You are on page 1of 21

DOCUMENT REVISION

VGS 23.3.2 4

Engineering DATE PAGE


Standards & Specifications 14 November 2019 1 of 21

TITLE: MAGNETIC PARTICLE EXAMINATION OF FERROMAGNETIC FORGINGS IN COMPLIANCE WITH


EQUINOR TR2382 AND TR3540 SPECIFICATIONS

BAKER HUGHES CONFIDENTIAL


This document is classified under the Baker Hughes document classification and security policy as
“Baker Hughes Confidential”. Access is granted to Baker Hughes employees with a need to know.
Access is granted to external parties subject to implementation of a non-disclosure agreement and a
business need to know. Refer to ENGWW19.05 for authorization levels required for communication of
technical documents to customers or customer representatives.
VIEWED: 2020/11/09 05:31:21
VGS23.3.2 | 4

1. SCOPE

1.1. Contents

This Magnetic Particle Testing Procedure outlines the magnetizing methods (direct, indirect), magnetic
DOCUMENT:

particles (fluorescent, color contrast, wet or dry), and techniques to be used for the detection of
discontinuities on the surface / near surface of ferromagnetic forgings in compliance with Equinor TR2382
and TR3540 specifications, both un-machined and machined. It is also applicable to other wrought metals
and wrought metal products such as rolled billets or plates, extruded or rolled bars, extruded or rolled
shapes and parts made of them as for example welded pipes.
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

Only continuous wet method with fluorescent magnetic particles shall be used by this
specification.

This specification defines the sensitivity, light intensity, contrast requirements and corresponding
PROE MODEL VERSION:

acceptance criteria for evaluation. There is no limit to shape or size object tested using this document. It
also covers the qualifications of individuals engaged in the production, interpretation, and recording of
results.

1.2. Timing

Unless otherwise specified in the Engineering Part Specification, final examination shall be performed after
final heat treatment and final machining (for materials), or after all welding, post-weld heat treatment,
machining operations including grinding processes, and the metal is at ambient temperature (for welds).
Examination shall be conducted earliest 24 hours after final heat treatment (depending on material).

Preliminary examinations may be performed at any time during the process as long as the material
APPROVED BY: Eddie Pompa

temperature is within the procedure limits.

2. APPLICABLE DOCUMENTS

2.1. Revisions
PROE REV:

Unless otherwise specified, revision levels of the applicable standards are noted below. If no revision is
noted, the latest edition to the standards shall be applied. Conflicts shall be brought to the attention of
BAKER HUGHES.
REVISION PENDING: NO

ASME BPVC Section-V Article 7, Magnetic Particle Examination, Article 25,


Magnetic Particle Standards
STATE: RELEASED

PREPARED BY REVIEWED BY APPROVED BY

Jianyun Cheng Premkumar Subramanian Eddie Pompa


PROE NAME:

ASNT Level III, Cert# 211409 ASNT Level III, Cert# 177835 ASNT Level III, Cert # 107661

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 2 of 21
Confidential

ASTM E709 Standard Guide for Magnetic Particle Testing

API Spec 6A Specification for Wellhead and Christmas Tree Equipment

API Spec 17D Design and Operation of Subsea Production Systems-


Subsea Wellhead and Tree Equipment

ASTM E1444M Standard Practice for Magnetic Particle Examination

ASTM E3022 Standard Practice for Measurement of Emission


Characteristics and Requirements for LED UV-A Lamps
Used in Fluorescent Penetrant and Magnetic Particle Testing
VIEWED: 2020/11/09 05:31:21
VGS23.3.2 | 4

EN 10228-1 Non-destructive testing of steel forgings


Part 1: Magnetic particle inspection`

ISO 9712 Non-destructive Testing -- Qualification and Certification of


NDT Personnel
DOCUMENT:

ISO 9934-2 Non-destructive Testing- Magnetic Particle Testing: Part 2:


Detection Media

Equinor TR2382 Material and Fabrication Requirements for Subsea XT, WH,
TH and WOS
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

Equinor TR 3540 Surface Wellhead and Christmas Tree System

3. PERSONNEL
PROE MODEL VERSION:

3.1. Certification

Personnel responsible for all NDE activities shall be qualified according to ISO 9712, PCN or ASNT
Central Certification Program (ACCP) Level 3 1.

Personnel performing manual or semi-automated NDE and interpretation of test results shall be certified
to Level 2 by a Certification Body or Authorized Qualifying Body in accordance with ISO 9712, PCN or
the ASNT Central Certification Program (ACCP).

Operators holding Level 1 qualifications may carry out NDE under the direct supervision of Level 2
operators.
APPROVED BY: Eddie Pompa

NOTE: Baker Hughes NDE Level III’s are certified by third parties/bodies.

3.2. Eye Exam

NDT personnel shall take and pass an annual vision examination in accordance with the manufacturer’s
PROE REV:

documented procedures that meet its NDT personnel training / certification program which is based on
ISO 9712, PCN or ASNT Central Certification Program (ACCP).

4. SAFETY & ENVIRONMENT


REVISION PENDING: NO

Operational safety associated with the use of this procedure shall be the responsibility of the
STATE: RELEASED

1 Companies performing NDT activities shall have a quality system in compliance with ISO/IEC 17020 or equivalent and
PROE NAME:

shall as minimum comply with the requirements of Type B inspection body.

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 3 of 21
Confidential

user/contractor under the guidelines of the site-specific safety, health, and environmental program.
The safe handling and disposal of magnetic particle materials are governed by the supplier’s Safety
Data Sheet (SDS). The control of any waste associated with this specification or any hazards to the
environment shall be the responsibility of the user/contractor under the guidelines of the user or
contractor’s site-specific safety, health, and environmental program.

Prolonged or repeated contact of these materials with the skin or any mucous membrane should be
avoided. Working areas shall be adequately ventilated and located away from sources of heat, sparks
or open flames.

When using filtered UV-A black lights, care shall be taken to ensure that unfiltered radiation from the
UV-A source does not directly reach the eyes of the inspector. Whether it forms an integral part of the
lamp or is a separate component, the UV-A filter shall always be maintained in good condition.
VIEWED: 2020/11/09 05:31:21
VGS23.3.2 | 4

5. EQUIPMENT

5.1. Magnetizing Unit

Portable and Stationary Power Units: Alternating rectified alternating (full or half wave), or direct-current
electric power sources may be used. The equipment shall have a variable current control and be capable
DOCUMENT:

of producing the required current for circular and/or longitudinal magnetization.

Portable electromagnetic (AC/DC) yokes: Yokes may be used as a magnetizing apparatus for welds and
surface examination of simple cylindrical or rectangular shaped components. For complex shaped or large
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

components using the yoke technique, a map showing magnetizing coverage shall be submitted to the
Baker Hughes or a Baker Hughes approved cognizant NDT Level III for approval. Gridding the part into
small inspection sections is recommended.

Stationary bench units with a mechanical clamping head / tail stock may be used for direct magnetization
provided the contact pads are sufficiently clean and the part is adequately clamped to prevent arc burns
PROE MODEL VERSION:

and excessive heat.

NOTES:

1. The use of prods or contact pads (other than those on the head or tail stock of a stationary bench
unit) which pass current directly into the part for inspection should be avoided and is subject to
Baker Hughes and Equinor approval.
2. The use of permanent magnets to produce a magnetic field is not permitted.
3. Copper electrodes or contact plates are not permitted.
4. Arcing is strictly prohibited.
5. AC equipment shall be preferred towards DC equipment unless DC is needed for special
purposes (shall be justified).
APPROVED BY: Eddie Pompa

5.2. Lighting Equipment

For Fluorescent particle:


PROE REV:

• Ultraviolet (Black) light using a filter with a peak wavelength output at or near 365 nm and capable of
producing a minimum intensity of 1000 µwatts/cm² at the inspection surface shall meet the requirements
of this specification. Background light may be used as long as the intensity level does not exceed the 2
foot- candle (21.5 lx) requirement.
REVISION PENDING: NO

• UV-A lights that use a UV-A LED source shall produce a peak wavelength at 365 to 370 nanometers
STATE: RELEASED

as measured with a spectroradiometer. When requested, the manufacturer shall provide a certification
PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 4 of 21
Confidential

thereof. The light source shall be capable of producing a minimum intensity of 1000 µwatts/cm² at the
inspection surface.

• Light Meter equipped with visible white light and ultraviolet sensors or equivalent shall be used to verify
white and black light levels.

5.3. Magnetic field strength and Direction indicators

5.3.1. Magnetizing Field Strengths checks

To produce interpretable indications, the magnetic field in the part must have sufficient strength and
proper orientation. Factors that affect the strength of the field are the size, shape, section thickness,
material of the part/piece, and the technique of magnetization. Since these factors vary widely, it is
VIEWED: 2020/11/09 05:31:21
VGS23.3.2 | 4

difficult to establish rigid rules for consistent, this field strength must be controlled within reason.
Sufficient magnetic field strength can be established by:

• Standard flawed shims are typically used to establish proper field direction and ensure adequate field
strength during technique development in magnetic particle examination. Standard notched Shims
/Artificial Flawed Shims (i.e. QQI’s as specified in AS-5371 and shown in ASTM E709 Appendix X2), or
equivalent devices shall be used to verify magnetic field strength.
DOCUMENT:

Note: Pie gauge indicator and flexible laminated strips / Brumah Castrol strips are typically used to
ensure proper field direction during magnetic particle testing but should not be used for technique
development and field strength verification.
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

• Hall Effect gauss meters, parts of like geometry and material characteristics with known defects in areas
of interest and notched reference standard shims (AS-5371 as shown in ASTM E709 Appendix X2) may
be used to validate adequate field strength for inspection.
PROE MODEL VERSION:

• For AC electromagnetic Yoke - Magnetic field strength can be empirically determined by measuring
its lifting power on a 10 lb (45 N/4.5 kg) steel plate. A Hall Effect gauss meter or AS-5371 Standard
Notched Shims (QQI) should be used to determine the boundary of sufficient field strength.

Note: when Hall Effect gauss meters is used for the above purposes, the active area of the probe
should be no larger than 0.2 in. [5.1 mm] by 0.2 in. [5.1 mm]. The gaussmeter should have a
frequency response of 300 Hz or higher for AC or HW current or current applied in shots, and the
peak value should be read.

5.3.2. Magnetic field direction checks:

Flexible laminated strips are typically used to ensure proper field direction during magnetic particle testing.
APPROVED BY: Eddie Pompa

Magnetic field indicators such as Pie gauge indicator, flexible laminated strips, Brumah Castrol strips, AS-
5371 Standard Notched Shims (QQI) as shown in ASTM E709 Appendix X1 / X2 may also be used for this
purpose.

5.3.3. A Gauss Meter shall be used to measure residual magnetism.

Measuring of residual magnetic field and potential demagnetization of the material shall be addressed in the
PROE REV:

procedure and/or technique sheet, whether it is needed or not.

5.4. Magnetic Particles


REVISION PENDING: NO

Dry magnetic particle shall meet applicable requirements of ASME Section V, Article 7, ASTM E709/E1444,
or ISO 9934-2.
STATE: RELEASED
PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 5 of 21
Confidential

Wet magnetic particle shall meet applicable requirements of ASME Section V, Article 7, ASTM E709/E1444,
or ISO 9934-2. Fluorescent magnetic particles shall meet applicable requirements of ASME Section V, Article
7, ASTM E709/E1444, or ISO 9934-2.

NOTE: Wet particles supplied by the manufacturer in aerosol spray cans that meet applicable
requirements of ASME Section V, Article 7, ISO 9934-2 and ASTM E709/E1444 may be used.

6. CALIBRATION

A calibration system shall be established and maintained to assure that the gauges, measuring and
monitoring equipment called out in this specification are sufficient for maintaining compliance to this
specification.
VIEWED: 2020/11/09 05:31:21
VGS23.3.2 | 4

System performance and equipment checks shall be documented in reports or logs which will be made
available upon request.

6.1. Portable and Stationary Power Units:

Performed every six months: The accuracy of the magnetizing unit's amperage meter shall be verified
semi-annually by equipment (test meter) whose accuracy is verified (traceable) to NIST (National Institute
DOCUMENT:

of Standards and Technology), IRMM (Institute for Reference Materials and Measurements) or
equivalent. If a unit is equipped with timer control and quick break features the functioning of this circuit
should be checked and verified.

6.2. Portable Electromagnetic (AC) Yokes:


REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

Perform before use each day yoke is to be used: Alternating-current electromagnetic yokes shall be
capable of a lifting force of at least ten (10) pounds (4.5 Kg). This lifting power must be determined
before each period of use.
PROE MODEL VERSION:

6.3. Lighting Equipment

Light Meters: Perform every six months: The accuracy of the light meter shall be verified semi-
annually by equipment (test meter) whose accuracy is verified (traceable) to NIST (National Institute of
Standards and Technology), IRMM (Institute for Reference Materials and Measurements) or equivalent.

Black light intensity shall be checked: Prior to use, whenever the light power source is interrupted or
changed and at the completion of each examination or series of examinations: The black light intensity at
the examination surface shall be not less than 1000 µW/cm2.

Background Visible light intensity: Perform weekly: The intensity of ambient visible light in the darkened
area where fluorescent magnetic particles examination is performed should not exceed 21.5 lx (2 foot-
APPROVED BY: Eddie Pompa

candles).

6.4. Particle Quality Control Tests:

Dry particle meeting the requirements of section 5.4, may not be re-used.
PROE REV:

Wet particle meeting the requirements of section 5.4, the following checks are required:

Bath Concentration Verification; Every eight hours or every shift change, the particle suspension
shall run through the recirculation system for at least 30 min prior to bath concentration test.
REVISION PENDING: NO

Fluorescent Particle suspension shall be checked by the use of a pear-shaped ASTM centrifuge
STATE: RELEASED

tube with a 1-mL stem (0.05 ml divisions). A 100 ml. portion of the particle suspension shall be
obtained and allowed to settle for approximately 60 minutes for petroleum distillate suspension or
PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 6 of 21
Confidential

approximately 30 minutes with water-based suspensions before reading results. The required
concentration is 0.1 to 0.4 ml.

Bath Contamination— Shall be checked weekly for contaminants such as dirt, scale, oil, lint, loose
fluorescent pigment, water (in the case of oil suspensions), and particle agglomerates which can
adversely affect the performance of the magnetic particle examination process.

Carrier Contamination of fluorescent bath liquid directly above the precipitate should be evaluated
with black light. Acceptable liquid will have little fluorescence. Its color can be compared with freshly
made-up or retained unused sample of the same materials, if the “used” sample is noticeably more
fluorescent than the comparison standard, the bath should be replaced.

Particle Contamination of both fluorescent and nonfluorescent baths should be evaluated, if the
VIEWED: 2020/11/09 05:31:21
VGS23.3.2 | 4

total volume of the contaminates, including bands or striations exceeds 30% of the volume of
magnetic particles, the bath should be replaced.

Water Break Check for Conditioned Water Vehicles— The water break check shall be performed
daily by flooding a part, similar in surface finish to those under examination, with suspension, and then
noting the appearance of the surface of the part after the flooding is stopped. If the film of suspension
is continuous and even all over the part, sufficient wetting agent is present. If the film of suspension
DOCUMENT:

breaks, exposing bare surfaces of the part, and the suspension forms many separate droplets on the
surface, more wetting agent is needed, or the part has not been sufficiently cleaned. When using the
fluorescent method, this check should be performed under both black light and white light.
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

If aerosol spray cans, such as Magnaflux or equivalent, are used meeting the requirements of section
5.4, the quality control test above are not required.

6.5. Magnetic flux field meter (Gauss Meter)

Perform every six months: The accuracy of the Magnetic flux field meter (Gauss Meter) shall be
PROE MODEL VERSION:

verified semi-annually by equipment (test meter) whose accuracy is verified (traceable) to NIST
(National Institute of Standards and Technology), IRMM (Institute for Reference Materials and
Measurements) or equivalent.

6.6. Pressure, Temperature Gauges, Thermometers and Other Monitoring Equipment

Pressure and temperature gauges, thermometers, metering and monitoring equipment shall be
calibrated in accordance with their manufacturing requirements at a frequency recommended by the
manufacturer, state or local agency requirements or as detailed in this specification. The calibration
period shall not exceed 12 months.

6.7. System Performance Check:


APPROVED BY: Eddie Pompa

The system performance check shall be performed daily, using all associated equipment and
settings as to be encountered under actual examination.

Quantitative Quality Indicators (QQI, SAE AS 5371 Shims or equivalent; see 5.3), used with real parts
or those designed to be representative of the most challenging inspection currently being performed
PROE REV:

may be used.

If available, the ultimate specimens for the system performance tests are cracked parts containing
“appropriately sized” defects that are representative of the flaws that need to be detected. These
REVISION PENDING: NO

require careful handling to remain corrosion-free and retain their flaw size. Test parts shall be
demagnetized and free from indications resulting from previous tests.
STATE: RELEASED
PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 7 of 21
Confidential

7. INSPECTION

The entire surface area of the forgings shall be covered for examination. In the event this is not
possible, other methods shall be used to assure complete coverage.

Examination shall be performed by use of continuous wet method and fluorescent magnetic
particles. Any other method is subject to Baker Hughes and Equinor approval in written.

All examinations shall be performed with a minimum of two magnetizations with the magnetic field
direction 90 degrees apart.

Examination for the wet fluorescent method shall be in a darkened area with white light below 21.5 lux
(2 foot-candles).
VIEWED: 2020/11/09 05:31:21
VGS23.3.2 | 4

Personnel must be in the darkened area for a minimum of 1 minutes to allow the eyes to adapt to the
darkness before inspecting the part.

Inspector shall not wear eye glasses that are photochromic or that have permanently darkened lenses.
This is not intended to prohibit the use of eyeglasses with lenses treated to absorb ultraviolet light.
DOCUMENT:

7.1. Technique Sheet

7.1.1. A technique sheet shall be prepared prior to inspection, it shall have minimum information as required in
Annexure A, and be approved by Baker Hughes NDT level III or by an authorized NDT level III 1 of MT
provider 2, except the following DO NOT require Baker Hughes NDT Level III approval:
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

• All the preliminary MT inspection to forgings and raw materials before final machining operations
(especially the MT inspection at steel/forging mills) 3.

• Services parts, rental tools and refurbishment parts.


PROE MODEL VERSION:

The technique shall be selected, as far as practical, complete coverage of the area to be inspected in
two magnetizing directions 90 degrees apart as a minimum. All accessible surfaces of the area to be
inspected shall be examined using a suitable technique. The following can be considered as Non-
accessible surfaces:

• Bores, cavities, or areas where normal lighting or mirrors do not allow one to properly evaluate the
inspection surface.

• Bore Area of Internal diameter less than 1.5” except for the short portion (the length no more than ID)
near the open end(s).
APPROVED BY: Eddie Pompa

A generic technique sheet may be used that covers details common to a variety of components or family
of parts, having the same/similar material properties and of the same shape and size. For example: a
technique sheet written for a specific part number (sized valve body) may be used to inspect various

1 Baker Hughes provides authorization to Supplier’s NDT level III for self-approval of technique sheets, Inspectors shall
PROE REV:

prepare parts / product /project specific technique sheet in accordance with Annexure A of this document that shall be
approved by their level III’s. Self-approval authorization is provided when the suppliers are audited, has responsible level III
having certification in the method and their initial technique is approved by Baker Hughes NDE level III. (Contact Regional
level III or SQM for approval).
REVISION PENDING: NO

2 The NDT providers include Baker Hughes facilities and suppliers. Suppliers performing MT inspection for Baker Hughes

shall be a Baker Hughes approved NDT supplier / Vendor, i.e. their facilities, inspectors and capabilities are audited or
STATE: RELEASED

reviewed, and approved by Baker Hughes and documents available with e-SQM or with responsible SQE/PQE.
PROE NAME:

3 Final MT inspection shall be performed after final heat-treatment and final machining operations per API Spec 6A.

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 8 of 21
Confidential

part numbers of that valve body configuration and material.

Multidirectional magnetization technique may be used with approval by a Baker Hughes NDE Level III
certified in magnetic particle testing and if required, written documentation by the customer.

7.1.2. Revisions of drawings or P/Ns or specifications that do not affect the inspection do not require revision
of the technique sheet.

Where the VGS revision is different on the technique sheet but does not affect the technique, the
Technique Sheet shall be noted and re-signed by responsible / authorized Level III of MT provider in
the method.

The inspection providers shall monitor and record such revision changes in the technique sheet.
VIEWED: 2020/11/09 05:31:21
VGS23.3.2 | 4

7.2. Coil & Coil Wrap Technique:

The part shall be placed near the side of the coil during inspection if a fixed, pre-wound coil is used.

A cable must complete two loops to be considered a coil.


DOCUMENT:

When cable wraps are used, the cable must be repositioned/rotated at least once to inspect the test
surfaces covered by the cable wrap;

The following equations can be used to determine the needed ampere-turns (NI):
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

(1) Part with Low fill-factor Positioned Close to Inside Wall of Coil

45000
NI = 𝐿𝐿/𝐷𝐷
(±10%)
PROE MODEL VERSION:

(2) Parts with a Low Fill-Factor Positioned in the Center of the Coil

43000𝑅𝑅
NI = 𝐿𝐿 (±10%) (𝑅𝑅 𝑖𝑖𝑖𝑖 𝑡𝑡ℎ𝑒𝑒 𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟 𝑜𝑜𝑜𝑜 𝑡𝑡ℎ𝑒𝑒 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑖𝑖𝑖𝑖 𝑖𝑖𝑖𝑖𝑖𝑖ℎ)
�6 �−5
𝐷𝐷

(3) Cable Wrap or High Fill Factor Coils

35000
NI = 𝐿𝐿 (±10%)
� �+2
𝐷𝐷

For L/D ratios less than 3, a pole piece (ferromagnetic material approximately the same diameter as
APPROVED BY: Eddie Pompa

part) should be used to effectively increase the L/D ratio or utilize an alternative magnetization method
such as induced current. For L/D ratios greater than 15, a maximum L/D value of 15 should be used
for all formulas cited above.

For hollow piece, D should be replaced with an effective diameter Deff, where
PROE REV:

𝐷𝐷𝑒𝑒𝑒𝑒𝑒𝑒 = �(𝑂𝑂𝑂𝑂)2 − (𝐼𝐼𝐼𝐼)2

If the area to be magnetized extends beyond 225 mm (9”) on either side of the coil’s center, field
adequacy shall be demonstrated by using one of the methods described in section 5.3 of this
specification.
REVISION PENDING: NO

For large parts, due to size and shape, the magnetizing current shall be 1200 ampere-turns to 4500
STATE: RELEASED

ampere-turns. The field adequacy shall be demonstrated by using one of the methods described in
section 5.3 of this specification.
PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 9 of 21
Confidential

Notes: Hall-Effect probe gaussmeter shall not be used with encircling coil magnetization
techniques.

The above current calculations are for baseline current only; for larger irregular shaped parts,
the magnetizing current shall be adequate to produce the needed field strength to characterize
relevant size flaws as demonstrated by the AS 5371 Shims (QQI).

7.3. Central Conductor Technique:

Bars or cables, passed through the bore of a cylinder may be used to induce circular magnetization.
Central conductors may be solid or hollow and made from a non-ferrous material.
VIEWED: 2020/11/09 05:31:21
VGS23.3.2 | 4

This technique is used for hollow components and requires a second examination with a longitudinal
magnetic field in the perpendicular direction;

The nominal current should generally be 300–800 A/in. of part diameter (12 to 32 A/mm) and will
normally be 500 A/in. (20 A/mm) or lower.

The magnetizing current shall be adequate to produce the needed field strength to characterize relevant
DOCUMENT:

size flaws. A Hall Effect gaussmeter or AS 5371 shims (QQI) should be used to verify.

7.4. Portable Electromagnetic Yokes Technique:

Note: Baker Hughes NDE Level III Approval is required for the use of yokes for final machined
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

components

Using of AC current yoke is preferred. Leg spacing shall be from 4” to 8” apart; with a minimum lifting
force of 10 lbs. (4.5 kg) at the maximum pole distance that will be used;
PROE MODEL VERSION:

When using of DC Yoke is necessary, 40 lb (18 kg) lifting force at the pole leg spacing between 50 to
100 mm (2” to 4”) shall be required. When the maximum pole leg spacing is larger than 100 mm (4”),
50 lb (23 kg) at the maximum pole leg spacing that will be used is required.

Two examinations are required with the longitudinal magnetic field in perpendicular directions;

Note: Yoke technique shall not be allowed for final inspection of finished valve bores, valve
sealing areas, mechanisms (seats, gates, etc.), or for complex shaped components and large
components (as defined in Section 8.4) where areas may be accidently missed during yoke
placement.

7.5. Stationary Bench Head Technique (Circular Magnetization Using Direct Technique)
APPROVED BY: Eddie Pompa

A circular field is generated by passing current directly through the part which is firmly held between
the tail stock and head of the bench.

The nominal current should generally be 300–800 A/in. of part diameter (12 to 32 A/mm) and will
normally be 500 A/in. (20 A/mm) or lower.
PROE REV:

The field strengths generated through the use of this empirical formulas should be verified with a Hall
Effect gaussmeter or AS 5371 shims (QQI) to ensure adequate field strength.
REVISION PENDING: NO

Notes: This technique of producing circular magnetic field is followed by techniques to


produce a longitudinal field (e.g. coil technique) in the part.
STATE: RELEASED

When using the current flow technique of magnetization, precautions must be taken to prevent over-
PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 10 of 21
Confidential

heating, burning or arcing. Contact heads used without pads should be made preferably of steel or
aluminum. Copper or copper-faced heads should not be used. The contact heads and the test piece
shall be sufficiently clean to ensure good electrical contact, and the contact area shall be as large as
possible.

Lead contact pads shall only be used in a well-ventilated environment to ensure rapid dispersal of the
harmful vapors generated by local over-heating. Local or governmental environmental health and
safety organizations may have additional regulations regarding the use of lead pads.

Contact pads should always be maintained in good condition. They should be inspected regularly and
replaced whenever there is evidence of fraying, burning or other damage. Pads should be evenly
woven, of uniform thickness, and should be held firmly in position without distortion.
VIEWED: 2020/11/09 05:31:21
VGS23.3.2 | 4

8. EVALUATION

8.1. Inspection Coverage

Area Coverage of Magnetic Field Strength – Magnetic field indicators (Hall-effect gauss meters,
notched reference standard shims per AS-5371) shall be used to demonstrate the adequate
magnetization level, boundaries and desired orientation of each inspection.
DOCUMENT:

When Hall-effect Gauss Meter is used to determine the field strength, 30 G (2.4 kAM-1) shall be
required on all areas to be inspected. The probe should be positioned with 5 degrees of
perpendicularity to the part and the circular or longitudinal field is normal to the major dimension of the
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

Hall-effect senor.

A sketch showing coverage are required if the component is not 100% inspected.

8.2. Surface Condition


PROE MODEL VERSION:

Prior to each examination, the surface to be examined and all adjacent areas within at least 25 mm
(1”) shall be dry and free of all dirt, grease, lint, scale, welding flux, weld spatter, paint, oil, and other
extraneous matter that could obscure or otherwise interfere with the examination. Existing coating are
not permitted, with exception of coatings permitted per Section 8.2.1.

Surface, or surfaces requiring a specific finish or machining shall be given this finish or machining prior
to magnetic particle inspection.

8.2.1. Nonconductive coatings

Thin nonconductive coatings, such as paint in the order of 1 or 2 mils (0.02 to 0.05mm) will not normally
interfere with the formation of indications, but they must be removed at all points where electrical contact
APPROVED BY: Eddie Pompa

is to be made for direct magnetization. Indirect magnetization does not require electrical contact with
the part/piece.

Nonconductive coating thickness measurements can be made using the Magnetic Induction Thickness
technique per VGS8.6.1, latest revision. Coating thickness is also obtainable from technical document
(P/N specification, testing report, etc.).
PROE REV:

If a non-conducting coating/plating is left on the area to be examined that has a thickness greater than
0.002” (0.05 mm), it must be demonstrated that unacceptable discontinuities can be detected through the
maximum thickness applied.
REVISION PENDING: NO

Parts prepared and coated with thin surface protection non-conductive coatings, such as phosphate and
STATE: RELEASED

xylan, do not normally require the coating to be removed as long as the magnetizing method is indirect and
the thickness meets the requirements of the paragraph above.
PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 11 of 21
Confidential

8.2.2. Temperature

The surface being tested shall not exceed 120 degrees F. (49° C)

8.3. Sequence of Operations

8.3.1. Coil & Coil Wrap Technique:

The surface to be tested shall meet the surface conditions of section 8.2;

Place the coil encircling the part or section of the part to be examined.
VIEWED: 2020/11/09 05:31:21
VGS23.3.2 | 4

The boundaries of the magnetizing field shall be established using magnetic flux field indicators
described in section 5.3. Long parts should be examined in sections as not to exceed the effective
boundaries.

The sensitivity of the magnetizing field shall be established using magnetic flux field indicators described
in section 5.3.
DOCUMENT:

First examination with the longitudinal magnetic field is a ‘zero degree’ direction;

While the field is being generated, particle shall be applied;


REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

Wet Particle shall be applied either by spraying or flowing over the areas to be examined during the
application of the magnetizing field current. The spray or flow of wet magnetic particle must stop prior to
removing the applied current;

• Evaluation shall take place during and after the current is applied;
PROE MODEL VERSION:

• Examination coverage shall have a magnetic field boundary overlap of 10%, from the previous
inspected area to the next inspected area.

• Reposition the part (or cable) and repeat steps above until all inspection areas are examined with
that magnetic field direction;

• The second examination with the longitudinal magnetic field shall be approximately 90º in relations
to the first examination.

• Reposition the part (or cable) and repeat until all inspection areas are examined with that magnetic
field direction;
APPROVED BY: Eddie Pompa

8.3.2. Central Conductor Technique

The surface to be tested shall meet the surface conditions of section 8.2;

Place the central conductor inside the part to be examined;


PROE REV:

• When cable wraps are used, the cable must be repositioned/rotated at least once to inspect the test
surfaces covered by the cable wrap;

The boundaries of the magnetizing field shall be established using magnetic flux field indicators, see
REVISION PENDING: NO

Section 5.3.
STATE: RELEASED

The sensitivity of the magnetizing field shall be established using magnetic flux field indicators, see
section 5.3.
PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 12 of 21
Confidential

When using offset central conductors, the entire circumference shall have a magnetic field boundary
examined and rotating the part on the conductor if needed, allowing for approximately a 10% magnetic
field overlap.

NOTE: Examination with the circular magnetic field is considered the ‘ninety degrees’ direction
examination;

• While the magnetic field is being generated, particle shall be applied;

Wet Particle shall be applied either by spraying or flowing over the areas to be examined during the
application of the magnetizing field current. The spray or flow of wet magnetic particle must stop prior
to removing the applied current;
VIEWED: 2020/11/09 05:31:21
VGS23.3.2 | 4

• Evaluation shall take place during and after the current is applied;

Reposition the part or cable wraps and repeat steps above until all inspection areas are examined in
the 90º direction;

Second examination must utilize the longitudinal magnetic field (Coil & Coil Wrap Technique) for a ‘zero
DOCUMENT:

degree’ direction examination.

8.3.3. Yoke Technique


REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

The surface to be tested shall meet the surface conditions of section 8.2;

Leg spacing of AC Yoke shall be from 4” to 8” apart;

First examination with the longitudinal magnetic field is a ‘zero degree’ direction;
PROE MODEL VERSION:

• Place the yoke legs on the component surface and apply current. Do not move the yoke while
current is being applied;

• While the field is being generated, particle shall be applied;

Dry Particle shall be applied in such a manner that a light uniform, dust-like coating settles upon
the surface of the part. Excess particle must be lightly blown off the area of inspection prior the
removing the applied current;

Wet Particle: Shall be applied either by spraying or flowing over the areas to be examined during
the application of the magnetizing field current. The spray or flow of wet magnetic particle must stop
prior to removing the applied current;
APPROVED BY: Eddie Pompa

• Evaluation shall take place during and after the current is applied;

Examination coverage shall have magnetic field boundaries overlap of one inch, from the previous
inspected area to the next inspected area.
PROE REV:

Repeat steps above until all inspection areas are examined in the zero-degree direction;

The second examination with the longitudinal magnetic field shall be approximately 90º in relations to
the first examination.
REVISION PENDING: NO

Repeat steps per 8.3.3 above until all inspection areas are examined in the ninety-degree direction;
STATE: RELEASED
PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 13 of 21
Confidential

Yoke Technique:

1” Overlap

S
p
a
c
i
n
VIEWED: 2020/11/09 05:31:21

g
VGS23.3.2 | 4

Spacing

1” Overlap
DOCUMENT:

8.4. Acceptance Criteria

The acceptance criteria will be listed as one or more supplementary requirements in Section 11 of this
specification. The supplementary requirements shall apply and become a part of this specification when
specified on the GE drawing, part specification or purchase order by inserting ‘S’ and the supplement
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

number after the ‘VGS’ number. Supplements are added to this specification whenever GE Engineering
requirements reflect a specified code or specification where specific accept/reject requirements are
applicable.

Customer specific accept/reject criteria will be contained in a separate and unique VGS23 series
PROE MODEL VERSION:

specification as required by the Engineering Part Specification.

Interpret and evaluate the discontinuity indication(s) based on the size and shape of the results from the
magnetic leakage field. Where false or non-relevant indications are suspected, the area containing the
indications shall be examined by liquid penetrant inspection to verify relevancy. Testing shall be in
accordance with VGS 8.4.2.

Relevant Indications: Surface-rupture NDE indications that are caused by mechanical discontinuities with
major dimensions greater than 1.6mm (1/16”) shall be considered relevant, unless defined within the
acceptance supplement.

False or Non-Relevant Indications: Indications that are caused by physical characteristics such as
APPROVED BY: Eddie Pompa

permeability differences, scratches, stenciling marks, machining marks, keyways, rivets etc., and not
associated with material discontinuities.

Linear Indication: Any indication, where the length is equal to or greater than three times its width.

Rounded Indication: Any indication, where the length is less than three times the largest width.
PROE REV:

Simple cylindrical or rectangular shaped components: Raw or rough machined cylindrical or


rectangular components may be examined with a portable electromagnetic yoke.
REVISION PENDING: NO

Complex shaped components: are parts or material that have complex machined features that make it
difficult to obtain an adequate magnetic field within cavities (internal or external grooves, bolt holes, or
STATE: RELEASED

other potential stress points) which may prevent the inspector from identifying surface indications.
Additional NDE capable of providing adequate inspection of these areas should be used to obtain full
PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 14 of 21
Confidential

inspection coverage. The NDE Level III must be consulted.

Large components: are parts that have large areas (Ex. H4 housings, connectors, etc.) that make it
difficult to maintain proper coverage in both 0 and 90 degree orientations. Due to the relatively small
inspection area (~ 3” x 6”) of a portable electromagnetic yoke, inspectors may not properly cover the
large surfaces and miss defects as a result. Additional NDE capable of providing adequate inspection
of these areas should be used to obtain full inspection coverage. The NDE Level III must be consulted.

9. POST INSPECTION

Whenever possible, parts that have been magnetized circularly shall be magnetized in the longitudinal
direction before being demagnetized.
VIEWED: 2020/11/09 05:31:21
VGS23.3.2 | 4

Measuring of residual magnetic field and potential demagnetization of the material shall be addressed
in the procedure / technique sheet, whether it is needed or not.

Demagnetization is generally required for residual fields greater than three (3) gauss.

Where the residual magnetic fields affect further processing or where specified in the drawings,
specification, or purchase order, residual fields should not exceed the value specified or agreed upon
DOCUMENT:

between the supplier and customer.

Demagnetization is accomplished by subjecting the part to a field equal to or greater than that used to
magnetize the part and in nearly the same direction, then continuously reversing the field direction while
gradually decreasing it to zero.
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

Post cleaning is generally required, using the same cleaning operations as were used in the pre-cleaning
process. White contrast paint should be removed if test specimen is at its final operation.

9.1. Part Marking


PROE MODEL VERSION:

9.1.1. Rejectable Indications

Defects shall be marked on the part in a manner and with materials that are not harmful to the part.

The area of indication shall be marked on the part in some manner. The marking method is preferably
one that is directly adjacent to the indication, showing location, length, width and interpretation of defect.
In cases where this is not practical due to part size or configuration, the defect information or rejection
report number shall be recorded on a tag or report traveling with the part.

9.1.2. Accepted Parts


APPROVED BY: Eddie Pompa

Parts that have been accepted using magnetic particle testing shall be marked in accordance with the
applicable drawing, purchase order, contract or as specified by the Code or site-specific work
instructions.

10. RECORDS
PROE REV:

10.1. Test Report

Written reports shall be provided and shall contain as a minimum the following information:
REVISION PENDING: NO

• Logo and name of the firm executing the test


STATE: RELEASED

• Work Order or Purchase Order;


PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 15 of 21
Confidential

• Serial Number;

• Part Number and Description;

• Part Material;

• Procedure Number and Revision;

• Magnetizing unit Manufacturer, Type and Serial Number;

• Magnetizing Current Type (AC, DC, HWAC, FWAC) and Amperage Level;
VIEWED: 2020/11/09 05:31:21

• Technique Used (coil, cable wrap, central conductor, yoke);


VGS23.3.2 | 4

• Magnetic Particle Manufacturer, Type (fluorescent, visible wet or dry) type of carrier used.

• Magnetic Particle Concentration Level or Batch Number for Aerosol Spray Can;

• White Light Meter Serial Number and Light Intensity;


DOCUMENT:

• Black Light Meter Serial Number and Light Intensity; if applicable

• Sketch(es) showing areas of incomplete coverage when 100% of the components surface is not
inspected;
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

• Test Results - Accept/Non-Accept with comments;

• Date of examination; (if applicable, record PWHT date and time of completion)
PROE MODEL VERSION:

• A copy of the Baker Hughes Level III approved technique sheet.

• Technician’s printed name, NDT level and copy of inspector’s current certification credentials for the
magnetic particle inspection method. If there is any question as to if the credentials are archived, check
the status with your Baker Hughes Sourcing Quality Engineer (SQE).

• Demagnetization method used.

• GRR/NCR Number, if applicable

• Description of Indications - location, size, may be written, shown in a sketch, photograph or


electronically scanned. Indications can be preserved by transparent adhesive tape, varnish, peel able
APPROVED BY: Eddie Pompa

contrast-aids magnetic tapes or epoxy or chemical magnetic particle mixtures.

10.2. Data Retention

All Inspection reports required by this specification shall be maintained in a traceable manner and
retained for a minimum of ten years or as required by customer, legal or any other applicable
PROE REV:

requirements, whichever is longer (see also Baker Hughes Quality Management Procedure – Baker
Hughes-QUA-013 “Record Control”).
REVISION PENDING: NO
STATE: RELEASED
PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 16 of 21
Confidential

11. SUPPLEMENTS

The following supplementary requirements shall apply and become a part of this specification.
Supplementary specified on the drawing, part specification, or purchase order by inserting, 'S' and the
supplement number after the 'VGS’ specification number. If no supplement number is indicated, i.e.
when only the “base” number specification “VGS23.3.2” is specified, then S3 shall apply.

S1 EN 10228-1 Table 2 Quality class 2:

Quality class
Parameter
2
Recording level: indication length (mm) ≥2
VIEWED: 2020/11/09 05:31:21

allowable length L of isolated indications and allowable length Lg of


VGS23.3.2 | 4

≤8
interacting indications (mm)
allowable cumulative length of indications in the reference surface (mm) ≤ 36
Maximum allowable number of indications in the reference surface 10
Note:
Reference surface = 148 mm × 105 mm (i.e. A6 format). For objects smaller than the
reference surface, or if only an area is examined smaller than the reference surface, then the
DOCUMENT:

maximum allowable number of indications should be determined and agreed accordingly


(the acceptance criteria for the dimensions remain unchanged).

S2 EN 10228-1 Table 2 Quality class 4:


REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

Quality class
Parameter
4
Recording level: indication length (mm) ≥1
allowable length L of isolated indications and allowable length Lg of
≤2
interacting indications (mm)
PROE MODEL VERSION:

allowable cumulative length of indications in the reference surface (mm) ≤5


Maximum allowable number of indications in the reference surface 5
Note:
a) Quality class not applicable to the examination of areas with a machining allowance greater
than 1 mm per face.
b) Reference surface = 148 mm × 105 mm (i.e. A6 format). For objects smaller than the
reference surface, or if only an area is examined smaller than the reference surface, then the
maximum allowable number of indications should be determined and agreed accordingly
(the acceptance criteria for the dimensions remain unchanged).

S3 TR2382 and TR3540.


APPROVED BY: Eddie Pompa

The supplement number S2 shall be met, in addition, no visual or NDT-detectable indications shall be
acceptable in seal areas and high stressed hotspots and in fatigue hotspot areas determined by analysis.

For TR3540 application, the supplement number S5 can be the alternative of S2 here.

S4 (ISO 10423, ISO 13533, ISO 13628-4, pre-clad surfaces) Base Metal Acceptance Criteria .
PROE REV:

The following indications are unacceptable

a) No relevant linear indications.


REVISION PENDING: NO

b) Relevant indication with a major dimension equal to or greater than 3/16” (4.8 mm).
STATE: RELEASED
PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 17 of 21
Confidential

c) More than ten (10) relevant indications in any continuous 6 square-inch (40 cm2) area.

d) Four or more relevant indications in a line separated by less than 1/16” (1.6 mm), edge to edge are
unacceptable.

e) Relevant indications in the pressure contact sealing surfaces

S5 ASME BPVC Section VIII Division 1. App.6.

All surfaces to be examined shall be free of:

(a) relevant linear indications;


VIEWED: 2020/11/09 05:31:21
VGS23.3.2 | 4

(b) relevant rounded indications greater than 3/16 in. (5 mm);

(c) four or more relevant rounded indications in a line separated by 1/16 in. (1.5 mm) or less, edge to edge.

S6 DNVGL-RP-0034

Note: refer to Section 3.1 for the requirement of Personnel Certification.


DOCUMENT:

All forgings shall be subjected to magnetic particle testing (MT) on the accessible surfaces in the final
machined condition.
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

Where forgings are supplied in the black or rough machined condition, they shall be capable of meeting the
MT requirements for parts in the final machined condition. This shall only apply to defects related to forging
manufacturers’ activities, e.g. materials, forging and heat treatment. Forging manufacturers shall perform
intermediate MT taking this into consideration. In such cases, the extent of testing and acceptance criteria
shall be agreed with the purchaser.
PROE MODEL VERSION:

If access limits the possibility for MT at a bore, UT shall be performed on solid forgings before drilling of the
bore, or before final machining of the bore. In such cases, the UT shall be based on a reflector size of flat
bottom hole (FBH) Ø1.6 mm. No indications exceeding the reference are accepted in the location of final
machined surface. The testing shall be defined in the scan plan and shall be unambiguously reported.

Acceptance criteria for SFC 1 and SFC 2 parts in the final machined condition shall be:

• no relevant linear indication


• no relevant rounded indication with a major dimension equal to or greater than 3 mm (1/8 in)
• no more than ten relevant indications in any continuous 40 cm2 (6 in2) area
• four or more relevant indications in a line separated by less than 1.6 mm (1/16 in) (edge to edge)
APPROVED BY: Eddie Pompa

are unacceptable
• no relevant indications in pressure contact sealing surfaces. Relevant indication shall be as defined
in ISO 10423 or API 6A.

MT acceptance criteria for SFC 3 parts in the final machined condition shall be no relevant indication, as
defined in ISO 10423 or API 6A.
PROE REV:
REVISION PENDING: NO
STATE: RELEASED
PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 18 of 21
Confidential

12. RECORD OF REVISION

Revision Affected Description


Sections
All Newly prepared based on the latest VGS8.3.2, with API 6A 21st edition,
4
TR2382 ver 1 and TR3540 ver 3.01 compliance.
VIEWED: 2020/11/09 05:31:21
DOCUMENT: VGS23.3.2 | 4
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16
PROE MODEL VERSION:
APPROVED BY: Eddie Pompa
PROE REV:
REVISION PENDING: NO
STATE: RELEASED
PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 19 of 21
Confidential

Annex A
(Normative)

TECHNIQUE SHEET NUMBERING

A.1 Mandatory Numbering

The following numbering scheme to be used for both the technique sheet(s) created using the template form
provided at the end of this specification or those created with other formats per A.2. Baker Hughes need use
of the provided numbering system for standardization and traceability/archiving purposes. Different
Technique Sheet numbering may be used between square brackets [ ], when and where they are stated
below.
VIEWED: 2020/11/09 05:31:21
VGS23.3.2 | 4

Technique Sheet(s) to be submitted for Baker Hughes review, approval or archiving per Section 7.1 must be
one per file and have same digital file-name(s) generated by the present mandatory technique sheet
numbering scheme. Digital signatures in lieu of oleography signatures are preferred, provided the submitted
file(s) have not been secured for further commenting/digital approvals of Baker Hughes.
DOCUMENT:

Technique number / file name: AAAA–BB-P/N-RevZ–CC– [XXX]-[YY]

Where:
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

AAAA: 2 to 4 Letters abbreviation of NDT Inspection provider’s legal entity name.


If Baker Hughes would be the NDT provider, the four letters “Baker Hughes” would be used.

BB: 2 Letters abbreviation for the NDT method. Ultrasonic Testing method will be “MT” in this
case. (Terminology of ASTM E1316, SNT-TC-1A and ISO 9712 shall be used.)
PROE MODEL VERSION:

P/N-RevZ: Product number and its revision index e.g. R450350-1-RevA.

In case of grouping more than one Part Number, a general description of the group of part
numbers shall be used e.g. “3inODx3000mLG-RAWBAR-F22”.
CC: Revision of the technique sheet – 1 Letter & 1 Number – Not to be confused with the revision
of the draft of the technique sheet. Letters represent the revision whereas numbers represent
alternative test plans. Always start with “A0” and the release of a revision with the next letter
will void the revision with the last letter. Hence, if revision “B0” is released revision “A0” will
be void. An example for using an alternative number is, when a certain part will be inspected
after heat treatment (HT) and after final machining. Use number “1” for the first inspection
APPROVED BY: Eddie Pompa

(after HT) and number “2” for the inspection after final machining.
[XXX] – [YY]: Optional additional information, which can be used by the NDT provider / supplier for example
for the internal reference. To be used with brackets in order to mark it as additional information
or to insert a different Technique Sheet numbering according to NDT provider / Supplier
manual of quality.
PROE REV:

It should be separated with dashes. For example purchase order number 14 dated 2014-05-
24 would be “[PO014]-[140524]”

Example: Using the examples above would lead to the following number and file name of the technique
sheet:
REVISION PENDING: NO

Baker Hughes-MT-R450350-1-RevA-A1-[PO014]-[140524]
STATE: RELEASED

Note: DO NOT include any space between each letter, number or symbol. For example:
PROE NAME:

Security Level: CONFIDENTIAL


.
DOCUMENT DATE/REV. PAGE
VGS 23.3.2 14 November 2019
BAKER HUGHES Revision 4 20 of 21
Confidential

“RevA” rather than “Rev A” is required.

A.2 Technique Format


A template form is provided at the end of this document, however, a separate and editable template in Word
format is available. Different template can be used provided all the inspection parameters (where applicable)
noted in the one attached at the end of this specification are present.
The users of this document may contact a Baker Hughes NDT Level III for any technical question concerning
Technique Sheet content and formats.
VIEWED: 2020/11/09 05:31:21
DOCUMENT: VGS23.3.2 | 4
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16
PROE MODEL VERSION:
APPROVED BY: Eddie Pompa
PROE REV:
REVISION PENDING: NO
STATE: RELEASED
PROE NAME:

Security Level: CONFIDENTIAL


MAGNETIC PARTICLE TECHNIQUE PLAN
AA-MT-P/N&Rev-A0
Company Name/Logo Technique Sheet number
(Refer to Annex A for Numbering Instruction)
Address / Location
Procedure No. VGS23.3.2 Rev #
Part Number Acceptance No. VGS23.3.2-S# Rev #
Part Description Material Type:
Part: (Dimensions) Surface Condition
Timing of Inspection Choose an item. Inspection Area

Technique to Use Choose an item. Choose an item. Choose an item.

INSTRUMENT DETAILS
Magnetizing Unit Current Type and Max Choose an item.
Name and Type Amps: Max Amps: A
VIEWED: 2020/11/09 05:31:21

Magnetic Particle
VGS23.3.2 | 4

Lighting Equipment
brand & type
Magnetic field
Choose an item. Field direction checks by Choose an item.
strength checks
SET_UP DETAILS
1st or Circular Magnetization 2nd or Longitudinal Magnetization
Turns Turns
DOCUMENT:

Conductor
Choose an item. Conductor Size Choose an item.
Size
Amps Amps
TEST PLAN SKETCH
REVIEWED BY: Premkumar Subramanian REVIEWED ON: 2019/11/15 14:33:08
APPROVED ON: 2019/12/12 07:38:16

Choose an item. Choose an item.


Number of Examinations Number of Examinations
NOTE
PROE MODEL VERSION:

(Insert photos and/or sketch of setup here)

(For each “Choose an item” showed in this page, please click to show the drop-list and choose one item, then
manually edit it where necessary.)

(Any data already filled in are for your example only.)


(You may need to add additional row or column where necessary.)
(Fill in “N/A” where not applicable.)

(Delete the above NOTES before start)


APPROVED BY: Eddie Pompa

Bath Concentration ml/100ml Demagnetization Method/


Residual Level
Black Light Level μW/cm2 White Light Level Lux
Notes:
☒Record the Percentage of coverage and Access limitation/ area not covered in the Technique sheet.
PROE REV:

☐ Arcing is strictly prohibited when apply direct contact magnetization.


☐ Self-Approve to this technique sheet is authorized by Baker Hughes.
☐ Others.
REVISION PENDING: NO

Prepared By Reviewed By Approved By:


(BAKER HUGHES/Authorized Level III)
STATE: RELEASED

Date Date Date


PROE NAME:

Form # MT-Techniuqe-2332 (V0) Page 1 of 1

Security Level: CONFIDENTIAL