Professional Documents
Culture Documents
Element - 49 - 707-180606 - Structure Data
Element - 49 - 707-180606 - Structure Data
12 12
400x1000x1000mm
BASE B2
250
250
200x200mm
COLUMN C2
11 11
BEAM
250
250
200x250mm 200x250mm 200x250mm
COLUMN C1 COLUMN C1 COLUMN C1
10 10
500x1700x1700mm 500x1700x1700mm 500x1700x1700mm
BASE B1 BASE B1 BASE B1
150
150
200x250mm 200x250mm 200x250mm 200x250mm
COLUMN C1 COLUMN C1 COLUMN C1 COLUMN C1
200x200mm TYPICAL GROUND 200x200mm TYPICAL GROUND
9 BEAM BEAM 9
11
19
18
17
16
15
14
13
12
500x1700x1700mm 500x1700x1700mm 500x1700x1700mm 500x1700x1700mm
BASE B1 BASE B1 BASE B1 BASE B1
200x200mm TYPICAL GROUND
B
200x200mm TYPICAL GROUND
230
230
10
BEAM
BEAM
19 x 16 = 310
200x250mm 200x250mm
COLUMN C1 COLUMN C1
9
8 200x250mm
COLUMN C1
200x250mm
COLUMN C1
200x200mm TYPICAL GROUND
BEAM 8
55
500x1700x1700mm 500x1700x1700mm
7 BEAM 7 BASE B1 BASE B1
130
200x250mm 200x250mm
200x200mm
mm
COLUMN C1 COLUMN C1
500x1700x1700mm 500x1700x1700mm COLUMN C2
BASE B1 BASE B1
6 200x200mm TYPICAL GROUND
6
thic
BEAM
400x1000x1000mm
200x200mm TYPICAL GROUND
BEAM
BEAM
ret
BEAM
sla
BEAM
b
400
200x250mm 200x250mm 200x250mm
COLUMN C1 COLUMN C1 COLUMN C1
200x200mm TYPICAL GROUND
5 BEAM 200x200mm TYPICAL GROUND
BEAM 5
500x1700x1700mm 500x1700x1700mm 500x1700x1700mm
BASE B1 BASE B1 BASE B1
D
130
BEAM
200x200mm TYPICAL GROUND
290
290
BEAM
BEAM
200x250mm
COLUMN C1
3 3
500x1700x1700mm
110
200x250mm 200x250mm
COLUMN C1 COLUMN C1
1 1
500x1700x1700mm 500x1700x1700mm
75 65 415 340 BASE B1 170 BASE B1 100 60 140
A C E F H
FOUNDATION STRUCTURAL PLAN
NOTES LEGEND
REPUBLIC OF RWANDA Titre du Projet:
Modifications DATE ROPOSED RESIDENTIAL APPATMENT
FOUNDATION
9:......................................................... ........
DETAILS
10:......................................................... ........
DATE
PAGE NO: A 1 -1 FEB/2018
GSPublisherEngine 0.0.100.100
A B C D G H
200x200mm
12 COLUMN C2
12
250
BEAM
11 200x200mm
COLUMN C2 11
250
200x250mm 200x250mm 200x250mm
COLUMN C1 COLUMN C1 COLUMN C1
200x500mm TYPICAL BEAM
10 BEAM
10
150
150
200x250mm 200x250mm 200x250mm 200x250mm
COLUMN C1 COLUMN C1 COLUMN C1 COLUMN C1
200x500mm TYPICAL BEAM 200x500mm TYPICAL BEAM
9 BEAM BEAM 9
18
17
16
15
14
13
12
200x500mm TYPICAL BEAM
BEAM
BEAM
B
230
230
BEAM
10
BEAM
19 x 16 = 310
200x250mm 200x250mm
COLUMN C1 COLUMN C1
200x500mm TYPICAL BEAM
1
9
8 200x250mm
COLUMN C1
200x250mm
COLUMN C1
BEAM 8
55
7 BEAM 7
130
200x250mm 200x250mm
mm
COLUMN C1 COLUMN C1
200x200mm
200x500mm TYPICAL BEAM 200x300mm TYPICAL BEAM COLUMN C2
6 BEAM BEAM 6
thic
BEAM
onc
BEAM
BEAM
ret
e
BEAM
sla
E
b
400
200x250mm 200x250mm 200x250mm
COLUMN C1 COLUMN C1 COLUMN C1
200x500mm TYPICAL BEAM 200x500mm TYPICAL BEAM
5 BEAM BEAM 5
D
130
BEAM
BEAM
BEAM
BEAM
290
290
200x250mm 200x250mm
COLUMN C1 COLUMN C1
200x500mm TYPICAL BEAM
3 BEAM 3
110
280
180
200x250mm 200x250mm
COLUMN C1 COLUMN C1
200x500mm TYPICAL BEAM
1 BEAM 1
75 65 415 340 170 160 140
A C E F H
TYPICAL UPPER FLOR STRUCTURAL
PLAN
NOTES LEGEND
REPUBLIC OF RWANDA Titre du Projet:
Modifications DATE ROPOSED RESIDENTIAL APPATMENT
TYPICAL UPPER
9:......................................................... ........
FLOOR
10:......................................................... ........
DATE
PAGE NO: A 1 -2 FEB/2018
GSPublisherEngine 0.0.100.100
A B C D G H
12 250 12
250
11 11
250
250
10 10
150
150
Y10-@-200 B1
9 9
Y 1 0 -@ -2 0 0 B 1
Y 1 0 -@ -2 0 0 B 1
11
19
18
17
16
15
14
13
12
Y 1 0 -@ -2 0 0 B 1
B
230
230
10
19 x 16 = 310
Y 1 0 -@ -2 0 0 B 2
1
9
8 8
55
7 7
130
Y 1 0 -@ -2 0 0 B 1
6 6
Y 1 0 -@ -2 0 0 B 1
345
Y 1 0 -@ -2 0 0 B 2 Y 1 0 -@ -2 0 0 B 2
400
5 5
D
130
F
4 4
G
Y 1 0 -@ -2 0 0 B 2
290
290
Y 1 0 -@ -2 0 0 B 2
Y 1 0 -@ -2 0 0 B 1
Y10-@-200 B1
Y10-@-200 B1
3 3
110
2 2
280
Y 1 0 -@ -2 0 0 B 2 Y 1 0 -@ -2 0 0 B 2
180
1 1
75 65 415 340 170 160 140
A C E F H
BOTTOM REINFORCEMENTS BARS
NOTES LEGEND
REPUBLIC OF RWANDA Titre du Projet:
Modifications DATE ROPOSED RESIDENTIAL APPATMENT
SLAB BOTTOM
9:......................................................... ........
REBARS
10:......................................................... ........
DATE
PAGE NO: A 1 -3 FEB/2018
GSPublisherEngine 0.0.100.100
A B C D G H
155
140 270 145 180 430 60 140
12 12
250
250
11 11
250
250
10 10
Y 10-@ -200 T 1
271 145
150
150
150
Y 10@ -200 T 2
9 9
11
19
18
17
16
15
14
13
12
B
Y 10-@ -200 T 1
Y 10@ -200 T 2
230
230
240
10
284
180
19 x 16 = 310
Y 10@ -200 T 2
Y 10-@ -200 T 1
9
8 8
Y 10-@ -200 T 1
Y 10-@ -200 T 1
55
7 7
130
6 6
Y 10@ -200 T 2 Y 10@ -200 T 2
400
345
330 100
355
Y 10@ -200 T 2
542
400
400
5 5
Y 10-@ -200 T 1
Y 10-@ -200 T 1
D
130
F
4 4
G
290
290
288
Y 10-@ -200 T 1
3 3
110
2 2
280
280
660 330
Y 10@ -200 T 2
180
1 1
75 65 415 340 170 160 140
A C E F H
TOP REINFORCEMENT BARS
NOTES LEGEND
REPUBLIC OF RWANDA Titre du Projet:
Modifications DATE ROPOSED RESIDENTIAL APPATMENT
9:......................................................... ........
SLAB TOP REBARS
10:......................................................... ........
DATE
PAGE NO: A 1 -4 FEB/2018
GSPublisherEngine 0.0.100.100
+1280 +1280
200 200
250
200
4T12 4T12
COLUMN'S DETAILS COLUMN'S DETAILS
+960 +960
200 200
200
4T12 4T12
COLUMN'S DETAILS COLUMN'S DETAILS
+640 +640
200 200
200
4T12 4T12
COLUMN'S DETAILS COLUMN'S DETAILS
4T16 4T12
+320 +320
200 200
200
4T20 4T12
COLUMN'S DETAILS COLUMN'S DETAILS
4T20 4T12
±0.000 ±0.000
200 200
4T20 4T12
Stirrups T8/150mm Stirrups T8/150mm
250
200
-105 -105
500
400
2000 1000
5Y16 -@-220
1700
1000
C1 C2
8Y20 -@-250 5Y16-@-220
1700 1000
NOTES LEGEND
REPUBLIC OF RWANDA Titre du Projet:
Modifications DATE ROPOSED RESIDENTIAL APPATMENT
COLUMN AND
9:......................................................... ........
FOOTING DETAILS
10:......................................................... ........
DATE
PAGE NO: A 1 -5 FEB/2018
GSPublisherEngine 0.0.100.100
3Y16 .
2Y16 .
2Y16
.
2Y16 .
2Y16
A B C
2Y16-A 2Y14-A
15
2Y16-B
2 2
35
2Y16-B
65 415 340
A B C
A C E
TRANSVERSALE SECTION OF
THE BEAM
.3Y16 .2Y16 .
3Y16
.2Y16
.3Y16 .2Y16
A B C
2Y16-A 2Y14-A
15
1Y16-C 1Y16-C
A A
35
1Y16-D
2Y16-B
LONGITUDINALE SECTION OF
THE BEAM
NOTES LEGEND
REPUBLIC OF RWANDA Titre du Projet:
Modifications DATE ROPOSED RESIDENTIAL APPATMENT
B E A M & cantiliver
9:......................................................... ........ slab details
10:......................................................... ........
DATE
PAGE NO: A 1 -6 FEB/2018
GSPublisherEngine 0.0.100.100
10mm thick x150mm 200mm thick Solid Concrete blocks Masonry
high ceramic tile skirting On DPC
(Load bearing wall) Plastered and painted
9mm ceramic tile
10mm thick x200mm high
BRC A142 Cement mortar skirting
200
Floor construction 200x200mm RCC Ground beam
9mm thick Ceramic tiles 10 reinforced by 4T12
150 50 100 30
2,300
100
1,000 1,000
1,000
1000
9 7T10/m
11
8
12
4300
3200
6
Transversal steel bars 6T10/m
3,300
14
3,300
5
15
4
280
16
280
167
3
17 Main steel bars 7T12/m 7Ø10/m
2
18
NOTES LEGEND
REPUBLIC OF RWANDA Titre du Projet:
Modifications DATE ROPOSED RESIDENTIAL APPATMENT
100
Roof floor
30
270
Third floor
30
270
Second floor
30
270
First floor
30
270
Gound floor
c c
155 250 250
12 11 10
External wall view
NOTES LEGEND
REPUBLIC OF RWANDA Titre du Projet:
Modifications DATE ROPOSED RESIDENTIAL APPATMENT
extenal wall
9:......................................................... ........ DETAILS
10:......................................................... ........
DATE
PAGE NO: A 1 -1 FEB/2018
GSPublisherEngine 0.0.100.100
STRUCTURAL DESIGN OF A Reinforced
concreteRESIDENTIAL BUILDING
“G+3 BUILDING”
IDENTIFICATION
PROVINCE: WESTERN PROVINCE
DISTRICT: RUBAVU
OWNER : De BONNDT Aime Andre M.
Designed by: EAACON ltd
FEB , 2018
1
CONTENTS
CONTENTS ................................................................................................................................................ 1
0. INTRODUCTION .................................................................................................................................. 2
1. NOTATIONS .......................................................................................................................................... 3
2. ASSUMPTIONS ..................................................................................................................................... 4
3. LAYOUT OF OVERALL PLAN [STRUCTURAL ARRANGEMENT] ............................................. 6
4. CALCULATION AND DESIGN OF SLABS: Critical slabs ................................................................ 7
5. CALCULATION AND DESIGN OF BEAMS: Transversal Critical beams ....................................... 10
6. CALCULATION AND DESIGN OF BEAMS: Longitudinal Critical beams ..................................... 19
7. CALCULATION AND DESIGN OF COLUMN: Critical internal columns ...................................... 27
8. CALCULATION AND DESIGN OF COLUMN: Critical columnsin wall ......................................... 31
9. CALCULATION AND DESIGN OF FAUNDATIONS: Critical internal foundations ...................... 35
10. CALCULATION AND DESIGN OF FAUNDATIONS: Critical wall column foundations ............ 37
11. SUMMARIZED TABLE FOR STRUCTURAL DETAILING ......................................................... 43
0. INTRODUCTION
The aim of design is the achievement of an acceptable probability that structures being designed will
perform satisfactorily during their intended life. With an appropriate degree of safety, they should
sustain all the loads and deformations of normal construction and use and have adequate durability and
resistance to the effects of misuse and fire.
Once the building form and structural arrangement have been finalized the design problem consists of
the following:
1. Idealization of the structure into loadbearing frames and elements for analysis and design
2. Estimation of loads
3. Analysis to determine the maximum moments, thrusts and shears for design
4. Design of sections and reinforcement arrangements for slabs, beams, columns and walls using the
results from 3
5. Production of arrangement and detail drawings and bar schedules
This structural design process has been carried out under use of BS8110 design code of practice.
Especially, computations have been made by use of BS 8110 based spreadsheets; publication produced
by the Reinforced Concrete Council (RCC) as part of its project 'Spreadsheets for concrete design to BS
8110 and EC2'.
1. NOTATIONS
The symbolic notation used in this project is in accordance with the BS code of practice. Other symbols
not defined here, have been defined alongside the particular place where they have been applied.
2. ASSUMPTIONS
Design standard used to determine section of steel bars of different structural elements of concerned
building are BS 8110
Unities
Volumetric load: kN/m3
Surface load: kN/m2
Linear load: kN/m
Point load: kN
Dead loads
Cover conditions
Soil characteristics
Strength of reinforcement:
Hot rolled mild steel: 250 N/mm2
High yield steel (hot rolled or cold worked): 420 N/mm2
Concrete ƒck: 25N/mm2
Frame layout:
Beam 2 Layout
Type: T beam
L1=0.65m
L2=4.15m
L3=3.4m
Preliminary analysis
In the absence of any more accurate determination this should be taken as:
Where:
lz is the distance between points of zero moment (which, for a continuous beam, may be taken as 0.7
times the effective span).
( ) ( )
The basic span/effective depth ratios for beams are given in below. These are based on limiting the total
deflection to span/250 and this should normally ensure that the part of the deflection occurring after
construction of finishes and partitions will be limited to span/500 or 20 mm, whichever is the lesser, for
spans up to 10 m. For values of bw/b greater than 0.3, linear interpolation between the values given in
the table below for rectangular sections and for flanged beams with bw/b of 0.3 may be used.
Where:
b:effective width of a rectangular beam, the effective flange width of a flanged beam or the total average
width of the flanges.
Try d=250mm
dt=hf+d=150+250=400mm
h=dt+cover+t=400+20+16=436mm
h=500mm
Loading areas
Load Surface
span A of the beam FS=0.42m2
span A-C of the beam FS=11.77m2
span C-E of the beam FS=9.01m2
Computation
Beam A Layout
Type: T beam
L1=1.8m
L2=5.3m
L3=3.45m
L3=2.85m
L3=1.5m
Loading areas
Load Surface
span 1-2 of the beam FS=2.79m2
span 2-5 of the beam FS=10.16m2
span 5-7 of the beam FS=7.82m2
span 7-9 of the beam FS=2m2
span 9-10 of the beam FS=2.57m2
Computation
Computation
COMPUTATION
Critical stairs
The of practice C P 110 give the standart using in the design of stairs
Computation