Factory Name Process No. Process Name Department Group Write Review Acknowledgment
(JAEI/VoltAmp-01)
Work standard Electrical
Approval
MOBIS 1MVA, 11 / 0.415KV,50HZ Dry Type Transformer Facility Management Energy group
3 Emergency Push button Should be opened & Trip Indication Lamp should be in 'OFF' condition in the HT Panel.
5 Switch 'ON' the Incoming & Outgoing Feeder-01 (VCB breaker) through Trip Neutral Close(TNC) Switch.
7 Check the Secondary Voltage of the Transformer-1 at Main Incomer of the PCC-01 Panel.
8 Select the Selector Switch in Manual mode, to operate Blower/Fan through Illumination Push Button.
9 In Auto mode Blower/Fan will run automatically when temperature rises above 90 degree celcius.
※ Switch 'OFF'
11 Ensure 110V DC & 415V AC Available.
12 Ensure Spring Charge Indication is Healthy in the Outgoing Feeder-01 at the HT Panel.
15 Switch 'OFF' the Outgoing Feeders-01 (VCB breakers) through Trip Neutral Close(TNC) Switch.
Factory Name Process No. Process Name Department Group Write Review Acknowledgment
(JAEI/VoltAmp-01)
Work standard Electrical
Approval
MOBIS 1MVA, 11 / 0.415KV,50HZ Dry Type Transformer Facility Management Energy group
6 Switch 'ON' the Incoming & Outgoing Feeder-02 (VCB breaker) through Trip Neutral Close(TNC) Switch.
8 Check the Secondary Voltage of the Transformer-2 at Main Incomer of the PCC-02 Panel.
9 Select the Selector Switch in Manual mode, to operate Blower/Fan through Illumination Push Button.
10 In Auto mode Blower/Fan will run automatically when temperature rises above 90 degree celcius.
※ Switch 'OFF'
11 Ensure 110V DC & 415V AC Available.
12 Ensure Spring Charge Indication is Healthy in the Outgoing Feeder-02 at the HT Panel.
15 Switch 'OFF' the Outgoing Feeders-02 (VCB breakers) through Trip Neutral Close(TNC) Switch.
Factory Name Process No. Process Name Department Group write Review Acknowledgment
5 Ensure 11KV is 'ON' through MFM, MICOM & R,Y,B Indidcation in the Incoming VCB feeder.
6 Ensure the Trip Circuit Indication & Spring Charge Indication is Healthy.
11 Switch 'ON' the Incoming Feeder (VCB breaker) through Trip Neutral Close(TNC) Switch.
12 Switch 'ON' the Outgoing Feeders (VCB breakers) through Trip Neutral Close(TNC) Switch.
※ Switch 'OFF'
14 Ensure 110V DC & 230V AC Available.
18 Switch 'OFF' the Outgoing Feeders (VCB breakers) through Trip Neutral Close(TNC) Switch.
19 Switch 'OFF' the Incoming Feeder (VCB breaker) through Trip Neutral Close(TNC) Switch.
22 Ensure Fire Fighting System is at Safety Zone.(Dial Indication should be Green Zone)
Factory Name Process No. Process Name Department Group Write Review Acknowledgment
11 Check the Power Cables which is connected in the Capacitors, Series Reactor & MCCB is free from burning issue.
13 To operate Manually, select all the Selector switch in Manual mode and Close the TNC switch.
14 To operate in Auto, select all the Selector switch in Auto mode and it operates Automatically.
15 Ensure ACB is 'ON' through ACB ON Indication Lamp and symbol indicator in ACB.
※ Switch 'OFF'
16 Ensure 110V DC & 230V AC Available.
19 To operate Manually, put all the Selector switch in Manual mode and Trip the TNC switch.
20 To operate in Auto, put all the Selector switch in Auto mode and it operates Automatically.
21 Ensure ACB is 'OFF' through ACB OFF Indication Lamp and symbol indicator in ACB.
22 NOTE : If EB/TIE is ON, DG will not ON there is a Electrical Interlock between EB & DG.
23 NOTE : At Manual Mode, EB and DG will be ON, when TIE breaker is OFF.
Factory Name Process No. Process Name Department Group Write Review Acknowledgment
11 Check the Power Cables which is connected in the Capacitors, Series Reactor & MCCB is free from burning issue.
13 To operate Manually, select all the Selector switch in Manual mode and Close the TNC switch.
14 To operate in Auto, select all the Selector switch in Auto mode and it operates Automatically.
15 Ensure ACB is 'ON' through ACB ON Indication Lamp and symbol indicator in ACB.
※ Switch 'OFF'
16 Ensure 110V DC & 230V AC Available.
19 To operate Manually, put all the Selector switch in Manual mode and Trip the TNC switch.
20 To operate in Auto, put all the Selector switch in Auto mode and it operates Automatically.
21 Ensure ACB is 'OFF' through ACB OFF Indication Lamp and symbol indicator in ACB.
Factory Name Process No. Process Name Department Group Write Review Acknowledgment
4 Ensure the Panel is free from Fault and Trip, if any Acknowledge, Reset and Rectify the fault.
※ Switch 'OFF'
11 Ensure 110V DC & 415V AC is Available.
13 Switch OFF the Main Incoming Supply in the Incoming MCCB & Control MCB.
14 Ensure the Incoming Supply, Control Supply and Rectifier is OFF through 415V AC Voltmeter and MIMIC.
Utility center
1.(IngersollRand)
1250 hp-Low pressure COMPRESSOR Driving Work standard Energy Management Energy 1 group
Approval
C1000 6.0 ㎏/㎠ NAR-10491357 2125 lpm 2 1) Check the power supply status of the start panel. (Voltage 3300V check)
3 2) Cooling water pressure and temperature, oil tank, intercooler, condensate trap
4 Check for leaks, leaks, etc. Check for back pressure of compressor
5 3) After confirming SEAL AIR (5.0㎏ / ㎠ ↑), turn on S / W of CONTROL panel
6 4) Press the START button to check the oil pump operation, oil pressure and direction of rotate.
8 6) After checking the COMPRESSOR READY status, press the START button.
11 9) Check the operation status of the condensate trap of the intercooler and the after cooler.
12 ※ Stop
Review Acknowledgment
Remarks
Confirm
Asset no IRH -01 Management no:
Factory
Process No. Process Name Department Minor write
Name
1.(IngersollRand) COMPRESSOR Driving
Work standard Approval
Uility Center 1250 hp-High pressure
Tips Facility management Energy 1 group
Compressor
SIZE(5.5m×2.7m×1.447m) 7.5 ㎏/ ㎠ 1 2 Check the power supply status of the start panel. (Voltage 3300V check)
3 Cooling water pressure and temperature, oil tank, intercooler, condensate trap check for leaks etc.
5 Press the START button to check the oil pump operation, oil pressure(above 1.5 bar).
7 After checking the COMPRESSOR READY status, press the START button.
11 Check the operation status of the condensate trap of the intercooler and the after cooler.
※ Stop
12 Place the UNLOAD / switch in unload.
16 Now the oil pump is auto start again we run the oil pump for 30 minutes after compressor stop.
17 After 30 minutes stop the power supply switch and press the emergency button in the compressor panel.