SOFTSCAPE & HARDSCAPE CALCULATION :

A B C AXBXC
2
SURFACE AREA (M ) RUNOFF COEF. AVERAGE ANNUAL RAINFALL (M) VOLUME(M3)
SOFTSCAPE AREA 39.6 0.1500 1.7000 10.098
HARDSCAPE AREA 206.25 0.8000 1.7000 280.5
TOTAL : 290.59
RAIN WATER HARVESTING
TANK

QUANTITY OF WATER RUN OFF :

SOFTSCAPE = 10,098 L
HARDSCAPE = 2,80,500 L

RAINWATER HARVESTING STORAGE TANK CALCULATION :

AVERAGE DAILY RAINFALL IN UMARGAON = ANNUAL RAINFALL / NO. OF RAINY DAYS


= 1.7 / 31
= 0.0548

FILTRATION TANK
REQUIREMENT FOR 1 DAY IN THE BUILDING = WATER COLLECTED ON TERRACE X AVERAGE
DAILY RAINFALL X RUN OFF COEF.
PASSAGE LIFT
50mm high
= 415.8 X 0.0548 X 0.8
= 16.632 M3
ENTRY = 16,632 L

REQUIREMENT FOR 3 DAY IN THE BUILDING = 3 X 16,632 L


= 49,896 L
INNER VOLUME OF TANK = 49.896 L
B X 2B X 1.5 = 49.896 M3
B2 = 16.632
B = 4.07 M

DIMENSIONS OF THE TANK = 4.07 M x 8.15M x 1.5M

OHT

LEGEND:

PUMP SOFTSCAPE
ROOM
HARDSCAPE

RECHARGE
UGT TRENCH/ PIT

SITE PLAN
1:50

SONALI CHAMADIA | ACHIRA SHAH | NANDIKA SHAH 14/07/2021

Terrace plan SERVICES YEAR III SEM V

BSSA A003 | A022 | A032

You might also like