SUBMISSION QT FORMS TO SYABAS - 2016

ITE
FORM
M DESCRIPTION SIGNATORY BY REMARK
NO.
NO.
Form QT3,
Application for test and QT4(a), QT4(b)
inspection of External Water and QT5 to be
1 QT1 Developer
Reticulation System/Supply ready prior
Main. submission of
QT1.
Response on application for Response by
test and inspection of External SYABAS after
2 QT2 SYABAS
Reticulation System/Supply QT 1
Main. submission.
Plumber to fill
up forms for
3 QT3 Material inspection reports. Consultant/SYABAS
verification by
consultant.
Plumber to fill
Hydrostatic Pressure Test and
up form for
4 QT4(a) Leakage Test report for Consultant/SYABAS
verification by
external pipeline.
consultant.
Hydrostatic Pressure Test - Plumber to fill
External Pipeline and Main up form for
5 QT4(b) Consultant/SYABAS
Pipe Complete with verification by
Ferrule and consultant.
Communication Pipe.
Water Tightness Test report
6 QT5* Consultant/SYABAS
for Reservoir/Suction Cistern.
Plumber to fill
up form for
Final Joint Inspection
7 QT6(a) Consultant/SYABAS verification by
report (External Pipeline).
consultant and
SYABAS.
Final Joint Inspection report
QT6(b) Plumber/Consultant/
8 (Reservoir/Suction/Cistern/Pu
* SYABAS
mp House).
Notification for submission of Letter from
bank guarantee over defect SYABAS request
9 QT7 SYABAS
liability period (External bank
Reticulation/Supply Main). guarantee.
Support letter from district Plumber/Consultant/
10 QT8
O&M for tapping works. SYABAS
Plumber/Consultant/ Plumber to fill
11 QT9 Certificate of Disinfection.
SYABAS up form.
12 QT10 Application for handing over Consultant/Develop Consultant to
of external water reticulation er compile

documents as
system. listed for
submission.
SUBMISSION QT FORMS TO SYABAS - 2016
Acceptance of handing over of
SYABAS letter
13 QT11 external water reticulation SYABAS
of acceptance.
system.