testing methods. Repair of the membrane system following destructive testing shall be in
accordance with the manufacturer’s recommendations.
• Coverage Rates: Rates for all layers shall be monitored by checking quantity of material
used against the area covered.
• Holidays (pinholes): All horizontal and vertical surfaces shall be scanned by the applicator for
holidays (pinholes) by using the proper equipment followed by local touch up spraying at
these pinhole locations. No pinholes will be accepted in the completed waterproofing system.
Detailed shop drawings shall be submitted for the Engineer’s approval.
Page 28-17
CHAPTER 28: W ATERPROOFING First Edition -January 2018
STANDARD CONSTRUCTION SPECIFICATIONS PART 2 – ROAD STRUCTURES
d. Depending on the dry film thickness required, the rubberized bitumen coating shall be applied
at a rate recommended by the manufacturer and approved by the Engineer.
e. On vertical surfaces, the coating shall be applied in multiple layers. Subsequent coats shall
be applied only after the previous coat dries off completely and shall be applied at right angles
for the previous coat. Clean dry sand shall be broadcasted onto the wet coating.
f. The coating shall be cured for a minimum period of 48 hours before applying any protection
board or backfilling.
g. The Contractor shall ensure that the first coat is not punctured during the application of the
second coat. If the coating is damaged, the damaged area shall be over coated provided the
surface preparation is done properly.
h. Type C membrane shall be protected by protection boards as per Section 28.2.3. On vertical
surfaces, protection boards shall be fixed on the membrane by a double sided bitumen
adhesive tape as per the manufacturer recommendations.