1 Inlet Chamber
Quantity of Flow (Ave) 25000.00 Cum/day
Peak Flow 56250.00 Cum/day
0.05 Cum/Sec
Assumed Detention period 10.00 sec
Volume of the Inlet Chamber 0.50 Cum
Assumed Depth of flow 0.60 m
Area Required for Inlet Chamber 0.83 Sq.m
Assumed Length to Breadth Ratio 1.00
Breadth of the Tank 1.00 m
length of the Tank 1.00 m
Provide the Dimension of Inlet Chamber as 1 m x 1 m x 0.6 m SWD + 0.3 m Freeboard
Head loss on 50% clogging h1=0.0729(2*Vs2-Va2) 0.19 m less than 0.3 m hence ok
Water Depth downstream Hb, (Za-Zb)+Va2/2g-Vs2/2g+Ha- 0.66 m
Headloss thru screen in normal condition
Water Depth downstream Hb, (Za-Zb)+Va2/2g-Vs2/2g+Ha- 0.55 m
Headloss thru screen in clogged condition
Provide the Dimension of Screen Chamber (Fine Screens) as 1.8 m x 0.1 m x 0.8 m SWD + 0.3 m Freeboard
Page1 of 5
Design of STP Sewage Treatment Plant
Provide the Dimension of Grit Removal unit as 23.1 m x 2.5 m x 1.5 m SWD + 0.3 m Freeboard
Page2 of 5
Design of STP Sewage Treatment Plant
Mixing Arrangements
Assumed BOD reduction in the tank 15% Percent
Incoming BOD of Raw sewage 300.00 mg/L
BOD to be reduced 45 mg/L
BOD Load 2531.3 kg/day
Oxygen required to remove BOD load 2 kg/kg of BOD
Oxygen required 5062.5 kg/day
210.94 kg/hr
Actual Air Required 13286.56 Cum/hr
7 Aeration tank
No of Tanks 2
Flow - completely mixed
Q- per tank 12500.00 cum/day
BOD 255.00 mg/Lt
MLSS 2500.00
Type Aeration - Diffuser type fine bubble
Blowers - 2.00 ( 1W+1SB)
F/M assumed 0.12
Volume of the tank 10625.00 Cum volume of tank as per 13.6 page 226
Add additional volume of 25% for sludge recycle 2656.25 Cum
Total volume of tank 13281.25 Cum
Hydraulic Detention Time 1.06 day
8 Blower capacity
BoD load 3187.50 kg/day
132.81 kg/hr
Oxygen Required for 1 kg BOD removal 2.00 kg
Theoretical Oxygen 265.63 kg/hr
Actual requirement of air 12548.42 cum/hr
Provide 2 Blowers of capacity at 0.45 ksc (1W+ 1 SB) 25835.00 cum/hr for each tank
9 Secondary clarifier
No. of Tanks 2
Average Flow in each tank 12500.00 cum/day
Table 12.1, but it is 8-15 for average flow and 25-35 for
SOR 25.00 Cum/Sqm/day peak flow for extended aeration
Page3 of 5
Design of STP Sewage Treatment Plant
Provide the Dimension of Secondary clarifier as 28.7 m diamtre x 2.5 m SWD + 0.5 m Freeboard
Page4 of 5
Design of STP Sewage Treatment Plant
Or
Population Equivalent 187500.00 Persons
area per person 0.03 Sq.m
Total Area required 4687.50 Sq.m 5120
Provide Sludge Drying Beds of Size 16 m x 16 m x 1.8 M TD - 20 No.
Gravity Lines
Sludge line 160.00 mm
Sewage line 125.00 mm
15 Pump House
Size of the Pump House 100.00 Sq.m
Hydraulic Calculations
Inlet Chamber
Water Level in the Inlet Chamber be 212.00 m
Liquid Depth Provided in the Inlet Chamber 0.60 m
Bed Level of Inlet Chamber 211.40 m
Bar Screen Chamber
Water Level in the Bar Screen Chamber be 211.35 m
Bed Level of U/s of Bar Screen Chamber 210.69 m
Bed Level of D/s of Bar Screen Chamber 210.50 m
Grit Chamber
Water Level in the Grit Chamber be 210.40 m
Bottom Level of Grit Chamber 208.90 m
Silt Depoition Hopper bottom level 208.60 m
Equalization Tank
Water Level in the Equalization tank 209.90 m
Bed Level of Equalization tank 207.40 m
Aeration Tank
Water Level in the Aeration Tank 209.50 m
Bed Level of Aeration Tank 205.50 m
Secondary Clarifier
Water Level in the Secondary Clarifier 209.10 m
Bottom Level of secondary Clarifier 206.60 m
Treated Sewage Sump
Water Level in the Sump 208.10 m
Bed Level of Treated Sewage Sump 204.00 m
Wall Top Level of Treated Sewage Sump 210.50 m
Pump House
Size of the Pump House 100 Sq.m
Finished Floor Level of the Pump House above Treated Sewage
Sump 210.65 m
Roof Bottom Level of Pump house 214.00 m
Page5 of 5