1.0 Introduction
1.1 Scope
TomeetregulatoryrequirementsandexpandthejointlyownedwatersystemservingtheCityofParksville
andtheRegionalDistrictofNanaimo(RDN),theEnglishmanRiverWaterService(ERWS)isdevelopinganew
riverwatersupplycoupledwithAquiferStorageandRecovery(ASR).Thisinnovativeapproachmeetsthe
ERWS’smissionfor“AnEnvironmentallySensitiveUseofWatertoImproveFishHabitatandDomesticWater
Supply.”
Workcarriedoutpreviouslybyotherconsultantsincludeswaterqualitymonitoring,watertreatmentpilot
testing,andpreparationofaconceptualdesignfortheproject.PilottestingoftheASRisongoingand
expectedtobecompletedbythebeginningof2014.
ThepurposeofthisTechnicalMemorandum(TM)istoconfirmthedesignbasis,presentproposeddesign
alternatives,andrecommendadesignfortherawwaterintake,pumpstation,andtransmissionmaintothe
EnglishmanRiverWaterTreatmentPlant(WTP).

1.2 Existing System and Proposed Development


TheComparisonofIntakeandWaterTreatmentPlantSitingOptionsreportdescribesthepastandproposed
developmentoftheexistingEnglishmanRiverwatersystem.
Figure1Ͳ1showsthelocationoftheexistingdrinkingwaterinfrastructure.Inbrief,drinkingwateris
currentlyderivedfrommunicipalwellsandanintakeintheEnglishmanRiver.Treatmentislimitedto
chlorinationoftheriverwater.
Withthelimitedavailabilityofwatersupplysourcesinthearea,theArrowsmithdamisacriticalelementof
thewatersupplysystem.Thedamcollectsandstoreswaterduringthewinterforreleasebacktothe
EnglishmanRiverduringthesummerforfisheriesenhancementanddrinkingwateruse.
TheproposeddevelopmentoftheERWSisintendedtoaddresstheCityofParksville’sandRDN’sneedfor
additionaldrinkingwater,andtheVancouverIslandHealthAuthority’s(VIHA)requirementforadditional
watertreatmentbyDecember16,2016.Thisprojectwillinvolvedesignandconstructionof:
x AsurfacewaterintakeontheEnglishmanRivertoreplacetheexistingintakeandrawwaterpump
station
x AmembranefiltrationWTP
x Watermainupgradesandinstallationonnewwatersupplylines
DevelopmentofASRwellsarealsopartoftheoverallproject;theASRdesigniscurrentlybeingcompleted
byAssociatedEngineeringunderaseparatecontract.
ERWS_TM2C_INTAKEPS_KWL.DOCX 1
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS

TheASRwellshaveanestimatedpotentialcapacityof15ML/d,andwillallowtreatedwaterfromthenew
WTPtobepumpedintoanaquiferduringthewintermonthsandstoreduntilthesummerwhenwater
demandsareattheirhighest.Assuch,theywillprovideathirdsourceofsupplytosupplementtheriver
intake,inadditiontotheexistinggroundwaterwellswhichwillremaininoperationaftertheWTPhasbeen
commissioned.

1.3 References
ThefollowingreportsanddocumentswerereviewedduringthepreparationofthisTM:
1. ComparisonofIntakeandWaterTreatmentPlantSitingOptions,AssociatedEngineering,May2011
2. SiteDevelopment–WaterTransmissionandDistribution,Koers&AssociatesEngineeringLtd.,May2011
3. ArrowsmithWaterServiceEnglishmanRiverWaterIntake,TreatmentFacilitiesandSupplyMains,
Phase1–ConceptualPlanning,BudgetingandScheduling,AssociatedEngineering,KerrWoodLeidal,
Koers,April2011
4. EnvironmentalAssessmentofAlternativeWaterIntakeSitesinEnglishmanRiver,LGLLtd.,May2010
5. BritishColumbiaBuildingCode,2012
6. FloodHazardAreaLandUseManagementGuidelines,MinistryofEnvironment,2004
7. FreshwaterIntakeEndͲofͲPipeFishScreenGuidelines,DepartmentofFisheriesandOceans,1995
8. WorkSafeBCOccupationalHealthandSafetyRegulation

2.0 Design Basis


Thissectiondetailstheproposeddesignbasisfortheintake,rawwaterpumpstation,rawwater
transmissionmain,andaccessroad.Thedesignbasiswasformulatedusingindustrystandards,best
practices,andregulatoryrequirements;whereapplicable,specificdocumentshavebeenreferencedinthis
section.Attheprojectcharteringandintakesitereviewmeeting,thefollowingprojectobjectiveswere
presentedandagreeduponbyERWS:
x Acceptabletothepublic
x CostͲeffectivesolutions
x Facilitiesfitintothesurroundingenvironment
x Facilitiesaresimpletooperate
x EasyaccessfromtheWTPtothepumpstationandintake
Theseprojectobjectiveswerealsotakenintoconsiderationforthedesignbasis.

2.1 General
2.1.1 Raw Water Demands and Phasing
TheMinistryofForest,LandsandNaturalResourceOperations(MFLNO)hasapprovedtheproposedwater
withdrawalandpointofdiversionfromtheEnglishmanRiverthroughtheconditionalwaterlicense
(C129170)thatwasissuedonJanuary17,2013andisincludedasAppendixA.Thelicenseallowsfor
withdrawalofflowsupto48ML/d,whichistheultimatecapacityofthenewintakeandwatersupply
systemtotheWTP.
ProvidingacostͲeffectivesolutionwasidentifiedasoneofthecriticalsuccessfactorsattheproject
charteringmeetingwithERWS.Aneffectivephasingstrategywillminimizecostsbyevaluatingcapitalcosts
inthefirstphaseagainstpotentialsavingsinfuturephases.Table2Ͳ1showstheproposedsizingandphasing
oftheintake,pumpstation,transmissionmains,andWTPtoultimatebuildout.

2 ERWS_TM2C_INTAKEPS_KWL.DOCX
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS

TABLE2Ͳ1
ProposedSizingandPhasingofInfrastructure
 Capacity
InitialPhase,2016Ͳ2035 UltimatePhase,2036Ͳ2050
RawWaterFlow  
IntakeScreenandWeir 48 48
RawWaterPumpStation 28.8 48
RawWaterSupplyMaintoWTPa 48 48
aWTPwasteflowsareexpectedtobeapproximately1%.

Thisphasingstrategywillbepracticaltoconstructandmatchescommunityspendingwithneedsinan
affordablemanner.

2.1.2 Seismic Requirements


Theintakeandrawwaterpumpstationwillbedesignedtothe2012BCBuildingCodewhichdesignates
watertreatmentfacilitiesaspostͲdisasterstructures.

2.1.3 Flood Protection Level


ThefloodprotectionlevelisbasedontheMinistryofEnvironment(MOE)FloodHazardAreaLandUse
ManagementGuidelines(2004).Thisguidelinerecommendsafreeboardof0.6moverthe200yearpeak
floodforpublicutilities;however,duetothe“flashy”natureoftheEnglishmanRiverandthepotentialfor
debris,afreeboardof1.0misrecommended.
The200yearpeakfloodlevelwasupdatedaspartofthisproject.Detailsofthisanalysiscanbefoundin
TM2AIntakeHydrologyandHydraulics.

2.2 Intake
2.2.1 Location
Thefollowingmajorandminordesigncriteriaweredevelopedforthepurposeofevaluatingthepotential
intakelocations.ThesecriteriawerereviewedwithERWSpriortothesitemeetingonAugust13,2013.
MajorCriteria
x RiverDepth:Aminimumwaterdepthlessthan0.75mwilllikelyrequireaweirtoextract48ML/d.
Installingaweirislessdesirablebecauseitincreasescostandmayaffectrecreationalactivitiesonthe
river.RiverCrossing:Arivercrossingwillincreasecosts.
x LandOwnership:LandownedbytheCityofParksvilleortheRDNispreferred.Privatelandownership
willpotentiallyaddcostsanddelaysforlandacquisition.
x SiteAccess:AsiteaccessroadthatconnectstheintakeandpumpstationtotheWTPispreferred.
x FloodProtection:Thepumpstationmustbeabovethe200yearfloodplainelevation.
x RecreationImpacts:Asitewithfewerimpactstorecreationalactivitiesalongtheriverispreferred.
MinorCriteria
x ExistingWaterLicenses:Asitewithoutexistingwaterlicensesispreferred.
x Geotechnical:Ifrockexcavationisrequiredtoconstructthefoundationoftheintakeandpumpstation
ateithersite,itwillsignificantlyincreasethecost.Itshouldbenotedthatatthisstage,minimal
geotechnicalworkhasbeencompleted.
x RiparianHabitat:Asitewhichrequireslessriparianhabitattobedisturbedispreferablebecauseof
lowercostsofcompensationandpotentiallylessonerouspermittingrequirements.

ERWS_TM2C_INTAKEPS_KWL.DOCX 3
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS

2.2.2 Screen
x TotalDesignFlow=48ML/d(perTable2Ͳ1)
x ApproachVelocity=0.11m/s
TheapproachvelocityisbasedontheDFOFreshwaterIntakeEndͲofͲPipeFishScreenGuideline(1995)for
subcarangiformfish(troutͲorsalmonͲlikeswimmingmode).

2.2.3 Weir
x TotalDesignFlow=48ML/d(perTable2Ͳ1)
x InͲstreamFlow=1.20m3/s
Inordertoprotectaquaticlifeintheriver,theDepartmentofFisheriesandOceans(DFO)hasstipulatedthat
anabsoluteminimuminͲstreamflowof1.20m3/sbemaintainedattheWaterSurveyofCanada(WSC)
gaugesuchthatflowsdownstreamoftheCityofParksvilleintakecouldmeettherecommendedabsolute
minimumflowof0.7m3/s(basedontheoriginalDFOrecommendationsin1992).KWLandLGLarecurrently
undertakinganinͲstreamflowassessmenttoconfirmtheminimuminͲstreamflowrequirements.In
addition,KWLiscurrentlyreviewingtheaccuracyoftheWSCgaugeatdischargesbelow1.60m3/swithfield
dischargemeasurementsandareviewofhistoricalratingcurves.

2.2.4 Backwash System


x Maintenance:minimallabourrequirementsformaintenanceactivities

2.3 Raw Water Pump Station


2.3.1 Location
x Elevation:abovethe200yearfloodprotectionlevelof17.3mgeodetic(including1.0mfreeboard)
x Access:easyaccesstoandfromtheintakeandWTP
x Aesthetics:minimizeviewtorecreationalparkusers
2.3.2 Structure
x Expansion:abletoaccommodatefutureequipmentandpiping
x Maintenance:abletoprovideeasyaccessformaintenanceofpumpsandequipment

2.3.3 Pump Type and Other Requirements


x Efficiency:costandpowersavingsthroughhigherefficiencypumptypesormodels
x DesignLife:pumpsshalllastuntiltheendofPhase1(20years)
x InteriorNoiseLevel:lessthan78dBAwithinthepumpstationfor8Ͳhourexposure(WorkSafeBClimitis
85dBA,lowerlimitisrecommendedforadditionalworkersafetydependingonequipmentcost
premium)
x ExteriorNoiseLevel:lessthantheambientnoiselevelofHighway19

2.3.4 Pump Sizing


x TotalDesignFlow=48ML/d(perTable2Ͳ1)
x TotalDynamicHead(TDH)=55m
Figure2Ͳ1showstheoverallprofilefromtherawwaterintaketotheWTP.NotethattheTDHaccountsfor
therawwaterpumpsprovidingpressureforthevortexsandseparator,finestrainers,andprimaryͲstage
membranesattheWTP.

2.3.5 Mechanical Piping and Valves


x WorkingPressure=690kPa
x Material:mustbesuitableforusewithpotablewater(asperAWWApipematerialstandards)

4 ERWS_TM2C_INTAKEPS_KWL.DOCX
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS

2.4 Raw Water Pipeline


2.4.1 Horizontal Alignment
x Length:minimizetheoveralllengthofpipelinerequired(tominimizecapitalcost)
x CommonAlignment:installthepipelinealongsamealignmentastheaccessroad,unlessdivergingwill
reduceinstallationcosts
x TreeRemoval:minimizeimpactonexistingforestedareaasmuchaspractical
x BufferArea:leaveatreedsectionoflandbetweentheIslandHighwayandthepipealignment
x RightͲOfͲWays:minimizeencroachmentontheexistingMinistryofTransportation(MOT)andIsland
CorridorFoundation(ICF)rightsͲofͲway(fortheIslandHighway#19andtheICFRailway)
x RiparianArea:minimizedetrimentalimpactontheEnglishmanRiverriparianarea

2.4.2 Vertical Alignment


x MinimumDepthofCover:mustbesufficienttopreventfrostandpipedamagefromvehicleloading
x MaximumGrade:areassteeperthan10%requireinstallationofatrenchdam

2.4.3 Pipe Sizing


x TotalDesignFlow=48ML/d(asperTable2Ͳ1)
x MaximumVelocity=2.0m/s

2.4.4 Pipe Material


x WorkingPressure=690kPa
x Seismic:jointsmustbefullyrestrainedtoprovideforseismicreliability
x Material:mustbesuitableforusewithpotablewater(asperAWWApipematerialstandards)

2.5 Access Road


2.5.1 Horizontal Alignment
x Access:providevehicleaccesstotheintakepumpstationfromtheWTP
x Cut/FillBalance:minimizethetotalvolumesofcutandfillrequiredforconstruction(tominimizecapital
cost)
x SlopeStability:minimizedetrimentalimpactontheexistingbanksoftheEnglishmanRiver(slope
stabilitytobereviewedaspartofthegeotechnicalreport)
x TreeRemoval:minimizeimpactonexistingforestedareaasmuchaspractical
x BufferArea:leaveatreedsectionoflandbetweentheIslandHighwayandtheintakeaccessroad

2.5.2 Vertical Alignment


x Maximumgrade=8%
x Elevation:finishedgradeabovethe200yearfloodelevationincluding1.0mfreeboard
x VerticalClearance:minimum5.0mclearancefromfinishedroadgradetoundersideofrailwayand
highwaybridges(asperMinistryofTransportationandInfrastructuretypicaldesignguidelines)

2.5.3 Cross Section


x DesignVehicle:Theroadmustaccommodatea“rubbertire”craneforremovalandinstallationofthe
pumps
x RoadStructure:Theroadstructuremustsupportthedesignvehicle
x RoadSurface:Theroadsurfacemusthaveminimalmaintenancerequirements

ERWS_TM2C_INTAKEPS_KWL.DOCX 5
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS

x RoadDrainage:Theroadcrosssectionmustbegradedtoshedwaterfromitssurfaceandprevent
poolingofrunofffromthehillside

3.0 Preliminary Design


3.1 Intake
3.1.1 Location
Figure3Ͳ1showsthefourpotentialintakelocationsthatwerepreviouslyidentifiedattheconceptual
planningstage.Site1isdownstreamoftheE&NRailwaybridgeandHighway19bridge.Sites2,3,and4are
allupstreamofthebridges.
Site1offersthemoststraightforwardconstructionandroutetotheWTP,butwaseliminatedtoavoidany
riskofcontaminationfromtransportationaccidentsimmediatelyupstreamoftheintake.Site4was
eliminatedbecauseitrequiresalongerroutetotheWTPandoffersnootheradvantagesovertheother
sites.TheremainingSites2and3werethenevaluatedandscoredbasedonthecriteriadescribedin
Section2.2.1.
Table3Ͳ1comparesSites2and3usingascoringsystemwhichawardsafullpointformajorcriteria,ahalf
pointforminorcriteriaandnopointsforatie.Morepointsarebetter.

TABLE3Ͳ1
IntakeLocationComparisonMatrix
Criteria Site2 Points Site3 Points
RiverDepth ~0.9m 1 ~0.4m 0
RiverCrossing Required 0 Notrequired 1
LandOwnership Private/MOTIROW 0 CityPark 1
SiteAccess RoundaboutaccesstoWTP 0 DirectaccesstoWTP 1
FloodProtection PScanbebuiltabovefloodlevels 0 PScanbebuiltabovefloodlevels 0
RecreationImpacts None 1 Weirmayhaveimpacts 0
ExistingWaterLicenses Yesa 0 No 0
b
RiparianHabitat Removesomevegetation 0.5 Removematurevegetation 0
Geotechnicalc Sandstonebedrock 0 Glacialtilloverconglomeratebedrock 0.5
Total  2.5  3.5
aExistingwaterlicenseatSite2hasawithdrawalrateoflessthan1ML/d.Therefore,itisnotexpectedtosignificantlyaffectthe

withdrawalrateforERWS.
bSincevegetationmustberemovedfrombothsites,thiscriteriaisnotconsideredamajorfactor.

cThiscriteriawillbepromotedtothemajorcategoryoncemoregeotechnicalinformationisavailable.

BasedonthiscomparisonandthefinalonsitereviewwithERWSandRDNstaff,Site3isthepreferred
locationforthenewintake.

3.1.2 Screen
Theintakescreenswillbedesignedtoprotectfishandotheraquaticlifeattheintake,aswellasprevent
debrisfromenteringtherawwatersupply.Theintakestructurewillbedividedintotwobayssoonecanbe
takenoutofserviceformaintenance.Therewillbetwoscreensperbayforatotaloffourscreenpanels.
Figure3Ͳ2showsaplanviewoftheintakestructureandweir.

6 ERWS_TM2C_INTAKEPS_KWL.DOCX
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS

BasedonthedesignparametersinSection2.2.2,theproposedsizinganddesignoftheintakescreenisas
follows:
x NumberofScreenPanels=4
x ScreenSlope=1.5:1(H:V)
x EffectiveScreenLength=5.2m
x EffectiveDepth=0.60m(maximum)
x EffectiveScreenArea=5.6m2(atmaximumdepth)
ThedetailedscreensizingcalculationsaresummarizedinAppendixB.Theintakescreenwillbecleanedby
anautomatedairbackwashsystemasdescribedinSection3.1.4.

3.1.3 Weir
SincetheminimumwaterdepthatSite3issolow,aweirwillbeprovidedtoextracttheultimatedesign
flowfromtheriver.Theweirwillconsistoftwopneumaticcrestgatesconnectedtoaconcretesillwhichlies
acrosstheriver.Thesillwillextendfromtheriverbank(tothenorth)toalargerock(tothesouth).Anatural
channelwillbeprovidedtoenablefishpassagearoundtheweir.
Figure3Ͳ3showsacrosssectionoftheweir.BasedonthedesigncriteriainSection2.2.3,theproposed
sizinganddesignoftheweirisasfollows:
x NumberofWeirSections=2
x WidthofWeirSection=3.5m
x LowWeirHeight(at1.2m3/sInͲstreamFlow)=0.45m
x IntakeFlowat1.2m3/sInͲstreamFlow=24ML/d
x FullWeirHeight=0.75m
x IntakeFlowatFullWeirHeight=48ML/d
ThedetailedweircalculationsaresummarizedinAppendixC.

3.1.4 Backwash System


Thebackwashsystemconsistsofairpipingattheintakeandanaircompressorlocatedinthepumpstation.
Theairpipingwillbeattachedtotheconcreteintakestructureasopposedtobeingweldedtotheintake
screens.Thiswillreducetheweightofthescreenpanelswhichwillfacilitateeasierremoval.Also,theair
pipingwillnothavetobedisconnectedifthescreensareremoved.
Screencleaningwillbeautomatedandoccuratregularintervalsasrequired.Theairburstswillstartfrom
theupstreamscreenpanelandcontinuedownstreamsomaterialcaughtinonepaneldoesnotgettrapped
inanadjacentpanel.
Sizingoftheairpipingandcompressorwillbecompletedatthedetaileddesignstage.

3.2 Pump Station


3.2.1 Location
Basedonthetopographyaroundtheintakelocationandthe200yearfloodplainelevation,twoalternatives
forthepumpstationlocationandstructurewereconsidered:
x Araisedstructurewhichisbuiltontopoftheintake;and
x Asetbackstructurebuiltapproximately15mnorthoftheintake.
Thefirstalternativeinvolvesintegratingthepumpstationwiththeintakeinasinglestructureattheriver
bank.Thesecondalternativeinvolvessettingthepumpstationapproximately15mnorthoftheintake
structurewheretheexistinggroundliesabovethe200yearfloodlevel.

ERWS_TM2C_INTAKEPS_KWL.DOCX 7
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS

BothalternativeswouldalloweasyaccesstoandfromtheintakeandWTP.However,duetotheheightand
steepnessoftheriverbank,thefirstalternativewouldresultinamuchhigher,moreobtrusivestructure;
therefore,thesecondalternativeispreferredandproposedfordesign.Figure3Ͳ4showsthelocationin
plan,oftheproposedlocation.

3.2.2 Structure
Thepumpstationstructurewillbedesignedtoaccommodatetheadditionoffutureequipmentandpiping.
Thereislittleeconomicbenefittophasingtheconstructionofthepumpstationstructureduetothe
relativelysmallareathatneedstobeaddedtoaccommodatefutureworks.
Somerecommendedfeaturesofthepumpstationare:
x SkylightsforremovalanreͲinstallationofthepumpsformaintenanceandrepair
x Twinsupplylinesfromtheintakewithvalvestoallowisolationofhalfoftheintakeandpumpstationto
betakenoutofserviceformaintenanceandrepair
x Thepumpstationwouldhouseequipmentwhichcouldpotentiallybedamagedinaflood,including:
 Electrical,instrumentationandcontrolsequipment
 Aircompressorforbackwashingtheintakescreens
Figure3Ͳ5showsthepreliminarypumpstationlayout.

3.2.3 Pump Type


Submersibleandverticalturbinepumpswereconsideredforthisproject.Submersiblepumpsarequieter
thanverticalturbinepumpsgiventhattheyarelocatedbelowthefloorofthepumpstation.However,
submersiblepumpstypicallyhavelowerefficienciesthanverticalturbinepumpswhichmeanstheywillhave
ahigherenergycostoverthedesignlife.Therefore,verticalturbinepumpsarethepreferredtypeandwill
beused.
ThetypeofpumpdrivedependsontherequirementsoftheWTPandtheminimumwithdrawalrate
required.AVariableFrequencyDrive(VFD)allowstherawwaterpumpstoprovideafixedflowtotheWTP
undervaryingheadconditions.Inaddition,thewithdrawalrateofthepumpscanbeloweredtomaintain
requiredinͲstreamflowrequirements.Therefore,therawwaterpumpswillbeequippedwithVFDs.

3.2.4 Pump Sizing


Threepumpswillbeinstalledintheinitialphasewithanadditionalpumpinstalledintheultimatephase.
TheproposedsizingincludingthetotalandfirmcapacityisshowninTable3Ͳ2.
TABLE3Ͳ2
ProposedPumpInstallationPhasing
InitialPhase UltimatePhase TDH
Year 2016Ͳ2035 2036Ͳ2050 m
Pump1 9.5ML/d 16ML/d 55
Pump2 9.5ML/d 16ML/d 55
Pump3 19.3ML/d 16ML/d 55
Pump4  16ML/d 55
TotalCapacity 28.8ML/d 64ML/d 
FirmCapacitya 19ML/d 48ML/d 
RawWaterDemand 24ML/d 32ML/d 
aFirmcapacityassumesthelargestpumpisoutofservice

8 ERWS_TM2C_INTAKEPS_KWL.DOCX
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS

3.2.5 Mechanical Piping and Valves


TheproposedmaterialforthemechanicalpipingandvalveswillbeSchedule10Sstainlesssteel.

3.2.6 Electrical Power Supply


TheelectricalpowersupplyforthepumpstationandintakewillbefedfromtheWTP.Anunderground
electricalconduitisrecommendedfromtheWTPtotherawwaterpumpstationwhichwilltakeadvantage
ofcommontrenchconstructionwiththerawwaterpipeline.

3.3 Raw Water Transmission Main


3.3.1 Horizontal Alignment
TheproposedtransmissionmainalignmentisshownonFigures3Ͳ6and3Ͳ7.Thetransmissionmainwill
generallyfollowthecentreoftheproposedaccessroadbetweentheIslandHighway(Highway19)andthe
Esquimalt&NanaimoRailway.Theproposedtransmissionmainalignmenthasreceivedapprovalinprinciple
fromMOTIbutmustreceiveformalapprovalfromMOTIandICFduringthenextstageofdesign.

3.3.2 Vertical Alignment


TheproposedtransmissionmainprofileisshownonFigures3Ͳ6and3Ͳ7.Theprofilewasselectedusingthe
followingdesignrationale:
x Theprofilewillrisecontinuallyfromtherawwaterpumpstationtopreventsedimentaccumulationat
lowpoints
x Inthesectionalongtheriver(Station0+000toabout0+080),thecrownofthepipewillbebelow
naturalgradetopreventdamagetothepipeiftheaccessroadisdamaged
x InthesectionbetweentheMOTIandICFROWs,themainwillbelaidatapproximatelyexistinggrade,
andfillwillbeplacedontoptogettherequiredcover,eliminatingtheneedforextensiveshoringofthe
embankmentfillsduringwatermaininstallation
Thesteepestsectionofmainwillbelessthan8%;therefore,trenchdamsshouldnotberequired.
Theminimumdepthofcoverformunicipalitiesinthesouthcoastregionrangesfrom0.9mto1.2m.Given
thattheaccessroadissubjecttominimalvehicletraffic,aminimumdepthofcoverof0.9mforthe
transmissionmainisproposed.Thisdepthofcoverwillalsobesufficientforfrostprotection.
Thelimitedgeotechnicalinformationnearthehighwaybridgefillandpiersindicatesthatbedrockiswithin
1.0moftheexistinggroundsurfaceinsomelocations;therefore,rockblastingwilllikelyberequiredto
installthetransmissionmain.Thisrequirementwillbeconfirmeduponcompletionofthegeotechnical
reportforthisproject.

3.3.3 Pipe Sizing


Basedonthedesignflowof48ML/d,aninsidepipediameterof600mmisproposed.Thispipesizeresults
inamaximumvelocityoflessthan2.0m/sinthetransmissionmain.

3.3.4 Pipe Material


CityofParksvilleBylawNo.1261“SubdivisionServicingBylaw”permitstheuseofductileironorpolyvinyl
chloride(PVC)pipeforwatermains.However,theproposedpipematerialforthisapplicationis600mm
diameter(nominal)carbonsteelduetotheimprovedrepairabilityandreliabilitygainedwithsteelpipe.
Aworkingpressureof690kPahasbeenassumedforthepipe.Theworkingpressureforthetransmission
mainwillbeconfirmedoncethepumpsizinghasbeenfinalized.Standardschedulecarbonsteelpipehasa
sufficientlyhighpressureratingtosuittheworkingpressure.

ERWS_TM2C_INTAKEPS_KWL.DOCX 9
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
INTAKE, RAW WATER PUMP STATION, AND TRANSMISSION MAINS

3.3.5 Valves
Buriedisolation(line)valveswillberequiredimmediatelydownstreamofthepumpstationandimmediately
upstreamofthewatertreatmentplant.Tominimizecosts,thevalveswillbebutterflystyle.A600mm
diametergatevalveissignificantlymoreexpensivethanabutterflyvalveofthesamesize(typicallyonthe
orderof5timesthecost).Noadditionalvalvesarerequiredonthetransmissionmain.

3.4 Access Road


3.4.1 Horizontal Alignment
ThepreliminaryhorizontalalignmentoftheaccessroadisshownonFigures3Ͳ6and3Ͳ7.Theroadcrestisat
the200Ͳyearfloodconstructionlevel(FCL)fromStation0+000to0+080.Thealignmentcrossesunderneath
theHighway19bridge,goeseastupanexistingaccessroadbetweenHighway19andtheE&NRailway,and
thengoesnorthacrosstheE&NRailwaytotheWTPsite,crossingthroughboththeMOTIandICFROW.The
proposedalignmenthasreceivedapprovalinprinciplefromMOTIbutmustreceiveformalapprovalfrom
MOTIandICFduringthenextstageofdesign.Theroadwillbegatedattherailcrossing.

3.4.2 Vertical Alignment


TheprofileofthepreliminaryverticalalignmentoftheaccessroadisshownonFigures3Ͳ6and3Ͳ7.The
maximumgradeislessthan6%whichwillallowthedesignvehicle(rubbertirecrane)totravelbetweenthe
WTPandthepumpstation.TheelevationgainbetweentheintakeandtheWTPisapproximately13m.
Theverticalclearancebetweentheproposedroadsurfaceelevationandtheundersidesofthehighwayand
railwayisinexcessof5m,andwillnotposeaconstrainttotheplacementoftheaccessroad.
Theestimatedvolumeoffillrequiredtoconstructtheroad(basedon1moffreeboardabovethe200year
floodelevation)isapproximately2,100m3.

3.4.3 Cross Section


ThetypicalroadcrosssectionisshownonFigure3Ͳ7.Theproposedroadwidthof5missufficientforone
waytrafficforthedesignvehicle.Theroadcrossfallwillbeslopedtowardsthedownhillsidesuchthat
surfaceflowwillbeabletorundownhilltowardstheriver.
Theproposedroadstructurewillconsistofaminimum300mmthicknessof75mmminuscrushedgravel,
cappedwithaminimum100mmthicknessof19mmminusgravel.Somelocationswillrequiretheroadway
tobeoverͲexcavatedinordertoprovidethisminimumgravelthickness.Theroadstructurewillbe
confirmeduponcompletionofthegeotechnicalreport.
Inlocationswherepoolingcouldoccur(lowpointsontheroadprofile),culvertswillbeinstalledtoconvey
runoffundertheroadandontothedownhillsideoftheslope.Itisanticipatedthattwoculverts
(approximately10to15minlengtheach)willberequired.Thecrosssectionalsoshowsaditchontheinside
edgeoftheroadwhichwillpreventrunofffromthehillsidefromflowingacrosstheroad.Theditchwillcross
theroadatoneoftheculvertlocations.

10 ERWS_TM2C_INTAKEPS_KWL.DOCX
COPYRIGHT 2014 BY CH2M HILL CANADA LIMITED x ALL RIGHTS RESERVED x COMPANY CONFIDENTIAL
Figures
ERWS Intake Treatment and Supply
-

Mills Street

Shelly Road
-
d
oa
Plum R
m h
Stanford Avenue East er Ro
ad at
R
Legend

Contour
Rat
hO
nra
mp Railway
Roa
d
Tanglewood Place
Proposed Intake Sites
ad
Ro
ers
ide Treatment Plant Site
R iv

Greig Road
Resort Drive
Parrys Park Road
Blower Road

20

ort Way
- Res

ad
Despard Avenue

Ro
an
Tu
Arbutus
Road

Se
aw
ay
ay

D riv
lW

e
Martindale Road

ul
G
ng
rri
He
Fr
an
kl
in
s

-
G In Saturna Dr
ul du ive

-
lR st
oa ria

Ga
d lW
ay

b ri
Wain Road

ola
-

D ri
ve
Is
l
an

No
d
H

rth
ig
hw

we
ay

st
Ea

Ba
st

yR
oa
d
Fou
60 rnea
uW
ay

60

1
ass
yp
eB
v il l
ar ks
P 4
asvictoria.victoria.kerrwoodleidal.org\DATA\Victoria\Projects\0000-0999\0400-0499\468-010\430-GIS\Plan_overview.mxd Date Saved: 25/06/2013 3:51:12 PM

2
Evergreen Way © 2013 Kerr Wood Leidal Associates Ltd.

80 Chattell Ro Reference: Orthophoto from Bing aerial image map.


ad Copyright Notice: These materials are copyright of Kerr Wood Leidal Associates Ltd. (KWL). CH2M Hill is permitted to reproduce the materials for archiving
and for distribution to third parties only as required to conduct business specifically relating to the ERWS Intake Treatment and Supply. Any other use of these
materials without the written permission of KWL is prohibited.

200 0 200
(m)
80
1:5,000
60

Allsbrook Road - Project No. Date Drawn By


468-010 December 2013 PAC

ad
Ro
e
Kay
40
Englishman River
Proposed Intake Sites
User: LChristensen

Copyright:© 2013 Esri, DeLorme, NAVTEQ, TomTom, Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community

Figure 3-1
Path: \
Appendix A
ERWS Water License

Appendix B
Intake Screen Sizing Calculations
PROJECT: Englishman River Intake BY: R.E. Gatton CHK'D BY: J. Cheng
SUBJECT: Slant Screen Sizing DATE: 9/19/2013
PROJECT NO.: 476148.03.35.10.70

Purpose
The purpose of this calculation sheet is to determine the geometry and number of bays needed for slant screens.

Calculation
Design Criteria
Approach Velocity 0.11 m/s DFO criteria for subcarangiform fish (salmon and trout)
3
Total Design Flow 0.56 m /s 48 ML/d

Effective Water Depth 0.60 m Depth above effective invert of 10.000 m


Actual Water Depth 0.75 m Depth above concrete and river bed invert of 9.850 m
Number of Bays 4

Screen Area Determination Per Bay


Flow Per Bay 0.14 m3/s
Required Screen Panel Area 1.27 m2
Extra Screen Area 10 %
Desired Screen Panel Area 1.40 m2

Screen Panel Sizing


Screen Slope 1.5 H
1.0 V
Slope Factor 1.8
Screen Effective Width 1.08 m Measured along the sloped screen face
Effective Screen Length 1.30 m Measured upstream to downstream
Effective Screen Area 1.40 m2 Checks with desired screen panel area
PROJECT: Englishman River Intake BY: R.E. Gatton CHK'D BY: J. Cheng
SUBJECT: Screen capacity as a function of river depth DATE: 9/19/2013
PROJECT NO.: 476148.03.35.10.70

Purpose
The purpose of this calculation sheet is to determine the diversion capacity of the screens as a funciton of river depth.

Calculation

Effective Invert 10 m
Effective Screen Length 5.20 m
Slope Factor 1.8
Approach Velocity 0.11 m/s

WS Elev. Eff. Depth Eff. Width Eff, Area Capacity Capacity


(m) (m) (m) (m2) (m3/s) ML/d
10.00 0.00 0 0 0.00 0
10.15 0.15 0.27 1.404 0.14 12
10.30 0.30 0.54 2.808 0.28 24
10.45 0.45 0.81 4.212 0.42 36
10.60 0.60 1.08 5.616 0.56 48
PROJECT: Englishman River Intake BY: R.E. Gatton CHK'D BY: J. Cheng
SUBJECT: Screen capacity assuming a fixed water DATE: 9/19/2013
surface elevation of 10.60 m PROJECT NO.: 476148.03.35.10.70

Purpose
The purpose of this calculation sheet is to determine the approach velocity at different pumping rates.

Calculation

Effective Invert 10.000 m


Effective Screen Length 5.20 m
Slope Factor 1.8

WS Elev. Eff. Depth Eff. Width Eff, Area


2
(m) (m) (m) (m )
10.60 0.60 1.08 5.616

Approach
Capacity Capacity Velocity
(ML/d) (m3/s) (m/s)
48 0.56 0.10
42 0.49 0.09
36 0.42 0.07
30 0.35 0.06
24 0.28 0.05
18 0.21 0.04
12 0.14 0.02
6 0.07 0.01
Appendix C
Weir Sizing Calculations
PROJECT: Englishman River Intake BY: R.E. Gatton CHK'D BY: J. Cheng
SUBJECT: Weir Sizing DATE: 9/19/2013
PROJECT NO.: 476148.03.35.10.70

Purpose
The purpose of this calculation sheet is to determine the geometry and critical depth for the rectangular weir

Calculation
Design Criteria
Weir Width 3.50 m Based on 2 weir sections
Weir Coefficient 2.00 Based on a discharge coefficient of 0.68
2
Gravity 9.81 m/s

Critical Critical Critical Depth Above


Flow Depth Velocity EGL Weir
3
(m /s) (m) (m/s) (m) (m)
0.10 0.04 0.65 0.07 0.06
0.20 0.07 0.82 0.10 0.09
0.30 0.09 0.94 0.14 0.12
0.40 0.11 1.04 0.17 0.15
0.50 0.13 1.12 0.19 0.17
0.60 0.14 1.19 0.22 0.19
0.70 0.16 1.25 0.24 0.22
0.80 0.17 1.31 0.26 0.24
0.90 0.19 1.36 0.28 0.25
1.00 0.20 1.41 0.30 0.27
1.10 0.22 1.46 0.32 0.29
1.20 0.23 1.50 0.34 0.31
1.30 0.24 1.54 0.36 0.33
1.40 0.25 1.58 0.38 0.34
1.50 0.27 1.61 0.40 0.36
1.60 0.28 1.65 0.42 0.37
1.70 0.29 1.68 0.43 0.39
1.80 0.30 1.72 0.45 0.40
1.90 0.31 1.75 0.47 0.42
2.00 0.32 1.78 0.48 0.43
2.10 0.33 1.81 0.50 0.45
2.20 0.34 1.83 0.51 0.46
2.30 0.35 1.86 0.53 0.48
2.40 0.36 1.89 0.54 0.49
2.50 0.37 1.91 0.56 0.50