DATA SHEET : HYDRAULIC TAILINGS RECLAIM SYSTEM

Equipment No: Contract/PO No:


Equipment Title: Hydraulic Tailings Reclaim
Commissioning No: Package Number:

Type Submerged and Horizontal Booster Pumps


Application Tailings removal from old MFL dam by a submerged and horizontal booster pumps
The system shall ensure complete talings reclaim with 35 -50% solids slurry to process pla

Capacity Tailings removal:


Hourly rate:
Utilization factor minimun
S.G sólids
Water flow
Equipment Water adition (+10%):
Design Slurry, sólids
Capacity Slurry nominal flow
DP Pump 2 Slurry Submerged Pump
Pumps required including water ring and agitator
Water piton & pump 2 Pressure device and capacity

Slurry pump 2 Slurry booster pump to feed process plant

Maximun distance from slurry sump to process plant


Description of Equipment

The system ia a complete functional package including: DP pumps, water pumps & pipes, slurry booster pumps & pipes, motor control, electrical cables within
the battery limits of the tailings dam. The package shall ensure complete service inside the dam, including movil cranes for DP pump positioning and water piton
to mantain a slurry sump for the submerged pumps operation

Type: Local control, self contained


Materials of construction:

Skid Mounted: Yes No


Modular design.
Include ancilliary equipment : X Yes No Vendor or contracter to confirm

Location: Indoor X Outdoor Climate:

Other:

(i) The package shall be complete with all necessary pipes, valves, gauges etc to allow direct connection to power,
and water services as required.
(ii) The unit shall have suitable internal and external protective coatings.
(iii) Instruments/controls shall be contained in a local control panel.
(iv) Electrical services include field ligthting

DATA SHEET : HYDRAULIC TAILINGS RECLAIM SYSTEM

Equipment No: Contract/PO No:


Equipment Title: Hydraulic Tailings Reclaim
Commissioning No: Package Number:

Type Submerged and Horizontal Booster Pumps


Application Tailings removal from old MFL dam using a submerged and horizontal booster pumps
The system shall ensure the complete talings reclaim with 35 -50% solids slurry to process

Utilities
Fresh water required : m³/h Vendor or Contractor to advice
Fresh water presure required : kPa Vendor or Contractor to advice
Process water required : m³/h Vendor or Contractor to advice
Process water pressure required : kPa Vendor or Contractor to advice
Plant Air Pressure Requiered : kPa Vendor or Contractor to advice
Plant Air Requiered : Nm³/h Vendor or Contractor to advice
Instrument Air requiered : Nm³/h Vendor or Contractor to advice
Instrument Air pressure requiered : kPa Vendor or Contractor to advice
Installed power consumptión, per : kW Vendor or Contractor to advice
major component
Total installed power requiered : kW Vendor or Contractor to advice
Total power consumption : kW Vendor or Contractor to advice
Man power (Operation : N° Vendor or Contractor to advice
per 12 hours shifts)
Man power (Maintenance : N° Vendor or Contractor to advice
per 8 hours shifts)
Battery Limits

Inputs Tailing -
Water -
Power -

Outputs Tailing slurry -

Remarks: The system include operation and maintenance service on anual basis
The system must feed the tailing to the process plant on regular rate
Reclaim of the lateral tailing wall dam will require aditional earth moving equipment

For Technical Package P 28.01.10 REG JFH FOG


For Review B 15.01.10 REG JFH FOG
For Review A 08.01.10 REG JFH FOG
REVISION No DATE BY CHK LE
SHEET 1 OF 2
SYSTEM

45244

910-YM-002

rizontal booster pumps


50% solids slurry to process plant

t/d 2,833
t/h 197
% 60 Minimun
t/m3 2.80
m³/h 295
L/s 90
% solid 35-50
m³/h 365
m³/min 6 Nominal
local control (one operating , one stand by)
650 to 850 kPa 92 L/s Maximun
local control (one operating , one stand by)
6 m³/min Nominal
local control (one operating , one stand by)
1,000 m

SHEET 2 OF 2
SYSTEM

45244

910-YM-002

d horizontal booster pumps


35 -50% solids slurry to process planta
To reclaim from existing dam
Tie in - Water suply pipe flange outside tailing dam
Tie in - Electrical feeder outside tailing dam

Tie in - Trash screen feed box (Tag 921-TB-001).