Professional Documents
Culture Documents
“SB 200”
200 liters per batch, 19 Plato
i.bilan@simple-brew.com
Specification:
1. Brewing section
- Inner – 3 mm;
- External – 2 mm;
Mash / Lauter
Н = 2000mm, Ø = 675mm
V(total) = 290l Thermal insulation (polyurethane foam) – 60 mm;
1.1 V(net) = 200l 1
Configuration:
- mashing - rotary cleaning ball 360°
- filtration - manholes – 2 pcs
- motor reducer - 0.75 kW, 380V
Surface: stainless steel - ripper-mixer
(or *copper covering) - wavy knives
- waterjet-cutted removable sieves
- side and bottom steam jacket for heating
- - 100% TIG welded joints
- - stainless steel heavy duty legs with levelling pad
Piping system
1.3 1 Material: stainless steel AISI 304
& Hop separator
i.bilan@simple-brew.com
1. Wort pump P = 0,55kW, 380V
1.4 Pumps 3
2. Coolant pump P = 0,75kW, 380V, 2 pcs
Control panel:
Semiautomatic control:
- Mash and boiling temperature programme
1.5 1 - Adjustable ripper’s speed drive
- Pumping frequency control
- Temperature control in heat exchanger
2. Cooling section
i.bilan@simple-brew.com
PID control cabinet
Refraktometer – 1 pc;
Alcohol thermometer – 1 pc;
Dropper (iodine) - 1 pc;
4.2 Brewer’s set 1
Spanner Wrenches for Bearing Nuts – 1 pc;
Aerometer (0-10%) – 1 pc.
Aerometer (10-20%) – 1 pc.
i.bilan@simple-brew.com
The offer also includes:
virtual layout and development of technical task
turnkey installation
staff-training during the first batches
3 years warranty and post warranty service
Why is it simple?
The compact Brewhouse consists of two universal apparatus: Mash/Lauter
and Kettle/Whirlpool. Both devices are able to heat, which gives a wide
range of opportunities for the implementation of creative ideas of brewers.
Small dimensions and advanced piping system make the workflow simple
and convenient.
In addition, such a combination of brewing vessels eliminates the additional wort
transfers during brewing, which allows to provide up to 6 batches in 24 hours.
Room requirements
The estimated area for such a brewery is 20-30 m2
Doorway (minimum): width - 750 mm, height - 2200 mm
Ceiling height (minimum) - 2350 mm
Energy supply: 27 kW; Water supply: 3 bar
INSTALLATION
1. Supervision installation (included in the price)
The engineer from the supplier controls the installation process;
Accommodation, installation materials, an electrician, and a plumber are required
from the customer.
2. Turnkey installation (15 % of the brewery price)
All installation expenses are covered by the supplier.
i.bilan@simple-brew.com
Optionally
Sincerely,
i.bilan@simple-brew.com