Supply Chain Professional with experience handling implementation in Contact
Supply Chain Planning. Lead and managed cross-functional teams through an end-to-end project lifecycle to implement new processes Phone and systems. 665 653 2563
E-mail Work History Hector.benitez@msn.com
2019-10 - MATERIALS MANAGER
Current Skills Flex Implemented process for S&OP. Process Development Manage Production Plan to meet customer specific demands. Strategic Planning Re-structure CP headcount without operational Relationship-Building impact. Create Integrated planning and based on SAP implementation bottleneck / restrictions. Continuous Improvement Kaizen to improve water spider productivity and AGV implementation. WIP inventory absolute variance reduction by 18%. Implemented policies to reduce cost and eliminate waste. Improved resource allocation to promote efficiency and deadline management. Adjusted procedures as needed to maximize department effectiveness. Used coordination and planning skills to achieve results according to schedule.
2015-08 - Supply Chain Supervisor
2019-10 TE Connectivity, Tecate, Baja california SAP Implementation super user for PP/MM. Implemented process for S&OP /CRP Tecate plant. Transfer process plant. Implemented process for RapidResponse (Kinaxys) for 3 different plant. Implemented process weekly production schedule. Improve on 10% ship to schedule on time. Decrease 55% on back orders. Kaizen to increment output on 110% for key customer. Development of strategy to change from MTO to ATS/MTS. Create standard work for MPS, buyers, planner, schedulers. Led change management initiatives and designed functional area infrastructure to support demand planning and supply strategy. Managed production levels, identified material shortages and monitored inventory levels to meet order delivery requirements.
2006-09 - Master Production Scheduler Supervisor
2015-07 Rockwell Automation, Tecate, Baja California Rockwell Tecate MPS for ETO Bussines (High mix/Low volume manufacturing):. SAP Implementation team for Supply/Planning. Performing activities to create a feasible production schedule through resolution of material and capacity constraints, coordinating efforts to maintain feasible dates on demand orders, attending meetings with Project Managers to provide proper follow up in every project and with Demand-Forecast team to maintain proper level load for the BU/Plant. Coordinating scheduling and planning activities with PCAs: Level Load, On Time to Promise, Schedule Attainment, On Time to Start, Shipments, Absorption hrs, etc. Leading activities to maintain and improve established metrics for PCAs: OTTP, SCAT, OTTS, Daily Shipments, Zero Past Due, Aged WIP, Expedites,, Exceptions Report, Lead Times, Capacities Analysis, OCNs/ECNs. Leader in the implementation of RPS (Rockwell Production System) for Production Scheduling. Managed team of 8 employees, overseeing hiring, training, and professional growth of employees. 2005-01 - BUYER/PLANER 2006-09 MeadWestVaco, Tecate, Baja California Planner/Buyes for plastic components, to be used on subassemblies process. Inspector for subassembly production line. Computed and created purchase orders in ABMS to monitor stock levels, verify purchase requisitions and expedite customer orders. Maintained key item stock levels and wrote or expedited purchase orders. Reviewed proposals, qualified vendors and recommended optimal suppliers. Tracked inventory shipments and prepared spreadsheets detailing item information.