Professional Documents
Culture Documents
Date SITE ID
8-Nov-17 BTM410
9-Nov-17 BTM389, BTM897
10-Nov-17 BTM389
11-Nov-17 BTM106, BTM645
12-Nov-17 Standby
13-Nov-17 BTM595,BTM116, BTM663,BTM676
14-Nov-17 BTM724,BTM646, BTM672, BTM557
15-Nov-17 BTM623,BTM340
16-Nov-17 BTM769,BTM626,BTM806
17-Nov-17 BTM114,BTM153,BTM631
18-Nov-17 Support angkut antenna Ke Gudang Telkomsel
19-Nov-17 Standby
20-Nov-17 BTM193
eet Report
: Raja Arif Ramoza
: Tsel Huawei Kepri
: November
Tshoot,Integrasi,simulasi eas
Tshoot, Support Integrasi
Tshoot
Simulasi EAS & Integrasi Site Marcopolo
Standby
Simulasi EAS
Simulasi EAS
Simulasi EAS
Simulasi EAS
Simulasi EAS
Support angkut antenna Ke Gudang Telkomsel
Standby
Tag Vlan
Remark
Done
Botania1 Not Done, Need tshoot optical connection
Done
Done
Standby
Done
Done
Done
Done
Done
Done
Standby
Not Done Permit Rejected ( harus Permit asli)
Engineer Timesheet Report
Engineer Name
Project
Month
Date SITE ID
Done
Done
Not Done, TRM not RSL, Tag Vlan sagulung 2 done
Done
Standby
Standby
Done
Done
Not Done(need wear pack)
Not Done(need wear pack)
Standby
Standby
Standby
Done
Standby
Standby
Standby
Standby
Not Done (hujan)
Done
Done, STO Batam Center Not done (no space)
Done
Done
Pulau kasu Not Done (waiting OPS), Legenda bali 2 done
Done
Swap Antenna Done
Not Done (hujan)
Done
Done
Done