor : Tundi Construction Pvt. Ltd. I 10:30 34 32 170
Test No. : 1211/11 II 13:15 36 33 170
Date of Test : 18/Sep/14 III
Weather : Sunny IV
Test Description : Surface Dressing 1st Coat V
Description of Binder: Bitumen 95 % Cutter 5% VI
Binder density at 150C :- 1.015 Reloaded VII
Initial Dip (Lit) 5700 5240 VIII
Final Dip (Lit.) 620 935
Consumed qty. (Lit.) 9385 4305
Area (m2) 6151.25
Volume Correction Factor 0.9060
Corrected Binder Spray Rate
1.382
by Deep stick (Lit.)

Chippings
Run Chainage Tray Tray + Wt. of Spray Average Specified
Area of Tray Spray
Tray No Weight Binder Binder Rate Spray Rate Rate Remarks
(m2) Rate
(g) Wt. (g) Spread (g) (Kg/m )2
(lit/m2) (lit/m2)
(Kg/m2)
From To

1 1638 1759 121 0.09 1.344


1 14+580 14+060 1.361 1.378 23.44
2 1700 1824 124 0.09 1.378

3 1680 1804 124 0.09 1.378


2 14+030 13+390 1.367 1.378
4 1630 1752 122 0.09 1.356

Contractor Consultant

Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,


New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal

Tested by:………………….. Witnessed by:…………………………………………


Lab Technician Lab Technician

Recommended By:…… Verified by:………………………………………………


Contract Manager Material Engineer

Approved by:…………………………………………….
Resident Engineer
Form F 2

Sub-Regional Transport Enhancement Project STEP


DAILY BITUMEN SPRAY CONTROL (TRAY TEST)

Run Time Temperature °C


Road : Harkapur-Okhaldhunga Road
Contract No : STEP/NCB/HO-02 Road Air Bit./ Prime
Contractor : Tundi Construction Pvt. Ltd. I 12:00 41 32 165
Test No. : 1171/10 II 13:45 40 31 165
Date of Test : 2/Sep/14 III
Weather : Sunny IV
Test Description : Surface Dressing 1st Coat V
Description of Binder: Bitumen 95 % Cutter 5% VI
Binder density at 150C :- 1.015 Reloaded VII
Initial Dip (Lit) 5700 2620 VIII
Final Dip (Lit.) 880 1590
Consumed qty. (Lit.) 5850 1030
Area (m2) 3856.95
Volume Correction Factor 0.9089
Corrected Binder Spray Rate
1.379
by Deep stick (Lit.)

Run Chainage Tray Tray + Wt. of Spray Average Specified Chippings


Area of Tray
Tray No Weight Binder Binder Rate Spray Rate Rate Spray Rate Remarks
(m2)
(g) Wt. (g) Spread (g) (Kg/m )2
(lit/m2) (lit/m2) (Kg/m2)
From To

1 1646 1772 126 0.09 1.400


1 15+300 14+900 1.389 1.378 23.66
2 1640 1764 124 0.09 1.378

3 1725 1849 124 0.09 1.378


2 14+900 14+580 1.372 1.378
4 1695 1818 123 0.09 1.367

5 1110 1058 -52 0.09


3 18+170 17+980 0.706 1.378
6 1660 1789 129 0.09 1.433

Contractor Consultant

Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,


New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal

Tested by:………………….. Witnessed by:…………………………………………


Lab Technician Lab Technician

Recommended By:…… Verified by:………………………………………………


Contract Manager Material Engineer

Approved by:…………………………………………….
Resident Engineer
Form F 2

Sub-Regional Transport Enhancement Project STEP


DAILY BITUMEN SPRAY CONTROL (TRAY TEST)

Run Time Temperature °C


Road : Harkapur-Okhaldhunga Road
Contract No : STEP/NCB/HO-02 Road Air Bit./ Prime
Contractor : Tundi Construction Pvt. Ltd. I 12:00 43 31 175
Test No. : 1169/9 II 13:00 41 31 175
Date of Test : 1/Sep/14 III
Weather : Sunny IV
Test Description : Surface Dressing 1st Coat V
Description of Binder: Bitumen 95 % Cutter 5% VI
Binder density at 150C :- 1.015 Reloaded VII
Initial Dip (Lit) 5800 2950 VIII
Final Dip (Lit.) 1120 990
Consumed qty. (Lit.) 6640 1960
Area (m2) 4348.7
Volume Correction Factor 0.9031
Corrected Binder Spray Rate
1.379
by Deep stick (Lit.)

Run Chainage Tray Tray + Wt. of Spray Average Specified Chippings


Area of Tray
Tray No Weight Binder Binder Rate Spray Rate Rate Spray Rate Remarks
(m2)
(g) Wt. (g) Spread (g) (Kg/m )2
(lit/m2) (lit/m2) (Kg/m2)
From To

1 1720 1845 125 0.09 1.389


1 16+090 15+720 1.378 1.378 23.41
2 918 1041 123 0.09 1.367

3 1690 1812 122 0.09 1.356


2 15+720 15+300 1.367 1.378
4 1699 1823 124 0.09 1.378

Contractor Consultant

Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,


New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal

Tested by:………………….. Witnessed by:…………………………………………


Lab Technician Lab Technician

Recommended By:…… Verified by:………………………………………………


Contract Manager Material Engineer

Approved by:…………………………………………….
Resident Engineer
Form F 2

Sub-Regional Transport Enhancement Project STEP


DAILY BITUMEN SPRAY CONTROL (TRAY TEST)

Run Time Temperature °C


Road : Harkapur-Okhaldhunga Road
Contract No : STEP/NCB/HO-02 Road Air Bit./ Prime
Contractor : Tundi Construction Pvt. Ltd. I 13:00 40 32 170
Test No. : 1167/8 II 14:00 38 31 170
Date of Test : 31/Aug/14 III
Weather : Sunny IV
Test Description : Surface Dressing 1st Coat V
Description of Binder: Bitumen 95 % Cutter 5% VI
Binder density at 150C :- 1.015 Reloaded VII
Instil Deep (Lit) 5350 3260 VIII
Final Deep (Lit.) 930 1030
Consumed qty. (Lit.) 6650 2230
Area (m2) 4383.4
Volume Correction Factor 0.9060
Corrected Binder Spray Rate
1.374
by Deep stick (Lit.)

Run Chainage Tray Tray + Wt. of Spray Average Specified Chippings


Area of Tray
Tray No Weight Binder Binder Rate Spray Rate Rate Spray Rate Remarks
(m2)
(g) Wt. (g) Spread (g) (Kg/m )2
(lit/m2) (lit/m2) (Kg/m2)
From To

1 1625 1758 133 0.09 1.478


1 17+000 16+530 1.341 1.378 23.8
2 1626 1738 112 0.09 1.244

3 1620 1742 122 0.09 1.356


2 16+530 16+090 1.346 1.378
4 1619 1743 124 0.09 1.378

Contractor Consultant

Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,


New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal

Tested by:………………….. Witnessed by:…………………………………………


Lab Technician Lab Technician

Recommended By:…… Verified by:………………………………………………


Contract Manager Material Engineer

Approved by:…………………………………………….
Resident Engineer
Form F 2

Sub-Regional Transport Enhancement Project STEP


DAILY BITUMEN SPRAY CONTROL (TRAY TEST)

Run Time Temperature °C


Road : Harkapur-Okhaldhunga Road
Contract No : STEP/NCB/HO-02 Road Air Bit./ Prime
Contractor : Tundi Construction Pvt. Ltd. I 12:15 37 32
Test No. : 1133/7 II 13:15 37 31
Date of Test : 5/Aug/14 III 14:30 36 31
Weather : Sunny IV
Test Description : Surface Dressing 1st Coat V
Description of Binder: Bitumen 95 % Cutter 5% VI
Binder density at 150C :- 1.015 VII
Initial Dip (Lit) 6250 VIII
Final Dip (Lit.) 992
Consumed qty. (Lit.) 5258
Area (m2) 3476.65
Volume Correction Factor 0.9089
Corrected Binder Spray Rate
1.375
by Deep stick (Lit.)

Run Chainage Tray Tray + Wt. of Spray Average Specified Chippings


Area of Tray
Tray No Weight Binder Binder Rate Spray Rate Rate Spray Rate Remarks
(m2)
(g) Wt. (g) Spread (g) (Kg/m )2
(lit/m2) (lit/m2) (Kg/m2)
From To

1 946 1068 122 0.09 1.356


1 17+730 17+560 1.367 1.378 24.26
2 1730 1854 124 0.09 1.378

3 1022 1142.8 120.8 0.09 1.342


2 17+560 17+380 1.364 1.378
4 1050 1174.7 124.7 0.09 1.386
3
5 1122 1244.4 122.4 0.09 1.360
17+380 17+000 1.373 1.378
6 1650 1774.8 124.8 0.09 1.387

Contractor Consultant

Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,


New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal

Tested by:………………….. Witnessed by:…………………………………………


Lab Technician Lab Technician

Recommended By:…… Verified by:………………………………………………


Contract Manager Material Engineer

Approved by:…………………………………………….
Resident Engineer
Form F 2

Sub-Regional Transport Enhancement Project STEP


DAILY BITUMEN SPRAY CONTROL (TRAY TEST)

Run Time Temperature °C


Road : Harkapur-Okhaldhunga Road
Contract No : STEP/NCB/HO-02 Road Air Bit./ Prime
Contractor : Tundi Construction Pvt. Ltd. I 10:30 37 31
Test No. : 1098/6 II 12:45 38 32
Date of Test : 19/Jul/14 III 13:30 36 32
Weather : Sunny IV 16:00 35 31
Test Description : Surface Dressing 1st Coat V
Description of Binder: Bitumen 95 % Cutter 5% VI
Binder density at 150C :- 1.015 VII
Initial Dip (Lit) 6270 VIII
Final Dip (Lit.) 400
Consumed qty. (Lit.) 5870
Area (m2) 3972.4
Volume Correction Factor 0.9089
Corrected Binder Spray Rate
1.343
by Deep stick (Lit.)

Run Chainage Tray Tray + Wt. of Spray Average Specified Chippings


Area of Tray
Tray No Weight Binder Binder Rate Spray Rate Rate Spray Rate Remarks
(m2)
(g) Wt. (g) Spread (g) (Kg/m )2
(lit/m2) (lit/m2) (Kg/m2)
From To

1 1738 1866 128 0.09 1.422


1 18+430 18+310 1.411 1.378 24.05
2 1109 1235 126 0.09 1.400

3 1545 1672 127 0.09 1.411


2 18+310 18+170 1.407 1.378
4 1255 1381.2 126.2 0.09 1.402

5 932 1058 126 0.09 1.400


3 18+170 17+980 1.396 1.378
6 1660 1789 129 0.09 1.433

7 1315 1441.3 126.3 0.09 1.403


4 17+980 17+730 1.392 1.378
8 1150 1278.1 128.1 0.09 1.423

Contractor Consultant

Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,


New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal

Tested by:………………….. Witnessed by:…………………………………………


Lab Technician Lab Technician

Recommended By:…… Verified by:………………………………………………


Contract Manager Material Engineer

Approved by:…………………………………………….
Resident Engineer
Form F 2

Sub-Regional Transport Enhancement Project STEP


DAILY BITUMEN SPRAY CONTROL (TRAY TEST)

Run Time Temperature °C


Road : Harkapur-Okhaldhunga Road
Contract No : STEP/NCB/HO-02 Road Air Bit./ Prime
Contractor : Tundi Construction Pvt. Ltd. I 13:30 35 29
Test No. : 1093/5 II
Date of Test : 12/Jul/14 III
Weather : Sunny IV
Test Description : Surface Dressing 1st Coat V
Description of Binder: Bitumen 95 % Cutter 5% VI
Binder density at 150C :- 1.015 VII
Initial Dip (Lit) 5400 VIII
Final Dip (Lit.) 3040
Consumed qty. (Lit.) 2360
Area (m2) 1543.35
Volume Correction Factor 0.9060
Corrected Binder Spray Rate
1.385
by Deep stick (Lit.)

Run Chainage Tray Tray + Wt. of Spray Average Specified Chippings


Area of Tray
Tray No Weight Binder Binder Rate Spray Rate Rate Spray Rate Remarks
(m2)
(g) Wt. (g) Spread (g) (Kg/m )2
(lit/m2) (lit/m2) (Kg/m2)
From To

1 939 1065.3 126.3 0.09 1.403


1 18+740 18+430 1.401 1.378 24.36
2 1113 1238.8 125.8 0.09 1.398

Contractor Consultant

Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,


New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal

Tested by:………………….. Witnessed by:…………………………………………


Lab Technician Lab Technician

Recommended By:…… Verified by:………………………………………………


Contract Manager Material Engineer

Approved by:…………………………………………….
Resident Engineer
Form F 2

Sub-Regional Transport Enhancement Project STEP


DAILY BITUMEN SPRAY CONTROL (TRAY TEST)

Run Time Temperature °C


Road : Harkapur-Okhaldhunga Road
Contract No : STEP/NCB/HO-02 Road Air Bit./ Prime
Contractor : Tundi Construction Pvt. Ltd. I 12:30 30 28
Test No. : 1090/4 II 15:00 29 27
Date of Test : 11/Jul/14 III
Weather : Sunny IV
Test Description : Surface Dressing 1st Coat V
Description of Binder: Bitumen 95 % Cutter 5% VI
Binder density at 150C :- 1.015 VII
Initial Dip (Lit) 5050 VIII
Final Dip (Lit.) 516
Consumed qty. (Lit.) 4534
Area (m2) 3005.15
Volume Correction Factor 0.9060
Corrected Binder Spray Rate
1.367
by Deep stick (Lit.)

Run Chainage Tray Tray + Wt. of Spray Average Specified Chippings


Area of Tray
Tray No Weight Binder Binder Rate Spray Rate Rate Spray Rate Remarks
(m2)
(g) Wt. (g) Spread (g) (Kg/m )2
(lit/m2) (lit/m2) (Kg/m2)
From To

1 1703 1826.6 123.6 0.09 1.373


1 19+330 19+170 1.396 1.378 24.15
2 1741 1868.6 127.6 0.09 1.418

2 3 1643 1768.6 125.6 0.09 1.396


19+170 18+740 1.388 1.378
4 1105 1229.3 124.3 0.09 1.381

Contractor Consultant

Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,


New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal

Tested by:………………….. Witnessed by:…………………………………………


Lab Technician Lab Technician

Recommended By:…… Verified by:………………………………………………


Contract Manager Material Engineer

Approved by:…………………………………………….
Resident Engineer
Form F 2

Sub-Regional Transport Enhancement Project STEP


DAILY BITUMEN SPRAY CONTROL (TRAY TEST)

Run Time Temperature °C


Road : Harkapur-Okhaldhunga Road
Contract No : STEP/NCB/HO-02 Road Air Bit./ Prime
Contractor : Tundi Construction Pvt. Ltd. I 12:00 38 33
Test No. : 1088/3 II 16:00 34 30
Date of Test : 10/Jul/14 III
Weather : Sunny IV
Test Description : Surface Dressing 1st Coat V
Description of Binder: Bitumen 95 % Cutter 5% VI
Binder density at 150C :- 1.015 VII
Initial Dip (Lit) 5275 VIII
Final Dip (Lit.) 2115
Consumed qty. (Lit.) 3160
Area (m2) 2085.25
Volume Correction Factor 0.9060
Corrected Binder Spray Rate
1.373
by Deep stick (Lit.)

Run Chainage Tray Tray + Wt. of Spray Average Specified Chippings


Area of Tray
Tray No Weight Binder Binder Rate Spray Rate Rate Spray Rate Remarks
(m2)
(g) Wt. (g) Spread (g) (Kg/m )2
(lit/m2) (lit/m2) (Kg/m2)
From To

1 1662 1786.4 124.4 0.09 1.382


1 19+700 19+500 1.387 1.383 25.25
2 1111 1236.2 125.2 0.09 1.391

3 1725 1849.9 124.9 0.09 1.388


2 19+500 19+330 1.379 1.383
4 1820 1943.3 123.3 0.09 1.370

Contractor Consultant

Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,


New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal

Tested by:………………….. Witnessed by:…………………………………………


Lab Technician Lab Technician

Recommended By:…… Verified by:………………………………………………


Contract Manager Material Engineer

Approved by:…………………………………………….
Resident Engineer
Form F 2

Sub-Regional Transport Enhancement Project STEP


DAILY BITUMEN SPRAY CONTROL (TRAY TEST)

Run Time Temperature °C


Road : Harkapur-Okhaldhunga Road
Contract No : STEP/NCB/HO-02 Road Air Bit./ Prime
Contractor : Tundi Construction Pvt. Ltd. I 12:00 38 32 170
Test No. : 1086/2 II 16:30 31 29
Date of Test : 9/Jul/14 III
Weather : Sunny IV
Test Description : Surface Dressing 1st Coat V
Description of Binder: Bitumen 95 % Cutter 5% VI
Binder density at 150C :- 1.015 VII
Initial Dip (Lit) 5812 VIII
Final Dip (Lit.) 1248
Consumed qty. (Lit.) 4564
Area (m2) 2999.55
Volume Correction Factor 0.9060
Corrected Binder Spray Rate
1.379
by Deep stick (Lit.)

Run Chainage Tray Tray + Wt. of Spray Average Specified Chippings


Area of Tray
Tray No Weight Binder Binder Rate Spray Rate Rate Spray Rate Remarks
(m2)
(g) Wt. (g) Spread (g) (Kg/m )2
(lit/m2) (lit/m2) (Kg/m2)
From To

1 1649.4 1772.6 123.2 0.09 1.369


1 20+230 20+180 1.379 1.383 24.98
2 1102.5 1227.6 125.1 0.09 1.390

3 1746.2 1869.5 123.3 0.09 1.370


2 20+180 19+700 1.378 1.383
4 906.4 1031.1 124.7 0.09 1.386

Contractor Consultant

Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,


New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal

Tested by:………………….. Witnessed by:…………………………………………


Lab Technician Lab Technician

Recommended By:…… Verified by:………………………………………………


Contract Manager Material Engineer

Approved by:…………………………………………….
Resident Engineer
Form F 2

Sub-Regional Transport Enhancement Project STEP


DAILY BITUMEN SPRAY CONTROL (TRAY TEST)

Run Time Temperature °C


Road : Harkapur-Okhaldhunga Road
Contract No : STEP/NCB/HO-02 Road Air Bit./ Prime
Contractor : Tundi Construction Pvt. Ltd. I 13:00 31 24 170
Test No. : 1084/1 II
Date of Test : 8/Jul/14 III
Weather : Sunny IV
Test Description : Surface Dressing 1st Coat V
Description of Binder: Bitumen 95 % Cutter 5% VI
Binder density at 150C :- 1.015 VII
Initial Dip (Lit) 5150 VIII
Final Dip (Lit.) 2875
Consumed qty. (Lit.) 2275
Area (m2) 1494.5
Volume Correction Factor 0.9060
Corrected Binder Spray Rate
1.379
by Deep stick (Lit.)

Run Chainage Tray Tray + Wt. of Spray Average Specified Chippings


Area of Tray
Tray No Weight Binder Binder Rate Spray Rate Rate Spray Rate Remarks
(m2)
(g) Wt. (g) Spread (g) (Kg/m )2
(lit/m2) (lit/m2) (Kg/m2)
From To

1 1724.4 1849.2 124.8 0.09 1.387


1 20+500 20+230 1.393 1.383 25.12
2 1670.1 1796 125.9 0.09 1.399

Contractor Consultant

Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,


New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal

Tested by:………………….. Witnessed by:…………………………………………


Lab Technician Lab Technician

Recommended By:…… Verified by:………………………………………………


Contract Manager Material Engineer

Approved by:…………………………………………….
Resident Engineer