Demolition Safety - Check


List
DATE: REV.: FORM NO.

Project: Date :

STATUS
Sl. # DESCRIPTION REMARKS
YES NO N/A
3rd Party certified and well maintained equipment to be
1
used.
3rd Party certified and competency certificate for
2
operators to operate.
3 Permit to Work has been obtained.

4 Daily Toolbox Talk given to all crafts personnel.

5 JSA explained to workers

6 Drinking water provided

7 Temporary shaded area provided.

8 People working at height are have full body harness

Equipment must be used on a level and stable surface


9
and its level indicator must be working.

10 Work area has been barricaded.

11 Signage posted for demolition area

12 Use of hearing protection.

13 Use of dust mask


Access and egress to inspection point clear of all
14
obstructions.
Debris accumulated for removal do not obstruct the
15
access for inspection.
No unauthorized persons found within the approved
16
demolition zone.

Comments / Observations if any:


Project: Date :

Inspected by: Manager In Charge: