You are on page 1of 14

MIRPUR UNIVERSITY OF SCIENCE AND

TECHNOLOGY (MUST), AJK


Present by : Shamshad Hussain
Presented to : Engr. Sir Junaid
Tariq
Roll no: Fa19-bcv-090
Session : 2019-2023
Department : civil engineering
Section : B
Presentation title : Concept and
Implementation of value engineering

Mirpur University Of Science And Technology (MUST) AJK 1


Outline

 History
 Value concept
 What is Value engineering
 Principle and purpose of VE
 Implementation of VE in our project
 Case study
 conclusions

Mirpur University Of Science And Technology (MUST) AJK 2


History

Storage of materials during world war


II
General Electrical company found that
many of the substitutes have better or
equal performance at least cost
Lawrence De Miles launched an effort
to make the concept systematic
Establishment of society of american
value engineers “ SAVE “IN 1959

Mirpur University Of Science And Technology (MUST) AJK 3


Value concept

value is the lowest price you pay


to provides a reliable function or
service ( law rence de. Miles )

The ratio of function to cost

����ℎ �������� (������� )
value = = ���� 
����

Mirpur University Of Science And Technology (MUST) AJK 4


Waste cost why ?

Why do have unnecessary costs


v Low time for designing
v Lack of information
v Lack of ideas
v Lack of experience
v project Weaknesses in human
relation
v Multi concept

Mirpur University Of Science And Technology (MUST) AJK 5


What is value engineering

Value engineering also known as value analysis.


The process of optimizing or improving project or product to deliver its
maximum functionality or capabilities without spending much cost and
without damaging the quality of it.

Mirpur University Of Science And Technology (MUST) AJK 6


Principle of value engineering

A. Systematic method for evaluating product performance and


value
B. The use of multi functional teams
C. Focus on a simplified product

Mirpur University Of Science And Technology (MUST) AJK 7


Objectives and Goals of VE
 The main objective of value engineering are
as ;
i. Determine the best design alternation
ii. Reduce cost
iii. Increase reliability and availability
iv. Enhance customer satisfaction
v. Improve organizational performance
vi. Identify problem
vii. Develop recommended solution

Mirpur University Of Science And Technology (MUST) AJK 8


VE job plan
 Value engineering is often done by systematically following a multi stage
job plan.
 Larry miles mention a system was a six step procedure which is called “the
value analysis job plan “
1. Orientation
2. Information
3. Functional
4. Creative
5. Evaluation
6. Development
7. Presentation
8. Implementation and follow up

Mirpur University Of Science And Technology (MUST) AJK 9


Case study

 In this case I study about the residential buildings area. Value engineering is applied to a
2160.05 sq ft . The information collected in the first phase of the study
 Owner requirements
 Building details
 Building plan
 Estimation details
 Problem involved
 The cost of the building is Rs 1519260 Rupees before the apply of value engineering .
 when VE Analysis the sub , super structure, and roof section .
 VE found finishing works in super structure consume more cost.

Mirpur University Of Science And Technology (MUST) AJK 10


paint
Inner
plastering wall
Wall finish
wallpaper Outer
Toilet wall wall
tile
Vietified
tile
Finishing works

Floor tile
Floor finish
carpet ceramics

concrete Hardwoo
d Door
P vc
Extra fittings Glazed
curtain window
Electrical ,
woodwork plumbing
cupboard
Mirpur University Of Science And Technology (MUST) AJK Sanitary 11

Other work works


NO FUNCTION FUNCTION Total sum
COST
1 Enhance 602467
appearance
2 Remove 210000
waste
3 Supply 175000
power
4 Distribute 120000
water
5 Level 113095
surface
6 Enable 107922
protection
7 Facilitate 107139
cleaning
8 Enhance 43593
durability
9 Contro;
Mirpur University Of Science And Technology (MUST) AJK 40043 1519260 12

access
 When VE are applied on residential building then, it concluded that
80% of cost for finishing works are uses for enhance apperance .
 The ideas of VE are examined again and the values of building is
improved by following ideas
1. Five wooden doors and windows are replaced by UPVC.
2. By tiling the windowsills, cleaning is made easier.
3. By using gypsum plaster, it requires a less wastage of time, labour
and material ,
4. It is saving time process, thus project cost is decreases. And it is
cheaper as a result cost is less .

Mirpur University Of Science And Technology (MUST) AJK 13


Mirpur University Of Science And Technology (MUST) AJK 14

You might also like