SYABAS Water Reticulation Target Dates (Contractor - How Thong)

No Form Ref. No. Description Original Target Duration Action Remarks


1 QT1 Application for test and inspection TYLIN Target award by September 2021

2 QT2 Response on application for test and inspection of external water reticulation SYABAS Start work by March 2022
system
3 QT3 Material inspection reports TYLIN

4 QT4(a) Hydrostatic pressure test & leakage test report TYLIN/HT

5 QT4(b) Hydrostatic pressure test report for external pipeline complete with ferrule & N/A
communication pipe
6 QT5 Water tightness test report for reservoirs N/A

7 QT6(a) Final joint inspection report for external pipelines TYLIN/HT

8 QT6(b) Final joint inspection report for reservoirs & pump houses N/A

9 QT7 Notification for submission of bank guarantee for defects liability period TYLIN/PPD
(external reticulation system/supply mains)
10 QT8 Support letter from district O&M department for tapping connection works TYLIN

11 EPS16 Application for sterilizing/flushing/water quality SYP

12 EPS16A Notification fof sterilizing/flushing/water quality TYLIN/HT

13 EPS17 Sterilizing/flushing/water quality pipeline report TYLIN/HT

14 EPS17A Forms for sterilizing/flushing for tapping connection works TYLIN/HT

15 QT9 Support letter from district water quality department for sterilization, TYLIN Completion by September 2022
dewatering, flushing and water quality testing activities
16 QT10 Application for handing over external water reticulation system/supply main to TYLIN/PPD Approval by Dec 2022
a water distribution license/services license
17 KA1/1 Handing over of water reticulation system TYLIN/PPD

18 SYA/F1A/Ver2.0 Water meter application form PPD

19 QT11 Acceptance of handing over of external water reticulation system/supply main May 2023 TYLIN/PPD