You are on page 1of 32

EMILY 1 PROJECT

FUEL TERMINAL AND JETTY

TITLE OF DOCUMENT:

PROSEDUR HANDLING DAN LIFTING INSTALASI MLA

DOCUMENT NO. : 9754-MKE-CON-PCD-0010


PO / SCA NO. : 9754-CISS-3240001979 Rev. 0/9750-ID00-
3240002045
COMPANY NAME : PT. BUDI PERKASA ALAM/PT. MKE
SERVICE DESCRIPTION : JETTY AND SEA WATER INTAKE CONSTRUCTION/
STEEL STRUCTURE AND MECHANICAL
INSTALLATION

PT. TRIPATRA ENGINEERS AND CONSTRUCTORS


1 - APPROVED DATE:
2 - APPROVED WITH COMMENT
3 - COMMENTED
4 - REJECTED SIGN:
REVIEWED
REV. ISSUED DATE STATUS PREPARED BY BY APPROVED BY
A 23-Jun-2020 Issued for Approval ASY NH LIA
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

REVISION HISTORY

Revision Date Description of Changes

A 22-Jun-20 Issued for Review


EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

LIST OF CONTENT
1. EQUIPMENT & LIFTING GEAR ...................................................................................................... 1
2. MANPOWER ................................................................................................................................... 1
3. MLA DATA....................................................................................................................................... 2
4. METODE HANDLING MLA ............................................................................................................. 2
5. METODE LIFTING PENGINSTALAN MLA ..................................................................................... 7
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

1. EQUIPMENT & LIFTING GEAR


A. Equipment
No Description Specification

1 GM 35 Crane Barge Barge 180 Ft (54,43 m x 15, 24 m)

2 Crane Manitowoc 4100 W 200 T (Boom Length 54,8 m)

3 Sunlion Crane Barge Barge 180 Ft (52,68 m x 15,24 m)

4 Crane Kobelco 180 Ft 180 T (Boom Length 42,7 m)

5 Anchor Boat Anila 400 Hp

6 TB. Delta Cahaya 1200 HP


B. Lifting Gear
No Item Brand/Series QTY Capacity Condition

1 Shackle 2 “ RRT/G209 2 SWL 35 T New/Good

2 Wire Sling 64 mm x POSB2729 2 SWL 49 T Good


8 mm

4 Tagline 12 m - 2 - New/Good

2. MANPOWER
No NAME POSITION RESPONSIBILITY AREA

1 Rio F PIC Lifting MLA Leader Proses Platform Berth 1


Lifting MLA

2 Hajri Syarifudin Barge Master Memberikan Sunlion


Sunlion-Signal Man Sinyal/aba aba
kepada seluruh
operator crane
yang terlibat ketika
proses tailing

3 Firdaus Barge Master GM Memberikan Platform Berth 1


35-Signal man Sinyal/aba aba
platform Berth 1 kepada operator
crane Kobelco 180
T pada proses
installasi MLA

4 Rizki Operator Crane Mengoperasikan Sunlion


Crane Kobelco 180

Page 1 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Kobelco 180 T T

5 Eko Operator Crane Mengoperasikan GM 35


Manitowoc 4100 W Crane Manitowoc
200 T

6 Rinto Operator Winch Sunlion


Sunlion

7 Chandra Operator Winch Sunlion


Mengoperasikan
Sunlion
mesin winch
8 Doli Operator Winch GM GM 35

9 Dedek Setiawan Operator Winch GM GM 35

10 Caswanto Rigger Sunlion Sunlion

11 Wahyudi Rigger GM 35 GM 35
Melaksanakan
instruksi signalman
12 Yadi Harianto Rigger MKE Platform Berth 1

13 Galih Ginanjar Rigger MKE Platform Berth 1

3. MLA DATA
MLA K-73455 – Berth 1 B

Gambar. 1 Dimensi MLA K-73455- Berth 1 B

Total Panjang- 20,748 m


Total Berat – 29,928 T ~ 30 T

4. METODE HANDLING MLA


 Metode Handling MLA K-73455-Berth 1 B

Crane barge Sunlion merapat ke Berth 4 south heavy lift area, material MLA di transfer menggunakan

Page 2 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

crane darat/ Menggunakan Crane Kobelco CKE 1800 dari platform Berth 4.
Letakkan balok kayu/ pallet sebagai pelindung agar MLA ataupun top deck barge tidak rusak.

Gambar. 2 Illustrasi Posisi Crane Barge Sunlion Ketika Transfer Material MLA

Setelah MLA selesai dirakit oleh MKE sesuai dengan spesifikasi maka crane barge Sunlion pindah
posisi di depan Platform Berth 1.
Sebelum crane barge Sunlion menempati posisi di depan Platform Berth 1, maka crane barge GM
terlebih dahulu melakukan anchoring.
Posisiskan crane barge GM pada posisi dekat dengan area penginstalan MLA, bentangkan jangkar
dengan jarak berkisar 100 m .

Page 3 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Gambar. 3 Illustrasi Posisi Crane Barge GM 35

Crane Barge Sunlion yang bermuatan MLA merapat masuk pada sisi Utara Sunlion, posisikan jarak
ujung depan Barge Sunlion dan GM 35 dengan Jarak 10 m.

Page 4 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Gambar. 4 Illustrasi Posisi Crane Barge Sunlion dan GM 35

barge GM dan barge sunlion maju bersamaan kearah platform berth 1, hingga jarak Pondasi MLA 16”
berada pada radius kerja crane Kobelco 180 T, dengan cara menarik sling jangkar depan dari Sunlion.
Kemudian ikatkan kuat tali pada Boulder barge Sunlion dan Barge GM

Page 5 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Gambar. 5 Illustrasi Posisi Crane Sunlion dan GM 35

Gambar. 6 Illustrasi Posisi Anchor Depan Barge Sunlion

Page 6 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Manitowoc 4100W bergerak mundur sejauh 10 m diatas Gm 35 Crane Barge.

Gambar. 7 Illustrasi Posisi Manitowoc 4100 W di Deck GM

5. METODE LIFTING PENGINSTALAN MLA

 Proses Penginstalan MLA K-73455-Berth 1 B

Pasangkan shackle dan sling angkat Manitowoc 4100W pada lifting pad MLA bagian bawah (Toe), dan
pasangkan shackle dan sling angkat Sunlion pada lifting pad bagian atas MLA.

Page 7 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Gambar. 8 Posisi Lifting Pad Bagian Bawah (Toe) MLA K-73455-Berth 1 B

Gambar. 9 Illustrasi Konfigurasi Lifting Gear Pada Lifting Pad Bagian Bawah (Toe) MLA K-73455-
Berth 1 B

Page 8 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Gambar. 10 Posisi Lifting Pad Bagian Atas MLA K-73455-Berth 1 B

Gambar. 11 Illustrasi Konfigurasi Lifting Gear Pada Lifting Pad Bagian Atas MLA K-73455-Berth 1 B

Page 9 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Gambar. 12 Illustrasi Posisi Pengangkatan Awal MLA K-73455-Berth 1 B

Page 10 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Gambar. 13 Illustrasi Posisi Pengangkatan Awal MLA K-73455-Berth 1 B

NO DESCRIPTION MLA HANDLING TAILING

I CRANE TYPE AND MODEL CKE 1800 MANITOWOC 4100W

II ERECTION LOAD
1 Erection MLA (t) 15,00 15,00
2 Weight of Shackle/ Sling (t) 0,50 0,50
3 Weight of Hook Block (t) 0,60 0,90
4 weight of Spreader Bar/ Chain Block/ Level Block (t) - -
TOTAL LOAD 16,10 16,40
III CRANE DATA'S
1 Crane Capacity (t) 180,00 200,00
2 Crane Condition (t) 85% 85%
3 Existing Boom Length (m) 42,70 54,80
4 Load Line Riving (ea) 4,00 4,00
5 Hook Block capacity/ SWL (t) 75,00 100,00
6 Working radius (Max in m) 11,28 19,39
7 Lifting Capacity (t0 60,78 32,77
8 Dynamic Factors 1,25 1,25
Lift. Cap. X Crane Cond. 2,57 1,36
SAFETY FACTORS =
Tot. Load X Dynamic Factor More than 1.0 (OK) More than 1.0 (OK)
IV LIFTING DEVICES
1 Sling Wire Size (Dia x Length), minimum will be used. 1 x 64 mm x 8 m 1 x 64 mm x 8 m
2 Maximum Breaking Forced of Sling IWRC (t)
3 Sling Quality to be used Good Good
4 Sling Wire Arrangement vertical vertical
5 Sling Wire - Safe Working Load/ SWL (t) 1 x 49 T 1 x 49 T
6 shackle - Safe Working Load/ SWL (t) 1x 2" x 35 T 1x 2" x 35 T
7 Spreader Bar - safe Working Load/ SWL (t) N/A N/A
8 Chain Block - safe Working Load/ SWL (t) N/A N/A
V GROUND CONDITION Check Before lift Check Before lift
VI OVER HEAD OR UNDER GROUND OBSTRUCTION N/A N/A
VII SETTING ELEVATIONS OF EQUIPMENT N/A N/A

Page 11 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Gambar. 14 Illustrasi Posisi Pengangkatan MLA K-73455-Berth 1 B setinggi 1 m

Angkat MLA setinggi 1 m dari muka lantai, lakukan proses tailing. Angkat sling material Kobelco 180 T,
Crane Manitowoc 200 T Swing mengikuti pergerakan MLA kearah crane Kobelco 180 T.

Page 12 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Gambar. 15 Illustrasi Posisi Tailing MLA K-73455-Berth 1 B

Gambar. 16 Illustrasi Pembagian Beban MLA K-73455-Berth 1 B Terberat Pada Saat Proses Tailing
Lifting

Page 13 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Gambar. 17 Illustrasi Proses Lifting Tailing MLA K-73455-Berth 1 B

NO DESCRIPTION MLA HANDLING TAILING

I CRANE TYPE AND MODEL CKE 1800 MANITOWOC 4100W

II ERECTION LOAD
1 Erection MLA (t) 12,00 20,00
2 Weight of Shackle/ Sling (t) 0,50 0,50
3 Weight of Hook Block (t) 0,60 0,90
4 weight of Spreader Bar/ Chain Block/ Level Block (t) - -
TOTAL LOAD 13,10 21,40
III CRANE DATA'S
1 Crane Capacity (t) 180,00 200,00
2 Crane Condition (t) 85% 85%
3 Existing Boom Length (m) 42,70 54,80
4 Load Line Riving (ea) 4,00 4,00
5 Hook Block capacity/ SWL (t) 75,00 100,00
6 Working radius (Max in m) 11,28 18,84
7 Lifting Capacity (t0 60,78 33,73
8 Dynamic Factors 1,25 1,25
Lift. Cap. X Crane Cond. 3,15 1,07
SAFETY FACTORS =
Tot. Load X Dynamic Factor More than 1.0 (OK) More than 1.0 (OK)
IV LIFTING DEVICES
1 Sling Wire Size (Dia x Length), minimum will be used. 1 x 64 mm x 8 m 1 x 64 mm x 8 m
2 Maximum Breaking Forced of Sling IWRC (t)
3 Sling Quality to be used Good Good
4 Sling Wire Arrangement vertical vertical
5 Sling Wire - Safe Working Load/ SWL (t) 1 x 49 T 1 x 49 T
6 shackle - Safe Working Load/ SWL (t) 1x 2" x 35 T 1x 2" x 35 T
7 Spreader Bar - safe Working Load/ SWL (t) N/A N/A
8 Chain Block - safe Working Load/ SWL (t) N/A N/A
V GROUND CONDITION Check Before lift Check Before lift
VI OVER HEAD OR UNDER GROUND OBSTRUCTION N/A N/A
VII SETTING ELEVATIONS OF EQUIPMENT N/A N/A

Page 14 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Lakukan proses tailing sampai material MLA pada posisi vertical.

Gambar. 18 Illustrasi Proses Lifting Tailing MLA K-73455-Berth 1 B

Page 15 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Gambar. 19 Illustrasi Proses Lifting Tailing MLA K-73455-Berth 1 B

NO DESCRIPTION MLA HANDLING

I CRANE TYPE AND MODEL CKE 1800

II ERECTION LOAD
1 Erection MLA (t) 30,00
2 Weight of Shackle/ Sling (t) 0,50
3 Weight of Hook Block (t) 0,60
4 weight of Spreader Bar/ Chain Block/ Level Block (t) -
TOTAL LOAD 31,10
III CRANE DATA'S
1 Crane Capacity (t) 180,00
2 Crane Condition (t) 85%
3 Existing Boom Length (m) 42,70
4 Load Line Riving (ea) 4,00
5 Hook Block capacity/ SWL (t) 75,00
6 Working radius (Max in m) 11,28
7 Lifting Capacity (t0 60,78
8 Dynamic Factors 1,25
Lift. Cap. X Crane Cond. 1,33
SAFETY FACTORS =
Tot. Load X Dynamic Factor More than 1.0 (OK)
IV LIFTING DEVICES
1 Sling Wire Size (Dia x Length), minimum will be used. 1 x 64 mm x 8 m
2 Maximum Breaking Forced of Sling IWRC (t)
3 Sling Quality to be used Good
4 Sling Wire Arrangement vertical
5 Sling Wire - Safe Working Load/ SWL (t) 1 x 49 T
6 shackle - Safe Working Load/ SWL (t) 1x 2" x 35 T
7 Spreader Bar - safe Working Load/ SWL (t) N/A
8 Chain Block - safe Working Load/ SWL (t) N/A
V GROUND CONDITION Check Before lift
VI OVER HEAD OR UNDER GROUND OBSTRUCTION N/A
VII SETTING ELEVATIONS OF EQUIPMENT N/A

Page 16 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Setelah seluruh beban ditahan oleh crane Kobelco CKE 1800, lepas hook Crane Manitowoc 4100w.
Swing Boom Manitowoc kearah GM Barge.
Dengan radius pengangkatan 10 m, swing boom crane Kobelco 180 T ke arah Pondasi MLA.

Gambar. 20 Illustrasi Proses Swing MLA K-73455-Berth 1 B ke Arah Pondasi MLA

Page 17 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Gambar. 21 Illustrasi Proses Swing MLA K-73455- Berth 1 B ke Arah Pondasi MLA

NO DESCRIPTION MLA INSTALLATION

I CRANE TYPE AND MODEL CKE 1800

II ERECTION LOAD
1 Erection MLA (t) 30,00
2 Weight of Shackle/ Sling (t) 0,50
3 Weight of Hook Block (t) 0,60
4 weight of Spreader Bar/ Chain Block/ Level Block (t) -
TOTAL LOAD 31,10
III CRANE DATA'S
1 Crane Capacity (t) 180,00
2 Crane Condition (t) 85%
3 Existing Boom Length (m) 42,70
4 Load Line Riving (ea) 4,00
5 Hook Block capacity/ SWL (t) 75,00
6 Working radius (Max in m) 10,00
7 Lifting Capacity (t0 68,40
8 Dynamic Factors 1,25
Lift. Cap. X Crane Cond. 1,50
SAFETY FACTORS =
Tot. Load X Dynamic Factor More than 1.0 (OK)
IV LIFTING DEVICES
1 Sling Wire Size (Dia x Length), minimum will be used. 1 x 64 mm x 8 m
2 Maximum Breaking Forced of Sling IWRC (t)
3 Sling Quality to be used Good
4 Sling Wire Arrangement vertical
5 Sling Wire - Safe Working Load/ SWL (t) 1 x 49 T
6 shackle - Safe Working Load/ SWL (t) 1x 2" x 35 T
7 Spreader Bar - safe Working Load/ SWL (t) N/A
8 Chain Block - safe Working Load/ SWL (t) N/A
V GROUND CONDITION Check Before lift
VI OVER HEAD OR UNDER GROUND OBSTRUCTION N/A
VII SETTING ELEVATIONS OF EQUIPMENT N/A

Page 18 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Ketika pisi MLA sudah tegak lurus dengan posisi pondasi MLA, Area boom dan posisikan MLA pada
posisi penginstalan.
Posisi penginstalan tidak terpengaruh oleh pasang surut dikarenakan jarak clearance yang cukup
bebas, namun pada proses pelaksanaannya, proses penginstalan MLA hanya akan dilakukan ketika
arus cukup tenang.

Gambar. 22 Illustrasi Proses Installasi MLA Menggunaan Crane Barge Sunlion

Page 19 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Gambar. 23 Illustrasi Proses Installasi MLA Menggunaan Crane Barge Sunlion

NO DESCRIPTION MLA INSTALLATION

I CRANE TYPE AND MODEL CKE 1800

II ERECTION LOAD
1 Erection MLA (t) 30,00
2 Weight of Shackle/ Sling (t) 0,50
3 Weight of Hook Block (t) 0,60
4 weight of Spreader Bar/ Chain Block/ Level Block (t) -
TOTAL LOAD 31,10
III CRANE DATA'S
1 Crane Capacity (t) 180,00
2 Crane Condition (t) 85%
3 Existing Boom Length (m) 42,70
4 Load Line Riving (ea) 4,00
5 Hook Block capacity/ SWL (t) 75,00
6 Working radius (Max in m) 14,00
7 Lifting Capacity (t0 46,70
8 Dynamic Factors 1,25
Lift. Cap. X Crane Cond. 1,02
SAFETY FACTORS =
Tot. Load X Dynamic Factor More than 1.0 (OK)
IV LIFTING DEVICES
1 Sling Wire Size (Dia x Length), minimum will be used. 1 x 64 mm x 8 m
2 Maximum Breaking Forced of Sling IWRC (t)
3 Sling Quality to be used Good
4 Sling Wire Arrangement vertical
5 Sling Wire - Safe Working Load/ SWL (t) 1 x 49 T
6 shackle - Safe Working Load/ SWL (t) 1x 2" x 35 T
7 Spreader Bar - safe Working Load/ SWL (t) N/A
8 Chain Block - safe Working Load/ SWL (t) N/A
V GROUND CONDITION Check Before lift
VI OVER HEAD OR UNDER GROUND OBSTRUCTION N/A
VII SETTING ELEVATIONS OF EQUIPMENT N/A

Page 20 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Page 21 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Page 22 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Page 23 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

46,7

Page 24 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALASI MLA Job No. 9754

Page 25 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALLASI MLA Job No. 9754

LOAD CHART MANI TOWOC 200T


RADIUS ( PANJANG BOOM )
(feet) (m) 21.1 24.3 27.4 30.4 33.5 36.5 39.6 42.6 45.7 48.7 51.8 54.8 57.9 60.9 64.0 67.0 70.1 73.1 76.2 79.2

16.5 4.8 208.6


17.0 5.1 181.4 178.1
18.0 5.4 172.3 171.8 161.1
19.0 5.7 164.6 164.0 157.3 150.9
20.0 6.0 157.5 156.9 152.7 148.3
22.0 6.7 144.9 144.3 143.9 143.4 132.2 129.2
24.0 7.3 133.0 132.6 132.2 177.2 128.2 123.2 117.9
26.0 7.9 120.6 120.4 120.0 119.6 119.3 117.8 112.7 108.7
28.0 8.5 107.7 107.4 107.3 107.1 106.9 106.7 106.4 104.6 99.1 94.5
30.0 9.1 97.1 96.9 96.7 96.5 96.3 95.1 96.0 95.8 95.3 92.2 87.3
32.0 9.7 88.4 88.2 88.0 87.8 87.6 87.4 87.3 87.1 86.8 86.6 85.4 81.6 77.5
34.0 10.3 81.1 80.9 80.7 80.4 80.3 80.0 79.9 79.7 79.5 79.3 79.1 78.9 75.2 71.2
36.0 10.9 74.9 74.6 74.4 74.2 74.0 73.8 73.6 73.4 73.2 73.0 72.9 72.6 72.4 69.6 66.2
38.0 11.5 69.5 69.2 69.0 68.8 68.6 68.4 68.0 68.0 67.8 67.6 67.4 67.2 67.0 66.8 64.9 61.6 60.2
40.0 12.1 64.8 64.5 64.3 64.1 63.9 63.7 63.5 63.3 63.1 62.6 62.7 62.5 62.3 62.0 61.9 60.4 56.7 55.9
45.0 13.7 55.3 55.1 54.9 55.6 54.4 54.1 54.1 53.8 53.6 53.3 53,2 53.0 52.7 52.5 52.3 52.1 51.9 51.0 55.2 47.5
50.0 15.2 48.2 47.9 47.7 47.4 47.2 47.0 46.8 46.6 46.4 46.1 46.0 45.8 45.5 45.3 45.1 44.9 44.7 44.4 44.3 43.4
55.0 16.7 42.5 42.3 42.0 41.8 41.6 41.4 41.2 40.9 40.7 40.4 40.4 40.1 39.9 39.6 39.5 39.2 39.0 38.8 38.6 38.4
60.0 18.2 38.0 37.8 37.5 37.3 37.0 36.8 36.7 36.4 36.2 35.9 35.8 35.6 35.3 35.1 34.9 34.7 34.5 34.2 34.1 33.8
65.0 19.8 34.3 34.1 33.8 33.6 33.3 33.1 33.0 32.7 32.5 32.2 32.1 31.8 31.6 31.3 31.2 30.9 30.7 30.5 30.3 30.1
70.0 21.3 28.9 30.9 30.7 30.4 30.2 30.0 29.6 29.6 29.3 29.1 26.9 28.7 28.4 28.2 28.0 27.8 27.6 27.3 27.2 26.9
75.0 22.8 28.3 28.1 27.8 27.6 27.3 27.2 25.9 26.7 26.4 26.3 26.0 25.8 25.5 25.4 25.1 24.9 24.7 24.5 24.3
80 24.3 24.4 25.8 25.5 25.3 25.0 24.9 24.6 24.4 24.1 24.0 23.8 23.3 23.3 23.1 22.9 22.6 22.4 22.2 21.9
85 25.9 23.8 23.5 23.4 23.1 22.9 22.7 22.4 22.2 22.0 21.8 21.3 21.3 21.1 20.9 20.6 20.4 20.2 20.0
90 27.4 20.8 21.8 21.6 21.4 21.2 20.9 20.7 20.4 20.3 20.0 19.8 19.5 19.4 19.1 18.9 18.6 18.5 18.2
95 25.9 20.3 20.1 19.8 19.7 19.4 19.2 18.9 18.8 18.3 18.3 18.0 17.8 17.6 17.4 17.1 15.9 16.7
100 30.4 17.8 18.7 18.5 18.3 18.0 17.8 17.5 17.4 17.1 16.9 16.6 16.5 16.2 16.0 15.7 15.6 15.3
105 32.0 17.5 17.2 17.1 16.8 16.6 16.3 16.2 15.9 15.7 15.4 15.2 15.0 14.7 14.5 14.3 14.1
110 33.5 15.3 16.4 16.0 15.7 15.5 15.2 15.1 14.8 14.5 14.3 14.1 13.9 13.6 13.4 13.2 13.0
115 35.0 15.1 15.0 14.7 14.5 14.2 14.1 13.8 13.6 13.3 13.1 12.9 12.6 12.4 12.2 12.0
120 35.5 14.1 13.8 13.6 13.3 13.1 12.9 12.6 12.4 12.2 12.0 11.7 11.5 11.1 11.1

Page 26 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALLASI MLA Job No. 9754

Page 27 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALLASI MLA Job No. 9754

Page 28 of 29
EMILY 1 PROJECT
FUEL TERMINAL AND JETTY
Document No. 9754-MKE-CON-PCD-0010
Title
Revision A
PROSEDUR HANDLING DAN LIFTING Issued Date 22-Jun-20
INSTALLASI MLA Job No. 9754

ATTACHMENT

Drawing Lifting 9754-TSE-ROT-PCD- 9754-TSE-ROT-DWG


MLA 1.pdf 0005_A_Erection and-0005_B_Transport
Installation.pdf and Erection Drawing Sign.pdf

Page 29 of 29

You might also like