Al Arrab Contracting Co. Custodian of Two Holy Mosques the King Abdullah Bin Abdulaziz's Project - KAP2 B2
Contract No.: 119/35/53/1 Doc. No.: ACC-KAP2B-HSSE-009
HSE Risk Assessment for water proofing works for wet area
Hazard : The potential unsafe incidents to be occurred while the initiating event is happening.
Severity Rating ; 1 – 5 (1 = least severe; 5 = most severe) Occurrence Possibility: 1 – 5 (1 = least possible; 5 = most possible)
Page 2 of 3 Revision No.00
HSE Risk Assessment for water proofing works for wet area