You are on page 1of 2

MODULE 1.

0
____________________________________________________________________________________________________
PPR 141

UNIVERSITY OF NORTHERN PHILIPPINES (UNP) QUIZ NO. 1


COLLEGE OF ARCHITECTURE & ENVINROMENTAL PLANNING DATE:
______________
SUBJECT :
PPR 141 PROFESSIONAL PRACTICE 2
CLASS : BS ARCH 4___ SCORE:_____________

STUDENT’S NAME:_____________________________________________
Surname First name MI

NOTE; Strictly NO ERASURES or ALTERATIONS of answers. Erasures or alterations are automatically


considered WRONG. READ and follow instructions carefully (both written and verbal); answers not following
instructions will not be considered. Use BLACK INK only and write in BLOCK CAPITAL LETTERS.

MULTIPLE CHOICE Select the best answer for each of the following items by shading the corresponding letter
of your choice for each number in the answer sheet.

1. The role of the Architect in the building industry.


The Architect create designs for :
O a) New construction projects
O b) Alterations
O c) Redevelopments
O d) All of the above
2. As Main Consultant; who do and prepare the
schematic design phase, (including sppcc) are the ?
O a) Client
O b) Architect
O c) Allied professionals/engineers
O d) Contractor
3. What is SPP Pursuant to RA No. 9266 ?
O a) The Architectural Act of 2005 and its IRR
O b) The Civil Engineer Law
O c) The Electrical Engineer Law
O d) The HB 10234
4. Individual, Professional Practice of an Architect as natural person and need to
be registered under Department of Trade and Industry (DTI), it is categorized as ?
O a) Sole Proprietorship
O b) Partnership
O c) Company
O d) Corporation

1/2 `
MODULE 1.0
____________________________________________________________________________________________________
PPR 141
5. Which of the Standards Professional Practice (SPP) Document we will adopt for
our PROJECT NO 1; Administering the Regular Services of the Architect ?
O a) SPP Document 201 - Pre-Design Services
O b) SPP Document 202 - Regular Design Services
O c) SPP Document 206 - Comprehensive Architectural Services
O d) SPP Document 207 - Design & Built Services
6. Reference to our PROJECT NO. 1,– through Section 2, SCOPE OF SERVICES
Standards Professional Practice (SPP) Document 202. Our PROJECT NO.1,
which the class submitted, is considered under what phase ?
O a) Project Definition Phase
O b) Schematic Design Phase
O c) Design Development Phase
O d) Contract Documentation Phase
7. SPP Document 202 – SCOPE OF SERVICES are comprised of ____ Phases ?
O a) Three (3) Phases
O b) Four (4) Phases
O c) Five (5) Phases
O d) Six (6) Phases
8. Upon submission our PROJECT NO. 1, which Phase shall we proceed next?
O a) Project Definition Phase
O b) Design Development Phase
O c) Contract Document Phase
O d) Bidding or Negotiation Phase
9. In preparation of a Project using SPP Document 202, under Project Definition
Phase. What important items Architect are required from the Owner/Client?
O a) Lot Plan/ Site/ Location (Project Legality).
O b) Project Requirements and other necessary documents.
O c) Owner’s Allocated budget/ (Finance)
O d) All of the above
10. In actual Standards of Professional Practice SPP Document “SERIES” ,
The Architect shall perform his/her duties and responsibilities as stated in the
SCOPE OF SERVICES; For this, the Architect shall receive remuneration from the
client as we called it, (the proper term)?
O a) Reward
O b) Reimbursement
O c) Compensation
O d) Architect’s Professional Fees (in phases)