You are on page 1of 7

Detailed Business Requirements Document

PM-002- Auto-notification when


measuring point limit got out of range

23 Nov. 21
About this tool/enabler

Objective and benefits


This template provides a standardized format for documenting detailed business requirements and testing conditions/
scenarios for development of custom WRICEF (W stands for Workflow, R stands for Reports, I stands for Interfaces, C stands
for Conversions, E stands for Enhancements and F stands for Forms) objects. This detailed requirement document along with
the testing conditions will be in turn used for the development of functional specification documents for the same objects.
This document will be created by a member of the business functional team.
How to use this tool/enabler
This document is a template for maintaining detailed business requirements and testing conditions/ scenarios enhancement
specification document for a project The template
includes the instructions to the author, boilerplate text, and fields that should be replaced with the values specific to the
project.
*.
* Text and tables in black are provided as boilerplate examples of wording and formats that may be used or modified as
appropriate as needed.  These are offered only as suggestions to assist in developing project documents.
When using this template for your project document, it is recommended that you follow these steps:
1. Replace all text enclosed in angle brackets (i.e., <Project Name>) with the correct field values. 
2. Modify boilerplate text as appropriate to the specific project. 
3. To add any new sections to the document, ensure that the appropriate header and body text styles are maintained.  Styles
used for the Section Headings are Heading 1, Heading 2 and Heading 3.  Style used for boilerplate text is Body Text.
4. To update the Table of Contents, right-click and select “Update field” and choose the option- “Update entire table”.
When to use this tool/enabler
Complete this document during Detailed Design phase.

Document details
Last updated: Add Date
Document version: 1.0
Point of contact: Mr. Faizan
Table of Contents

DOCUMENT CONTROL...................................................................................................................................................................................4
1. GENERAL INFORMATION...................................................................................................................................................................5
2. RELATED WRICEF OBJECTS............................................................................................................................................................5
3. REQUIREMENT SUMMARY AND BUSINESS DRIVERS.............................................................................................................................5
4. DETAILED BUSINESS REQUIREMENTS.................................................................................................................................................5
A. PROCESS FLOW FOR WORKFLOWS.....................................................................................................................................................6
B. FORMULAE AND CALCULATION.........................................................................................................................................................6
C. IMPACT/ BENEFIT OF THE WRICEF IMPLEMENTATION.........................................................................................................................6
D. IMPACT IF THE WRICEF IS NOT IMPLEMENTED...................................................................................................................................6
5. SECURITY REQUIREMENTS/ AUTHORIZATION DETAILS.........................................................................................................................6
6. UNIT TESTING SCENARIOS................................................................................................................................................................6
7. ADDITIONAL INFORMATION AND ATTACHMENTS.................................................................................................................................7
Document control
Document information
Owner Mr. Imad Ahmed Khan
Document status Initial Draft
Document location Path EY Delivers

Document revision history


Version No. Status Date Author Change Log
1.0 Draft 25.08.2021 Mr. Faizan Draft

Reviewers
Date Reviewed By Role Signature
25.08.2021 Mr. Haris Khan EY PM – Track Lead
25.08.2021 Mr. Jawwad EY PM – Consultant

Approvers for sign off


Date Approved By Role Signature

Distribution in addition to reviewers and authorizers


Name Role

Note: Documents are either approved by physical signatures or via an email clearly stating approval of document
with reference to the version.

Reference documents
Document Location

BPD <> Path EY Delivers

GAP ID <PM-002> Path EY Delivers

© 2021 EYFR Limited. All rights reserved. For internal distribution only.
1. General Information
  
Area (SAP System components): Plant Maintenance (PM) DATE: 25.08.2021
Type of WRICEF: Reporting CAB NO:
Reference Transaction code: IK11
Title Auto-notification when measuring point limit is out of range
Priority: High/mandatory Medium/recommended Low/optional
Daily Weekly Monthly Biweekly
Frequency:
Others (Specify) : As per requirement
Is there an alternative in the
standard system? Or discussed in the Yes No
Fit-Gap workshop?
If yes, provide description of
alternative:

2. Related WRICEF Objects


If there are other WRICEF objects that are related to this gap, please list below.
GAP ID WRICEF ID Comments
PM-037 N/A N/A

3. Requirement Summary and Business Drivers


Auto-notification on exceeding the limits of measuring values highly minimizes the human errors and machine
reliability.

4. Detailed Business Requirements


Currently we have a Preventive Maintenacne schedule of condition monitoring of equipments as per pre-described
frequencies. Operator note the measuring values and write it onto a pre-formulated format (e.g. vibration &
temperature of bearings etc.) and got it signed by concerned authorities. Mostly it takes a huge time to complete the
condition monitoring of a whole plant and sometimes it got neglected by authorities to take a deep insight of values
and consequently failure occurs in case of either negligence or late information.
So in order to avoid this probability of failure, we have take a pro-active approach and decided that operator will
note these values directly onto PM module via a tablet of any gadget. In case of deviation from standard limits, an
auto-notification will be created into the system which will intimate the concerned authorities to take the action
accordingly. In this way we will save the asset life and any sudden production loss.

© 2021 EYFR Limited. All rights reserved. For internal distribution only.
a. Process Flow for Workflows
Not Applicable

b. Formulae and Calculation


Not Applicable

c. Impact/ benefit of the WRICEF implementation


 Equipment Reliability
 Asset Management

d. Impact if the WRICEF is not implemented


 Equipment Unreliability
 Asset Mismanagement

5. Security Requirements/ Authorization Details


Not Applicable

6. Unit Testing Scenarios


Not Applicable

7. Additional Information and Attachments

© 2021 EYFR Limited. All rights reserved. For internal distribution only.
EY | Assurance | Tax | Strategy & Transactions | Consulting

About EY
EY is a global leader in assurance, tax, transaction and advisory
Services. The insights and quality services we deliver help build
Trust and confidence in the capital markets and in economies the
World over. We develop outstanding leaders who team to deliver
On our promises to all of our stakeholders. In so doing, we play a
Critical role in building a better working world for our people, for
Our clients and for our communities.

EY refers to the global organization, and may refer to one or


More, of the member firms of Ernst & Young Global Limited,
each of which is a separate legal entity. Ernst & Young Global
Limited, a UK company limited by guarantee, does not provide
Services to clients. For more information about our organization,
Please visit ey.com.

EY Ford Rhodes is a client-serving member firm of


Ernst & Young Global Limited operating in the US.

© 2021 EY Ford Rhodes.


All Rights Reserved.

EY Ford Rhodes
Progressive Plaza, Beaumont Road,
Karachi 75530, Pakistan

This material has been prepared for general informational purposes


Only and is not intended to be relied upon as accounting, tax, or other
Professional advice. Please refer to your advisors for specific advice.

ey.com

You might also like