Instructions:
1. Refer to the corresponding working drawings to answer the following questions
regarding concrete and earth works.
2. Compute for the total volume of soil to be excavated and backfilled for the given
project.
3. Compute for the total surface area for soil compaction upon backfill.
4. Compute for the quantity of cement, fine aggregates and coarse aggregates that must
be supplied for the concrete works.
5. Answers must be fully accompanied with solutions. Otherwise, deduction in points will
be given for those who fails to show their solutions.
Grading:
Each correct answer grants 2 points. A total of 50 items must be determined for this exercise;
refer to the list of items to determine. For questions requiring solutions, 1 point will be deducted
if solutions are not provided with your answers.
1. Column Footing
2. Wall Footing
3. Columns
4. Slab
5. Beams