Introduction 3
Objective 3
Scope 3
Methodology 4
Conclusion 8
Reference 9
The simplest task begins with a plan. The success or failure of a project is dependent on
planning. Daniels (2018), a management accountant in his article recognizes that monitoring
management; he included the quote “if you fail to plan, you are planning to fail”, a quote that
Project decomposition is a process of breaking down deliverables into smaller and the
smallest possible activity. This will be presented in the format of an organizational chart.
Objective
This paper aims to present the work breakdown structure of the activities required in
repairing a bedroom. The decomposition of the main element of this project into specific
The Scope
The scope of the project ranges from removing and replacing the ceiling to painting the entire
room.
In accomplishing this, the project identified will be arranged into the WBS to demonstrate
how the project requirements are decomposed to specific activities and further discussed
A WBS according to PMBOK is a hierarchical decomposition of the total scope of the project
Though it is time-consuming and needs regular updating, the WBS is an important technique
in project management and is commonly accepted because it helps project managers to divide
projects into workable and manageable activities, it helps with the estimating, monitoring,
and assigning of responsibilities and resources allocation and it identifies potential risks and
threats.
Lock (2014. p. 82-83) states that the most useful tool in achieving accurate cost and duration
estimates is the WBS. With its many levels it has divided and subdivided complex tasks into
much smaller tasks until it cannot be broken down any further though not necessarily
presented work order. WBS has been used by many industries such as software engineering
and construction companies in their complex projects as it provides sufficient details enabling
communication. The WBS was used in the construction of the complex Karaj Metro Tunnel
and the Golabar diversion tunnel which were validated (Siami-Irdemoosa, Dindarloo, and
Sharifzadeh, 2015).
WBS figure 1 below shows the different activities involve in repairing the bedroom; the
major tasks being the ceiling, painting, securing of the furniture, the refitting of the room,
sourcing and material purchasing, identifying and engaging the relevant contractors. These
major tasks were further broken down into smaller deliverables, for example, the ceiling
repair, the demolishing of the old ceiling, removing the demolished rubble of the old ceiling,
installing the new ceiling; these represent smaller and manageable activities.
SECURING
CEILING PAINTING FURNITURE REFITTING
REPAIRS (CR) (P) ROOM (RR)
IDENTIFY REPLACE
SKILLED FURNITURE
GET &
PAINTER REMOVE ITEMS
MATERIAL FROM
ESTIMATE FURNITURE
CLOSE
COVER FLOOR TREAT WALL WITH
PROJECT
PAINT TREATMENT
REFINE PAINTED
AREAS
WITH PAINT BRUSH
CLEAN PAINT
DROPPINGS &
MOP FLOOR
allocation. The broken-down activities help to estimate every cost factor in the project, this
type of WBS works well with the estimating method called bottom-up estimating which is the
most accurate estimating tool; however, this does not only help with the costing aspect but
also with the duration estimate. All possible activities must be included in the WBS. Each
element also allows the project manager to identify the task and to match the task with the
relevant human resource person and required material. According to Alutbi (2020), the WBS
NASA applied in their reporting structure provided a framework for the natural development
of the overall plan and control of a contract and a basis for the division of work into definable
activities from which statements of work were developed schedules, cost, labour hour and
Finally, WBS is important in PM and commonly used because it helps to identify potential
risks and threats; the risks identified every activity allows the project manager to make
necessary corrections and possible re-arranging and allocation of resources which may be
time consuming. With the level of risk involved it helps to identify those risks is especially
complex construction projects as with the Karaj Metro Tunnel (Siami-Irdemoosa, Dindarloo,
Thus while it is time consuming and need regular updating, WBS is important in project
management, it has been widely accepted and applied in many areas and industries involved
in project management. It is the most useful tool in achieving accurate cost and duration
estimates WBS helps project managers to divide projects into workable and manageable
activities, it helps with the estimating, monitoring, and assigning of responsibilities and
resources allocation and it identifies potential risks and threats. It is noted how effective it is
Daniels, C., (2018) How to Create an Accurate Budget. Mold Making Technology, 21(12), p.
23-24.
PMI (2017) A Guide to the Project Management Body of Knowledge (PMBOK guide) 6th
edn. Pennsylvania, USA: Project Management Institute, p.144.
Siami-Irdemoosa, E., Dindarloo, S.R. and Sharifzadeh, M., (2015) Work breakdown structure
(WBS) development for underground construction. Automation in construction, 58, pp.85-94.
Lock, D. (2014). The Essentials of Project Management. 4th edn. England: Gower Publishing
Limited, p.82-96.