JCB Inspection Report For Al Khayyat Red Bricks Factory
JCB Inspection Report For Al Khayyat Red Bricks Factory
1. Boom Hydraulic Piping need to be replaced due to hydraulic leak, Auxiliary pipes has
been canceled
2. Internal Boom cylinder need to be resealed and its cartridge need to be replaced
3. Boom Bushing all failed need to be replaced
Engine
Hydraulics
Steering System:
Brake System:
• Condition : Normal
• Noise: Not Available
Page 1
Photos:
Boom
Hydraulic
Piping need to
be replaced
Boom Bushing
all failed need
to be replaced
Page 2