Professional Documents
Culture Documents
0.3 0 0.3 0
FT. 25-0 W FT. 25-0 W
06 ,2 06 ,2
A 2 NC 1 A 2 NC 1
0V 0V
23 23
03 03
14 14
y y
man an
.3m 0
Ger G0er 0.3 0
e in eFinT. 5-0 FT. 25-0 W
Mad Mad 2062 1,2 W 06 ,2
A NC A 2 NC 1
0V 0V
23 23
03 03
14 14
.3
FT.0 5-00
2
y y 06 2W
man man A 2 C 1,
N
Ger Ger 0V
e in e in
23
Mad Mad 03
14
y
man
Ger
e in
Mad
>click<
Installation of the FlowCon FT actuator Upside down installation is allowed for all FT-
To ensure that the valve is in an open position actuators along with the standard horizontal and
during commissioning of the system, all men- vertical installation (figure 2).
tioned actuators will be delivered in a Normally
Open position and remain in this position until Figure 2
they are electrically operated first time. FIRST
TIME POWERING requires operating voltage 360º
applied for approximately 6 minutes.
FT.0.2 Actuator
Black
Blue
Red
0-10V DC
Power 24V AC
Ground/common
Close Open
24V AC/DC
Power 230V AC
Ground/common