Project Description

The project is for a Single-Level House with the total floor area of 42 m2 to be built for ACCESSVILE Homeowners
o

Association, a group of Persons with Disabilities (PWDs) which have 50 members in Marikina led by their president
Purita Cayanan. It will be built at Marikina City.
aC s
vi y re

At Grady Homes we like to ensure that all of our client’s needs are met, and that includes altering floor plans and
building homes that make living just that bit easier for the disabled or elderly.
ed d

Work Scope
ar stu

This proposal is a comprehensive estimate for the full range of services required to complete this project from start to
finish. All materials, labor, goods, and services are included in this estimate.
is
Th

Time Frame

This project will be completed in seven to eight months.


sh

Start Date 1st January 2021

End Date 1st September 2021

This study source was downloaded by 100000836106819 from CourseHero.com on 11-13-2021 20:35:28 GMT -06:00

https://www.coursehero.com/file/76619058/Assignment-52-Project-Proposal-Villaflorpdf/
• Duration of Different Processes

Initiation 1st January – 31st January (1 month)


Planning 1st February – 28st February (1 month)
Execution 1st March – 31st July (5 months)
Monitoring & Control Monitoring & Control for the whole execution (8 months)
Closing 1st August – 1st September (1 month)

Project Specifications

• Ample space in hallways, kitchens, doorways and bathrooms for wheelchair


• Handles, specific tap wear, and lower tap positions to aid with bathroom access and
• Ramp access to home and garage
• Porch and patio slabs are raised so the step down from inside the home is minimal.

m
er as
• The step into the home from the garage also needs ramp access.

co
• Ramp access to the yard space from the laundry/patio, potentially including hand rails.

eH w
• Suitable interior flooring for smooth wheelchair access that is low maintenance and easy to clean.
• Kitchen suitable for wheel chair access which may include lower bench tops

o.
• Ensuring electricity outlets and light switches are within easy reach.
• rs e
Ample storage space in easy to reach locations.
ou urc
• Potential double door access to rooms where a hospital bed may need to get in and out.
• Noggings in the ceiling to allow for slings/handles to pull yourself out of bed.
• Minimizing glass in the bathroom showers so that wheelchairs can go in and out easily.
o

• Larger garage to accommodate vehicles with wheelchair access.


aC s

• 2 bedrooms : one (1) 2.95 m x 2.4 m & one (1) 2.95 m x 2.65 m
vi y re

• Sala – 2.65 m x 5.8 m


• Comfort Room – 1.45 m x 1.8 m
• Boysen paint
• Bedroom built-in cabinet
ed d
ar stu

Note: Other interior designs are not included

Budget
is

Total project cost for the project (42 m2 house) would cover all materials, labor, goods, and services.
Th

• Cost Plan (each house)

Work Cost
sh

Plumbing • P194,000.00
Concrete rods • P116,000.00
Paint • P120,000.00
Flooring materials • P125,000.00
Electrical equipment • P135,000.00

This study source was downloaded by 100000836106819 from CourseHero.com on 11-13-2021 20:35:28 GMT -06:00

https://www.coursehero.com/file/76619058/Assignment-52-Project-Proposal-Villaflorpdf/
Glass windows • P12,000.00
Wood • P545,000.00
Cement • P400,000.00
Bricks • P473,500.00
Labor • P210,147.00

Total cost • P2,330,647.00

Reserve • P100,000

Total Price • P2,430,647.00

m
• Estimated Budget (each house)

er as
In this project keeping all expenses in mind I can say that the estimated budget required for this project is

co
3,570,725.00

eH w
Estimated Budget of 50 homes

o.
(3,570,725.00)(50) = 178,536,250.00
rs e
ou urc
o

Conclusion
aC s
vi y re

The project is for a Single-Level Dreamhouse with the total floor area of 42 m2 floor area to be built for ACCESSVILE
Homeowners Association, a group of Persons with Disabilities (PWDs) with 50 members in Marikina led by their
president, Purita Cayanan. It will be built at Marikina City. It is expected to be completed in 8 months providing that
the budget of ₱178,536,250.00 will be approved.
ed d
ar stu
is

Prepared by:
Th

Engr. John Frederick D. Villaflor


Company Engineer
sh

This study source was downloaded by 100000836106819 from CourseHero.com on 11-13-2021 20:35:28 GMT -06:00

https://www.coursehero.com/file/76619058/Assignment-52-Project-Proposal-Villaflorpdf/
Powered by TCPDF (www.tcpdf.org)

You might also like