You are on page 1of 64

Material Assessment

Superheated Steam Pipe


Japan Inspection Co., Ltd. July 15, 2021 Sea of Kepulauan Seribu
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

Table Of Contents

1. INSITU METALLOGRAPHY . .............................................................................................................1


1.1 PURPOSE OF THE EXIMINATION.............................................................................................. 1
1.2 EXIMINATION LOCATION........................................................................................................ 1
1.3 RESULT..................................................................................................................................... 2
1.4 REFERENCE.............................................................................................................................. 3
.
2. HARDNESS TESTER ....................................................................................................................... 16
3. ULTRASONIC THICKNESS GRID MEASUREMENT ........................................................................... 22
4. MAGNETIC TEST .......................................................................................................................... 44
5. CONCLUSION AND SUGGESTION .................................................................................................. 48
5.1 CONCLUSIONS ....................................................................................................................... 48
5.1.1 Insitu Metallography. .................................................................................................... 48
5.1.2 Hardness Tester ............................................................................................................. 48
5.1.3 Ultrasonic Thickness Grid Measurement.... ..................................................................... 48
5.1.4 Magnetic Test. ............................................................................................................... 48
5.2 SUGGESTION.......................................................................................................................... 48
6. DOCUMENTATION .........................................................................................................................49
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

Final Inspection Report.

Part Name : Superheated Steam Pipe


Material : ASTM 335 Gr P11
Design Pressure : 925 PSIG
MAWP(Max All Working Press) : 870.49 PSIG
Operating Pressure : 890 PSIG
Design Temperature : 955 ⁰ F
Operation Time : (To Be Confirm With HUMOLCO)
Yield strength (Max) : 43.000 SHP
Total Diameter x Nominal THK :
1. 10" Sch 100 (Spot 1,2 & 10)
2. 6” Sch 80 (Spot 3,4,5,6,7)
3. 4" Sch 80 (Spot 8 & 9)
Testing Parameter : Insitu Metallography,ultrasonic thickness measurement,
Hardness Tester, Magnetic Test
Reference :
I. INSITU METALLOGRAPHY
 SM Metals Handbook 09 : Metallography and Microstructure 2004.
 B.J Cane and John W., September 1992. “Remanent Life Assessment
Seminar”, - ERA Technology Leatherhead-UK22/23.
 Plant Life Assessment - Data Collection Procedure -
https://www.corrosionpedia.com/definition/6264/spheroidizing
 ECCC RECOMMENDATIONS - VOLUME 6 [Issue 1]
 Residual Life Assessment and Microstructure

II. ULTRASONIC MEASUREMENT


 TES - UTG - 09 - Thickness Gauging - Revision 00

III. HARDNESS TESTER


 003-TES-PROC-HT

IV. MAGNETIC TEST.


 TES -MT - ASME - 01 - Magnetic - REV – 00.
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

1. INSITU METALLOGRAPHY .
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021
1. INSITU METALLOGRAPHY.
1.1 PURPOSE OF THE EXIMINATION

According to PT. Humolco LNG Indonesia, jakarta Plant to conduct In-situ


metallographic examinations " Superheated" in the context of Plant Life Assessment
which was carried out in july 2021. The examination aims to determine the condition
of the microstructure using Replication Technique (In-situ metallography) .

TECHNICAL DATA

1. Material : SA335 Grade P11


2. Operating Pressure : 925 psig
3. Operating Temperature : 955° F

1.2 EXIMINATION LOCATION

Location of metallographic In-situ examination in the context of material


assesment which was held in july 2021 at engine room with the approval of PT.
Humolco LNG Indonesia, Jakarta with 10 spot replicas.

1 1 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021
1.3 RESULT
Table 1: In-situ examination results for metallography of the Diaphragm
Equipment as follows:

NO. LOCATION CONDITION STRUCTUERE MICRO INFO.

Superheated Steam Pipe

1 Point 1 Microstructure is ferritic, Material good Figure 2


condition. Class B condition

2 Point 2 Microstructure is ferritic, Material good Figure 3


condition. Class B condition

3 Point 3 Microstructure is ferritic, grain growth Figure 4


occurs on the outer surface, the increase
in size of grains (crystallites) in a material
at high temperature, Material good
condition Class B condition

4 Point 4 Microstructure is ferritic, Normal Figure 5


condition, Class B condition

5 Point 5 Microstructure is ferritic with spheroidized Figure 6


carbide pearlite, Class B condition

6 Point 6 Microstructure is ferritic with carbide, Figure 7


Class B condition

7 Point 7 Microstructure is Ferritic. Class B condition Figure 8

8 Point 8 Microstructure is ferritic with spheroidized Figure 9


carbide pearlite, Normal condition Class B
condition

9 Point 9 Microstructure is ferritic small grains which Figure 10


has recrystallized before the recovery
process. Class B condition

12
2 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

10 Point 10 microstructure ferritic small grains which Figure 11


has recrystallized before the recovery
process, initial creep will occur. Class C
condition

1.4 REFERENCE
- SM Metals Handbook 09 : Metallography and Microstructure 2004.
- B.J Cane and John W., September 1992. “Remanent Life Assessment Seminar”,
- ERA Technology Leatherhead-UK22/23.
- Plant Life Assessment - Data Collection Procedure
- https://www.corrosionpedia.com/definition/6264/spheroidizing
- ECCC RECOMMENDATIONS - VOLUME 6 [Issue 1]
- Residual Life Assessment and Microstructure

14
3 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

Location of the In-Situ Pipe Superheated point taker Metallography

Figure 1. point taker of in-situ mettallography Spot Inspection No 1 until No 10

1
4 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

 Spot Inspection No. 1

200x

500x

Figure 2. Examination of Spot Inspection No. 1, from visual inspection no corrosion


or crack was found Microstructure is ferritic, Material good condition. class B
condition.Etching : Kalling Reagent

1
5 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

 Spot Inspection No. 2

200x

500x

Figure 3. Spot Inspection No.2, from visual inspection no corrosion or crack was
found. Microstructure is ferritic, Material good condition.
Class B condition. Etching : Kalling Reagent

1
6 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

 Spot Inspection No 3

200x

500x

Figure 4. Spot Inspection No. 3 , from visual inspection no corrosion or crack was
found. The Microstructure is ferritic, grain growth occurs on the outer surface, the
increase in size of grains (crystallites) in a material at high temperature, Material
good condition Class B condition.
Etching : Kalling Reagent

1
7 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021
Spot Inspection No. 4

200x

500x

Figure 5. Spot Inspection No. 4, from visual inspection no corrosion or crack was
found. The Microstructure is ferritic, Normal contdition, Class B condition. Etching :
Kalling reagent

8 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

Spot Inspection No. 5

200x

500x

Figure 6. Spot Inspection No. 5 from visual inspection no corrosion or crack was
found. The Microstructure is ferritic with spheroidized carbide pearlite.
Class B condition. Etching : Kalling reagent

9 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

Spot Inspection No. 6

200x

carbide

500x

Figure 7. Spot Inspection No. 6, from visual inspection no corrosion or crack was
found.
The Microstructure is ferritic with carbide. Class B condition. Etching : Kalling reagent

10 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

Spot Inspection No. 7

200x

500x

Figure 8. Spot Inspection No. 7 , from visual inspection no corrosion or crack was
found.

The Microstructure is Ferritic. Class B condition. Etching : Kalling reagent

11 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

Spot Inspection No. 8

200x

500x

Figure 9. Spot Inspection No.8, from visual inspection no corrosion or crack was
found Microstructure is ferritic with spheroidized carbide pearlite, Normal conditon
Class B condition. Etching : Kalling reagent

12 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

Spot Inspection No.9

200x

500x

Figure 10. Spot Inspection No. 9, from visual inspection no corrosion or crack was
found. The Microstructure is ferritic small grains which has recrystallized before the
recovery process. Class B condition, Etching : Kalling reagent

13 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

Spot Inspection No. 10

200x

500x

Figure 11. Spot Inspection No. 10, from visual inspection no corrosion or crack was
found. microstructure ferritic small grains which has recrystallized before the recovery
process, initial creep will occur. Class C condition,
Etching : Kalling reagent

14 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

Figure 12. Classification for microstructure according to ERA Technology

15 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

2. HARDNESS TESTER.
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING SERVICE INDONESIA
PT. HUMOLCO LNG INDONESIA
Report No: 02/PR-MA/JICSI-HUMOLCO/VII/2021

Material : ASTM 35GR P11 Method : Hardness Brinel Report No. : 01/HDT/JICSI/VII/21
Specification : ASTM 355 Gr P11 Hardness In Base Metal : Cast steel Date : 14/7/2021
Pipe Size : - Procedure No : 003-TES-PROC-HT

Diameter Value (HB) Impact


No Description Hardness Survey Location
Pipe Direction
1 2 3 4 5 6 7 Average
1 POINT No. 1 10" 109 105 103 103 113 116 123 109
2 POINT No. 2 10" 106 104 108 103 110 113 111 108 c
3 POINT No. 3 5" 136 133 107 122 117 128 134 127
4 POINT No. 4 5" 126 124 124 123 116 129 127 125 c
5 POINT No. 5 5" 109 103 93 96 96 101 96 98
6 POINT No. 6 5" 124 131 128 131 128 127 122 128
7 POINT No. 7 5" 129 121 124 126 128 127 123 126 c
8 POINT No. 8 4" 120 123 137 125 146 129 124 128
9 POINT No. 9 4" 109 107 111 113 114 89 114 111
10 POINT No. 10 10" 107 91 101 104 81 92 118 99

NOTE : Average Count Exlude Max and Min Hardness Value

PT. JICSI PT. HUMOLCO LNG INDONESIA PT. HUMOLCO LNG INDONESIA
Prepared by Reviewed by Customer Representative
Operator

Rido Lewerissa
Date: Rido Lewerissa Date: Date:

16 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING SERVICE INDONESIA
PT. HUMOLCO LNG INDONESIA
Report No: 02/PR-MA/JICSI-HUMOLCO/VII/2021

Spot Inspection No.1 Spot Inspection No.2

17 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING SERVICE INDONESIA
PT. HUMOLCO LNG INDONESIA
Report No: 02/PR-MA/JICSI-HUMOLCO/VII/2021

Spot Inspection No.3 Spot Inspection No.4

18 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING SERVICE INDONESIA
PT. HUMOLCO LNG INDONESIA
Report No: 02/PR-MA/JICSI-HUMOLCO/VII/2021

Spot Inspection No.5 Spot Inspection No.6

19 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING SERVICE INDONESIA
PT. HUMOLCO LNG INDONESIA
Report No: 02/PR-MA/JICSI-HUMOLCO/VII/2021

Spot Inspection No.7 Spot Inspection No.8

20 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING SERVICE INDONESIA
PT. HUMOLCO LNG INDONESIA
Report No: 02/PR-MA/JICSI-HUMOLCO/VII/2021

Spot Inspection No.9 Spot Inspection No.10

21 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

3. ULTRASONIC THICKNESS GRID MEASUREMENT


UT Thickness Grid
Measurement Report
PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

Client : PT. Japan Inspection Cosulting Service Indonesia Equipment : Olypus 38DL plus
Project : Material Assesment for Superheater steam pipe. Probe Number : D790
Location : Vessel LNG Aquarius Cal. Block : Step Wadge
P & ID No. : - Couplant : Grase
Line Number : Line Pipe 10" Spot Inspection No 1. Measurement : Milemeters
From : Main Boiler no 1
To : Main Turbine (M/T) Surface Temp : Ambient

Last Inspection Date : - Date Inspection : July 13,2021


Nominal Point of Measurement (mm) Min
Spot No 1 Dia
Piping Spec Thickness Remarks
Grid No (Inch) A B C D E F G H I J Reading
(mm)

1 10" sch 120 21.43 18.58 18.74 18.49 18.38 18.22 18.52 18.17 18.04 17.96 17.92 17.92
2 10" sch 120 21.43 18.49 18.41 18.42 18.80 18.47 18.41 18.33 18.14 18.41 17.98 17.98
3 10" sch 120 21.43 18.52 18.51 18.29 18.36 18.18 18.43 18.25 18.81 18.06 18.14 18.06
4 10" sch 120 21.43 18.32 18.47 18.54 18.24 19.00 18.34 18.82 18.10 18.74 18.05 18.05
5 10" sch 120 21.43 18.19 18.44 18.64 18.20 18.94 18.26 18.28 18.31 18.26 18.12 18.12
6 10" sch 120 21.43 18.13 18.70 18.56 18.39 18.56 18.62 18.32 18.16 18.03 18.13 18.03
7 10" sch 120 21.43 18.32 18.37 18.94 18.37 18.50 18.46 18.53 18.53 18.33 18.25 18.25
8 10" sch 120 21.43 18.33 18.38 18.28 18.19 18.50 18.62 18.68 18.44 18.37 18.24 18.19 Highlight is spot of
9 10" sch 120 21.43 18.31 18.24 18.85 18.41 18.30 18.45 18.36 18.40 18.38 18.45 18.24 metallurgy
10 10" sch 120 21.43 18.69 18.12 18.75 18.68 18.46 18.30 18.32 18.65 18.71 18.36 18.12
11 10" sch 120 21.43 18.02 18.60 18.68 16.67 18.70 18.97 18.29 18.20 18.50 18.55 16.67 minimum thickness
12 10" sch 120 21.43 18.50 18.59 17.92 18.52 17.91 18.63 18.69 18.88 18.37 18.15 17.91
13 10" sch 120 21.43 18.50 17.58 18.64 18.65 18.60 18.66 18.80 18.81 18.40 18.16 17.58
14 10" sch 120 21.43 18.50 18.49 18.10 18.59 18.59 18.62 18.71 18.79 18.81 18.63 18.10
15 10" sch 120 21.43 18.35 18.55 19.02 18.62 18.56 18.54 17.86 18.70 18.53 18.75 17.86
16 10" sch 120 21.43 17.56 17.61 18.33 18.45 18.44 18.59 18.71 18.17 18.65 18.61 17.56
17 10" sch 120 21.43 17.85 17.85 18.25 18.61 18.57 18.62 18.54 18.41 18.66 18.61 17.85
18 10" sch 120 21.43 18.20 18.46 18.50 18.71 18.63 18.73 18.58 18.69 18.79 18.69 18.20
19 10" sch 120 21.43 18.31 18.36 18.71 18.62 18.63 18.71 18.72 18.81 18.89 18.24 18.24
20 10" sch 120 21.43 18.53 18.54 18.91 18.97 18.81 18.70 18.19 18.16 18.76 18.61 18.16
21 10" sch 120 21.43 18.36 18.41 18.61 18.46 18.47 18.91 18.71 18.31 18.61 18.16 18.16
22 10" sch 120 21.43 18.52 18.36 18.40 18.35 18.39 18.41 18.63 18.49 18.52 18.70 18.35
23 10" sch 120 21.43 18.56 18.74 18.84 18.21 18.31 18.61 18.72 18.63 18.45 18.12 18.12
24 10" sch 120 21.43 18.24 18.14 18.12 18.90 18.51 18.90 18.80 18.81 18.74 18.19 18.12
25 10" sch 120 21.43 18.19 18.22 18.26 18.38 18.44 18.65 18.83 18.18 18.36 18.68 18.18

22 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
UT Thickness Grid
Measurement Report PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

Client : PT. Japan Inspection Cosulting Service Indonesia Equipment : Olypus 38DL plus
Project : Material Assesment for Superheater steam pipe. Probe Number : D790
Location : Vessel LNG Aquarius Cal. Block : Step Wadge
P & ID No. : - Couplant : Grase
Line Number : Line Pipe 10" Spot Inspection No 1. Measurement : Milemeters
From : Main Boiler no 1
To : Main Turbine (M/T) Surface Temp : Ambient

Nominal Point of Measurement (mm) Min


Spot No 1 Dia
Piping Spec Thickness Remarks
Grid No (Inch) A B C D E F G H I J Reading
(mm)

26 10" sch 120 21.43 18.03 17.68 17.64 18.72 18.87 18.59 18.62 18.51 18.67 18,75 17.64
27 10" sch 120 21.43 18.17 18.33 18.22 18.38 18.33 18.75 18.73 18.83 18.65 18.77 18.17
28 10" sch 120 21.43 18.10 18.52 17.55 17.60 18.40 18.57 18.07 18.66 18.43 18.53 17.55
29 10" sch 120 21.43 18.21 18.64 18.51 18.67 18.61 17.64 18.35 18.93 18.61 18.46 17.64
30 10" sch 120 21.43 18.34 18.40 18.26 18.25 18.64 18.51 18.81 18.39 18.33 18.25 18.25
31 10" sch 120 21.43 17.98 17.22 17.39 18.91 17.75 17.70 17.55 18.35 18.28 18.51 17.22
32 10" sch 120 21.43 18.02 17.28 18.20 17.20 17.38 18.61 18.39 17.91 17.65 18.03 17.28
33 10" sch 120 21.43 17.62 17.23 17.95 18.23 18.63 18.23 17.81 18.21 18.20 18.61 17.23
34 10" sch 120 21.43 17.28 17.45 17.30 17.96 17.91 17.39 18.11 18.08 18.11 18.13 17.28
35 10" sch 120 21.43 17.92 18.96 18.74 18.19 18.69 18.66 18.65 18.16 17.33 17.31 17.31
36 10" sch 120 21.43 18.05 18.16 18.91 17.78 18.14 18.63 18.42 17.59 18.66 18.63 17.59
37 10" sch 120 21.43 18.05 18.16 18.17 17.25 18.38 17.62 18.23 18.22 17.81 17.67 17.25
38 10" sch 120 21.43 17.84 18.21 17.59 18.33 17.49 18.49 18.23 18.34 18.49 17.51 17.49
39 10" sch 120 21.43 18.18 18.23 18.21 18.23 18.71 18.62 18.77 18.95 18.03 18.19 18.03
40 10" sch 120 21.43 18.36 18.54 18.19 18.87 18.77 18.09 18.36 18.01 18.16 18.44 18.01
41 10" sch 120 21.43 18.67 18.45 18.08 18.05 18.29 18.31 18.22 17.32 18.16 18.44 17.32

Result measurement:
minimum Value for UT grid Thickness measurment Is : 16.67 mm

Inspector Review Client

Rachman Adrian
Date : July 13,2021 Date : Date :

23 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
Spot Inspection No 1

UT Grid Measurement of Spot No 1 UT Grid Activity on Spot No 1


PICTURE REPORT
PROJECT : Material Assesment for Superheater steam pipe. LOCATION : Vessel LNG Aquarius
TAG/LINE NO. : Line Pipe 10" P &ID NO. : -
FROM : Main Boiler No.2 :

PT.JAPAN INSPECTION CONSULTING SERVICE


PT. HUMOLCO LNG INDONESIA TO : SSTG No.2 Spot No.4 DATE OF INSP. : July 13,2021 INDONESIA

24 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
UT Thickness Grid
Measurement Report
PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

Client : PT. Japan Inspection Cosulting Service Indonesia Equipment : Olypus 38DL plus
Project : Material Assesment for Superheater steam pipe. Probe Number : D790
Location : Vessel LNG Aquarius Cal. Block : Step Wadge
P & ID No. : - Couplant : Grase
Line Number : Line Pipe 10" Spot Inspection No 2 Measurement : Milemeters
From : Main Boiler no 2
To : SSTG No. 2 Surface Temp : Ambient

Last Inspection Date : - Date Inspection : July 13,2021


Part Dia Nominal Point of Measurement (mm) Min
Piping Spec Remarks
Inspection (Inch) Thickness A B C D E F G H I J Reading

1 10" sch 120 21.43 17.13 18.00 17.09 17.13 17.04 17.05 17.47 16.87 16.79 17.44 16.79
2 10" sch 120 21.43 16.92 16.93 17.25 17.70 17.47 17.83 16.75 16.82 16.72 16.80 16.72 minimum thickness
3 10" sch 120 21.43 16.75 16.85 17.03 17.28 17.10 16.83 16.96 17.32 17.77 17.44 16.75
4 10" sch 120 21.43 16.80 16.75 16.96 17.67 17.08 17.18 17.09 17.24 17.82 17.15 16.75
5 10" sch 120 21.43 17.61 16.87 17.61 17.06 17.14 17.12 18.02 17.24 17.28 17.21 16.87
6 10" sch 120 21.43 17.15 16.99 17.01 17.13 16.96 17.04 17.12 17.02 17.07 17.23 16.96
7 10" sch 120 21.43 17.11 16.97 17.29 17.20 17.41 17.18 17.14 17.19 17.26 17.69 16.97 Highlight is spot of
8 10" sch 120 21.43 17.41 17.38 17.55 17.49 17.42 17.28 17.91 17.50 17.85 18.93 17.28 metallurgy
9 10" sch 120 21.43 17.97 18.05 17.70 17.57 17.65 17.57 17.74 17.84 18.62 18.48 17.57
10 10" sch 120 21.43 17.80 17.77 17.70 17.65 17.64 17.81 18.26 18.50 18.71 18.45 17.64
11 10" sch 120 21.43 17.94 17.96 17.90 17.88 17.81 17.84 18.97 18.29 18.42 18.51 17.81
12 10" sch 120 21.43 18.81 18.23 18.58 18.07 17.83 18.01 18.90 18.00 18.14 18.15 17.83
13 10" sch 120 21.43 18.45 18.72 18.07 18.36 18.64 18.03 18.11 18.24 18.53 18.27 18.03
14 10" sch 120 21.43 18.94 18.91 18.37 18.61 18.25 18.49 17.89 18.49 18.22 18.27 17.89
15 10" sch 120 21.43 18.04 18.50 18.86 18.66 18.77 18.63 18.21 18.85 18.80 17.78 17.78
16 10" sch 120 21.43 18.25 18.02 18.69 18.87 18.92 18.48 18.31 18.59 18.58 18.20 18.02
17 10" sch 120 21.43 18.05 18.49 18.53 18.31 18.08 18.97 18.00 18.70 18.05 18.27 18.05
18 10" sch 120 21.43 18.54 18.64 18.74 18.73 18.75 18.75 19.52 18.13 18.08 18.99 18.08
19 10" sch 120 21.43 18.41 18.63 18.37 18.62 18.86 18.06 18.27 18.99 18.09 18.18 18.06
20 10" sch 120 21.43 18.53 18.46 18.51 18.26 18.60 18.14 18.73 18.96 18.77 18.60 18.14
21 10" sch 120 21.43 18.47 18.48 18.32 18.39 18.91 18.17 18.05 18.57 17.90 18.67 17.90
22 10" sch 120 21.43 18.14 18.05 18.02 18.61 18.11 18.20 18.21 18.20 18.03 17.80 17.80
23 10" sch 120 21.43 18.12 18.20 18.63 18.58 18.22 17.92 18.69 17.95 18.18 18.16 17.92
24 10" sch 120 21.43 17.84 18.51 17.89 17.86 17.72 18.62 18.19 17.95 17.91 18.50 17.72
25 10" sch 120 21.43 17.93 17.95 17.78 17.71 17.76 17.69 18.59 17.88 18.57 17.94 17.69
26 10" sch 120 21.43 17.74 17.78 17.86 18.46 18.52 18.54 18.03 18.03 18.01 18.03 17.74

25 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
UT Thickness Grid
Measurement Report
PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

Part Dia Nominal Point of Measurement (mm) Min


Piping Spec Remarks
Inspection (Inch) Thickness A B C D E F G H I J Reading

27 10" sch 120 21.43 17.61 18.58 17.68 17.49 18.59 17.77 17.94 18.20 17.84 17.72 17.49
28 10" sch 120 21.43 17.51 17.52 17.44 17.65 17.48 17.51 17.47 17.83 17.84 17.97 17.44
29 10" sch 120 21.43 17.21 17.49 17.32 17.98 17.95 17.62 17.80 17.39 17.53 17.66 17.21
30 10" sch 120 21.43 16.85 16.91 16.86 17.17 17.91 17.39 17.79 17.61 17.48 17.37 16.85
31 10" sch 120 21.43 17.96 17.23 17.11 17.41 17.02 17.46 17.36 17.31 17.28 17.18 17.02
32 10" sch 120 21.43 17.69 17.04 16.95 17.01 17.75 17.25 18.43 17.44 17.25 17.24 16.95
33 10" sch 120 21.43 17.62 17.23 17.95 18.23 18.63 18.23 17.81 18.21 18.20 18.61 17.23
34 10" sch 120 21.43 17.28 17.45 17.30 17.96 17.91 17.39 18.11 18.08 18.11 18.13 17.28
35 10" sch 120 21.43 17.92 18.96 18.74 18.19 18.69 18.66 18.65 18.16 17.33 17.31 17.31
36 10" sch 120 21.43 18.05 18.16 18.91 17.78 18.14 18.63 18.42 17.59 18.66 18.63 17.59
37 10" sch 120 21.43 18.05 18.16 18.17 17.25 18.38 17.62 18.23 18.22 17.81 17.67 17.25
38 10" sch 120 21.43 17.84 18.21 17.59 18.33 17.49 18.49 18.23 18.34 18.49 17.51 17.49
39 10" sch 120 21.43 18.18 18.23 18.21 18.23 18.71 18.62 18.77 18.95 18.03 18.19 18.03
40 10" sch 120 21.43 18.36 18.54 18.19 18.87 18.77 18.09 18.36 18.01 18.16 18.44 18.01
41 10" sch 120 21.43 18.67 18.45 18.08 18.05 18.29 18.31 18.22 17.32 18.16 18.44 17.32

Note :
minimum Value for UT grid Thickness measurment Is : 16.72 mm

Inspector Review Client

Rachman Adrian
Date : July 13, 2021 Date : Date :

26 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
Spot Inspection No 2 UT Grid Activity on Spot No 2

UT Grid Measurement of Spot No 1

UTG measurement for 10" spot inspection no 2

PICTURE REPORT
PROJECT : Material Assesment for Superheater steam pipe. LOCATION : Vessel LNG Aquarius
TAG/LINE NO. : Line Pipe 10" Spot Inspection no 2 P &ID NO. : -
FROM : Main Boiler No.2 :
TO : SSTG No.2 DATE OF INSP. : July 13,2021 PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

27 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
UT Thickness Grid
Measurement Report PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

Client : PT. Japan Inspection Cosulting Service Indonesia Equipment : Olypus 38DL plus
Project : Material Assesment for Superheater steam pipe. Probe Number : D790
Location : Vessel LNG Aquarius Cal. Block : Step Wadge
P & ID No. : - Couplant : Grase
Line Number : Line Pipe 5" Spot Inspection no 3 Measurement : Milemeters
From : Main Boiler No.2
To : SSTG No.2 Surface Temp : Ambient

Last Inspection Date : - Date Inspection : July 13,2021


Part Dia Nominal Point of Measurement (mm) Min
Piping Spec Remarks
Inspection (Inch) Thickness 1 2 3 4 5 6 7 8 9 10 Reading

1 5" sch 120 12.70 11.57 11.21 11.19 11.06 11.01 11.14 11.16 11.24 11.26 11.28 11.01
2 5" sch 120 12.70 11.20 11.04 11.20 11.30 11.37 11.48 11.50 11.45 11.35 11.21 11.04
3 5" sch 120 12.70 11.27 11.04 11.35 11.66 11.61 11.57 11.21 11.27 11.18 11.19 11.04
4 5" sch 120 12.70 11.09 11.18 11.48 11.60 11.32 11.31 11.28 11.06 10.88 10.84 10.84
5 5" sch 120 12.70 10.73 11.11 11.30 11.52 11.52 11.62 10.90 11.36 11.02 10.96 10.73
6 5" sch 120 12.70 11.45 11.67 11.92 11.59 11.60 11.63 11.64 11.67 11.66 11.39 11.39 Highlight is spot of
7 5" sch 120 12.70 11.13 11.44 11.26 11.27 11.34 11.44 11.93 11.78 11.72 11.77 11.13 metallurgy
8 5" sch 120 12.70 11.31 11.79 11.22 11.14 11.26 11.63 11.88 11.65 11.73 11.72 11.14
9 5" sch 120 12.70 11.44 11.43 11.42 11.30 11.24 11.75 11.79 11.67 11.70 11.71 11.24
10 5" sch 120 12.70 11.32 11.38 11.45 11.53 11.06 11.89 11.40 11.71 11.64 11.57 11.06
11 5" sch 120 12.70 11.47 11.50 11.50 11.24 11.41 11.71 11.52 11.43 11.37 11.31 11.24
12 5" sch 120 12.70 11.15 11.20 11.19 11.01 11.12 11.24 11.43 11.33 11.96 10.19 10.19 minimum thickness
13 5" sch 120 12.70 11.81 11.24 11.00 11.91 11.42 11.41 11.45 11.46 11.67 11.61 11.24
14 5" sch 120 12.70 11.36 11.49 11.40 11.20 11.46 11.20 11.45 11.47 11.30 11.57 11.20
15 5" sch 120 12.70 11.24 11.33 11.29 11.30 11.59 11.55 11.36 11.79 11.51 11.49 11.24
16 5" sch 120 12.70 10.39 11.10 10.96 11.27 11.35 11.05 11.43 11.38 11.34 11.22 10.39
17 5" sch 120 12.70 11.05 11.20 11.43 11.21 11.17 11.66 11.13 11.44 11.34 11.05 11.05
18 5" sch 120 12.70 11.46 11.37 11.32 11.14 11.30 11.97 11.17 11.23 11.24 11.20 11.14
19 5" sch 120 12.70 11.64 11.42 11.27 11.36 11.41 11.66 11.06 11.24 11.15 11.15 11.06
20 5" sch 120 12.70 11.81 11.64 11.93 11.33 11.20 11.65 11.51 11.61 11.70 11.35 11.20
21 5" sch 120 12.70 11.58 11.77 11.30 11.42 11.52 11.69 11.52 11.61 11.72 11.72 11.30
22 5" sch 120 12.70 11.37 11.41 11.47 11.59 11.59 11.63 11.41 11.44 11.33 11.38 11.33
23 5" sch 120 12.70 11.76 11.68 11.90 11.56 11.49 11.25 11.39 11.49 11.37 11.36 11.25
24 5" sch 120 12.70 11.93 11.82 11.64 11.81 11.96 11.76 11.73 11.55 11.54 11.48 11.48
25 5" sch 120 12.70 11.79 11.82 11.67 11.22 11.45 11.41 11.27 11.37 11.65 11.54 11.22

Note :
minimum Value for UT grid Thickness measurment Is : 10.19 mm

Inspector Review Client

Rachman Adrian
Date : July 13, 2021 Date : Date :

28 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
Spot Inspection No 3

UT Grid Activity on Spot No 3 UT Grid Measurement of Spot No 3

PICTURE REPORT
PROJECT : Vessel LNG Aquarius LOCATION : Vessel LNG Aquarius
TAG/LINE NO. : Line Pipe 5" Spot Inspection No 3 P &ID NO. : -
FROM : Main Boiler No.2 :
TO : SSTG No.2 DATE OF INSP. : July 13,2021 PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

29 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
UT Thickness Grid
Measurement Report
PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

Client : PT. Japan Inspection Cosulting Service Indonesia Equipment : Olypus 38DL plus
Project : Material Assesment for Superheater steam pipe. Probe Number : D790
Location : Vessel LNG Aquarius Cal. Block : Step Wadge
P & ID No. : - Couplant : Grase
Line Number : Line Pipe 5" Spot Inspection No 4 Measurement : Milemeters
From : Main Boiler No.2
To : SSTG No.2 Surface Temp : Ambient

Last Inspection Date : - Date Inspection : July 13,2021


Part Dia Nominal Point of Measurement (mm) Min
Piping Spec Remarks
Inspection (Inch) Thickness 1 2 3 4 5 6 7 8 9 10 Reading

1 5" sch 120 12.50 11.31 11.33 11.07 11.17 11.23 11.01 11.23 11.15 11.17 11.09 11.01
2 5" sch 120 12.50 10.97 11.11 11.16 11.07 11.17 11.16 11.05 11.18 11.13 11.05 10.97 Minimum thikness
3 5" sch 120 12.50 11.01 11.01 11.02 10.93 11.07 10.94 11.06 11.02 11.15 11.05 10.93
4 5" sch 120 12.50 11.05 11.08 11.13 11.10 11.17 11.10 11.17 11.11 11.24 11.13 11.05
5 5" sch 120 12.50 11.17 11.06 11.15 11.13 11.20 11.14 11.24 11.17 11.29 11.22 11.06
6 5" sch 120 12.50 11.00 11.00 11.20 11.15 11.14 11.11 11.15 11.11 11.16 11.15 11.11
7 5" sch 120 12.50 11.01 11.09 11.22 11.20 11.10 11.17 11.24 11.21 11.17 11.23 11.01
8 5" sch 120 12.50 11.21 11.15 11.22 11.22 11.14 11.15 11.20 11.25 11.11 11.16 11.11
9 5" sch 120 12.50 11.27 11.38 11.63 11.69 11.17 11.88 11.50 11.60 11.21 11.77 11.17
10 5" sch 120 12.50 11.58 11.61 11.90 11.88 11.15 11.62 11.88 11.90 11.25 11.63 11.15
11 5" sch 120 12.50 11.88 11.81 11.89 11.88 11.88 11.88 11.87 12.03 11.17 12.04 11.17
12 5" sch 120 12.50 11.83 11.95 11.89 11.88 11.86 11.86 11.96 11.90 11.89 11.87 11.83
13 5" sch 120 12.50 12.00 12.25 11.00 12.05 11.97 11.97 12.26 12.26 11.99 11.85 11.85
14 5" sch 120 12.50 12.35 12.40 12.08 12.20 12.08 12.08 12.17 12.17 11.94 12.24 11.94
15 5" sch 120 12.50 11.11 12.30 12.10 12.11 12.09 12.09 12.25 12.27 12.32 12.33 11.11
16 5" sch 120 12.50 12.13 12.38 12.17 12.69 12.27 12.27 12.18 12.25 12.19 12.19 12.13
17 5" sch 120 12.50 12.45 12.32 12.14 12.29 12.33 12.32 12.25 12.12 12.30 12.41 12.12
18 5" sch 120 12.50 11.49 12.38 12.40 12.33 12.28 12.32 12.22 12.25 12.28 12.28 11.49
19 5" sch 120 12.50 12.34 12.20 12.01 12.08 12.07 12.54 12.15 11.97 12.33 12.19 11.97
20 5" sch 120 12.50 11.34 12.08 12.03 12.14 12.16 12.06 11.97 12.03 11.72 12.03 11.34
21 5" sch 120 12.50 11.94 11.99 11.85 11.99 11.70 11.71 12.23 12.11 11.79 11.73 11.70
22 5" sch 120 12.50 11.71 12.39 11.61 11.58 11.58 12.17 11.70 11.68 11.59 11.66 11.58
23 5" sch 120 12.50 11.64 11.91 12.17 11.90 11.81 11.86 11.77 11.84 11.88 11.69 11.64 Highlight is spot of
24 5" sch 120 12.50 11.54 11.61 11.61 11.74 11.55 11.86 11.54 11.50 11.70 11.61 11.50 metallurgy

Note :
minimum Value for UT grid Thickness measurment Is : 10.93 mm

Inspector Review Client

Rachman Adrian
Date : July 13, 2021 Date : Date :

30 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
Spot Inspection No 4

UT Grid Measurement of Spot No 4


UT Grid Activity on Spot No 4

PICTURE REPORT
PROJECT : Material Assesment for Superheater steam pipe. LOCATION : Vessel LNG Aquarius
TAG/LINE NO. : Line Pipe 5" Spot Inspection No 4 P &ID NO. : -
FROM : Main Boiler No.2

PT.JAPAN INSPECTION CONSULTING SERVICE


PT. HUMOLCO LNG INDONESIA TO : SSTG No.2 DATE OF INSP. : July 13,2021 INDONESIA

31 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
UT Thickness Grid
Measurement Report PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

Client : PT. Japan Inspection Cosulting Service Indonesia Equipment : Olypus 38DL plus
Project : Material Assesment for Superheater steam pipe. Probe Number : D790
Location : Vessel LNG Aquarius Cal. Block : Step Wadge
P & ID No. : - Couplant : Grase
Line Number : Line Pipe 5" Spot Inspection No 5 Measurement : Milemeters
From : Main Boiler No.2
To : SSTG No.2 Spot No.4 Surface Temp : Ambient

Last Inspection Date : - Date Inspection : July 13,2021


Part Dia Nominal Point of Measurement (mm) Min
Piping Spec Remarks
Inspection (Inch) Thickness A B C D E F G H I J Reading

1 5" sch 120 12.70 11.86 11.90 11.50 11.56 11.50 11.65 11.54 11.64 11.54 11.70 11.54
2 5" sch 120 12.71 11.71 11.90 11.64 11.54 11.54 11.64 11.70 11.81 11.64 11.45 11.45
3 5" sch 120 12.72 11.50 11.45 11.61 11.36 11.64 11.40 11.44 11.45 11.66 11.64 11.36
4 5" sch 120 12.73 11.09 11.52 11.55 11.44 11.49 11.43 11.36 11.44 11.44 12.06 11.09
5 5" sch 120 12.74 11.55 11.51 11.50 11.50 11.38 11.42 11.30 11.48 11.40 11.44 11.30
6 5" sch 120 12.75 11.33 11.31 11.28 11.29 11.49 11.47 11.21 11.28 11.71 11.24 11.21
7 5" sch 120 12.76 11.28 11.30 11.34 11.29 11.15 11.25 11.29 11.02 11.15 11.21 11.02
8 5" sch 120 12.77 11.06 11.10 11.20 11.11 11.12 11.18 11.06 11.04 11.02 11.10 11.02
9 5" sch 120 12.78 10.95 10.98 10.92 10.92 11.01 10.95 11.05 11.15 11.17 11.02 10.92
10 5" sch 120 12.79 11.10 11.12 11.09 11.15 11.15 11.15 11.14 11.09 11.07 11.06 11.06
11 5" sch 120 12.80 10.97 11.06 11.18 11.03 11.06 11.08 11.12 11.05 10.86 11.00 10.86
12 5" sch 120 12.81 10.98 10.87 10.83 10.92 10.93 11.02 10.92 10.73 10.87 10.88 10.73 Minimum thikness
13 5" sch 120 12.82 10.94 11.00 10.97 10.94 11.03 11.06 11.04 10.93 11.16 10.98 10.93
14 5" sch 120 12.83 10.95 10.94 10.93 11.00 11.71 11.70 11.15 11.11 11.00 10.97 10.93
15 5" sch 120 12.84 11.02 11.10 11.08 11.18 11.16 11.21 11.25 11.22 11.25 11.09 11.02
16 5" sch 120 12.85 10.82 10.91 11.06 11.09 11.11 11.07 11.50 11.18 11.09 11.05 10.82
17 5" sch 120 12.86 10.93 11.01 11.01 11.08 11.01 11.12 11.02 11.07 11.02 11.05 10.93
18 5" sch 120 12.87 11.20 11.27 11.13 11.21 11.18 11.18 11.14 11.20 11.21 11.14 11.13
19 5" sch 120 12.88 11.03 11.14 11.13 11.21 11.21 11.22 11.34 11.16 11.18 11.10 11.03
20 5" sch 120 12.89 11.01 11.08 11.20 11.15 11.09 11.13 11.17 11.12 11.14 11.07 11.01
21 5" sch 120 12.90 11.10 11.09 11.12 11.09 11.20 11.19 11.25 11.25 11.19 11.14 11.09
22 5" sch 120 12.91 11.01 11.12 11.10 11.08 11.13 11.15 11.16 11.20 11.28 11.25 11.01
23 5" sch 120 12.92 11.19 11.16 11.26 11.20 11.17 11.19 11.18 11.17 11.37 11.19 11.16 Highlight is spot of
24 5" sch 120 12.93 11.31 11.23 11.35 11.44 11.45 11.57 11.57 11.25 11.25 11.36 11.23 metallurgy

Note:
minimum Value for UT grid Thickness measurment Is : 10.73 mm

Inspector Review Client

Rachman Adrian
Date : July 13, 2021 Date : Date :

32 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia
, Copy And Reproduce Is Prohibited Without Written Permission
Spot Inspection No 5

UT Grid Activity on Spot No 5 UT Grid Measurement of Spot No 5

PICTURE REPORT
PROJECT : Material Assesment for Superheater steam pipe. LOCATION : Vessel LNG Aquarius
TAG/LINE NO. : Line Pipe 5" Spot Inspection no 5 P &ID NO. : -
FROM : Main Boiler No.2

PT.JAPAN INSPECTION CONSULTING SERVICE


PT. HUMOLCO LNG INDONESIA TO : SSTG No.2 DATE OF INSP. : July 13,2021 INDONESIA

33 33Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia ,
Copy And Reproduce Is Prohibited Without Written Permission
UT Thickness Grid
Measurement Report PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

Client : PT. Japan Inspection Cosulting Service Indonesia Equipment : Olypus 38DL plus
Project : Material Assessment for Superheater steam pipe. Probe Number : D790
Location : Vessel LNG Aquarius Cal. Block : Step Wadge
P & ID No. : - Couplant : Grase
Line Number : Line Pipe 5" Spot Inspection No.6 Measurement : Milemeters
From : Main Boiler No.1
To : SSTG No.1 Surface Temp : Ambient

Last Inspection Date : - Date Inspection : July 13,2021


Part Dia Nominal Point of Measurement (mm) Min
Piping Spec Remarks
Inspection (Inch) Thickness 1 2 3 4 5 6 7 8 9 10 Reading

1 5" sch 120 12.70 11.26 11.29 11.21 11.27 11.23 11.11 11.21 11.1 11.26 11.12 11.10
2 5" sch 120 12.70 11.06 11.14 11.02 11.03 11.05 10.79 10.99 10.98 11.05 10.83 10.79
3 5" sch 120 12.70 11.08 11.16 11.09 11.44 10.99 10.95 11.03 11.06 11.10 10.92 10.92
4 5" sch 120 12.70 10.92 11.24 11.26 10.99 10.17 10.94 11.01 11.47 11.69 10.82 10.17
5 5" sch 120 12.70 10.84 10.87 11.49 10.82 10.91 10.72 10.91 10.81 10.94 10.82 10.72
6 5" sch 120 12.70 10.74 10.86 10.82 10.79 10.64 10.76 10.61 10.69 10.71 10.72 10.61 Highlight is spot of
7 5" sch 120 12.70 10.79 10.92 10.81 10.88 10.98 10.86 10.90 10.91 10.69 10.70 10.69 metallurgy
8 5" sch 120 12.70 10.82 10.90 10.95 10.87 10.83 10.99 10.93 10.91 10.80 10.90 10.80
9 5" sch 120 12.70 10.96 10.97 10.90 10.89 10.83 10.85 10.84 10.87 10.78 10.98 10.78
10 5" sch 120 12.70 10.92 10.77 10.85 10.85 10.07 10.92 10.92 10.72 10.87 10.90 10.07 minimum thickness
11 5" sch 120 12.70 11.05 10.95 11.10 10.95 11.30 11.27 11.37 11.31 11.21 11.37 10.95
12 5" sch 120 12.70 11.08 11.23 11.28 11.19 11.29 11.24 11.33 11.49 11.49 11.62 11.08
13 5" sch 120 12.70 11.84 11.31 11.34 11.47 11.33 11.51 11.41 11.48 11.45 11.53 11.31
14 5" sch 120 12.70 11.37 11.33 11.45 11.47 11.50 11.49 11.41 11.61 11.43 11.52 11.33
15 5" sch 120 12.70 11.32 11.43 11.48 11.50 11.57 11.49 11.62 11.68 11.77 11.61 11.32
16 5" sch 120 12.70 11.53 11.38 11.50 11.44 11.55 11.75 11.81 11.82 11.82 12.03 11.38
17 5" sch 120 12.70 11.65 11.82 11.74 11.95 11.69 11.73 12.04 11.77 11.87 11.81 11.65
18 5" sch 120 12.70 11.94 11.87 11.87 12.04 12.21 12.10 12.07 11.29 12.04 12.21 11.29
19 5" sch 120 12.70 12.02 11.91 12.10 12.01 11.63 11.30 11.25 12.14 11.85 11.83 11.25
20 5" sch 120 12.70 11.61 12.38 12.08 11.55 11.54 11.71 11.93 11.81 11.89 11.90 11.54
21 5" sch 120 12.70 11.97 11.74 11.71 11.76 11.85 11.91 11.80 11.94 11.80 11.61 11.61
22 5" sch 120 12.70 11.60 11.58 11.49 12.16 11.42 11.70 11.43 11.46 11.57 11.44 11.42
23 5" sch 120 12.70 11.59 11.60 11.38 11.65 11.60 11.69 11.41 11.47 11.98 11.57 11.38
24 5" sch 120 12.70 11.47 11.49 11.92 11.54 11.52 11.41 11.51 11.41 11.37 11.44 11.37

Recommendation:
minimum Value for UT grid Thickness measurment Is : 10.07 mm

Inspector Review Client

Date :July 14,2021 Date : Date :

34 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia , Copy And
Reproduce Is Prohibited Without Written Permission
Spot Inspection No 6

UT Grid Activity on Spot No 6 UT Grid Measurement of Spot No 6

PICTURE REPORT
PROJECT : Material Assesment for Superheater steam pipe. LOCATION : Vessel LNG Aquarius
TAG/LINE NO. : Line Pipe 5" Spot Inspection No 6 P &ID NO. : -
FROM : Main Boiler No.1 :
TO : SSTG No.1 DATE OF INSP. : July 14,2021 PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

35 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia ,
Copy And Reproduce Is Prohibited Without Written Permission
UT Thickness Grid
Measurement Report
PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

Client : PT. Japan Inspection Cosulting Service Indonesia Equipment : Olypus 38DL plus
Project : Material Assesment for Superheater steam pipe. Probe Number : D790
Location : Vessel LNG Aquarius Cal. Block : Step Wadge
P & ID No. : - Couplant : Grase
Line Number : Line Pipe 5" Spot Inspection No.7 Measurement : Milemeters
From : Main Boiler No.2
To : 2-MS-13 to MS-14 to SSTG No.2 Surface Temp : Ambient

Last Inspection Date : - Date Inspection : July 14,2021


Spot No 1 Dia Piping Nominal Point of Measurement (mm) Min
Remarks
Grid No (Inch) Spec Thickness A B C D E F G H I J Reading

1 5" sch 120 12.70 11.55 11.52 11.55 11.63 11.67 11.59 11.56 11.64 11.48 11.57 11.48
2 5" sch 120 12.70 11.53 11.52 11.42 11.50 11.42 11.47 11.39 11.48 11.39 11.46 11.39
3 5" sch 120 12.70 11.61 11.45 11.53 11.35 11.37 11.44 11.53 11.47 11.43 11.67 11.35
4 5" sch 120 12.70 11.86 11.53 11.48 11.42 11.58 11.60 11.65 11.60 11.44 11.65 11.42
5 5" sch 120 12.70 11.53 11.65 11.35 11.91 11.43 11.46 11.38 11.58 11.39 11.45 11.35
6 5" sch 120 12.70 11.36 11.43 11.31 11.25 11.46 11.34 11.43 11.56 11.46 11.45 11.25
7 5" sch 120 12.70 11.42 11.38 11.48 11.47 11.49 11.45 11.59 11.66 11.59 11.51 11.38
8 5" sch 120 12.70 11.41 11.51 11.68 11.56 11.48 11.43 11.53 11.51 11.68 11.49 11.41
9 5" sch 120 12.70 11.57 11.56 11.48 11.49 11.49 11.47 11.50 11.54 11.48 11.41 11.41
10 5" sch 120 12.70 11.41 11.52 11.43 11.42 11.51 11.65 11.58 11.65 11.52 11.56 11.41
11 5" sch 120 12.70 11.49 11.53 11.49 11.52 11.58 11.62 11.54 11.60 11.66 11.72 11.49
12 5" sch 120 12.70 11.57 11.64 11.67 11.63 11.62 11.73 11.63 11.67 11.74 11.56 11.56
13 5" sch 120 12.70 11.72 11.68 11.67 11.73 11.57 11.69 11.83 11.62 11.73 11.57 11.57
14 5" sch 120 12.70 11.44 11.52 11.60 11.59 11.59 11.70 11.64 11.65 11.61 11.49 11.44
15 5" sch 120 12.70 11.42 11.54 11.62 11.63 11.65 11.64 11.74 11.65 11.63 11.63 11.42
16 5" sch 120 12.70 11.72 11.59 11.75 11.63 11.85 11.73 11.81 11.40 11.73 11.87 11.40
17 5" sch 120 12.70 11.74 11.83 11.80 11.80 11.75 11.78 11.81 11.78 11.79 11.66 11.66
18 5" sch 120 12.70 11.97 11.09 11.91 11.92 11.52 11.78 11.83 11.81 11.79 11.78 11.09 minimum thickness
19 5" sch 120 12.70 11.92 11.97 11.88 11.82 11.92 11.83 11.86 11.88 11.79 11.84 11.79
20 5" sch 120 12.70 11.85 11.89 11.85 11.96 11.93 11.96 11.69 11.75 11.79 11.80 11.69
21 5" sch 120 12.70 11.94 11.86 11.87 11.95 11.90 11.79 11.82 11.81 11.88 11.74 11.74
22 5" sch 120 12.70 11.94 11.78 11.79 11.68 11.78 11.70 11.84 11.69 11.64 11.71 11.64
23 5" sch 120 12.70 11.87 11.87 11.75 11.66 11.83 11.66 11.75 11.70 11.55 11.63 11.55 Highlight is spot of metallurgy
24 5" sch 120 12.70 11.86 11.90 11.88 11.88 11.83 11.69 11.53 11.26 11.46 11.52 11.26

Note:
minimum Value for UT grid Thickness measurment Is : 11.09 mm

Inspector Review Client

Rachman Adrian
Date : July 14,2021 Date : Date :

36 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service
Indonesia , Copy And Reproduce Is Prohibited Without Written Permission
Spot Inspection No 7

UT Grid Measurement of Spot No 7 UT Grid Activity on Spot No 7

PICTURE REPORT
PROJECT : Material Assesment for Superheater steam pipe. LOCATION : Vessel LNG Aquarius
TAG/LINE NO. : Line Pipe 5" Spot on Inspection No.7 P &ID NO. : -
FROM : Main Boiler No.2 :

PT.JAPAN INSPECTION CONSULTING SERVICE


PT. HUMOLCO LNG INDONESIA TO : 2-MS-13 to MS-14 to SSTG No.2 DATE OF INSP. : July 14,2021 INDONESIA

37 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia ,
Copy And Reproduce Is Prohibited Without Written Permission
UT Thickness Grid
Measurement Report
PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

Client : PT. Japan Inspection Cosulting Service Indonesia Equipment : Olypus 38DL plus
Project : Material Assessment for Superheater steam pipe. Probe Number : D790
Location : Vessel LNG Aquarius Cal. Block : Step Wadge
P & ID No. : - Couplant : Grase
Line Number : Line Pipe 4" Spot Inspection No 8 Measurement : Milemeters
From : Main Boiler No.2
To : Steam drum / SSTG No.2 Surface Temp : Ambient

Last Inspection Date : - Date Inspection : July 13,2021


Spot No 1 Dia Piping Nominal Point of Measurement (mm) Min
Remarks
Grid No (Inch) Spec Thickness 1 2 3 4 5 6 7 8 Reading

1 4" sch 120 11.12 8.84 8.90 8.18 8.99 8.93 8.90 8.91 8.90 8.18 minimum thickness
2 4" sch 120 11.12 8.83 8.97 8.90 8.92 8.89 8.90 8.96 8.90 8.83
3 4" sch 120 11.12 8.89 8.87 8.73 8.89 8.93 8.87 8.88 8.87 8.73
4 4" sch 120 11.12 8.79 8.87 8.79 8.86 8.77 8.79 8.82 8.82 8.77
5 4" sch 120 11.12 8.71 8.87 8.78 8.83 8.73 8.72 8.71 8.74 8.71
6 4" sch 120 11.12 8.70 8.87 8.80 8.67 8.72 8.64 8.74 8.73 8.64
7 4" sch 120 11.12 8.97 8.23 8.64 8.68 8.65 8.68 8.67 8.65 8.23
8 4" sch 120 11.12 8.63 8.62 8.64 8.59 8.64 8.55 8.74 8.51 8.51
9 4" sch 120 11.12 8.45 8.47 8.47 8.53 8.57 8.55 8.90 8.83 8.45
10 4" sch 120 11.12 8.79 8.83 8.79 8.84 8.98 8.85 8.92 8.89 8.79
11 4" sch 120 11.12 8.97 8.92 8.84 8.87 8.95 8.85 8.95 8.47 8.47
12 4" sch 120 11.12 8.88 8.87 8.84 8.85 8.99 8.97 8.87 8.93 8.84
13 4" sch 120 11.12 8.89 8.87 8.97 8.99 8.97 8.97 8.97 8.95 8.87
14 4" sch 120 11.12 8.92 8.54 8.63 8.95 8.97 8.99 8.92 9.04 8.54 Highlight is spot of
15 4" sch 120 11.12 9.02 8.98 9.82 9.04 9.12 9.07 9.14 9.14 8.98 metallurgy
16 4" sch 120 11.12 9.15 9.16 9.15 9.13 9.20 9.10 9.15 9.10 9.10
17 4" sch 120 11.12 9.29 9.35 9.33 9.32 9.60 9.42 9.23 9.26 9.23
18 4" sch 120 11.12 9.28 9.40 9.41 9.25 9.34 9.26 9.22 9.37 9.22

Recommendation:
minimum Value for UT grid Thickness measurment Is : 8.18 mm
Inspector Review Client

Rachman Adrian
Date : July 14,2021 Date : Date :

38 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia ,
Copy And Reproduce Is Prohibited Without Written Permission
Spot Inspection No 8

UT Grid Measurement of Spot No 8 UT Grid Activity on Spot No 8

PICTURE REPORT
PROJECT : Material Assesment for Superheater steam pipe. LOCATION : Vessel LNG Aquarius
TAG/LINE NO. : Line Pipe 5" Spot Inspection No 8 P &ID NO. : -
FROM : Main Boiler No.1 :

PT.JAPAN INSPECTION CONSULTING SERVICE


PT. HUMOLCO LNG INDONESIA TO : Steam Dump No.2 to SSTG No.2 Spot .8 DATE OF INSP. : July 14,2021 INDONESIA

39 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia ,
Copy And Reproduce Is Prohibited Without Written Permission
UT Thickness Grid
Measurement Report
PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

Client : PT. Japan Inspection Cosulting Service Indonesia Equipment : Olypus 38DL plus
Project : Material Assesment for Superheater steam pipe. Probe Number : D790
Location : Vessel LNG Aquarius Cal. Block : Step Wadge
P & ID No. : - Couplant : Grase
Line Number : Line Pipe 5" spot inspection No.9 Measurement : Milemeters
From : Main Boiler No.1 & no 2
To : SSTG No.1 Surface Temp : Ambient

Last Inspection Date : - Date Inspection : July 13,2021


Spot No 1 Dia Piping Nominal Point of Measurement (mm) Min
Remarks
Grid No (Inch) Spec Thickness 1 2 3 4 5 6 7 8 Reading

1 4" sch 120 11.12 7.87 7.89 7.94 8.16 8.03 8.16 8.26 8.04 7.87 minimum thickness
2 4" sch 120 11.12 8.08 8.16 8.09 8.11 8.11 8.28 8.33 8.31 8.08
3 4" sch 120 11.12 8.25 8.33 8.28 8.29 8.24 8.54 8.41 8.27 8.24
4 4" sch 120 11.12 8.33 8.51 8.43 8.42 8.46 8.50 8.52 8.53 8.33
5 4" sch 120 11.12 8.58 8.58 8.67 8.33 8.69 8.85 8.71 8.62 8.33
6 4" sch 120 11.12 8.57 8.76 8.76 8.78 8.77 8.83 8.88 8.66 8.57
7 4" sch 120 11.12 8.44 8.81 8.83 8.86 8.81 8.79 8.88 8.83 8.44
8 4" sch 120 11.12 8.67 8.68 8.86 8.95 8.84 8.89 8.84 8.72 8.67
9 4" sch 120 11.12 8.34 8.70 8.77 8.70 8.57 8.76 8.44 8.72 8.34
10 4" sch 120 11.12 8.76 8.78 8.95 8.93 8.06 8.93 8.84 8.97 8.06
11 4" sch 120 11.12 8.93 8.50 8.97 8.96 8.91 8.86 8.04 8.85 8.04
12 4" sch 120 11.12 8.84 8.94 8.95 8.98 8.92 8.98 8.11 8.85 8.11
13 4" sch 120 11.12 8.73 8.84 8.83 8.89 8.98 8.83 8.85 8.77 8.73 Highlight is spot of
14 4" sch 120 11.12 8.35 8.68 8.80 8.69 8.78 8.58 8.71 8.89 8.35 metallurgy
15 4" sch 120 11.12 8.37 8.49 8.63 8.54 8.76 8.60 8.70 8.54 8.37
16 4" sch 120 11.12 8.00 8.18 8.25 8.35 8.03 8.25 8.20 8.51 8.00

Note :
minimum Value for UT grid Thickness measurment Is : 7.87 mm

Inspector Review Client

Rachman Adrian
Date : July 14,2021 Date : Date :

40 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia ,
Copy And Reproduce Is Prohibited Without Written Permission
Spot Inspection No 9

UT Grid Measurement of Spot No 9 UT Grid Activity on Spot No 9

PICTURE REPORT
PROJECT : Material Assesment for Superheater steam pipe. LOCATION : Vessel LNG Aquarius
TAG/LINE NO. : Line Pipe 5" Spopt Inspection No 9 P &ID NO. : -
FROM : Main Boiler No.2 :

PT.JAPAN INSPECTION CONSULTING SERVICE


PT. HUMOLCO LNG INDONESIA TO : SSTG No.2 DATE OF INSP. : July 13,2021 INDONESIA

41 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia ,
Copy And Reproduce Is Prohibited Without Written Permission
UT Thickness Grid
Measurement Report
PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

Client : PT. Japan Inspection Cosulting Service Indonesia Equipment : Olypus 38DL plus
Project : Material Assesment for Superheater steam pipe. Probe Number : D790
Location : Vessel LNG Aquarius Cal. Block : Step Wadge
P & ID No. : - Couplant : Grase
Line Number : Line Pipe 10" Spot Inspection No 10 Measurement : Milemeters
From : Main Boiler No1 and No.2
To : Main Turnie (M/T) Surface Temp : Ambient

Last Inspection Date : - Date Inspection : July 15,2021


Part Dia Nominal Point of Measurement (mm) Min
Piping Spec Remarks
Inspection (Inch) Thickness A B C D E F G H I J Reading

1 10" sch 120 21.43 19.27 19.08 18.86 19.07 18.77 18.99 19.04 19.14 19.35 19.24 18.77
2 10" sch 120 21.43 18.81 19.04 19.06 18.86 19.02 19.19 19.15 19.22 19.18 19.01 18.81
3 10" sch 120 21.43 18.80 18.79 18.74 19.17 18.53 19.00 18.83 19.76 19.18 19.28 18.53
4 10" sch 120 21.43 18.72 18.78 18.77 18.86 18.96 18.94 18.91 18.90 19.03 19.08 18.72
5 10" sch 120 21.43 18.61 18.63 18.70 18.65 18.85 18.82 19.10 19.35 19.35 19.32 18.61
6 10" sch 120 21.43 18.81 19.18 18.90 19.92 19.07 19.14 19.20 19.08 19.28 19.22 18.81
7 10" sch 120 21.43 18.45 19.12 19.17 19.01 19.04 19.17 18.89 19.71 18.95 18.91 18.45
8 10" sch 120 21.43 18.64 19.80 18.99 18.84 19.46 18.92 19.79 18.95 18.83 18.71 18.64
9 10" sch 120 21.43 18.46 19.49 18.86 19.67 18.92 18.97 18.74 18.92 18.62 18.57 18.46
10 10" sch 120 21.43 18.61 18.64 18.81 19.69 18.87 19.37 18.70 19.21 19.24 18.51 18.51
11 10" sch 120 21.43 18.35 18.90 19.01 18.78 19.32 19.46 19.55 18.26 18.98 18.30 18.26
12 10" sch 120 21.43 18.43 18.52 19.32 18.04 18.32 18.62 18.28 18.16 18.15 18.10 18.04
13 10" sch 120 21.43 17.92 18.04 18.02 17.64 17.73 17.70 17.68 17.80 17.69 17.78 17.64
14 10" sch 120 21.43 17.86 17.95 18.54 17.78 17.80 17.64 17.71 17.30 17.53 17.51 17.30
15 10" sch 120 21.43 19.72 17.85 17.92 17.72 17.56 17.51 17.55 17.38 17.64 17.11 17.11 minimum thickness
16 10" sch 120 21.43 17.77 17.74 17.64 18.23 18.29 18.32 17.48 17.45 17.39 17.47 17.39
17 10" sch 120 21.43 17.83 17.69 17.70 18.43 18.36 18.03 18.27 17.38 18.13 17.62 17.38
18 10" sch 120 21.43 17.73 17.57 17.57 18.12 18.24 18.00 17.70 18.21 17.55 18.35 17.55
19 10" sch 120 21.43 17.76 17.46 17.45 17.34 17.37 17.54 17.53 18.56 17.65 18.40 17.34
20 10" sch 120 21.43 17.72 18.25 17.66 17.39 17.48 17.79 17.74 17.92 17.83 17.73 17.39
21 10" sch 120 21.43 18.14 18.22 18.23 17.67 17.35 18.68 18.20 17.90 17.89 17.73 17.35
22 10" sch 120 21.43 17.53 18.63 17.66 18.30 18.30 17.72 18.21 17.66 18.24 17.66 17.53
23 10" sch 120 21.43 18.24 17.70 18.29 17.67 18.60 18.02 17.93 18.33 17.72 18.26 17.67
24 10" sch 120 21.43 17.67 17.65 17.87 17.65 17.68 17.96 18.02 17.92 17.70 17.96 17.65
25 10" sch 120 21.43 18.64 18.34 18.27 17.68 18.56 18.27 18.09 18.07 18.50 18.55 17.68
26 10" sch 120 21.43 18.43 17.75 17.86 17.65 19.18 17.95 18.81 18.37 17.97 18.29 17.65
27 10" sch 120 21.43 17.80 17.76 17.73 18.37 18.67 18.59 18.39 17.84 17.84 18.59 17.73
28 10" sch 120 21.43 18.80 18.01 17.84 17.90 18.44 18.34 18.52 17.65 17.72 17.57 17.57
29 10" sch 120 21.43 18.05 18.83 18.76 18.11 18.58 18.69 17.74 18.42 18.44 17.72 17.72
30 10" sch 120 21.43 18.25 18.37 18.90 18.83 18.09 18.17 18.93 18.05 18.16 17.88 17.88

42 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia ,
Copy And Reproduce Is Prohibited Without Written Permission
UT Thickness
Measurement Report
PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

Part Dia Nominal Point of Measurement (mm) Min


Piping Spec Remarks
Inspection (Inch) Thickness 1 2 3 4 5 6 7 8 9 10 Reading
31 10" sch 120 21.43 18.60 19.35 18.75 18.52 18.53 19.19 18.51 18.46 18.37 18.21 18.21
32 10" sch 120 21.43 18.51 18.81 18.96 18.80 18.50 18.95 18.43 18.57 19.06 18.91 18.43
33 10" sch 120 21.43 18.77 18.94 19.06 18.86 18.58 18.63 18.39 18.46 18.62 18.76 18.39
34 10" sch 120 21.43 19.40 19.98 19.44 19.15 19.00 19.09 19.09 19.20 19.00 18.96 18.96
35 10" sch 120 21.43 19.34 19.33 19.82 19.60 19.12 19.21 19.23 19.07 19.21 19.77 19.07
36 10" sch 120 21.43 19.21 19.26 19.65 19.35 19.78 19.49 19.47 19.33 19.35 19.52 19.21
37 10" sch 120 21.43 19.57 19.28 19.13 19.05 19.27 19.36 19.30 19.37 19.64 19.51 19.05
38 10" sch 120 21.43 19.72 19.49 19.51 19.23 19.37 19.81 19.24 19.38 19.39 19.54 19.23
39 10" sch 120 21.43 19.46 19.51 19.53 19.34 19.77 19.09 19.31 19.76 19.72 19.41 19.09
40 10" sch 120 21.43 19.44 19.35 19.41 19.83 19.35 19.38 19.28 19.71 19.55 19.11 19.11
41 10" sch 120 21.43 19.44 19.30 19.44 19.23 19.99 19.24 19.26 19.65 19.59 19.73 19.23
42 10" sch 120 21.43 19.26 19.46 19.92 19.19 19.32 19.41 19.59 19.46 19.62 19.39 19.19
43 10" sch 120 21.43 19.24 19.35 19.43 19.21 19.37 19.52 19.55 19.43 19.54 19.55 19.21 Highlight is spot of
metallurgy

Note :
minimum Value for UT grid Thickness measurment Is : 17.11

Inspector Review Client

Rachman Adrian
Date : July 15,2021 Date : Date :

43 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia ,
Copy And Reproduce Is Prohibited Without Written Permission
Spot Inspection No 10

UT Grid Activity on Spot No 10 UT Grid Measurement of Spot No 10

PICTURE REPORT
PROJECT : Material Assesment for Superheater steam pipe. LOCATION : Vessel LNG Aquarius
TAG/LINE NO. : Line Pipe 10" Spot Inspection No 10 P &ID NO. : -
FROM : Main Boiler No.1 And No.2 :
TO : Main Turbine (M/T) DATE OF INSP. : July 15,2021 PT.JAPAN INSPECTION CONSULTING SERVICE
PT. HUMOLCO LNG INDONESIA INDONESIA

44 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia ,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

4. MAGNETIC TEST
MAGNETIC PARTICLE
EXAMINATION REPORT
Client : PT. HUMOLCO LNG INDONESIA Report No. : 01/PR-MA/JICSI-HLI/VII/2021
Project : Material Assesment Vessel LNG Aquarius
Procedure No. : TES - MT - ASME - 01
Location : Sea of Kepulauan Seribu ASME B31.1
Date : July 15, 2021
Drawing No : - Welding Process : -
Material Spec : C/S Applicable Code : ASME V art 7
Light Equipment/S.N. : Day light Light Intensity : 1200 Lux
Brand's Name/Type : -

MT Equipment : √ Permanent Yoke Prods Coil Serial No. : IM-5


Type Current : AC √ DC HWDC/HWAC Other ( )
Type : Dry Wet Fluorescent √ Color Contrast
Cleaner : SKC-S (Magnaflux) Contrast : WCP-2 (Magnaflux) Magnetic Particle : 7 HF (Magnaflux)
Method : √ Continuous Residual
Surface Condition : As Welded As casting & forging As Ground √ As Maintenace
Time of Examination : After Welding After Hidrotest After PWHT
Scope of Examination : √ Base Metal Edge Prep Back Chipping
Weld Part Repair Weld Others ( )
Spot Type of
No Identification Size Result Remarks
Number Discontinuity
Superheater Steam Pipe Ø (INCH)
1. Line Pipe10" From Main Boiler No. 1 to 10' 1 - ACC
SSTG No. 1
Line Pipe 10" From Main Boiler No. 2 to
2. 10" 2 - ACC
SSTG No. 2
Line Pipe 5" From Main Boiler No. 2 to
3. 5" 3 - ACC
SSTG No. 2
Line Pipe 5" From Main Boiler No. 2 to
4. 5" 4 - ACC
SSTG No. 2
Line Pipe 5" From Main Boiler No. 1 to
5. 5" 5 - ACC
SSTG No. 1
Line Pipe 5" From Main Boiler No. 2 to
6. 5" 6 - ACC
SSTG No. 2
Line Pipe 5" From Main Boiler No. 1 to
7. 5" 7 - ACC
SSTG No. 1
Line Pipe 4" From Main Boiler No. 2 to
8. 4" 8 - ACC
SSTG No. 2
Line Pipe 4" From Main Boiler No. 1 to
9. 4" 9 - ACC
SSTG No. 1
Line Pipe 10" From Main Boiler No. 1&2
10. 10" 10 - ACC
to Main Turbin (M/T).
Legend:
Pr: Porosity Si: Slag Inclusion
Ln: Linear Cr: Crack
U/c: Undercut Sp: Spatter

PT. JICSI Witnessed by, Acknowledge


Inspected By; PT. HUMOLCO LNG INDONESIA PT. PT. HUMOLCO LNG INDONESIA

Ade Septian

Date : 15-07-21 Date : 15-07-21 Date : 15-07-21

45 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
PICTURE REPORT

Superheater Steam Pipe

Line Pipe 10" Spot No.1 Line Pipe 10" Spot No.1

Line Pipe 10" Spot No.2 Line Pipe 10" Spot No.2

Line Pipe 5" Spot No.3 Line Pipe 5" Spot No.3

Line Pipe 5" Spot No.4 Line Pipe 5" Spot No.4

46 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
PICTURE REPORT

Superheater Steam Pipe

Line Pipe 5" Spot No.5 Line Pipe 5" Spot No.5

Line Pipe 5" Spot No.6 Line Pipe 5" Spot No.6

Line Pipe 5" Spot No.7 Line Pipe 5" Spot No.7

Line Pipe 4" Spot No.8 Line Pipe 4" Spot No.8

47 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
PICTURE REPORT

Superheater Steam Pipe

Line Pipe 4" Spot No.9 Line Pipe 4" Spot No.9

Line Pipe 10" Spot No.10 Line Pipe 10" Spot No.10

48 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

5. CONCLUSION AND SUGGESTION


5.1 CONCLUSIONS

5.1.1 Insitu Metallography.


From the results of metallographic tests that have been carried out and based on standard
references, the condition of the superheated line tube transfer line is still good, but there is a
decrease in the hardness value on point 5 that occurs due to spheroidized.

Spheroidizing is performed by annealing steels with more than 0.8% carbon. The
metal is heated to a temperature of about 1200°F (650°C) and maintained at this
temperature for apredetermined amount of time to convert its microstructure. This
allows for a cementite steel structure to change from a lamella formation to an alpha
ferrite matrix.

The alpha ferrite matrix is made up of particles of spheroidal cementite formations.

Spherodizing is typically done on parts that have been work hardened for improved
ductility, toughness, strength and reduced hardness.

5.1.2 Hardness Tester


Found reduction for Hardness on material with maximum value 98 Hb from 125 Hb standard
value

5.1.3 Ultrasonic Thickness Grid Measurement.


Found metal loss and several location on pipe more Than 12.5 %

49 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

actual diameter pipe Spot Inspection No. 3,4,5,6,7


434 mm/π/25.4 = 5.4"

5.1.4 Magnetic Test.


Not Found Indication on surface of pipe.

5.2 SUGGESTION
- To find out the remaining strength condition, laboratory scale mechanical testing is
recommended.
- Perform annual Inspection for monitoring condition pipe
- Recalculation engineering for integrity of pipe and remaining life.

50 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

6. DOCUMENTATION
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA

Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

6. DOCUMENTATION

Insitu Metallography.

Take Sample Of Material

51 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021
Hardness Tester

52 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021

UT Grid Measurement.

53 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA
Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021
Magnetic Test.

Disclaimer:

This report reflects our findings during inspection in time and place according to the agreed scope of our
performance or deliverables and does not release buyer and/or seller from their contractual responsibilities. This
report does not construe any guarantee or warranty that the purchase contract between buyer and seller is
fulfilled correctly and all performances have been delivered without any defect. Furthermore the report and its
results does not affect any potential buyer’s right to claim for compensation or remedy towards the seller/supplier
of apparent or hidden defects not detected during our inspection or occurred afterwards.

===== End of Report =====

54 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia,
Copy And Reproduce Is Prohibited Without Written Permission
A B C D E F G H I J
.
.
.
.
.
1 1
2 2
3 3
4
4
5
6

Flow

55 Final Inspection Report| This Document Is Exclusive Property Of PT. Japan Inspection consulting service Indonesia ,
Copy And Reproduce Is Prohibited Without Written Permission
INSPECTION REPORT
MATERIAL ASSESSMENT
VESSEL LNG AQUARIUS
PT.JAPAN INSPECTION CONSULTING
PT. HUMOLCO LNG INDONESIA SERVICE INDONESIA

Report No: 01/FIR-MA/JICSI-HUMOLCO/VII/2021


Inspected By : Inspected By : Inspected By :
Engineer Metallography Hardness Operator NDT ASNT UT LV II

Farrid Suhada Rido Lewerissa Rachman Adrian


Date : Date : Date :

Inspected By :
NDT ASNT MT LV II

Ade Septian
Date :

Prepared By : Review By: Acknowledge By:


PT.JICSI PT. HUMOLCO LNG INDONESIA PT. HUMOLCO LNG INDONESIA

Ruddy Gunawan Manalu Teguh Budiawan


Date : Date : Date :
Position: Engineer Position: Technical Manager Position: Master LNG Aquarius

Disclaimer:

This report reflects our findings during inspection in time and place according to the agreed scope of our
performance or deliverables and does not release buyer and/or seller from their contractual responsibilities. This
report does not construe any guarantee or warranty that the purchase contract between buyer and seller is
fulfilled correctly and all performances have been delivered without any defect. Furthermore the report and its
results does not affect any potential buyer’s right to claim for compensation or remedy towards the seller/supplier
of apparent or hidden defects not detected during our inspection or occurred afterwards.

===== End of Report =====