SPECIAL TOOLS LAYOUT

Total Layout A. PIO Area


B. DIO, PDS, Repair Area

C
B

E
Server Andon

C. Washing-Drying-PDI Line

D. Car Carrier In Area E. Car Carrier Out Area

Lampu Indikator ( Hijau, Kuning,


Merah ) + Buzzer,
1 lampu / stall ( posisi lampu
ditengah stall ujung belakang )
Lampu Indikator ( Hijau, Kuning, Merah ) + Bazzer,
1 lampu / stall ( posisi lampu ditengah stall ujung
belakang )

F. Warehouse Area

Keterangan Keterangan
Nama Jumlah Nama Jumlah
gambar gambar

Energy Box 291 units Andong car carrier out 1 set unit

Scissor Lift 4 units Andong PIO, Spec Up, GF 1 set unit

Washing machine 1 set unit Dock leveller 2 units

Andong car carrier in 1 set unit Exhaust hose 1 units