HAZARD OBSERVATION LOG

ALLIANZ-FRM-03.34
Vessel / Dept. / Site: SWISSCO SINGAPORE Month: November Year: 2020

REPORTED BY POTENTIAL
SN # DATE OBSERVATION CORRECTIVE ACTION WORK AREA TASK PERFORMED ROOT CAUSE STATUS
(Name/Designation) CONSEQUENCES

Observed one crew during vsl a/side to the Tug


1 3.11.20 Mesdy / Chief Officer inform him to use PFD when ship to ship operation Main Deck Deck cargo operation Bodily Injury Procedures Closed
vessel, he did'nt use PFD

Found in the Loundry, someone use dried machine


2 03.11.20 Ruslan / CH.Eng ask to the crew to use timer one hour limit Accommodation Housekeeping Damage to Property Quality Control Closed
with timer more then ahour for few clothes

observed some leftover food in the messroom after tell to all crew do not leftover after meal time in the
3 04.11.20 Jefry / Master Accommodation Housekeeping Others Quality Control Closed
Dinner time mess room, keep tidy the messrom

Found inside Firdge in Galley, empty box food left


4 06.11.20 Ruslan / CH.Eng Inform to cook to keep clean the Fridge Accommodation Housekeeping Others Quality Control Closed
inside the Fridge

Found in the mess room, some use spoon after Ask crew to keep mess room clean and tidy and tell
5 07.11.20 Jefry / Master Messroom Housekeeping Others Quality Control Closed
make cofee, and put inside the cup all the spoon them after use the spoon to clean up again

During weekly watch on RB found the Rescue Boat


6 08.11.20 Ruslan / CH.Eng Ask 3rd Eng to change the bulb Rescue Boat Deck Others Others Procedures Closed
lights burned out.

Observed that. Some of the crew left pan without Galley Operations / Food
7 10.11.20 Amit / Cook Explain them keep pan closed after receiving food Galley Others Quality Control Closed
cover after taking food Handling

Found some crew left the tools not put back in the
8 11.11.20 Ramli / 2nd Eng take and putback in the workshop table Machinery Others Others Quality Control Closed
workshop table

During Bunkering to one of crew boat, bunkering


Call the boat to tell do not smoking while bunkering Exposure - Fumes / Nox
9 15.11.20 Mesdy / Chief Officer on progress found one crew from other boat, he Main Deck Bunkering operation Procedures Closed
operation Substance.
smoking while bunker operation

Some crew left the used paper cup in the mess put it thorw to the garbage bin, and tell the crew do
10 17.11.20 Supriyono/ Bosun Accommodation Housekeeping Others Quality Control Closed
room not left used paper cup in the mess room

Found in the galley, inside food garbage bin there


11 19.11.20 Dirham /AB put it in the right garbage bin Accommodation Housekeeping Others Procedures Closed
are paper cup inside

During shi to ship at Delfine, found the moring rope


12 21.11.20 Ahmed / 2nd Off ask AB to pay in the rope Main Deck Moaring Others Procedures Closed
slack

Founf AB when doing some chipping work, he


13 25.11.20 Supriyono/ Bosun Call him to used safety goggles Main Deck daily work Bodily Injury Work Direction Closed
didn't use safety glass

when received Food from the Maridve 510, 20%


14 29.11.20 Amit / Cook Inform to Ship chandler and request for new shrimp Accommodation Food Provision Others Quality Control Closed
shrimp not good condition

Observed in the passage to BT room, there some


15 30.10.20 Mesdy / Chief Officer Infor to AB and oiler to clean up area in the BT room Accommodation Housekeeping Others Quality Control Closed
garbage and cotton rags in the foor

Revision 01. Original Date: 01/03/2017. Version date: 20/02/2020.


1
Prepared by: ALLIANZ QHSE Manager. Approved by: ALLIANZ General Manager. Validated by: ALLIANZ QHSE Manager.
HAZARD OBSERVATION LOG
ALLIANZ-FRM-03.34

Revision 01. Original Date: 01/03/2017. Version date: 20/02/2020.


2
Prepared by: ALLIANZ QHSE Manager. Approved by: ALLIANZ General Manager. Validated by: ALLIANZ QHSE Manager.
Wo
Br
Ta

id

rki
Ma
nk

ge

To
ng
ch
/
De

Wo
/
Ma

tal
En

Ac

in

At

Ot
Ga

ck
in
Area of Work

rks
er

Re
clo

co

he
H
lle

S
De

ho

eig

po
m
tor

se

rs
y

Sp
ck

mo

rt
p
d

hts
e

ac

ed
Sp

da

es

/A
ac

tio

lof
e
Area of Vessel

n
Others

t
No. Reports YTD 4 1 0 0 7 1 0 0 2 15 13%
Machinery Main Deck
Data Table
Spaces 27%
January 0
7%
February 0
March 0
April 0 Bridge /
May 0 Accommodatio Galley
n 7%
June 0
47%
July 0
August 0
September 0
October 0
November 4 1 7 1 2 15
December 0

8
7
7
6
5
4
4
3
2
2
1 1
1
0

Working At Heigh...
Bridge / Accom...
Tank / Enclose...

Machinery Sp...
Deck Store
Main Deck

Workshops
Galley

Others
Ga
lle
Ve

Ro
Lif
De
An

yO
Lif
Task Performed

sse

Bu

uti
t

Pe
ck
ch

t/C
Mo

Ch
/Ca

pe
lM

nk

To
Ele

ne
rso

Ho
or

Ca

em
o

Na

rat
er
rry
ain
rin

rry

ta l
Mooring / Berthing

ctr

us
ha

Ve
rgo
vig

ing
ica

i on

Ot
ne
ten
g
7%

ek
nd

by

Re
sse
ica
M
ati

he
/B

lH

lT
op

s/
O
ec

ee
Deck Cargo operations

lin

an

Ha

po
lW

l In
pe

rs
o

an

ran
er

er

ha

pi n
Fo
na

ce

nd

rte
rat
thi

/To

ati

or

dli

sp
n ic
7%

od
sfe

g
Others

/R

ec

d
ion
on

ng
ng

wi

al

Ha
27%

tio
ep
Chemical Handling

s
ng

nd
7%

air

n
lin
Task Performed

g
No. Reports YTD 1 0 0 0 1 0 0 0 1 0 0 1 7 0 4 15
Galley Operations /
Food Handling
Data Table January 0 7%
February 0
March 0
April 0
May 0
June 0
July 0 Housekeeping
August 0 47%
September 0
October 0
November 1 1 1 1 7 4 15
December 0

8
7
7

5
4
4

2
1 1 1 1
1

0
Sp
ills
Ex bstan
Potential Consequences

Su
Hit

Hit

po

Da

/
Fa

En
su

To
ma
Ele
by

by
Sli

Bo
ll

re .

vir

tal
ge
p/T

ctr

d
fro

Mo

Fa

Ot
Bu
-F

on
ily
e

Re
to
llin

ic
vin

he
m
r

rn
me
um
ip/

Inj

po
P
Sh

rs
He

gO

s
g

ro
F

nt
es

ur

rte
oc
Ob
all

igh

pe

al
bje

y
/N

d
jec
Exposure -

rty
t

Da
ct

ox
Fumes / Nox

ma
Substance.

ge
Consequences 7%
Bodily Injury
No. Reports YTD 0 0 0 0 1 0 2 1 0 0 11 15 13%

Data Table January 0 Damage to


February 0 Property
March 0
7%
April 0 Others
May 0 73%
June 0
July 0
August 0
September 0
October 0
November 1 2 1 11 15
December 0

12 11
10
8
6
4
2
2 1 1
0
B Safe Cards Angola

Root Causes

Hu
Co

To
Qu

Wo
ma
mm
Pr

ta
ali

r
Tr
nE

kD
o

lR
ty
ce

un

ai
ng

ir e

ep
nin
du

Co
ica

ine

or
c ti
r

nt

g
ti
es

eri

ted
on

rol

on
Work Direction

ng
7%
Root Causes
No. Reports YTD 5 0 0 9 0 1 15
Procedures
Data Table January 0 33%
February 0
March 0
April 0 Quality Control
60%
May 0
June 0
July 0
August 0
September 0
October 0
November 5 9 1 15
December 0

10
9
9

6
5
5

2
1
1

0
Procedures Communications Human Engineering Quality Control Training Work Direction

You might also like