- Getting the new sets ready for Pre-Vis revision.
Remodeling the Lab Building (Rough). Rough Lab Remodel for Pre-Vis.
Lab Design Before Redesign.
Creating the Main Street Set. Rough Set Blocking and Truck. Mel’s Flower Shop. Harret Sets Tailors Shop. Main St So Far. Candy Shop and Sweet Treats Shop Front. Temporary Miscellaneous Building. Street Right Side. Street Left Side and Temp Broken Home. Main Street Arial View. Creating the Generator Hallway Set. Generator Hallway Set (without Lab Deck). Prepping to add Lab Deck to Tower Staircase (Getting Doorway Ready).
Doorway up to Lab Deck.
Added Lab Deck to Tower Stairs up to Lab Deck. Staircase.
Pre-Vis Lab Deck from Premise (1). Pre-Vis Lab Deck from Premise (2). Pre-Vis Lab Deck from Premise (3).