You are on page 1of 60

PHASING OF FULL ASSUMPTION OF DEVOLVED F

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

P
(B

Functions/Services/ Programs/Projects/
Timeline for Full
Facilities to be Activities for
Assumption
Assumed Implementation
[1] [2] [3]

Agricultural support services


which include planting
materials, distribution BARANGAY AGRICULTURAL
system and operation of PROGRAM
farm produce collection and
buying stations

Information and reading Barangay library / Information


center. and reading center

Services and facilities related


to general hygiene and i WASH Program
sanitation.

Legend:
[1] All devolved functions and services to be fully assumed by the barangay acco
Prepared [2]
by: The specific program,
Reviewed by: project, or activity to be
Approved implemented by the barangay u
by:
[3] The target year the barangay plans to fully assume the devolved functions, se
[4] The person/s responsible
______________________________ for the delivery of the devolved functions,
______________________________ services, a
_____________
Barangay[5]
Secretary The resources needed
Barangay by the barangay to fullyPunong
Treasurer assume, absorb, and manage
Barangay
Date Date Date
Attachment 2-B: Phasing of Full Assumption of Devolved Functions,

FULL ASSUMPTION OF DEVOLVED FUNCTIONS, SERVICES, AND FACILITIES FOR BARANGAYS

POBLACION
(BARANGAY)

Resource Requirements
Responsible Person/s Personnel/Staffing Capacity Development
FY 2022 FY 2023 FY 2024 FY 2022 FY 2023
[4] [5]
be fully assumed by the barangay according to Section 17 of the LGC and other pertinent laws on devolution.
ty to be
roved by:implemented by the barangay under the devolved functions and services.
fully assume the devolved functions, services, and facilities.
ery of the devolved functions,
_______________ services, and facilities.
______________________________
y to fullyPunong
assume, absorb, and manage the devolved functions, services, and facilities.
Barangay
ANNEX F-2
Devolved Functions, Services, and Facilities for Barangays

BARANGAYS

e Requirements
y Development Funding
FY 2024 FY 2022 FY 2023 FY 2024
[5]
aws on devolution.
PHASING OF FULL ASSUMPTION OF DEVOLVED FUN

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

LINAN
(BAR

Functions/Services/ Programs/Projects/
Timeline for Full
Facilities to be Activities for
Assumption
Assumed Implementation
[1] [2] [3]
Information and reading Barangay library / Information
center. and reading center

Sattelite or Public Market


were viable Barangay Public Market

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Legend:
[1] All devolved functions and services to be fully assumed by the barangay accordin
[2] The specific program, project, or activity to be implemented by the barangay unde
[3] The target year the barangay plans to fully assume the devolved functions, servic
[4] The person/s responsible for the delivery of the devolved functions, services, and
[5] The resources needed by the barangay to fully assume, absorb, and manage the
Attachment 2-B: Phasing of Full Assumption of Devolved Functions, Ser

FULL ASSUMPTION OF DEVOLVED FUNCTIONS, SERVICES, AND FACILITIES FOR BARANGAYS

LINANGKAYAN
(BARANGAY)

Resource Requirements
Responsible Person/s Personnel/Staffing Capacity Development
FY 2022 FY 2023 FY 2024 FY 2022 FY 2023
[4] [5]

roved by:

_______________ ______________________________
Punong Barangay

be fully assumed by the barangay according to Section 17 of the LGC and other pertinent laws on devolution.
ty to be implemented by the barangay under the devolved functions and services.
fully assume the devolved functions, services, and facilities.
ery of the devolved functions, services, and facilities.
y to fully assume, absorb, and manage the devolved functions, services, and facilities.
ANNEX F-2
Devolved Functions, Services, and Facilities for Barangays

BARANGAYS

e Requirements
y Development Funding
FY 2024 FY 2022 FY 2023 FY 2024
[5]

aws on devolution.
PHASING OF FULL ASSUMPTION OF DEVOLVED F

Region: _____________ 10
Province: ___________ Misamis Oriental
City/Municipality: ___ Naawan

(B

Functions/Services/ Programs/Projects/
Timeline for Full
Facilities to be Activities for
Assumption
Assumed Implementation
[1] [2] [3]

Information and reading Barangay library / Information


center. and reading center 2024

Construction of Information
and Reading Center Building 2024
Provision of books and other
reading materials 2023

Services and facilities related


to beautification, and solid Barangay ESWM Program 2022
waste collection.

Provision of MRF 2023

Purchase of dumptruck for


garbage collection 2024

Barangay Beautification 2024

Conduct of regular clean-up


drive 2022

Services and facilities related


to general hygiene and i WASH Program 2022
sanitation.

Provision of toilet bowls 2023

Installation of Handwashing 2022


Prepared by: Reviewed by: Approved by:

_____Marry Grace D. Araneta______________________ Wendy Q. Dadole Mariza P


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Legend:
[1] All devolved functions and services to be fully assumed by the barangay acco
[2] The specific program, project, or activity to be implemented by the barangay u
[3] The target year the barangay plans to fully assume the devolved functions, se
[4] The person/s responsible for the delivery of the devolved functions, services, a
[5] The resources needed by the barangay to fully assume, absorb, and manage
Attachment 2-B: Phasing of Full Assumption of Devolved Functions,

FULL ASSUMPTION OF DEVOLVED FUNCTIONS, SERVICES, AND FACILITIES FOR BARANGAYS

MAPUTI
(BARANGAY)

Resource Requirements
Responsible Person/s Personnel/Staffing Capacity Development
FY 2022 FY 2023 FY 2024 FY 2022 FY 2023
[4] [5]
Training on
Punong Barangay,
Information
Committee on 1 incharge
Technology
Education
Seminar
Sangguniang
Barangay
Sangguniang
Barangay

Punong Barangay, Training on


Solid Waste
Committee on Management
Environment System
Punong Barangay,
Committee on
Environment
Sangguniang
Barangay
Punong Barangay, Training on
Committee on Tourism
Environment, utilities Development

Sangguniang
Barangay and staff
Training on
Punong Barangay,
Proper
Committee on Health
IWASH
and Sanitation
program
Committee on Health
and Sanitation
Committee on Health
and Sanitation
roved by:

Wendy Q. Dadole Mariza P. Velez


Punong Barangay

be fully assumed by the barangay according to Section 17 of the LGC and other pertinent laws on devolution.
ty to be implemented by the barangay under the devolved functions and services.
fully assume the devolved functions, services, and facilities.
ery of the devolved functions, services, and facilities.
y to fully assume, absorb, and manage the devolved functions, services, and facilities.
ANNEX F-2
Devolved Functions, Services, and Facilities for Barangays

BARANGAYS

e Requirements
y Development Funding
FY 2024 FY 2022 FY 2023 FY 2024
[5]

10,000 10,000 10,000

100,000 100,000 100,000

25,000 25,000 25,000

10,000 10,000 10,000

20,000 20,000 20,000

500,000 500,000 500,000

10,000 10,000 10,000

15,000 15,000 15,000

10,000 10,000 10,000

35,000 35,000 35,000

15,000 15,000 15,000


aws on devolution.
PHASING OF FULL ASSUMPTION OF DEVOLVED F

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

D
(B

Functions/Services/ Programs/Projects/
Timeline for Full
Facilities to be Activities for
Assumption
Assumed Implementation
[1] [2] [3]

Agricultural support services


which include planting
materials, distribution
system and operation of Support to Agriculture
farm produce collection and
buying stations

Information and reading Barangay library / Information


center. and reading center

Services and facilities related Solid Waste Management


to beautification, and solid
waste collection. Program

Sattelite or Public Market


were viable Barangay Public Market

Services and facilities related


to general hygiene and i WASH Program
sanitation.

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ _____________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date
______________________________ ______________________________ _____________
Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Legend:
[1] All devolved functions and services to be fully assumed by the barangay acco
[2] The specific program, project, or activity to be implemented by the barangay u
[3] The target year the barangay plans to fully assume the devolved functions, se
[4] The person/s responsible for the delivery of the devolved functions, services, a
[5] The resources needed by the barangay to fully assume, absorb, and manage
Attachment 2-B: Phasing of Full Assumption of Devolved Functions,

FULL ASSUMPTION OF DEVOLVED FUNCTIONS, SERVICES, AND FACILITIES FOR BARANGAYS

DON PEDRO
(BARANGAY)

Resource Requirements
Responsible Person/s Personnel/Staffing Capacity Development
FY 2022 FY 2023 FY 2024 FY 2022 FY 2023
[4] [5]

roved by:

_______________ ______________________________
Punong Barangay
_______________ ______________________________
Punong Barangay

be fully assumed by the barangay according to Section 17 of the LGC and other pertinent laws on devolution.
ty to be implemented by the barangay under the devolved functions and services.
fully assume the devolved functions, services, and facilities.
ery of the devolved functions, services, and facilities.
y to fully assume, absorb, and manage the devolved functions, services, and facilities.
ANNEX F-2
Devolved Functions, Services, and Facilities for Barangays

BARANGAYS

e Requirements
y Development Funding
FY 2024 FY 2022 FY 2023 FY 2024
[5]
aws on devolution.
PHASING OF FULL ASSUMPTION OF DEVOLVED FUN

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

P
(BAR

Functions/Services/ Programs/Projects/
Timeline for Full
Facilities to be Activities for
Assumption
Assumed Implementation
[1] [2] [3]

Agricultural support services


which include planting
materials, distribution
SUPPORT TO AGRICULTURE
system and operation of
farm produce collection and
buying stations

Information and reading Barangay library / Information


center. and reading center

Services and facilities related


ECOLOGICAL SOLID WASTE
to beautification, and solid
MANAGEMENT
waste collection.

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date
______________________________ ______________________________ ________________
Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Legend:
[1] All devolved functions and services to be fully assumed by the barangay accordin
[2] The specific program, project, or activity to be implemented by the barangay unde
[3] The target year the barangay plans to fully assume the devolved functions, servic
[4] The person/s responsible for the delivery of the devolved functions, services, and
[5] The resources needed by the barangay to fully assume, absorb, and manage the
Attachment 2-B: Phasing of Full Assumption of Devolved Functions, Ser

FULL ASSUMPTION OF DEVOLVED FUNCTIONS, SERVICES, AND FACILITIES FOR BARANGAYS

PATAG
(BARANGAY)

Resource Requirements
Responsible Person/s Personnel/Staffing Capacity Development
FY 2022 FY 2023 FY 2024 FY 2022 FY 2023
[4] [5]

roved by:

_______________ ______________________________
Punong Barangay
_______________ ______________________________
Punong Barangay

be fully assumed by the barangay according to Section 17 of the LGC and other pertinent laws on devolution.
ty to be implemented by the barangay under the devolved functions and services.
fully assume the devolved functions, services, and facilities.
ery of the devolved functions, services, and facilities.
y to fully assume, absorb, and manage the devolved functions, services, and facilities.
ANNEX F-2
Devolved Functions, Services, and Facilities for Barangays

BARANGAYS

e Requirements
y Development Funding
FY 2024 FY 2022 FY 2023 FY 2024
[5]
aws on devolution.
PHASING OF FULL ASSUMPTION OF DEVOLVED FUN

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

MA
(BAR

Functions/Services/ Programs/Projects/
Timeline for Full
Facilities to be Activities for
Assumption
Assumed Implementation
[1] [2] [3]
Information and reading Barangay library / Information
center. and reading center

Sattelite or Public Market


were viable Barangay Public Market

Services and facilities related iWASH (Water, Sanitation &


to general hygiene and
sanitation. Hygiene )

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Legend:
[1] All devolved functions and services to be fully assumed by the barangay accordin
[2] The specific program, project, or activity to be implemented by the barangay unde
[3] The target year the barangay plans to fully assume the devolved functions, servic
[4] The person/s responsible for the delivery of the devolved functions, services, and
[5] The resources needed by the barangay to fully assume, absorb, and manage the
Attachment 2-B: Phasing of Full Assumption of Devolved Functions, Ser

FULL ASSUMPTION OF DEVOLVED FUNCTIONS, SERVICES, AND FACILITIES FOR BARANGAYS

MAPULOG
(BARANGAY)

Resource Requirements
Responsible Person/s Personnel/Staffing Capacity Development
FY 2022 FY 2023 FY 2024 FY 2022 FY 2023
[4] [5]

roved by:

_______________ ______________________________
Punong Barangay

be fully assumed by the barangay according to Section 17 of the LGC and other pertinent laws on devolution.
ty to be implemented by the barangay under the devolved functions and services.
fully assume the devolved functions, services, and facilities.
ery of the devolved functions, services, and facilities.
y to fully assume, absorb, and manage the devolved functions, services, and facilities.
ANNEX F-2
Devolved Functions, Services, and Facilities for Barangays

BARANGAYS

e Requirements
y Development Funding
FY 2024 FY 2022 FY 2023 FY 2024
[5]

aws on devolution.
PHASING OF FULL ASSUMPTION OF DEVOLVED FUN

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

M
(BAR

Functions/Services/ Programs/Projects/
Timeline for Full
Facilities to be Activities for
Assumption
Assumed Implementation
[1] [2] [3]

Information and reading Barangay library / Information


center. and reading center

Services and facilities related Barangay ESWM Program


to beautification, and solid
waste collection. Barangay Beautification

Services and facilities related


to general hygiene and iWASH Program
sanitation.

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Legend:
[1] All devolved functions and services to be fully assumed by the barangay accordin
[2] The specific program, project, or activity to be implemented by the barangay unde
[3] The target year the barangay plans to fully assume the devolved functions, servic
[4] The person/s responsible for the delivery of the devolved functions, services, and
[5] The resources needed by the barangay to fully assume, absorb, and manage the
Attachment 2-B: Phasing of Full Assumption of Devolved Functions, Ser

FULL ASSUMPTION OF DEVOLVED FUNCTIONS, SERVICES, AND FACILITIES FOR BARANGAYS

MAT - I
(BARANGAY)

Resource Requirements
Responsible Person/s Personnel/Staffing Capacity Development
FY 2022 FY 2023 FY 2024 FY 2022 FY 2023
[4] [5]

roved by:

_______________ ______________________________
Punong Barangay

be fully assumed by the barangay according to Section 17 of the LGC and other pertinent laws on devolution.
ty to be implemented by the barangay under the devolved functions and services.
fully assume the devolved functions, services, and facilities.
ery of the devolved functions, services, and facilities.
y to fully assume, absorb, and manage the devolved functions, services, and facilities.
ANNEX F-2
Devolved Functions, Services, and Facilities for Barangays

BARANGAYS

e Requirements
y Development Funding
FY 2024 FY 2022 FY 2023 FY 2024
[5]

aws on devolution.
PHASING OF FULL ASSUMPTION OF DEVOLVED FUN

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

TAGB
(BAR

Functions/Services/ Programs/Projects/
Timeline for Full
Facilities to be Activities for
Assumption
Assumed Implementation
[1] [2] [3]

Agricultural support services


which include planting
materials, distribution
AGRICULTURE SERVICES
system and operation of
farm produce collection and
buying stations

Information and reading Barangay library / Information


center. and reading center

Services and facilities related


to general hygiene and i WASH Program
sanitation.

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date
______________________________ ______________________________ ________________
Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Legend:
[1] All devolved functions and services to be fully assumed by the barangay accordin
[2] The specific program, project, or activity to be implemented by the barangay unde
[3] The target year the barangay plans to fully assume the devolved functions, servic
[4] The person/s responsible for the delivery of the devolved functions, services, and
[5] The resources needed by the barangay to fully assume, absorb, and manage the
Attachment 2-B: Phasing of Full Assumption of Devolved Functions, Ser

FULL ASSUMPTION OF DEVOLVED FUNCTIONS, SERVICES, AND FACILITIES FOR BARANGAYS

TAGBALOGO
(BARANGAY)

Resource Requirements
Responsible Person/s Personnel/Staffing Capacity Development
FY 2022 FY 2023 FY 2024 FY 2022 FY 2023
[4] [5]

roved by:

_______________ ______________________________
Punong Barangay
_______________ ______________________________
Punong Barangay

be fully assumed by the barangay according to Section 17 of the LGC and other pertinent laws on devolution.
ty to be implemented by the barangay under the devolved functions and services.
fully assume the devolved functions, services, and facilities.
ery of the devolved functions, services, and facilities.
y to fully assume, absorb, and manage the devolved functions, services, and facilities.
ANNEX F-2
Devolved Functions, Services, and Facilities for Barangays

BARANGAYS

e Requirements
y Development Funding
FY 2024 FY 2022 FY 2023 FY 2024
[5]
aws on devolution.
PHASING OF FULL ASSUMPTION OF DEVOLVED FUN

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

TUB
(BAR

Functions/Services/ Programs/Projects/
Timeline for Full
Facilities to be Activities for
Assumption
Assumed Implementation
[1] [2] [3]

Information and reading Barangay library / Information


center. and reading center

Services and facilities related


ECOLOGICAL SOLID WASTE
to beautification, and solid
MANAGEMENT
waste collection.

Services and facilities related


to general hygiene and i WASH Program
sanitation.

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Legend:
[1] All devolved functions and services to be fully assumed by the barangay accordin
[2] The specific program, project, or activity to be implemented by the barangay unde
[3] The target year the barangay plans to fully assume the devolved functions, servic
[4] The person/s responsible for the delivery of the devolved functions, services, and
[5] The resources needed by the barangay to fully assume, absorb, and manage the
Attachment 2-B: Phasing of Full Assumption of Devolved Functions, Ser

FULL ASSUMPTION OF DEVOLVED FUNCTIONS, SERVICES, AND FACILITIES FOR BARANGAYS

TUBORAN
(BARANGAY)

Resource Requirements
Responsible Person/s Personnel/Staffing Capacity Development
FY 2022 FY 2023 FY 2024 FY 2022 FY 2023
[4] [5]

roved by:

_______________ ______________________________
Punong Barangay

be fully assumed by the barangay according to Section 17 of the LGC and other pertinent laws on devolution.
ty to be implemented by the barangay under the devolved functions and services.
fully assume the devolved functions, services, and facilities.
ery of the devolved functions, services, and facilities.
y to fully assume, absorb, and manage the devolved functions, services, and facilities.
ANNEX F-2
Devolved Functions, Services, and Facilities for Barangays

BARANGAYS

e Requirements
y Development Funding
FY 2024 FY 2022 FY 2023 FY 2024
[5]

aws on devolution.
PHASING OF FULL ASSUMPTION OF DEVOLVED FUN

Region: ___________________________
Province: ___________________________
City/Municipality: ___________________________

LU
(BAR

Functions/Services/ Programs/Projects/
Timeline for Full
Facilities to be Activities for
Assumption
Assumed Implementation
[1] [2] [3]

Agricultural support services


which include planting
materials, distribution
AGRICULTURE SERVICES
system and operation of
farm produce collection and
buying stations

Information and reading Barangay library / Information


center. and reading center

Services and facilities related


ECOLOGICAL SOLID WASTE
to beautification, and solid
MANAGEMENT
waste collection.
Sattelite or Public Market
Barangay Public Market
were viable
Services and facilities related
to general hygiene and i WASH Program
sanitation.

Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date
Prepared by: Reviewed by: Approved by:

______________________________ ______________________________ ________________


Barangay Secretary Barangay Treasurer Punong Barangay
Date Date Date

Legend:
[1] All devolved functions and services to be fully assumed by the barangay accordin
[2] The specific program, project, or activity to be implemented by the barangay unde
[3] The target year the barangay plans to fully assume the devolved functions, servic
[4] The person/s responsible for the delivery of the devolved functions, services, and
[5] The resources needed by the barangay to fully assume, absorb, and manage the
Attachment 2-B: Phasing of Full Assumption of Devolved Functions, Ser

FULL ASSUMPTION OF DEVOLVED FUNCTIONS, SERVICES, AND FACILITIES FOR BARANGAYS

LUBILAN
(BARANGAY)

Resource Requirements
Responsible Person/s Personnel/Staffing Capacity Development
FY 2022 FY 2023 FY 2024 FY 2022 FY 2023
[4] [5]

roved by:

_______________ ______________________________
Punong Barangay
roved by:

_______________ ______________________________
Punong Barangay

be fully assumed by the barangay according to Section 17 of the LGC and other pertinent laws on devolution.
ty to be implemented by the barangay under the devolved functions and services.
fully assume the devolved functions, services, and facilities.
ery of the devolved functions, services, and facilities.
y to fully assume, absorb, and manage the devolved functions, services, and facilities.
ANNEX F-2
Devolved Functions, Services, and Facilities for Barangays

BARANGAYS

e Requirements
y Development Funding
FY 2024 FY 2022 FY 2023 FY 2024
[5]
aws on devolution.

You might also like