Professional Documents
Culture Documents
Appendix E TM #2C - Intake, Raw Water Pump Station, and Transmission Mains
Appendix E TM #2C - Intake, Raw Water Pump Station, and Transmission Mains
1.0 Introduction
1.1 Scope
TomeetregulatoryrequirementsandexpandthejointlyownedwatersystemservingtheCityofParksville
andtheRegionalDistrictofNanaimo(RDN),theEnglishmanRiverWaterService(ERWS)isdevelopinganew
riverwatersupplycoupledwithAquiferStorageandRecovery(ASR).Thisinnovativeapproachmeetsthe
ERWS’smissionfor“AnEnvironmentallySensitiveUseofWatertoImproveFishHabitatandDomesticWater
Supply.”
Workcarriedoutpreviouslybyotherconsultantsincludeswaterqualitymonitoring,watertreatmentpilot
testing,andpreparationofaconceptualdesignfortheproject.PilottestingoftheASRisongoingand
expectedtobecompletedbythebeginningof2014.
ThepurposeofthisTechnicalMemorandum(TM)istoconfirmthedesignbasis,presentproposeddesign
alternatives,andrecommendadesignfortherawwaterintake,pumpstation,andtransmissionmaintothe
EnglishmanRiverWaterTreatmentPlant(WTP).
TheASRwellshaveanestimatedpotentialcapacityof15ML/d,andwillallowtreatedwaterfromthenew
WTPtobepumpedintoanaquiferduringthewintermonthsandstoreduntilthesummerwhenwater
demandsareattheirhighest.Assuch,theywillprovideathirdsourceofsupplytosupplementtheriver
intake,inadditiontotheexistinggroundwaterwellswhichwillremaininoperationaftertheWTPhasbeen
commissioned.
1.3 References
ThefollowingreportsanddocumentswerereviewedduringthepreparationofthisTM:
1. ComparisonofIntakeandWaterTreatmentPlantSitingOptions,AssociatedEngineering,May2011
2. SiteDevelopment–WaterTransmissionandDistribution,Koers&AssociatesEngineeringLtd.,May2011
3. ArrowsmithWaterServiceEnglishmanRiverWaterIntake,TreatmentFacilitiesandSupplyMains,
Phase1–ConceptualPlanning,BudgetingandScheduling,AssociatedEngineering,KerrWoodLeidal,
Koers,April2011
4. EnvironmentalAssessmentofAlternativeWaterIntakeSitesinEnglishmanRiver,LGLLtd.,May2010
5. BritishColumbiaBuildingCode,2012
6. FloodHazardAreaLandUseManagementGuidelines,MinistryofEnvironment,2004
7. FreshwaterIntakeEndͲofͲPipeFishScreenGuidelines,DepartmentofFisheriesandOceans,1995
8. WorkSafeBCOccupationalHealthandSafetyRegulation
2.1 General
2.1.1 Raw Water Demands and Phasing
TheMinistryofForest,LandsandNaturalResourceOperations(MFLNO)hasapprovedtheproposedwater
withdrawalandpointofdiversionfromtheEnglishmanRiverthroughtheconditionalwaterlicense
(C129170)thatwasissuedonJanuary17,2013andisincludedasAppendixA.Thelicenseallowsfor
withdrawalofflowsupto48ML/d,whichistheultimatecapacityofthenewintakeandwatersupply
systemtotheWTP.
ProvidingacostͲeffectivesolutionwasidentifiedasoneofthecriticalsuccessfactorsattheproject
charteringmeetingwithERWS.Aneffectivephasingstrategywillminimizecostsbyevaluatingcapitalcosts
inthefirstphaseagainstpotentialsavingsinfuturephases.Table2Ͳ1showstheproposedsizingandphasing
oftheintake,pumpstation,transmissionmains,andWTPtoultimatebuildout.
2 ERWS_TM2C_INTAKEPS_KWL.DOCX
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS
TABLE2Ͳ1
ProposedSizingandPhasingofInfrastructure
Capacity
InitialPhase,2016Ͳ2035 UltimatePhase,2036Ͳ2050
RawWaterFlow
IntakeScreenandWeir 48 48
RawWaterPumpStation 28.8 48
RawWaterSupplyMaintoWTPa 48 48
aWTPwasteflowsareexpectedtobeapproximately1%.
Thisphasingstrategywillbepracticaltoconstructandmatchescommunityspendingwithneedsinan
affordablemanner.
2.2 Intake
2.2.1 Location
Thefollowingmajorandminordesigncriteriaweredevelopedforthepurposeofevaluatingthepotential
intakelocations.ThesecriteriawerereviewedwithERWSpriortothesitemeetingonAugust13,2013.
MajorCriteria
x RiverDepth:Aminimumwaterdepthlessthan0.75mwilllikelyrequireaweirtoextract48ML/d.
Installingaweirislessdesirablebecauseitincreasescostandmayaffectrecreationalactivitiesonthe
river.RiverCrossing:Arivercrossingwillincreasecosts.
x LandOwnership:LandownedbytheCityofParksvilleortheRDNispreferred.Privatelandownership
willpotentiallyaddcostsanddelaysforlandacquisition.
x SiteAccess:AsiteaccessroadthatconnectstheintakeandpumpstationtotheWTPispreferred.
x FloodProtection:Thepumpstationmustbeabovethe200yearfloodplainelevation.
x RecreationImpacts:Asitewithfewerimpactstorecreationalactivitiesalongtheriverispreferred.
MinorCriteria
x ExistingWaterLicenses:Asitewithoutexistingwaterlicensesispreferred.
x Geotechnical:Ifrockexcavationisrequiredtoconstructthefoundationoftheintakeandpumpstation
ateithersite,itwillsignificantlyincreasethecost.Itshouldbenotedthatatthisstage,minimal
geotechnicalworkhasbeencompleted.
x RiparianHabitat:Asitewhichrequireslessriparianhabitattobedisturbedispreferablebecauseof
lowercostsofcompensationandpotentiallylessonerouspermittingrequirements.
ERWS_TM2C_INTAKEPS_KWL.DOCX 3
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS
2.2.2 Screen
x TotalDesignFlow=48ML/d(perTable2Ͳ1)
x ApproachVelocity=0.11m/s
TheapproachvelocityisbasedontheDFOFreshwaterIntakeEndͲofͲPipeFishScreenGuideline(1995)for
subcarangiformfish(troutͲorsalmonͲlikeswimmingmode).
2.2.3 Weir
x TotalDesignFlow=48ML/d(perTable2Ͳ1)
x InͲstreamFlow=1.20m3/s
Inordertoprotectaquaticlifeintheriver,theDepartmentofFisheriesandOceans(DFO)hasstipulatedthat
anabsoluteminimuminͲstreamflowof1.20m3/sbemaintainedattheWaterSurveyofCanada(WSC)
gaugesuchthatflowsdownstreamoftheCityofParksvilleintakecouldmeettherecommendedabsolute
minimumflowof0.7m3/s(basedontheoriginalDFOrecommendationsin1992).KWLandLGLarecurrently
undertakinganinͲstreamflowassessmenttoconfirmtheminimuminͲstreamflowrequirements.In
addition,KWLiscurrentlyreviewingtheaccuracyoftheWSCgaugeatdischargesbelow1.60m3/swithfield
dischargemeasurementsandareviewofhistoricalratingcurves.
4 ERWS_TM2C_INTAKEPS_KWL.DOCX
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS
ERWS_TM2C_INTAKEPS_KWL.DOCX 5
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS
x RoadDrainage:Theroadcrosssectionmustbegradedtoshedwaterfromitssurfaceandprevent
poolingofrunofffromthehillside
TABLE3Ͳ1
IntakeLocationComparisonMatrix
Criteria Site2 Points Site3 Points
RiverDepth ~0.9m 1 ~0.4m 0
RiverCrossing Required 0 Notrequired 1
LandOwnership Private/MOTIROW 0 CityPark 1
SiteAccess RoundaboutaccesstoWTP 0 DirectaccesstoWTP 1
FloodProtection PScanbebuiltabovefloodlevels 0 PScanbebuiltabovefloodlevels 0
RecreationImpacts None 1 Weirmayhaveimpacts 0
ExistingWaterLicenses Yesa 0 No 0
b
RiparianHabitat Removesomevegetation 0.5 Removematurevegetation 0
Geotechnicalc Sandstonebedrock 0 Glacialtilloverconglomeratebedrock 0.5
Total 2.5 3.5
aExistingwaterlicenseatSite2hasawithdrawalrateoflessthan1ML/d.Therefore,itisnotexpectedtosignificantlyaffectthe
withdrawalrateforERWS.
bSincevegetationmustberemovedfrombothsites,thiscriteriaisnotconsideredamajorfactor.
cThiscriteriawillbepromotedtothemajorcategoryoncemoregeotechnicalinformationisavailable.
BasedonthiscomparisonandthefinalonsitereviewwithERWSandRDNstaff,Site3isthepreferred
locationforthenewintake.
3.1.2 Screen
Theintakescreenswillbedesignedtoprotectfishandotheraquaticlifeattheintake,aswellasprevent
debrisfromenteringtherawwatersupply.Theintakestructurewillbedividedintotwobayssoonecanbe
takenoutofserviceformaintenance.Therewillbetwoscreensperbayforatotaloffourscreenpanels.
Figure3Ͳ2showsaplanviewoftheintakestructureandweir.
6 ERWS_TM2C_INTAKEPS_KWL.DOCX
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS
BasedonthedesignparametersinSection2.2.2,theproposedsizinganddesignoftheintakescreenisas
follows:
x NumberofScreenPanels=4
x ScreenSlope=1.5:1(H:V)
x EffectiveScreenLength=5.2m
x EffectiveDepth=0.60m(maximum)
x EffectiveScreenArea=5.6m2(atmaximumdepth)
ThedetailedscreensizingcalculationsaresummarizedinAppendixB.Theintakescreenwillbecleanedby
anautomatedairbackwashsystemasdescribedinSection3.1.4.
3.1.3 Weir
SincetheminimumwaterdepthatSite3issolow,aweirwillbeprovidedtoextracttheultimatedesign
flowfromtheriver.Theweirwillconsistoftwopneumaticcrestgatesconnectedtoaconcretesillwhichlies
acrosstheriver.Thesillwillextendfromtheriverbank(tothenorth)toalargerock(tothesouth).Anatural
channelwillbeprovidedtoenablefishpassagearoundtheweir.
Figure3Ͳ3showsacrosssectionoftheweir.BasedonthedesigncriteriainSection2.2.3,theproposed
sizinganddesignoftheweirisasfollows:
x NumberofWeirSections=2
x WidthofWeirSection=3.5m
x LowWeirHeight(at1.2m3/sInͲstreamFlow)=0.45m
x IntakeFlowat1.2m3/sInͲstreamFlow=24ML/d
x FullWeirHeight=0.75m
x IntakeFlowatFullWeirHeight=48ML/d
ThedetailedweircalculationsaresummarizedinAppendixC.
ERWS_TM2C_INTAKEPS_KWL.DOCX 7
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS
BothalternativeswouldalloweasyaccesstoandfromtheintakeandWTP.However,duetotheheightand
steepnessoftheriverbank,thefirstalternativewouldresultinamuchhigher,moreobtrusivestructure;
therefore,thesecondalternativeispreferredandproposedfordesign.Figure3Ͳ4showsthelocationin
plan,oftheproposedlocation.
3.2.2 Structure
Thepumpstationstructurewillbedesignedtoaccommodatetheadditionoffutureequipmentandpiping.
Thereislittleeconomicbenefittophasingtheconstructionofthepumpstationstructureduetothe
relativelysmallareathatneedstobeaddedtoaccommodatefutureworks.
Somerecommendedfeaturesofthepumpstationare:
x SkylightsforremovalanreͲinstallationofthepumpsformaintenanceandrepair
x Twinsupplylinesfromtheintakewithvalvestoallowisolationofhalfoftheintakeandpumpstationto
betakenoutofserviceformaintenanceandrepair
x Thepumpstationwouldhouseequipmentwhichcouldpotentiallybedamagedinaflood,including:
Electrical,instrumentationandcontrolsequipment
Aircompressorforbackwashingtheintakescreens
Figure3Ͳ5showsthepreliminarypumpstationlayout.
8 ERWS_TM2C_INTAKEPS_KWL.DOCX
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS
ERWS_TM2C_INTAKEPS_KWL.DOCX 9
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS
3.3.5 Valves
Buriedisolation(line)valveswillberequiredimmediatelydownstreamofthepumpstationandimmediately
upstreamofthewatertreatmentplant.Tominimizecosts,thevalveswillbebutterflystyle.A600mm
diametergatevalveissignificantlymoreexpensivethanabutterflyvalveofthesamesize(typicallyonthe
orderof5timesthecost).Noadditionalvalvesarerequiredonthetransmissionmain.
10 ERWS_TM2C_INTAKEPS_KWL.DOCX
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
Figures
ERWS Intake Treatment and Supply
-
Mills Street
Shelly Road
-
d
oa
Plum R
m h
Stanford Avenue East er Ro
ad at
R
Legend
Contour
Rat
hO
nra
mp Railway
Roa
d
Tanglewood Place
Proposed Intake Sites
ad
Ro
ers
ide Treatment Plant Site
R iv
Greig Road
Resort Drive
Parrys Park Road
Blower Road
20
ort Way
- Res
ad
Despard Avenue
Ro
an
Tu
Arbutus
Road
Se
aw
ay
ay
D riv
lW
e
Martindale Road
ul
G
ng
rri
He
Fr
an
kl
in
s
-
G In Saturna Dr
ul du ive
-
lR st
oa ria
Ga
d lW
ay
b ri
Wain Road
ola
-
D ri
ve
Is
l
an
No
d
H
rth
ig
hw
we
ay
st
Ea
Ba
st
yR
oa
d
Fou
60 rnea
uW
ay
60
1
ass
yp
eB
v il l
ar ks
P 4
asvictoria.victoria.kerrwoodleidal.org\DATA\Victoria\Projects\0000-0999\0400-0499\468-010\430-GIS\Plan_overview.mxd Date Saved: 25/06/2013 3:51:12 PM
2
Evergreen Way © 2013 Kerr Wood Leidal Associates Ltd.
200 0 200
(m)
80
1:5,000
60
ad
Ro
e
Kay
40
Englishman River
Proposed Intake Sites
User: LChristensen
Copyright:© 2013 Esri, DeLorme, NAVTEQ, TomTom, Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Figure 3-1
Path: \
Appendix A
ERWS Water License
Appendix B
Intake Screen Sizing Calculations
PROJECT: Englishman River Intake BY: R.E. Gatton CHK'D BY: J. Cheng
SUBJECT: Slant Screen Sizing DATE: 9/19/2013
PROJECT NO.: 476148.03.35.10.70
Purpose
The purpose of this calculation sheet is to determine the geometry and number of bays needed for slant screens.
Calculation
Design Criteria
Approach Velocity 0.11 m/s DFO criteria for subcarangiform fish (salmon and trout)
3
Total Design Flow 0.56 m /s 48 ML/d
Purpose
The purpose of this calculation sheet is to determine the diversion capacity of the screens as a funciton of river depth.
Calculation
Effective Invert 10 m
Effective Screen Length 5.20 m
Slope Factor 1.8
Approach Velocity 0.11 m/s
Purpose
The purpose of this calculation sheet is to determine the approach velocity at different pumping rates.
Calculation
Approach
Capacity Capacity Velocity
(ML/d) (m3/s) (m/s)
48 0.56 0.10
42 0.49 0.09
36 0.42 0.07
30 0.35 0.06
24 0.28 0.05
18 0.21 0.04
12 0.14 0.02
6 0.07 0.01
Appendix C
Weir Sizing Calculations
PROJECT: Englishman River Intake BY: R.E. Gatton CHK'D BY: J. Cheng
SUBJECT: Weir Sizing DATE: 9/19/2013
PROJECT NO.: 476148.03.35.10.70
Purpose
The purpose of this calculation sheet is to determine the geometry and critical depth for the rectangular weir
Calculation
Design Criteria
Weir Width 3.50 m Based on 2 weir sections
Weir Coefficient 2.00 Based on a discharge coefficient of 0.68
2
Gravity 9.81 m/s