: BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
A CIVIL WORK
1. EARTH WORK
1 General
1.1 Earth Work Procedure Code/Std & Code/Std & Procedure M R R
Specification Specification
2 EARTH WORK
2.1
Soil Investigation
a) Field Exploration Procedure Procedure Report M W SW
b) Laboratory Testing Procedure Procedure Report M R R
- Natural Moisture content
- Atterber Limit
- Gradation/Sieve & Hydrometer
- Specific Grafity
- Bulk Density
- Moister Density
- Consolidation test
- Unconfine Compression test
- UU-Triaxial Compression test
- Cu-triaxial Compression Test
- CD-Triaxial compression test
- Swelling test
- CBR(Soaked, Disturbed)
- Classification of Soils
- pH on Soil paste
- Organic Content
- Sulfate Content
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
2.4 Excavation
a) Investigation of existing Procedure & Procedure & Report M SW SW
underground facilities Drawing Drawing
b) Demolition, relocation or
protection of existing facilities
c) Excavation method and
procedure
d) Depth and width of
excavation
e) Stability of side protection
against earth sliding
f) De-watering (Pumps and
Well point)
g) Condition of excavation
bottom
h) Soil replacement (when
unsuitable soil is encountered at
excavated bottom)
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
e) Compaction test
3 Completeness of Report Report M R R
2. CONCRETE WORK
2 CONCRETE WORK
2.1 Leveling Concrete (if Adopted)
a) Elevation, extent, thickness, Procedure & Procedure & Report M W W
flatness and smooth surface of Drawing Drawing
leveling
b) Cleaning of leveling concrete
surface prior to rebar work and /
or form – work
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
3 PILING WORK
3.1 General
Review Document
a. Piling & Test Procedure Code/Std & Code/Std & Procedure M R R
Specification Specification
b. WPS/PQR AWS D1.1 /ASME AWS D1.1 /ASME WPS/PQR M R R
Sect.IX Sect.IX
c. Welder List & WPQT Record AWS D1.1 or ASME AWS D1.1 /ASME WPS/PQR M R R
Sect.IX Sect.IX
d. NDE Procedure AWS D1.1 or ASME AWS D1.1 or AWS D1.1 or ASME M R R
Sect.V ASME Sect.V Sect.V
3.2 Incoming material
a) Quality of pile materials Procedure Procedure Report M W W
3.3 Installation
a) Pile Load Test
b) Location, number and size of pile Piling & Test Piling & Test Report M SW SW
Procedure
c) Sequence of piling Procedure
d) Blow-count and tip elevation
e) Rebound for driven piling (test
piles and random for production
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
4. BUILDING
1 REVIEW DOCUMENT Code/Std & Code/Std &
a. Building Work Procedure Specification Specification Procedure M R R
2 CONCRETE WORK
2.1 Leveling Concrete (if Adopted)
a) Elevation, extent, thickness, Procedure & Procedure & Report M W SW
flatness and smooth surface of Drawing Drawing
leveling
b) Cleaning of leveling concrete
surface prior to rebar work and /
or form – work
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
3 Water Proofing
Material Procedure & Procedure & Procedure M SW SW
Drawing Drawing
a. Dry Surface for Laying Proofing
b. Overlap for Joint
c. Laying of Insulation Board
5 Wall, Ceiling and Floor Finishing Procedure & Procedure & Procedure M SW SW
Drawing Drawing
a. Material
b. Joint Type
c. Appearance of Finish
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
5. HVAC
1 General
1.1 HVAC Installation Procedure Code/Std & Code/Std & Procedure M R R
1.2 Inspection and Testing Procedure M R R
1.3 Layout Drawing of HVAC Equipment M R R
& Ducting
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
6. AC Split
1 General
1.1 AC Split Installation Procedure Code/Std & Code/Std & Procedure M R R
1.2 Inspection and Testing Procedure M R R
3 Performance Test
2) Performance Test for AC split Procedure & Procedure & Report M W W
specification specification
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
7. STEEL STRUCTURE
1 General
1.1 Review Document
a) Installation/Construction Code/Std & Code/Std & Procedure M R R
Procedure Specification Specification
b) WPS/PQR AWS D1.1 /ASME AWS D1.1 /ASME WPS/PQR M R R
Sect.IX Sect.IX
c) Welder List & WPQT Record AWS D1.1 or ASME AWS D1.1 /ASME WPS/PQR M R R
Sect.IX Sect.IX
d) NDE Map & NDE Procedure AWS D1.1 or ASME AWS D1.1 or AWS D1.1 or ASME M R R
(if required) Sect.V ASME Sect.V Sect.V
e) Painting Procedure Painting Spec Painting Spec. Painting Procedure M R R
Receiving Inspection
1.2
a. Material Identification (incl. :
Marking, Heat No, Color Coding, Receiving Receiving
Etc)
b. Visual and Dimensional Inspection Inspection Report M W W
Inspection
c. Check Material Quantity Procedure Procedure
d. Check Completeness of
Documentation
2 Installation
2.1 Check Foundation readiness Procedure Procedure Report M W W
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
8. GROUTING WORK
1 Review Document Code/Std & Code/Std & Procedure
1.1 Grouting Procedure Specification Specification M R R
2 Grouting Work
a) Cement type as per specification
b) Mixing proportion (including
admixture, if used)
c) Form - work (size / cleaning) Procedure & Procedure & Report M W SW
d) Anchor bolts and embedded Manufacturer Manufacturer
items
e) Cleaning prior to concrete Standard Standard
placing
f) Curing period
g) Appearance of surface after form
removal
h) Mortar finishing (level, chamfer,
crack and mortar proportion)
i) Grout test (compressive
strength)-if required
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
9. DRAINAGE
1 Review Document
1.1 Construction Procedure Code/Std & Code/Std & Procedure M R R
Specification Specification
2 Drainage Work
2 Road Work
2.1 Sub-grade for Pavements
a) Quality of sub grade material M SW SW
b) Compaction test Procedure & Procedure & Report
c) Surface finishing, slope and Drawing Drawing
elevation
2.2 Granular Sub-base for Pavements
a) Quality of sub-base material M SW SW
(sieve test)
b) Thickness check Procedure & Procedure & Report
c) Compaction test Drawing Drawing
d) Surface finishing, slope and
elevation
2.3 Concrete Pavement
a) Sub-grade for Pavement Procedure & Procedure & Report M SW SW
b) Granular sub-base for Pavement Drawing Drawing
c) Elevation of high point and low
point
d) Thickness of concrete pavement
e) Concrete work
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
2 Miscellaneous Work
2.1 Fencing and Gate
a) Material inspection Procedure & Procedure & M W W
b) Alignment, top elevation and Drawing Drawing Report
location
c) Spacing of poles
d) Location of gate
2.2 Cable Trench and Underground
Piping
a) Excavation Procedure & Procedure & Report M SW SW
b) Filling around cable as per Drawing Drawing M SW SW
Backfill ITP (not to damage
cable surface or pipe wrapping /
coating)
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation
Doc. No. : BBS-00-Q1-PL-003
PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN BAMBU BESAR,
Discipline : Quality Control
PT PERTAMINA EP BBS & ABG DEVELOPMENT PROJECT
Doc. Type : Procedure
REMARKS : Abbreviation :
W : Witness, SW : Witness Spot/Random, R : Review, S : Surveillance,
H: Hold Inspection , M : Subcontractor Inspection/Implementation