Oil & Natural Gas Corporation Ltd.

Artificial Lift Services, PMS Base, Jhalora

Date: 22/05/2019

Sub: SRP running in programme at well no. SAN-110 (PI: 1462-1467)

1. R/I pump barrel (1.75”) along tubing string and adjust its depth at 1200 Mts. keeping bell bottom shoe
at 1400 Mts. from surface.
2. Test the hermiticity of the string at 100 KSC.
3. R/I pump plunger (1.75”) in the following sequence
a. 01 no 3/4” Sucker rod followed by C/o (3/4”X7/8”)
b. 14 no. of 7/8” Sucker rods, followed by C/o (7/8”X3/4”)
c. 12 no. of 3/4” Sucker rods
d. 01 3/4" MG
e. 12 no. of 3/4” Sucker rods
f. 01 3/4" MG
g. 12 no. of 3/4” Sucker rods
h. 01 3/4" MG
i. 12 no. of 3/4” Sucker rods
j. 01 3/4" MG
k. 12 no. of 3/4” Sucker rods
l. 01 3/4" MG
m. 12 no. of 3/4” Sucker rods
n. 01 3/4" MG
o. 12 no. of 3/4” Sucker rods followed by a C/o (3/4”X7/8”)
p. 59 no 7/8” Sucker rods or till rest.
4. Attach polish rod to the sucker rod string and space out the string with the help of pony rods so that
approximately 01 Mts. length of polish rod projects out of stuffing box.
5. Displace the entire well volume fluid with fresh water.
6. Test the pump up to 60 KSC in presence of representative of ALS.

(S. N. Gandhi)
CE (P)
I/c-ALS, Jhalora
DIC / Co-ordinator WOR at SAN-110.
Note: KOP is 1461 Mts, Moulded Guide based on the inspection of pulled put material