You are on page 1of 306

SWIFT ENGINEERIN

WEEKLY PROGRESS REP


J. DIVYA
RECIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE

1 2527 Majestic Homes Traction 06.12.2014


2 2638 Thendral mani Traction 04.12.2014
3 2642 Viswak Constructions Traction 09.12.2014
4 2638 Thendral mani MRL (Special type) 04.12.2014
5 2644 P dot G Constructions Traction 09.12.2014
6 2648 P dot G Constructions Traction 09.12.2014
7 2644 P dot G Constructions Traction 09.12.2014
8 2648 P dot G Constructions Traction 09.12.2014
9 Traction 08.12.2014
10 D.B(Dilli Babu) Traction 09.12.2014
11 Kumar Traction & MRL 09.12.2014
12 SRP Mahal Traction 09.12.2014
13 Meenakshi Homes Traction 10.12.2014
14 Traction 10.12.2014
15 Jayanam Traction 11.12.2014
16 Thendral mani MRL 11.11.2014

17 12.12.2014 and 13.12.2014

SWIFT ENGINEERIN
WEEKLY PROGRESS REP
J. DIVYA

S.NO JOB No. CLIENT NAME TYPE OF LIFT RECIVING


DATE
1 2644 P dot G Constructions Traction 15.12.2014
2 2648 P dot G Constructions Traction 15.12.2014
3 Traction 15.12.2014
4 Traction 15.12.2014
Line drawing (New
5 The nest design)MRL 15.12.2014
6 Ahamed Traction 16.12.2014
7 Ahamed Traction 16.12.2014
8 JKB Traction 16.12.2014
9 saan builders Traction 16.12.2014
10 saan builders Traction 16.12.2014
11 MRL(cantilever type) 16.12.2014
12 Traction 16.12.2014
13 2537 Bhuvaneshwari Constructions Traction 08.12.2014
14 Sivakumar Traction and MRL 16.12.2014
15 MRL 17.12.2014
16 Sampath Traction 17.12.2014
17 Kavitha Traction and Hydraulic 17.12.2014
18 Traction 17.12.2014
19 Traction 17.12.2014
20 MRL 17.12.2014
21 2639 Sivagaminathan MRL 16.12.2014
22 MRL 17.12.2014
23 2584 Sundarraman Traction 10.12.2014
24 Gawtham Traction and MRL 18.12.2014
25 Traction 18.12.2014
26 Dinakaran MRL 18.12.2014
27 MRL 18.12.2014
MRL(cantilever Special
28 type) 18.12.2014
29 2644 P dot G Constructions Traction 18.12.2014
30 2648 P dot G Constructions Traction 18.12.2014
31 2644 P dot G Constructions Traction 19.12.2014
32 2648 P dot G Constructions Traction 19.12.2014
33 2644 P dot G Constructions Traction
34 2648 P dot G Constructions Traction
35 Dinakaran MRL 18.12.2014
36 MRL 19.12.2014
37 K2 Engineering Traction 18.12.2014
38 K2 Engineering Traction 18.12.2014
39 2012.2014
WEEKLY PROGRESS REP
J. DIVYA

S.NO JOB No. CLIENT NAME TYPE OF LIFT RECIVING


DATE

1 Annamalai Traction 22.12.2014


2 Suresh Traction 22.12.2014
3 Bharath Traction 22.12.2014
4 Sanjay Traction 22.12.2014
5 Sundaram Traction 22.12.2014
6 Traction 22.12.2014
7 Thanvin Properties Traction 22.12.2014
8 MRL 22.12.2014
9 Senthil Kumar Traction 22.12.2014
10 Subramaniyam Traction 22.12.2014
11 Ganesan Traction 22.12.2014
12 Raj paris Traction 22.12.2014
13 Raj paris MRL 22.12.2014
14 Traction 22.12.2014
15 2465/1 Thilagar Traction 18.12.2014
16 2466/2 Thilagar Traction 18.12.2014
17 Traction 23.12.2014
18 Traction 23.12.2014
19 odyssey MRL 23.12.2014
20 Traction 23.12.2014
21 GS Builders Traction 23.12.2014
22 Traction 23.12.2014
23 Traction 23.12.2014
24 Traction 23.12.2014
2653 Mushtar Ahamed Traction 22.12.2014
25 Traction 23.12.2014
26 2645 P dot G Constructions Traction 19.12.2014
27 2645 P dot G Constructions Traction 19.12.2014
28 Mustafa Traction 24.12.2014
29 Ram Traction 24.12.2014
30 Mega promoters Traction 24.12.2014
31 Veera Kumar Traction 24.12.2014
32 Iscon Traction 24.12.2014
33 Murthy Traction 24.12.2014
34 Nazar Traction 24.12.2014
30 25.12.2014
35 26.12.2014 - 27.12.2014
WEEKLY PROGRESS REP
J. DIVYA
RECIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT
DATE

1 AA Constuctions Traction 29.12.2014


2 Mahaveeran Traction 29.12.2014
3 Udhaya Kumar Traction 29.12.2014
4 Udhaya Kumar MRL 29.12.2014
5 Aesthetic design MRL 29.12.2014
6 Ranjith Traction 29.12.2014
7 Mahesh Traction 29.12.2014
8 Mahesh MRL 29.12.2014
9 Gopi Traction 29.12.2014
10 2599 COP (NEW DESIGN) COP COVER 29.12.2014
11 2650 SUGANTHI Traction
12 2646 P dot G Constructions Traction
13 2647 P dot G Constructions Traction
14 Kannapan Traction 30.12.2014
15 jitesh kumar Traction 30.12.2014
16 Traction 30.12.2014
17 MRL 30.12.2014
18 2650 Suganthi
19 2650 Suganthi Traction
20 2646 P dot G Constructions Traction
21 2647 P dot G Constructions Traction
22 MRL 31.12.2014
23 Muffazar Traction 31.12.2014
24 Traction 31.12.2014
25 Gopi Traction 31.12.2014
26 Rams Traction 31.12.2014
27 2651 Mohan Traction 31.12.2014

28 2643 Viswak constructions Traction 09.12.2014

29 2654 Hanu Nursing Homes Traction 09.12.2014


30 01.01.2015
31 02.01.2015-03.01.2015
SWIFT ENGINEERING
WEEKLY PROGRESS REPORT
DATE: 08.12.2014 to 13.12.2014
EXPECTED SUBMITTED PRODUCTION CABIN
DATE FROM SEND DATE DRAWING SUBMITTED DATE SEND DATE
ERECTION
06.12.2012 08.12.2014 GAD
08.12.2014 08.12.2014 Line drawing
09.12.2014 09.12.2014 GAD
11.12.2014 11.12.2014 Line drawing
09.12.2014 09.12.2014 Line drawing
09.12.2014 09.12.2014 Line drawing
09.12.2014 10.12.2014 GAD 11.12.2014 11.12.2014
09.12.2014 10.12.2014 GAD 11.12.2014 11.12.2014
08.12.2014 08.12.2014 Enquiry (3TYPE)
09.12.2014 09.12.2012 4 -Enquiry(2TYPE)
09.12.2014 09.12.2012 1 -Enquiry(3TYPE)
09.12.2014 09.12.2012 1 -Enquiry(1TYPE)
10.12.2014 10.12.2014 2 -Enquiry(3TYPE)
10.12.2014 10.12.2014 1 -Enquiry(1TYPE)
11.12.2014 11.12.2014 1 -Enquiry(1TYPE)
11.12.2014 11.12.2014 Line drawing

13.12.2014 Leave

SWIFT ENGINEERING
WEEKLY PROGRESS REPORT
DATE: 15.12.2014 to 20.12.2014
EXPECTED
DATE FROM SEND DATE SUBMITTED PRODUCTION CABIN
DRAWING SUBMITTED DATE SEND DATE
ERECTION
15.12.2014 15.12.2014 Line drawing
15.12.2014 15.12.2014 Line drawing
15.12.2014 15.12.2014 1 -Enquiry(1TYPE)
15.12.2014 15.12.2014 1 -Enquiry(3TYPE)

15.12.2014 15.12.2014 1 -Enquiry(1TYPE)


16.12.2014 16.12.2014 1 -Enquiry(1TYPE)
16.12.2014 16.12.2014 1 -Enquiry(1TYPE)
16.12.2014 16.12.2014 1 -Enquiry(2TYPE)
16.12.2014 16.12.2014 1 -Enquiry(2TYPE)
16.12.2014 16.12.2014 1 -Enquiry(1TYPE)
16.12.2014 16.12.2014 1 -Enquiry(1TYPE)
16.12.2014 16.12.2014 1 -Enquiry(4TYPE)
16.12.2014 16.12.2014 GAD
16.12.2014 16.12.2014 1 -Enquiry(2TYPE)
17.12.2014 17.12.2014 1 -Enquiry(3TYPE)
17.12.2014 17.12.2014 1 -Enquiry(2TYPE)
17.12.2014 17.12.2014 1 -Enquiry(2TYPE)
17.12.2014 17.12.2014 1 -Enquiry(1TYPE)
17.12.2014 18.12.2014 1 -Enquiry(1TYPE)
17.12.2014 18.12.2014 1 -Enquiry(1TYPE)
17.12.2014 17.12.2014 Revised GAD
17.12.2014 18.12.2014 1 -Enquiry(2TYPE)
17.12.2014 GAD 17.12.2014 17.12.2014
18.12.2014 18.12.2014 1 -Enquiry(6TYPE)
18.12.2014 18.12.2014 1 -Enquiry(1TYPE)
18.12.2014 18.12.2014 1 -Enquiry(1TYPE)
18.12.2014 18.12.2014 1 -Enquiry(1TYPE)

18.12.2014 18.12.2014 1 -Enquiry(1TYPE)


18.12.2014 18.12.2014 Revised GAD
18.12.2014 18.12.2014 Revised GAD
19.12.2014 19.12.2014 Full Drawing 19.12.2014 19.12.2014
19.12.2014 19.12.2014 Full Drawing 19.12.2014 19.12.2014
door full drawing 19.12.2014 19.12.2014
door full drawing 19.12.2014 19.12.2014
19.12.2014 19.12.2014 1 -Enquiry(1TYPE)
19.12.2014 19.12.2014 1 -Enquiry(1TYPE)
18.12.2014 19.12.2014 Line drawing
18.12.2014 19.12.2014 Line drawing
14 LEAVE
WEEKLY PROGRESS REPORT
DATE: 22.12.2014 to 27.12.2014
EXPECTED
DATE FROM SEND DATE SUBMITTED PRODUCTION CABIN
DRAWING SUBMITTED DATE SEND DATE
ERECTION
22.12.2014 22.12.2014 1 -Enquiry(1TYPE)
22.12.2014 22.12.2014 1 -Enquiry(2TYPE)
22.12.2014 22.12.2014 1 -Enquiry(1TYPE)
22.12.2014 22.12.2014 1 -Enquiry(1TYPE)
22.12.2014 22.12.2014 1 -Enquiry(2TYPE)
22.12.2014 22.12.2014 1 -Enquiry(2TYPE)
22.12.2014 22.12.2014 1 -Enquiry(1TYPE)
22.12.2014 22.12.2014 1 -Enquiry(3TYPE)
22.12.2014 22.12.2014 1 -Enquiry(2TYPE)
22.12.2014 22.12.2014 1 -Enquiry(2TYPE)
22.12.2014 22.12.2014 1 -Enquiry(1TYPE)
22.12.2014 22.12.2014 1 -Enquiry(1TYPE)
22.12.2014 22.12.2014 1 -Enquiry(1TYPE)
22.12.2014 22.12.2014 1 -Enquiry(1TYPE)
22.12.2014 Revised GAD
22.12.2014 Revised GAD
23.12.2014 23.12.2014 1 -Enquiry(1TYPE)
23.12.2014 23.12.2014 1 -Enquiry(1TYPE)
23.12.2014 23.12.2014 1 -Enquiry(1TYPE)
23.12.2014 23.12.2014 1 -Enquiry(1TYPE)
23.12.2014 23.12.2014 1 -Enquiry(2TYPE)
23.12.2014 23.12.2014 1 -Enquiry(1TYPE)
23.12.2014 23.12.2014 1 -Enquiry(1TYPE)
23.12.2014 23.12.2014 1 -Enquiry(1TYPE)
23.12.2014 23.12.2014 Full Drawing
23.12.2014 23.12.2014 1 -Enquiry(1TYPE)
24.12.2014 Full Drawing
24.12.2014 Full Drawing 24.12.2014 24.12.2014
24.12.2014 24.12.2014 1 -Enquiry(2TYPE)
24.12.2014 24.12.2014 1 -Enquiry(2TYPE)
24.12.2014 24.12.2014 1 -Enquiry(1TYPE)
24.12.2014 24.12.2014 1 -Enquiry(2TYPE)
24.12.2014 24.12.2014 1 -Enquiry(1TYPE)
24.12.2014 24.12.2014 1 -Enquiry(1TYPE)
24.12.2014 24.12.2014 1 -Enquiry(2TYPE)
14 Holiday
.12.2014 LEAVE
WEEKLY PROGRESS REPORT
DATE: 29.12.2014 to 03.01.2015
EXPECTED SUBMITTED PRODUCTION CABIN
DATE FROM SEND DATE
ERECTION DRAWING SUBMITTED DATE SEND DATE

29.12.2014 29.12.2014 1 -Enquiry(1TYPE)


29.12.2014 29.12.2014 1 -Enquiry(3TYPE)
29.12.2014 29.12.2014 1 -Enquiry(2TYPE)
29.12.2014 29.12.2014 1 -Enquiry(2TYPE)
29.12.2014 29.12.2014 1 -Enquiry(2TYPE)
29.12.2014 29.12.2014 1 -Enquiry(2TYPE)
29.12.2014 29.12.2014 1 -Enquiry(2TYPE)
29.12.2014 29.12.2014 1 -Enquiry(2TYPE)
29.12.2014 29.12.2014 1 -Enquiry(3TYPE)
29.12.2014 29.12.2014 29.12.2014
29.12.2014 29.12.2014 Revised GAD
29.12.2014 Full Drawing
30.12.2014 Full Drawing
30.12.2014 30.12.2014 1 -Enquiry(2TYPE)
30.12.2014 30.12.2014 1 -Enquiry(2TYPE)
30.12.2014 30.12.2014 1 -Enquiry(2TYPE)
30.12.2014 30.12.2014 1 -Enquiry(2TYPE)
New production sheet
30.12.2014 Full Drawing 30.12.2014 30.12.2014
30.12.2014 Full Drawing 30.12.2014 30.12.2014
30.12.2014 Full Drawing 30.12.2014 30.12.2014
31.12.2014 31.12.2014 1 -Enquiry(3TYPE)
31.12.2014 31.12.2014 1 -Enquiry(2TYPE)
31.12.2014 31.12.2014 1 -Enquiry(2TYPE)
31.12.2014 31.12.2014 line dawing
31.12.2014 31.12.2014 line dawing
31.12.2014 31.12.2014 Full Drawing

Hold GAD

Hold GAD
15 Holiday
01.2015 LEAVE
08.12.2014 to 13.12.2014

REMARKS

Leave

15.12.2014 to 20.12.2014

REMARKS
G.M
G.M

P.D
G.M
G.M

R.A
G.M
R.A
S.k.
Karthick

G.M
Karthick
D.K
D.K

R.A

R.A

LEAVE
22.12.2014 to 27.12.2014

REMARKS

D.k
D.k
D.k
D.k
S.k

A.R
G.M
G.M
G.M
A.R
A.R
A.R

A.R
A.R

M.D
G.M
G.M
G.M

M.D

D.K
D.K
D.K
D.K

Karthick
G.M
Holiday
LEAVE
29.12.2014 to 03.01.2015

REMARKS

D.K
D.K
D.K
R.A
D.K
D.K
D.K
R.A

D.K
D.K
R.A
R.A

P.D
Karthick
Karthikeyan

floor height
problem/Erection

shaft size
problem/sales& Erection
Holiday
LEAVE
2017

WEEKLY PROGRESS REPORT


SURESH.R DATE: 06.03.2017 to 11.03.2017
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION
SALES ENQUIRY RELEASED
1 Sales Sidharth Housing Tarction / 6P 3/3/2017 3/6/2017 MOSD, IFG Sales - Anbu

2 Sales Dr. Gupta ( Site - 1 ) MRL / 6P 3/3/2017 3/6/2017 SOPD Sales - Harsha

3 Sales Dr. Gupta ( Site - 2 ) MRL / 6P 3/3/2017 3/6/2017 SOPD Sales - Harsha

4 Sales Dr. Gupta ( Site - 2 ) MRL / 6P (Cantilever) 3/3/2017 3/6/2017 SOPD Sales - Harsha

5 Sales Senthil Kumar Associates MRL / 6P 3/3/2017 3/6/2017 COPD Sales - Peter ( G.M. )

6 Sales Kondal Swamy Traction / 6P 3/6/2017 3/6/2017 IFG Sales - Rajadevkumar

7 Sales Destylus Designers MRL / 6P 3/6/2017 3/6/2017 SOPD Sales - Harsha

8 Sales Destylus Designers MRL / 6P (Cantilever) 3/6/2017 3/6/2017 COPD Sales - Harsha

9 Sales (BLR) Anand Traction / 6P 3/7/2017 3/7/2017 COPD, SOPD Sales - Palani (BLR)

10 Sales Hotel Akshya Bhavan MRL / 6P 3/8/2017 3/8/2017 SOPD Sales - Rajadevkumar
11 Sales Hotel Akshya Bhavan HYD / 6P 3/8/2017 3/8/2017 SOPD Sales - Rajadevkumar

12 Sales Vaanam Const Traction / 6P 3/8/2017 3/8/2017 COPD Sales - Anbu

13 Sales Vaanam Const MRL / 6P 3/8/2017 3/8/2017 COPD Sales - Anbu

14 Sales Rajarajan & Co ( Site - 1 ) Traction / 6P 3/8/2017 3/8/2017 SOPD, MOSD Sales - Anbu

15 Sales Rajarajan & Co ( Site - 2 ) Traction / 6P 3/8/2017 3/8/2017 SOPD, MOSD Sales - Anbu

16 Sales Ravindran MRL / 6P 3/8/2017 3/8/2017 COPD Sales - M.D.

17 Sales (BLR) Chandra Prabhu Traction / 6P 3/9/2017 3/9/2017 COPD Sales - Palani (BLR)

18 Sales (BLR) Prakash Traction / 6P 3/9/2017 3/9/2017 SOPD Sales - Palani (BLR)

19 Sales (BLR) Prakash MRL / 6P 3/9/2017 3/9/2017 Not Possible ( Small Shaft ) Sales - Palani (BLR)

Mettupakkam Foundation
20 Sales Traction / 6P 3/9/2017 3/9/2017 COPD Sales - M.D.
(Neelangarai Site)
Mettupakkam Foundation
21 Sales MRL / 6P 3/9/2017 3/9/2017 COPD Sales - M.D.
(Neelangarai Site)

22 Sales Mettupakkam Foundation Traction / 6P 3/9/2017 3/9/2017 COPD Sales - M.D.


(Kodambakkam Site)

23 Sales Mettupakkam Foundation Traction / 6P 3/9/2017 3/9/2017 COPD Sales - M.D.


(Mandhavelli)
Mettupakkam Foundation
24 Sales (Mandhavelli) MRL / Normal Type 3/9/2017 3/9/2017 COPD Sales - M.D.

25 Sales Divya Homes Traction / 6P 3/9/2017 3/9/2017 COPD, SOPD, MOSD Sales - M.D.

26 Sales (BLR) Rehman Traction / 6P 3/9/2017 3/9/2017 COPD, SOPD Sales - Palani (BLR)

27 Sales (BLR) Ambal Foundation HYD / 6P 3/9/2017 3/9/2017 COPD Sales - Palani (BLR)

28 Sales Mohan Nair Spalon Traction / 6P 3/10/2017 3/10/2017 SOPD Sales - Anbu

29 Sales Shah Jahan MRL / 6P 3/10/2017 3/10/2017 SOPD Sales - M.D.

30

LINE DRAWINGS RELEASED


1 Purchase 3/6/2017 L - Angle Details Mail - Supplier

2 Sales (BLR) Anand Traction / 6P 3/7/2017 Plan Detail Dwg Sales - Palani (BLR)

3 Sales (BLR) Rehman Traction / 6P 3/9/2017 Plan Detail Dwg Sales - Palani (BLR)

4 Sales (BLR) Ambal Foundation HYD / 6P 3/9/2017 Plan & Elevation Detail Dwg Sales - M.D.

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3093 Sharmila Traction / 6P 3/10/2017 GAD ( New ) Erection - Premkumar

2 3077 Shri Janani Homes Traction / 6P 3/10/2017 GAD ( New ) Erection - Premkumar

3 3079 G. Elavarasan Traction / 6P 3/10/2017 GAD ( New ) Erection - Premkumar

CABIN RECHECK & CONFORMATION TO MASS


1 BEL-203 Rajasekher Traction / 6P 3/6/2017 Cabin Dwg ( New ) Mail - Mass

2 BEL-208 Sai Associates Traction / 6P 3/6/2017 Cabin Dwg ( New ) Mail - Mass

3 3028 Bhuaneshwari Const Traction / 6P 3/9/2017 Cabin Dwg ( Checking ) Mail - Lens

4 3070 Eeshani Builders Traction / 6P 3/9/2017 Cabin Dwg ( Checking ) Mail - Lens

5 3071 Muruganantham Traction / 6P 3/11/2017 Cabin Colour Conformation Mail - Client

6 3067 Ganesh Traction / 6P 3/11/2017 Cabin Dwg ( New ) Mail - Mass

7 3074 P dot G Traction / 6P 3/11/2017 Cabin Dwg ( New ) Mail - Mass

8 3075 P dot G Traction / 6P 3/11/2017 Cabin Dwg ( New ) Mail - Mass

9 3076 P dot G Traction / 6P 3/11/2017 Cabin Dwg ( New ) Mail - Mass

10

PRODUCTION DRAWING DETAILINGS RELEASED


Production ( Drawing, Detail
1 3069 V. Lalitha Traction / 6P 3/6/2017 Purchase - Prakash
Dwg, BOM Details )
Production ( Drawing, Detail
2 3067 / 01 Ganesh Traction / 6P 3/10/2017 Purchase - Prakash
Dwg, BOM Details )
Production ( Drawing, Detail
3 3074 P dot G Traction / 6P Dwg, BOM Details ) 3/11/2017 Purchase - Prakash

Production ( Drawing, Detail


4 3075 P dot G Traction / 6P 3/11/2017 Purchase - Prakash
Dwg, BOM Details )
Production ( Drawing, Detail
5 3076 P dot G Traction / 6P Dwg, BOM Details ) 3/11/2017 Purchase - Prakash

WEEKLY PROGRESS REPORT


MURALI.M DATE: 20.03.2017 to 25.03.2017
SITE DETAIL
PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE
ERECTION
SALES ENQUIRY RELEASED
1

LINE DRAWINGS RELEASED


1

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3101 NUTECH ASSOCIATES Traction / 6P 3/20/2017 3/20/2017 GAD ( New )

2 3099 SHRI KAMATCHI CONSTRUCTIONS Traction / 6P 3/20/2017 3/21/2017 GAD ( New )


3 3100 INDIA NEST Traction / 6P 3/20/2017 3/21/2017 GAD ( New )

4 3098 VARAHA PROPERTIES Traction / 6P 3/22/2017 3/22/2017 GAD ( New )

5 3102 THILAGAVATHY Traction / 6P 3/23/2017 3/24/2017 GAD ( New )

6 3105 PA. ASSOCIATES Traction / 6P 3/24/2017 3/25/2017 GAD ( New )

7 3115 NUTECH ASSOCIATES Traction / 6P 3/25/2017 3/25/2017 GAD ( New )

CABIN RECHECK & CONFORMATION TO MASS


1

PRODUCTION DRAWING DETAILINGS RELEASED


1

WEEKLY PROGRESS REPORT


MURALI.M DATE: 27.03.2017 to 01.04.2017
SITE DETAIL PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Bharathan ( Site - 1 ) Traction / 8P 4/8/2017 4/8/2017 COPD, SOPD Sales - Peter ( G.M. )

2 Sales Bharathan ( Site - 2 ) Traction / 8P 4/8/2017 4/8/2017 COPD Sales - Peter ( G.M. )

3 Sales INFANT BUILDERS ( Site - 1 ) Traction / 8P 4/8/2017 4/8/2017 COPD Sales - Palani ( BLR )
4 Sales INFANT BUILDERS ( Site - 1 ) Traction / 10P 4/8/2017 4/8/2017 COPD Sales - Palani ( BLR )

5 Sales INFANT BUILDERS ( Site - 2 ) Traction / 8P 4/8/2017 4/8/2017 COPD Sales - Palani ( BLR )

6 Sales INFANT BUILDERS ( Site - 2 ) Traction / 10P 4/8/2017 4/8/2017 COPD Sales - Palani ( BLR )

LINE DRAWINGS RELEASED


1

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3108 GURU FOUNDATIONS Traction / 6P 3/28/2017 3/29/2017 GAD ( New ) Design - Suresh

2 3109 GURU FOUNDATIONS Traction / 6P 3/28/2017 3/29/2017 GAD ( New ) Design - Suresh

3 3112 P. VIJAYA Traction / 6P 3/29/2017 3/30/2017 GAD ( New ) Design - Suresh

4 3113 PRABHU Traction / 6P 3/30/2017 3/30/2017 GAD ( New ) Design - Suresh

5 3107 GREENWICH CONSTRUCTIONS Traction / 6P 3/29/2017 3/31/2017 GAD ( New ) Design - Suresh

6 3106 GREENWICH CONSTRUCTIONS Traction / 6P 3/29/2017 4/1/2017 GAD ( New ) Design - Suresh

CABIN RECHECK & CONFORMATION TO MASS


1

PRODUCTION DRAWING DETAILINGS RELEASED


1

2
WEEKLY PROGRESS REPORT
MURALI.M DATE: 03.04.2017 to 08.04.2017
SITE DETAIL
PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION
SALES ENQUIRY RELEASED
1

LINE DRAWINGS RELEASED


1 Erection I.L.B.ramesh Traction / 6P 4/8/2017 Slab marking Erection - Prem

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3124 FIRM FOUNDATIONS Traction / 6P 4/3/2017 4/4/2017 GAD ( New ) Design - Suresh

2 3126 NAHAR FOUNDATIONS Traction / 6P 4/3/2017 4/4/2017 GAD ( New ) Design - Suresh

3 3127 NAHAR FOUNDATIONS Traction / 6P 4/3/2017 4/4/2017 GAD ( New ) Design - Suresh

4 3125 FIRM FOUNDATIONS Traction / 6P 4/3/2017 4/5/2017 GAD ( New ) Design - Suresh

5 3116 MSP HOMES Traction / 6P 4/3/2017 4/5/2017 GAD ( New ) Design - Suresh

6 3128 VINOTH BUILDERS Traction / 6P 4/5/2017 3/6/2017 GAD ( New ) Design - Suresh

7 3129 VINOTH BUILDERS Traction / 6P 4/5/2017 4/6/2017 GAD ( New ) Design - Suresh

CABIN RECHECK & CONFORMATION TO MASS


1

PRODUCTION DRAWING DETAILINGS RELEASED


1

WEEKLY PROGRESS REPORT


MURALI.M DATE: 10.04.2017 to 15.04.2017
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION
SALES ENQUIRY RELEASED
1 Sales Sathyaseiyan Traction/6P 4/15/2017 4/15/2017 IFG Sales - Peter (G.M.)

2 Sales Senthil kumar Traction/6P 4/15/2017 4/15/2017 COPD Sales - Harsha

LINE DRAWINGS RELEASED


1

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3087 Bhuvaneshwari Const Traction / 6P 4/10/2017 GAD ( New ) Design - Suresh

2 3117 MSP Homes - Block - C Traction / 6P 4/12/2017 GAD ( New ) Design - Suresh

3 Nagalakshmi Traction / 6P 4/13/2017 GAD ( New ) Design - Suresh

CABIN RECHECK & CONFORMATION TO MASS


1

PRODUCTION DRAWING DETAILINGS RELEASED


1

WEEKLY PROGRESS REPORT


MURALI.M DATE: 17.04.2017 to 22.04.2017
SITE DETAIL
PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

SALES ENQUIRY RELEASED


1

LINE DRAWINGS RELEASED


1

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3132 M.M. Builders Traction / 6P 4/19/2017 4/20/2017 GAD ( New ) Design - Suresh

2 3068 Kanmani Readymades Traction / 10P 4/20/2017 4/20/2017 GAD ( New ) Design - Suresh

3 3133 Vijay Jothi Builders Traction / 6P 4/22/2017 4/22/2017 GAD ( New ) Design - Suresh

CABIN RECHECK & CONFORMATION TO MASS


1

PRODUCTION DRAWING DETAILINGS RELEASED


1 3059 Prabha Homes Traction / 6P 4/22/2017 Cabin, BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 24.04.2017 to 29.04.2017
SITE DETAIL
RECEIVING RECEIVING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
ERECTION DATE

SALES ENQUIRY RELEASED


1

LINE DRAWINGS RELEASED


1

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3136 Sanjana Constructions Traction / 6P 4/24/2017 4/24/2017 GAD ( New ) Design - Suresh

2 3103 Uthrasekar Traction / 6P 4/24/2017 4/24/2017 GAD ( New ) Design - Suresh

3 3137 Kumar Traction / 6P 4/28/2017 4/28/2017 GAD ( New ) Design - Suresh

4
CABIN RECHECK & CONFORMATION TO MASS
1

PRODUCTION DRAWING DETAILINGS RELEASED


1 3136 Sanjana Constructions Traction / 6P 4/29/2017 Cabin, BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 02.05.2017 to 06.05.2017
SITE DETAIL
PRODUCTION
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SUBMITTED REMARKS
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Afzal Basha Traction/6P 5/5/2017 5/5/2017 COPD Sales - Anburathinam

LINE DRAWINGS RELEASED


1

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3134 Anirudh Foundation Traction / 6P 4/27/2017 5/2/2017 GAD ( New ) Design - Suresh

CABIN RECHECK & CONFORMATION TO MASS


1
2

PRODUCTION DRAWING DETAILINGS RELEASED


1 2290 SPK Interiors and Decors Traction / 6P 5/3/2017 Cabin, BOM Design - Suresh

2 3018 ILB Ramesh Homes Traction / 6P 5/3/2017 Cabin, BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 08.05.2017 to 13.05.2017
SITE DETAIL
PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Alaram Promoters Traction/6P 5/8/2017 5/8/2017 SOPD, MOSD Sales - Peter (G.M.)

2 Sales Chandran Traction/6P 5/8/2017 5/8/2017 MOSD Sales - Peter (G.M.)

Sales - Peter (G.M.) &


3 Sales Kapasi Traction/6P 5/8/2017 5/8/2017 SOPD, MOSD
Anburathinam

4 Sales Dinesh Traction/6P 5/12/2017 5/12/2017 COPD, Sales-Harshavardhana

LINE DRAWINGS RELEASED


1

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3135 V. Kumar Traction / 6P 5/8/2017 5/9/2017 GAD ( New ) Design - Suresh
2 3091 Lakshmikantham and sons Traction / 6P 5/8/2017 5/9/2017 GAD ( New ) Design - Suresh

3 3144 Pradeep Kumar Traction / 6P 5/10/2017 5/10/2017 GAD ( New ) Design - Suresh

CABIN RECHECK & CONFORMATION TO MASS


1

PRODUCTION DRAWING DETAILINGS RELEASED


1 3047 Sundaram Homes Traction / 6P 5/8/2017 CABIN, BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 15.05.2017 to 20.05.2017
SITE DETAIL
RECEIVING RECEIVING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Sairam Promoters Traction/6P 5/15/2017 5/15/2017 COPD Sales - Peter (G.M.)

2 Sales Akshya lodge Traction/6P 5/15/2017 5/15/2017 COPD Sales - Peter (G.M.)

3 Sales Edwin Traction/6P 17/2017 5/17/2017 MOSD Sales - Anburathinam

LINE DRAWINGS RELEASED


1
2

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3145 Perumalrajan Traction / 6P 5/19/2017 5/20/2017 GAD ( New ) Design - Suresh

CABIN RECHECK & CONFORMATION TO MASS


1

PRODUCTION DRAWING DETAILINGS RELEASED


1 3113 Prabhu Traction / 6P 5/15/2017 CABIN, BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 22.05.2017 to 27.05.2017
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE
SALES ENQUIRY RELEASED
1 Sales Krishna Nagar Traction/6P 5/25/2017 5/25/2017 COPD Sales - Palani ( BLR )

2 Sales Ram Reddy Traction/6P 5/25/2017 5/25/2017 COPD Sales - Palani ( BLR )

3 Sales ILB Ramesh Traction/6P 5/26/2017 5/26/2017 COPD Sales - Anburathinam

4 Sales Karnataka Sengundhar Sangam Traction/8P 5/26/2017 5/26/2017 COPD Sales - Palani ( BLR )

5 Sales Pavan Traction/6P 5/26/2017 5/26/2017 IFG Sales - Palani ( BLR )


LINE DRAWINGS RELEASED
1

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3147 Ranganathan Traction / 6P 5/20/2017 5/24/2017 GAD ( New ) Design - Suresh

2 3148 Sivathanu Traction / 6P 5/23/2017 5/24/2017 GAD ( New ) Design - Suresh

3 3139 Sri Raghavendra Constructions Traction / 6P 5/22/2017 5/24/2017 GAD ( New ) Design - Suresh

4 3149 Rajarathinam Constructions Traction / 6P 5/24/2017 5/27/2017 GAD ( New ) Design - Suresh

5 3151 Rajarathinam Constructions Traction / 6P 5/24/2017 5/27/2017 GAD ( New ) Design - Suresh

6 3152 Rajarathinam Constructions Traction / 6P 5/24/2017 5/27/2017 GAD ( New ) Design - Suresh

CABIN RECHECK & CONFORMATION TO MASS


1

PRODUCTION DRAWING DETAILINGS RELEASED


1 3128 Vinoth Builders Traction / 6P 5/22/2017 CABIN, BOM Design - Suresh

2 3129 Vinoth Builders Traction / 6P 5/23/2017 CABIN, BOM Design - Suresh

4
WEEKLY PROGRESS REPORT
MURALI.M DATE: 29.05.2017 to 03.06.2017
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales PKS Foundation Traction/6P 5/30/2017 5/30/2017 MOSD Sales-Harshavardhana

2 Sales Vignesh properties(1) & (2) Traction/6P 5/30/2017 5/30/2017 COPD, MOSD Sales - M.D.

SRM College Boys Hostel (1), (2) &


3 Sales Traction/8P 6/1/2017 6/3/2017 COPD Sales -Harshavardhana
(3)
SRM College Staff Quarters (1), (2)
4 Sales Traction/8P 6/1/2017 6/3/2017 COPD Sales -Harshavardhana
& (3)

LINE DRAWINGS RELEASED


1

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3150 Rajarathinam Constructions Traction / 6P 5/24/2017 5/29/2017 GAD ( New ) Design - Suresh

2 3153 Rajarathinam Constructions Traction / 6P 5/24/2017 6/1/2017 GAD ( New ) Design - Suresh
CABIN RECHECK & CONFORMATION TO MASS
1

PRODUCTION DRAWING DETAILINGS RELEASED


1 3139 Raghavendhra constructions Traction / 6P 5/31/2017 CABIN, BOM Design - Suresh

2 3068 Kanmani Readymades Traction / 10P 5/31/2017 CABIN, BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 05.06.2017 to 10.06.2017
SITE DETAIL PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED

1 Sales Deepak Traction/6P 6/6/2017 6/6/2017 SOPD Sales-

2 Sales Elite Contractors Traction/6P 6/7/2017 6/7/2017 Standard sizes Sales - Prakash

3 Sales Radhakrishnan Traction/6P 6/7/2017 6/7/2017 COPD,IFG Sales - Prakash


4 Sales Kishore Kumar Traction/6P 6/7/2017 6/7/2017 SOPD,IFG Sales - Prakash

5 Sales Raunan Foundation Traction/6P 6/7/2017 6/7/2017 Standard sizes Sales - Prakash

6 Sales Siva Builders (1) & (2) Traction/6P 6/10/2017 6/10/2017 COPD,SOPD Sales-Harshavardhana

LINE DRAWINGS RELEASED

GENERAL ARRANGEMENT DRAWINGS RELEASED

1 3154 Bhuvaneshwari Constructions Traction / 6P 6/6/2017 6/6/2017 GAD ( New ) Design - Suresh

2 3155 Ken Homes Traction / 6P 6/7/2017 6/9/2017 GAD ( New ) Design - Suresh

3 3040 L & L Constructions Traction / 6P 5/31/2017 6/5/2017 GAD ( New ) Design - Suresh

CABIN RECHECK & CONFORMATION TO MASS

PRODUCTION DRAWING DETAILINGS RELEASED


1 3108 Guru Foundation Traction / 6P 6/7/2017 CABIN, BOM Design - Suresh

2 3108 Guru Foundation Traction / 6P 6/7/2017 CABIN, BOM Design - Suresh

3 3109 Guru Foundation Traction / 6P 6/7/2017 CABIN, BOM Design - Suresh

4 3049 N.Gopal & B.Selvaraj Traction / 6P 6/8/2017 BOM Design - Suresh

5 3086 Bhuvaneshwari Constructions Traction / 6P 6/9/2017 CABIN, BOM Design - Suresh

6 3073 Abirami Constructions Traction / 6P 6/9/2017 CABIN, BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 12.06.2017 to 17.06.2017
SITE DETAIL
PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Madhavan Traction/6P 6/12/2017 6/12/2017 COPD Sales - Anburathinam

2 Sales Senthil Traction/6P 6/14/2017 6/14/2017 COPD Sales -Harshavardhana

3 Sales Pranav Foundation Traction/6P 6/16/2017 6/16/2017 MOSD Sales -Harshavardhana

4 Sales Guru Traction/6P 6/16/2017 6/16/2017 MOSD Sales -Harshavardhana


5 Sales Advaith Homes Traction/6P 6/17/2017 6/17/2017 COPD Sales -Peter (G.M.)

LINE DRAWINGS RELEASED


1

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3153 Rajarathinam Constructions Traction / 6P 5/24/2017 6/1/2017 GAD ( New ) Design - Suresh

2 3156 ILB Ramesh Traction / 6P 6/13/2017 6/14/2017 GAD ( New ) Design - Suresh

3 3157 ILB Ramesh Traction / 6P 6/14/2017 6/14/2017 GAD ( New ) Design - Suresh

4 3158 Thilagar Traction / 6P 6/15/2017 6/15/2017 GAD ( New ) Design - Suresh

5 3159 Thilagar Traction / 6P 6/15/2017 6/15/2017 GAD ( New ) Design - Suresh

CABIN RECHECK & CONFORMATION TO MASS


1

PRODUCTION DRAWING DETAILINGS RELEASED


1 3155 Ken Homes Traction / 6P 6/12/2017 CABIN, BOM Design - Suresh

2 3040 L & L Constructions Traction / 6P 6/12/2017 CABIN, BOM Design - Suresh

3 BEL - 190 Tropical Realty pvt ltd Traction / 6P 6/13/2017 CABIN, BOM Design - Suresh

4 BEL - 191 Raghumurthy Traction / 6P 6/13/2017 CABIN, BOM Design - Suresh


5 2978 Star Heaven Builders Traction / 6P 6/13/2017 CABIN, BOM Design - Suresh

6 3147 Ranganathan Traction / 6P 6/13/2017 CABIN, BOM Design - Suresh

7 3114 Sugumar Traction / 6P 6/15/2017 BOM Design - Suresh

8 BEL - 210 Murali Traction / 6P 6/15/2017 BOM Design - Suresh

9 3144 Pradeep Kumar Traction / 6P 6/15/2017 CABIN, BOM Design - Suresh

10 3158 Thilagar Traction / 6P 6/16/2017 CABIN, BOM Design - Suresh

11 3159 Thilagar Traction / 6P 6/16/2017 CABIN, BOM Design - Suresh

12 3145 PerumalRajan Traction / 6P 6/17/2017 CABIN, BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 19.06.2017 to 24.06.2017
SITE DETAIL
PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

SALES ENQUIRY RELEASED

1 Sales Anwar Hussain Traction/10P 6/22/2017 6/22/2017 COPD Sales - Anburathinam

2 Sales Jairam Reddy Traction/6P 6/22/2017 6/22/2017 IFG Sales - Anburathinam

3 Sales TNHB Ambattur (A), (B), (C) &(D) Traction/8P 6/24/2017 6/24/2017 COPD Sales - Peter (G.M)
LINE DRAWINGS RELEASED

GENERAL ARRANGEMENT DRAWINGS RELEASED

1 3118 M.S.P. Homes Traction / 6P 6/3/2017 6/19/2017 GAD ( New ) Design - Suresh

2 3121 P.Rukmani Traction / 6P 6/19/2017 6/20/2017 GAD ( New ) Design - Suresh

3 3092 Lakshmikantham & Sons Traction / 6P 6/16/2017 6/21/2017 GAD ( New ) Design - Suresh

4 3097 Vishva Homes Traction / 6P 6/20/2017 6/24/2017 GAD ( New ) Design - Suresh

CABIN RECHECK & CONFORMATION TO MASS

PRODUCTION DRAWING DETAILINGS RELEASED

1 3156 ILB Ramesh Homes Traction / 6P 6/23/2017 CABIN, BOM Design - Suresh

2 3157 ILB Ramesh Homes Traction / 6P 6/23/2017 CABIN, BOM Design - Suresh
WEEKLY PROGRESS REPORT
MURALI.M DATE: 26.06.2017 to 01.07.2017
SITE DETAIL PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Sidharth Housing (1) & (2) Traction/6P 6/25/2017 6/25/2017 SOPD,MOSD,IFG Sales - Anburathinam

2 Sales Jayaswathi Constructions Traction/6P 6/25/2017 6/25/2017 COPD,MOSD Sales - Anburathinam

LINE DRAWINGS RELEASED


1

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3162 Sumathi Hospital MRL / 16P 6/26/2017 GAD(NEW) Design - Suresh

2 3161 Indai Infratech MRL / 6P 6/29/2017 GAD(NEW) Design - Suresh

CABIN RECHECK & CONFORMATION TO MASS


1

PRODUCTION DRAWING DETAILINGS RELEASED


1

WEEKLY PROGRESS REPORT


MURALI.M DATE: 10.07.2017 to 15.07.2017
SITE DETAIL
PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Classic Homes Traction/6P 7/11/2017 7/11/2017 SOPD,IFG Sales - Anburathinam

2 Sales Sriram Traction/6P 7/12/2017 7/12/2017 COPD Sales -Harshavardhana

3 Sales Natarajan Traction/6P 7/13/2017 7/13/2017 COPD Sales - Prakash

4 Sales Imperial Homes Traction/6P 7/13/2017 7/13/2017 IFG Sales - Prakash

5 Sales Dinesh Ram Homes MRL/Traction/6P 7/13/2017 7/13/2017 COPD Sales - Peter (G.M)

6 Sales Anand Traction/6P 7/13/2017 7/13/2017 IFG,SOPD Sales -Harshavardhana

7 Sales Pranav Foundations Traction/6P 7/13/2017 7/13/2017 SOPD Sales -Harshavardhana

8 Sales Natarajan MRL/6P 7/13/2017 7/13/2017 SOPD Sales - Prakash

9 Sales Senthil Traction/8P 7/13/2017 7/13/2017 COPD Sales -Harshavardhana

10 Sales Sumangali Homes Traction/6P 7/15/2017 7/15/2017 COPD Sales - Anburathinam


LINE DRAWINGS RELEASED
1

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3164 Jayaswathi Constructions Traction/6P 7/14/2017 7/14/2017 GAD(NEW) Design - Suresh

2 3163 Sri Builders Traction/6P 7/15/2017 7/15/2017 GAD(NEW) Design - Suresh

CABIN RECHECK & CONFORMATION TO MASS


1

PRODUCTION DRAWING DETAILINGS RELEASED


1 3164 Jayaswathi Constructions Traction/6P 7/15/2017 CABIN,BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 17.07.2017 to 22.07.2017
SITE DETAIL PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales G.V.Builders Traction/6P 7/20/2017 7/20/2017 IFG Sales - Anburathinam

2 Sales Unic Associates Traction/6P 7/20/2017 7/20/2017 COPD Sales - Anburathinam

LINE DRAWINGS RELEASED


1

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 BEL - 206 K.Keshava Traction/ 6P 7/15/2017 7/17/2017 GAD(NEW) Design - Suresh

2 3062 Dr. C.Selvakumar & Saravanan Traction/6P 7/19/2017 7/19/2017 GAD(NEW) Design - Suresh

CABIN RECHECK & CONFORMATION TO MASS


1

PRODUCTION DRAWING DETAILINGS RELEASED


1

2
WEEKLY PROGRESS REPORT
MURALI.M DATE: 24.07.2017 to 29.07.2017
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales S.K. Foundations Traction/6P 7/25/2017 7/25/2017 MOSD Sales - Anburathinam

2 Sales Sarath Kumar Traction/6P 7/26/2017 7/26/2017 COPD Sales - Peter (G.M)

3 Sales Natarajan Traction/6P/8P 7/26/2017 7/26/2017 COPD Sales - Peter (G.M)

2 Sales Nest Traction/6P 7/28/2017 7/28/2017 IFG Sales - Anburathinam

LINE DRAWINGS RELEASED


1 3167 Sri Vari Electricals Traction/6P 7/26/2017 7/27/2017 SOPD Sales - Peter (G.M)

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3168 Palaniappa Constructions Traction/ 6P 7/26/2017 7/27/2017 GAD(NEW) Design - Suresh

2 3169 Shri Janani Homes Traction/6P 7/26/2017 7/29/2017 GAD(NEW) Design - Suresh

CABIN RECHECK & CONFORMATION TO MASS


1

PRODUCTION DRAWING DETAILINGS RELEASED


1 3102 Thilagavathy Traction/6P 7/25/2017 BOM,CABIN Design - Suresh

2 Nagalakshmi Traction/6P 7/28/2017 BOM,CABIN Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 04.09.2017 to 09.09.2017
SITE DETAIL PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Man & Soil, Amity Homes Traction/6P 5/9/2017 5/9/2017 IFG,COPD

2 Sales Jem Constructions Traction/6P 6/9/2017 6/9/2017 SOPD Sales - Sivakumar

3 Sales UM Associates Traction/6P 6/9/2017 6/9/2017 MOSD Sales - Sivakumar

4 Sales Rohini Constructions(1) Traction/6P 6/9/2017 6/9/2017 COPD Sales - Anburathinam

5 Sales Rohini Constructions(2),(3) Traction/8P 6/9/2017 6/9/2017 COPD,SOPD Sales - Anburathinam


LINE DRAWINGS RELEASED

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3191 Radhakrishnan Traction/ 6P 2/9/2017 7/9/2017 GAD(NEW) Design - Suresh

2 3195 Sai Anand Properties Traction/6P 30/8/2017 9/9/2017 GAD(NEW) Design - Suresh

3 3192 M.M.Residency Traction/6P 2/9/2017 5/9/2017 GAD(NEW) Design - Suresh

4 3171 Sai Venkatesan Traction/6P 30/8/2017 9/9/2017 GAD(NEW) Design - Suresh

5 3193 Paneer Selvam Traction/6P 2/9/2017 8/9/2017 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3189 Madanraj Traction/6P 6/9/2017 BOM,CABIN Design - Suresh

2 3186 V.S.P Supermarket Traction/8P 6/9/2017 BOM,CABIN Design - Suresh

3 3126 Nahar Foundation Traction/6P 6/9/2017 BOM,CABIN Design - Suresh

4 3127 Nahar Foundation Traction/6P 6/9/2017 BOM,CABIN Design - Suresh

5 BEL - 214 G.Shankar Traction/6P 6/9/2017 BOM Design - Suresh


WEEKLY PROGRESS REPORT
MURALI.M DATE: 11.09.2017 to 16.09.2017
SITE DETAIL
PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Sri Ram Constructions Traction/6P 11/9/2017 11/9/2017 COPD Sales - Sivakumar

2 Sales K.K.R. Builders Traction/6P 11/9/2017 11/9/2017 SOPD Sales - Sivakumar

LINE DRAWINGS RELEASED

GENERAL ARRANGEMENT DRAWINGS RELEASED


S.L. Anandan Developers &
1 3138 Traction/ 6P 1/9/2017 11/9/2017 GAD(NEW) Design - Suresh
Promoters

2 3196 Sumangali Homes Traction/ 6P 9/9/2017 11/9/2017 GAD(NEW) Design - Suresh

3 3131 Sumangali Homes Traction/ 6P 12/9/2017 13/9/2017 GAD(NEW) Design - Suresh

4 3201 Preetha Foundation Traction/ 6P 12/9/2017 13/9/2017 GAD(NEW) Design - Suresh

5 3198 Sri Abiraami Constructions Traction/ 6P 11/9/2017 12/9/2017 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3192 M.M. Residency Traction/6P 15/9/2017 BOM,CABIN Design - Suresh
WEEKLY PROGRESS REPORT
MURALI.M DATE: 18.09.2017 to 23.09.2017
SITE DETAIL
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Barcode Traction/6P 19/9/2017 19/9/2017 COPD Sales - Sivakumar

2 Sales Ram Kumar Traction/8P 19/9/2017 19/9/2017 COPD,SOPD,MOSD Standard Sales - Anburathinam
size

3 Sales Prakash Traction/6P 20/9/2017 20/9/2017 SOPD Sales - Sivakumar

4 Sales Alied Housing Traction/6P 20/9/2017 20/9/2017 IFG Sales - Sathish

5 Sales Sakthi Kumar Traction/6P 22/9/2017 22/9/2017 COPD Sales - Sivakumar

6 Sales Rajintham Builders Traction/6P 22/9/2017 22/9/2017 COPD Sales - Sivakumar

7 Sales Balaswamy MRL/6P 22/9/2017 22/9/2017 SOPD Sales - Sivakumar

8 Sales Rajesh Traction/6P 22/9/2017 22/9/2017 IFG Sales -Harshavardhana

9 Sales Rajesh Traction/6P 22/9/2017 22/9/2017 IFG Sales -Harshavardhana

10 Sales Jai Kumar Traction/6P 22/9/2017 22/9/2017 SOPD Sales - Sathish

11 Sales Mushtaq Ahamed Traction/6P 23/9/2017 23/9/2017 COPD


12 Sales Silver Castle Traction/6P 23/9/2017 23/9/2017 COPD

LINE DRAWINGS RELEASED

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3194 N.A.N Constructions Traction/ 6P 11/9/2017 20/9/2017 GAD(NEW) Design - Suresh

2 3203 Star Haven Builders Traction/ 6P 18/9/2017 21/9/2017 GAD(NEW) Design - Suresh

3 3202 Maestro Promoters Traction/ 6P 14/9/2017 22/9/2017 GAD(NEW) Design - Suresh

4 2371 Tropical Realty Traction/ 6P 14/9/2017 22/9/2017 GAD(NEW) Design - Suresh

5 3197 The Balussery Benefit Chit Fund Traction/ 6P 13/9/2017 23/9/2017 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3171 Sai Venkatesan Traction/6P 18/9/2017 BOM,CABIN Design - Suresh

2 3118 M.S.P. Homes Traction/6P 19/9/2017 BOM,CABIN Design - Suresh

3 3198 Sri Abiraami Constructions Traction/6P 19/9/2017 BOM,CABIN Design - Suresh

4 3091 Lakshmikantham Sons Traction/6P 19/9/2017 BOM,CABIN Design - Suresh

5 3178 Aishwaryam Creators Traction/6P 19/9/2017 BOM,CABIN Design - Suresh


WEEKLY PROGRESS REPORT
MURALI.M DATE: 25.09.2017 to 30.09.2017

SITE DETAIL
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Reliance Builders Traction/6P 25/9/2017 25/9/2017 COPD Sales - Sivakumar

2 Sales Prathin Traction/6P 30/9/2017 30/9/2017 MOSD Sales - Sivakumar

3 Sales SL Homes Traction/6P 30/9/2017 30/9/2017 IFG,MOSD Sales - Sivakumar

4 Sales Mohammed Traction/8P 30/9/2017 30/9/2017 MOSD,COPD Sales - Sivakumar

LINE DRAWINGS RELEASED

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3207 M.S.P. Homes Traction/ 8P 25/9/2017 25/9/2017 GAD(NEW) Design - Suresh

2 3204 Star Haven Builders Traction/ 6P 25/9/2017 26/9/2017 GAD(NEW) Design - Suresh
PRODUCTION DRAWING DETAILINGS RELEASED
1 3141 Sathyanathan Traction/6P 25/9/2017 BOM,CABIN Design - Suresh

2 3191 Radhakrishnan (PSBB School) Traction/6P 26/9/2017 BOM,CABIN Design - Suresh

3 3207 M.S.P. Homes Traction/8P 26/9/2017 BOM,CABIN Design - Suresh

4 BEL 206 Keshava Traction/6P 27/9/2017 BOM,CABIN Design - Suresh

5 3172 The Nest Traction/6P 28/9/2017 BOM,CABIN Design - Suresh

6 3062 Dr. Selvakumar & Dr. Saravanan Traction/6P 30/9/2017 BOM,CABIN Design - Suresh

7 3201 Preetha Foundation Traction/6P 30/9/2017 BOM,CABIN Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 03.10.2017 to 07.10.2017
SITE DETAIL PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Balaji MRL/6P 3/10/2017 3/10/2017 MOSD Sales - Sivakumar

2 Sales Rohini constructions (1) Traction/6P 4/10/2017 4/10/2017 MOSD Sales - Anburathinam

3 Sales Rohini constructions (2) Traction/6P 4/10/2017 4/10/2017 MOSD Sales - Anburathinam
4 Sales Rohini constructions (3) Traction/6P 4/10/2017 4/10/2017 MOSD Sales - Anburathinam

5 Sales Star Saphire Apartments Traction/6P 5/10/2017 5/10/2017 SOPD Sales - Anburathinam

LINE DRAWINGS RELEASED

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3184 Ramadurai Traction/ 6P 6/10/2017 7/10/2017 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3149 Rajarathinam Constructions Traction/6P 6/10/2017 BOM,CABIN Design - Suresh

2 3150 Rajarathinam Constructions Traction/6P 6/10/2017 BOM,CABIN Design - Suresh

3 3152 Rajarathinam Constructions Traction/6P 6/10/2017 BOM,CABIN Design - Suresh

4 3151 Rajarathinam Constructions Traction/6P 7/10/2017 BOM,CABIN Design - Suresh

5 3153 Rajarathinam Constructions Traction/6P 7/10/2017 BOM,CABIN Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 09.10.2017 to 14.10.2017

SITE DETAIL
PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Vijay Jothi Builders Traction/6P 9/10/2017 9/10/2017 IFG Sales - Peter (G.M.)

2 Sales KSR Real Value Traction/6P 10/10/2017 10/10/2017 COPD Sales - Anburathinam

3 Sales KSR Real Value MRL/6P 10/10/2017 10/10/2017 COPD Sales - Anburathinam

4 Sales RCRC Associates Traction/6P 10/10/2017 10/10/2017 COPD Sales - Sivakumar

5 Sales DRA HOMES(2) Traction/8P 11/10/2017 11/10/2017 COPD Sales - Sivakumar

6 Sales DRA HOMES(4) Traction/8P 11/10/2017 11/10/2017 COPD Sales - Sivakumar

CABIN RECHECK & CONFIRMATION


1 3178 Aishwaryam Construction Traction / 6P 12/10/2017 Cabin Checking Design - Suresh

2 3185 VSP Super Market MRL / 8P 12/10/2017 Cabin Checking Design - Suresh

3 3191 Radhakrishnan Traction / 6P 12/10/2017 Cabin Checking Design - Suresh

4 3201 Preetha Foundation Traction / 6P 12/10/2017 Cabin Checking Design - Suresh

5 2371 Tropical Reality Traction / 6P 13/13/2017 Cabin Checking Design - Suresh

6 3062 / 01 C. Selvakumar & Dr. Saravanan Traction / 6P 13/13/2017 Cabin Checking Design - Suresh

7 3141 J.I. Sathyanathan Traction / 6P 13/13/2017 Cabin Checking Design - Suresh


GENERAL ARRANGEMENT DRAWINGS RELEASED
1 3210 Prem kumar & Bharath Kumar Traction/ 6P 12/10/2017 12/10/2017 GAD(NEW) Design - Suresh

2 3209 Jem Constructions Traction/ 6P 12/10/2017 13/10/2017 GAD(NEW) Design - Suresh

3 3213 TNHB Traction/ 8P 14/10/2017 14/10/2017 GAD(NEW) Design - Suresh

4 3214 TNHB Traction/ 8P 14/10/2017 14/10/2017 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3098 Varaha Properties Traction/6P 10/10/2017 BOM,CABIN Design - Suresh

2 3184 Ramadurai Traction/6P 10/10/2017 BOM,CABIN Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 16.10.2017 to 21.10.2017
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Murali Traction/6P 16/10/2017 16/10/2017 COPD,MOSD Sales - Anburathinam
2 Sales Sreerosh MRL/6P 19/10/2017 19/10/2017 SOPD,IFG Sales -Harshavardhana

3 Sales Prathin Infra MRL/6P 20/10/2017 20/10/2017 COPD Sales - Anburathinam

4 Sales Rajendran apartments Traction/6P/ 20/10/2017 20/10/2017 COPD/IFG Reference - Ahmed


Modernisation

5 Sales Megha Constructions Traction/6P 20/10/2017 20/10/2017 COPD Sales - Anburathinam

CABIN RECHECK & CONFIRMATION


1 3178 Rajarathinam Constructions Traction / 6P 16/10/2017 Cabin Checking Design - Suresh

2 3185 Rajarathinam Constructions Traction / 6P 16/10/2017 Cabin Checking Design - Suresh

3 3191 Rajarathinam Constructions Traction / 6P 16/10/2017 Cabin Checking Design - Suresh

4 3201 Rajarathinam Constructions Traction / 6P 16/10/2017 Cabin Checking Design - Suresh

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3149 TNHB Traction/ 8P 14/10/2017 17/10/2017 GAD(NEW) Design - Suresh

2 3150 TNHB Traction/ 8P 14/10/2017 17/10/2017 GAD(NEW) Design - Suresh

3 3151 TNHB Traction/ 8P 14/10/2017 19/10/2017 GAD(NEW) Design - Suresh

4 3152 TNHB Traction/ 8P 14/10/2017 19/10/2017 GAD(NEW) Design - Suresh

5 3217 Daffodils Traction/ 6P 20/10/2017 21/10/2017 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3210 Prem kumar & Bharath Kumar Traction/6P 20/10/2017 BOM,CABIN Design - Suresh
2 3213 TNHB Traction/8P 20/10/2017 CABIN Design - Suresh

3 3214 TNHB Traction/8P 20/10/2017 CABIN Design - Suresh

4 3215 TNHB Traction/8P 21/10/2017 CABIN Design - Suresh

5 3216 TNHB Traction/8P 21/10/2017 CABIN Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 23.10.2017 to 28.10.2017
SITE DETAIL
RECEIVING RECEIVING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Priya Constructions(1) Traction/10P 24/10/2017 24/10/2017 SOPD,MOSD Sales - Sivakumar

2 Sales Priya Constructions(2) Traction/8P 24/10/2017 24/10/2017 SOPD,MOSD Sales -Harshavardhana


3 Sales Aashish(Vijay Kumar Patwa) Traction/10P 25/10/2017 25/10/2017 COPD Sales -Harshavardhana

4 Sales Subramanian Traction/6P 27/10/2017 27/10/2017 COPD Sales - Sivakumar

5 Sales Ramesh Traction/6P 27/10/2017 27/10/2017 IFG/SOPD Sales -Harshavardhana

LINE DRAWING RELEASED


1 Sales Srikanth Cosntructions(Bangalore) Traction / 8P 25/10/2017 Plan, Machine Room Design - Suresh

2 Sales Srikanth Cosntructions(Bangalore) Traction / 6P 25/10/2017 Plan, Machine Room Design - Suresh

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 BEL-217 Vijaya Kumar Traction/ 6P 20/10/2017 23/10/2017 GAD(NEW) Design - Suresh

2 3220 Varthini Foundations MRL/ 6P 23/10/2017 24/10/2017 GAD(NEW)

2 3221 Flat Promoters Association Traction/ 6P 26/10/2017 26/10/2017 GAD(NEW) Design - Suresh

3 3154 Bhuvaneshwari Constructions Traction/ 6P 26/10/2017 26/10/2017 GAD(Revision) Design - Suresh

4 3218 Tasneem Kapasi MRL/ 6P 25/10/2017 27/10/2017 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3197 Balussery Benefit Chit Funds Traction/6P 27/10/2017 BOM,CABIN Design - Suresh

2 3221 Flat Promoters Association Traction/6P 28/10/2017 BOM,CABIN Design - Suresh

3 3193 Paneer Selvam Traction/6P 28/10/2017 BOM,CABIN Design - Suresh


WEEKLY PROGRESS REPORT
MURALI.M DATE: 30.10.2017 to 04.11.2017
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales K.K. Developers Traction/6P 31/10/2017 31/10/2017 IFG Sales - Peter (G.M.)

2 Sales Pranav Foundations Traction/6P 1/11/2017 1/11/2017 COPD,IFG Sales -Harshavardhana

3 Sales Indu Housing Traction/6P 2/11/2017 2/11/2017 MOSD Sales - Sivakumar

4 Sales Elango MRL/6P 4/11/2017 4/11/2017 SOPD Sales - Sivakumar

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3223 N.K. Prabhakaran MRL/ 6P 30/10/2017 2/11/2017 GAD(NEW) Design - Suresh

2 3221 Flat Promoters Association Traction/ 6P 3/11/2017 3/11/2017 GAD Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3167 Sri Vari Electricals Pvt Ltd Traction/6P 31/10/2017 BOM,CABIN Design - Suresh

2 3221 Flat Promoters Association Traction/6P 3/11/2017 BOM,CABIN Design - Suresh


WEEKLY PROGRESS REPORT
MURALI.M DATE: 06.11.2017 to 11.11.2017
SITE DETAIL
PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Bharath Traction/6P 6/11/2017 6/11/2017 SOPD Sales - Palani

2 Sales Ramesh MRL/6P 8/11/2017 8/11/2017 IFG Sales -Harshavardhana

3 Sales Anand Traction/10P 9/11/2017 9/11/2017 SOPD/COPD Sales - Sivakumar

4 Sales SMR Builders Traction/6P 9/11/2017 9/11/2017 COPD/MOSD Sales - Sivakumar

5 Sales SMR Builders MRL/6P 9/11/2017 9/11/2017 COPD Sales - Sivakumar

6 Sales Prishe Homes Traction/6P 10/11/2017 10/11/2017 IFG Sales -Harshavardhana

7 Sales Saravana Kumar Traction/6P 10/11/2017 10/11/2017 SOPD Sales -Harshavardhana

8 Sales AMM Builders MRL/6P 11/11/2017 11/11/2017 COPD Sales - Anburathinam

9 Sales Balaji MRL/6P 11/11/2017 11/11/2017 SOPD Sales - Sivakumar

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3226 Nutech Associates Traction/ 6P 11/11/2017 11/11/2017 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3097 Vishva Homes Traction/6P 6/10/2017 BOM,CABIN Design - Suresh

2 3154/01 Bhuvaneshwari Constructions Traction/6P 7/11/2017 BOM,CABIN Design - Suresh


WEEKLY PROGRESS REPORT
MURALI.M DATE: 13.11.2017 to 18.11.2017
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Anush Foundation MRL/8P 14/11/2017 14/11/2017 SOPD, COPD Sales - Sivakumar

2 Sales Akash Builders MRL/6P 15/11/2017 15/11/2017 COPD Sales - Sivakumar

3 Sales Akash Builders Traction/6P 15/11/2017 15/11/2017 COPD Sales - Sivakumar

4 Sales Ravuru Baskaran Traction/6P 16/11/2017 16/11/2017 SOPD, IFG Sales - Anburathinam

5 Sales K.P. Subramaniam MRL/6P 16/11/2017 16/11/2017 SOPD Sales - Anburathinam

6 Sales Chandrasekar MRL/6P 17/11/2017 17/11/2017 SOPD Sales -Harshavardhana

7 Sales Banumathi Traction/6P 17/11/2017 17/11/2017 MOSD Sales - Sivakumar

8 Sales Dhanam apartments Traction/6P 17/11/2017 17/11/2017 COPD, IFG Sales - MD

9 Sales Suchitra apartments (1) Traction/6P 17/11/2017 17/11/2017 COPD Service - Giri

10 Sales Suchitra apartments (2) Traction/6P 17/11/2017 17/11/2017 COPD Service - Giri

11 Sales Preview Constructions Traction/10P 18/11/2017 18/11/2017 COPD Sales -Harshavardhana

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3228 Unic Associates Traction/ 6P 14/11/2017 14/11/2017 GAD(NEW) Design - Suresh

2 BEL -219 Srikanth Constructions Traction/ 8P 14/11/2017 15/11/2017 GAD(NEW) Design - Suresh

3 BEL -220 Srikanth Constructions Traction/ 6P 14/11/2017 15/11/2017 GAD(NEW) Design - Suresh

4 3224 Ramakrishna Math Traction/ 6P 16/11/2017 16/11/2017 GAD(NEW) Design - Suresh


5 3227 Guru Foundations Traction/ 6P 16/11/2017 17/11/2017 GAD(NEW) Design - Suresh

6 3225 Janani Homes Traction/ 6P 17/11/2017 18/11/2017 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 2649 Padmavathy Traction/6P 15/11/2017 BOM,CABIN Design - Suresh

2 3227 Guru Foundations Traction/6P 18/11/2017 BOM,CABIN Design - Suresh

3 BEL - 217 Vijaykumar Traction/6P 18/11/2017 BOM,CABIN Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 20.11.2017 to 25.11.2017
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SUBMITTED REMARKS
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Shanthi Tamilarasan Traction/6P 20/11/2017 20/11/2017 COPD Sales - Sivakumar

2 Sales Dileep Kumar MRL/6P 20/11/2017 20/11/2017 SOPD Sales - Sivakumar

3 Sales Dileep Kumar Traction/6P 20/11/2017 20/11/2017 COPD Sales - Sivakumar

4 Sales Preview Constructions MRL/10P 20/11/2017 20/11/2017 COPD Sales -Harshavardhana

5 Sales Dr.Kasi MRL/6P 22/11/2017 22/11/2017 SOPD Sales - Sivakumar

6 Sales Mercury Foundation Traction/6P 22/11/2017 22/11/2017 SOPD Sales - Sivakumar

7 Sales Paneer Ramachandran MRL/6P 25/11/2017 25/11/2017 COPD Sales - Anburathinam

8 Sales Salim Traction/6P 25/11/2017 25/11/2017 MOSD, IFG Sales - Anburathinam


9 Sales Sai MRL/6P 25/11/2017 25/11/2017 SOPD Sales - Peter (G.M.)

10 Sales Sai MRL/8P 25/11/2017 25/11/2017 SOPD Sales - Peter (G.M.)

CABIN RECHECK & CONFORMATION


1 3197 Baluserry Benefit Traction / 6P 11/21/2017 Cabin Dwg ( Checking ) Mail - Mass

2 3210 Premkumar & Bharath Kumar Traction / 6P 11/21/2017 Cabin Dwg ( Checking ) Mail - Mass

3 2649 K. Padmavathy Traction / 6P 11/21/2017 Cabin Dwg ( Checking ) Mail - Lens

4 3137 Kumar Traction / 6P 11/21/2017 Cabin Dwg ( Checking ) Mail - Lens

5 3190 Shri Kamatchi Construction MRL / 6 Person 11/21/2017 Cabin Dwg ( Checking ) Mail - Lens

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3229 Geetha Rajan MRL/ 6P 17/11/2017 20/11/2017 GAD(NEW) Design - Suresh

2 3230 Balaji MRL/ 6P 22/11/2017 23/11/2017 GAD(NEW) Design - Suresh

3 3235 Viswam Constructions Traction/ 6P 25/11/2017 25/11/2017 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3168 Palaniappa Constructions Traction/6P 21/11/2017 BOM,CABIN Design - Suresh

2 3225 Janani homes Traction/6P 24/11/2017 BOM,CABIN Design - Suresh

3 3228 Unic Associates Traction/6P 24/11/2017 BOM,CABIN Design - Suresh

4 3235 Viswam Constructions Traction/6P 25/11/2017 BOM,CABIN Design - Suresh

5 3179 Kannappan Traction/6P 25/11/2017 BOM,CABIN Design - Suresh


WEEKLY PROGRESS REPORT
MURALI.M DATE: 27.11.2017 to 02.12.2017
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Dr. Vasundhara Thyagarajan Traction/6P 27/11/2017 27/11/2017 COPD Sales - Sivakumar

2 Sales Sree Sai foundation (A) MRL/6P 28/11/2017 28/11/2017 SOPD Sales - Anburathinam

3 Sales Sree Sai foundation (B) (1) MRL/6P 28/11/2017 28/11/2017 COPD Sales - Anburathinam

4 Sales Sree Sai foundation (B) (2) MRL/6P 28/11/2017 28/11/2017 SOPD Sales - Anburathinam

5 Sales Sree Sai foundation (C) (1) MRL/6P 28/11/2017 28/11/2017 SOPD Sales - Anburathinam

6 Sales Sree Sai foundation (C) (2) MRL/6P 28/11/2017 28/11/2017 COPD Sales - Anburathinam

7 Sales Sree Sai foundation (D) (1) MRL/6P 28/11/2017 28/11/2017 SOPD Sales - Anburathinam

8 Sales Sree Sai foundation (D) (2) MRL/6P 28/11/2017 28/11/2017 COPD Sales - Anburathinam

9 Sales Lenin (1) Traction/6P/8P 29/11/2017 29/11/2017 MOSD Sales - Sivakumar

10 Sales Lenin (2) Traction/6P/8P 29/11/2017 29/11/2017 MOSD Sales - Sivakumar

11 Sales CSI St' Stephen Church-Req. Shaft MRL/10P/13P 29/11/2017 29/11/2017 COPD Sales - Sivakumar

12 Sales Ravi Shankar - Req. Shaft size MRL/10P 30/11/2017 30/11/2017 COPD Sales - Peter (G.M.)

13 Sales Thirumurthy Exports (1) Traction/10P 30/11/2017 30/11/2017 COPD Sales - Peter (G.M.)

14 Sales Thirumurthy Exports (2) Traction/10P 30/11/2017 30/11/2017 COPD Sales - Peter (G.M.)

15 Sales Thirumurthy Exports (3) Traction/10P 30/11/2017 30/11/2017 COPD Sales - Peter (G.M.)

16 Sales CKR - Ramapuram (1) MRL/6P 2/12/2017 2/12/2017 SOPD Sales -Harshavardhana

17 Sales CKR - Ramapuram (2) MRL/6P 2/12/2017 2/12/2017 SOPD Sales -Harshavardhana

18 Sales Babu Traction/6P 2/12/2017 2/12/2017 SOPD/IFG Sales -Harshavardhana


19 Sales Babu MRL/6P 2/12/2017 2/12/2017 SOPD Sales -Harshavardhana

20 Sales Hariharan - Ample properties Traction/6P 2/12/2017 2/12/2017 COPD Sales - Peter (G.M.)

CABIN RECHECK & CONFIRMATION


1 3201 Preetha Foundation Traction / 6P 30/11/2017 Cabin Dwg ( Checking ) Mail - Lens

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3231 District 324A6 Lions Foundation MRL/ 6P 22/11/2017 27/11/2017 GAD(NEW) Design - Suresh

2 3223 N.K.Prabhakaran/01 MRL/ 6P 27/11/2017 27/11/2017 GAD(Revised) Design - Suresh

3 3233 Indu Housing development Traction/ 6P 25/11/2017 29/11/2017 GAD(NEW) Design - Suresh

4 3234 Indu Housing development Traction/ 6P 25/11/2017 29/11/2017 GAD(NEW) Design - Suresh

5 3237 S.A.Sai Ramakrishnan MRL/ 6P 30/11/2017 1/12/2017 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3211 TNHB Traction/8P 27/12/2017 CABIN Design - Suresh

2 3212 TNHB Traction/8P 27/12/2017 CABIN Design - Suresh

3 BEL - 211 John / Kurian P Kurian Traction/6P 28/11/2017 CABIN Design - Suresh

4 3238 KCEE Properties Traction/6P 1/12/2017 CABIN Design - Suresh

5 3209 Jem Constructions Traction/6P 1/12/2017 CABIN Design - Suresh

6 3237 S.A. Sai Ramakrishnan MRL/6P 1/12/2017 CABIN Design - Suresh

7 3194 N.A.N Constructions Traction/6P 2/12/2017 BOM,CABIN Design - Suresh

8 3222 Ashok Kumar Traction/6P 2/12/2017 BOM,CABIN Design - Suresh

9 3202 Maestro Promoters Traction/6P 2/12/2017 BOM,CABIN Design - Suresh

10 3224 Ramakrishna Math Traction/6P 2/12/2017 BOM,CABIN Design - Suresh


WEEKLY PROGRESS REPORT
MURALI.M DATE: 04.12.2017 to 09.12.2017
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Swanag (A) (B) Block Traction/6P 4/12/2017 4/12/2017 COPD Sales - Sivakumar

2 Sales Swanag (C) Block Traction/6P 4/12/2017 4/12/2017 COPD Sales - Sivakumar

3 Sales Swanag (A) (B) Block MRL/6P 4/12/2017 4/12/2017 SOPD Sales - Sivakumar

4 Sales Swanag (C) Block MRL/6P 4/12/2017 4/12/2017 SOPD Sales - Sivakumar

5 Sales Jayaram MRL/6P 4/12/2017 4/12/2017 SOPD Sales - Sivakumar

6 Sales Viji Ramaswamy Traction/6P 5/12/2017 5/12/2017 COPD Sales -Harshavardhana

7 Sales Viji Ramaswamy MRL/6P 5/12/2017 5/12/2017 SOPD Sales -Harshavardhana

8 Sales Denolite Enterprises MRL/6P 5/12/2017 5/12/2017 MOSD Sales - Sivakumar

9 Sales Blessing Space MRL/6P 6/12/2017 6/12/2017 MOSD Sales -Harshavardhana

10 Sales Vijay Park Inn Traction/6P 7/12/2017 7/12/2017 COPD Sales - Anburathinam

11 Sales Vijay Park Inn MRL/6P 7/12/2017 7/12/2017 SOPD Sales - Anburathinam

12 Sales Kamatchi Constructions Traction/6P 8/12/2017 8/12/2017 SOPD Sales -Harshavardhana

13 Sales Balaraman Traction/6P 8/12/2017 8/12/2017 COPD Sales - Anburathinam

Traction/500kg
14 Sales Ravikumar 8/12/2017 8/12/2017 IFG Sales - Sivakumar
Goods/Std Size

15 Sales Sanjeeve Bakiyam Traction/6P 8/12/2017 8/12/2017 COPD Sales - Sivakumar

16 Sales Sri Jeyam Constructions Traction/6P 8/12/2017 8/12/2017 SOPD Sales - Sivakumar
17 Sales Krishna Constructions MRL/6P 8/12/2017 8/12/2017 COPD Sales - Sivakumar

18 Sales Aakash Builders MRL/6P 8/12/2017 8/12/2017 COPD Sales - Sivakumar

19 Sales Yusuf Traction/6P 8/12/2017 8/12/2017 IFG Sales - Anburathinam

20 Sales BCPL Traction/6P 8/12/2017 8/12/2017 MOSD Sales - Anburathinam

21 Sales Rite Choice Traction/6P 8/12/2017 8/12/2017 COPD Sales - Anburathinam

22 Sales Shankar Rajan MRL/8P 9/12/2017 9/12/2017 SOPD Sales - M.D.

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3240 V.P. Multi Creators Traction/ 10P 30/11/2017 4/12/2017 GAD(NEW) Design - Suresh

2 3237 Sri Builders MRL/ 6P 29/11/2017 5/12/2017 GAD(NEW) Design - Suresh

3 3230/01 Balaji MRL/ 6P 6/12/2017 6/12/2017 GAD(Revised) Design - Suresh

4 BEL - 212 John / Kurian P Kurian Traction/ 6P 4/12/2017 6/12/2017 GAD(Revised) Design - Suresh

5 3242 Divya Foundations MRL/ 6P 6/12/2017 7/12/2017 GAD(NEW) Design - Suresh

6 3239 Sumangali Homes Traction/ 6P 6/12/2017 9/12/2017 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 BEL - 211 John / Kurian P Kurian Traction / 6P 7/12/2017 CABIN, BOM Design - Suresh

2 3229 Geetha Raju MRL/ 6P 8/12/2017 CABIN Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 11.12.2017 to 16.12.2017
SITE DETAIL PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Vijay Krishnan MRL/6P 11/12/2017 11/12/2017 SOPD Sales - Sivakumar

2 Sales Sripriyan Architect Traction/6P 11/12/2017 11/12/2017 COPD Sales - Peter (G.M.)

3 Sales Sripriyan Architect MRL/6P 11/12/2017 11/12/2017 SOPD Sales - Peter (G.M.)

4 Sales Sai Homes Traction/6P 12/12/2017 12/12/2017 COPD, MOSD Sales - Sivakumar

5 Sales Adithya Estates Traction/6P 12/12/2017 12/12/2017 IFG Sales -Harshavardhana

6 Sales Ubiqon Traction/6P 12/12/2017 12/12/2017 COPD Sales - Anburathinam

7 Sales Ubiqon MRL/6P 12/12/2017 12/12/2017 COPD Sales - Anburathinam

8 Sales Sristi Builders Traction/6P 12/12/2017 12/12/2017 SOPD Sales - Sivakumar

9 Sales Sristi Builders MRL/6P 12/12/2017 12/12/2017 SOPD Sales - Sivakumar

10 Sales Ganeshan Traction/6P 15/12/2017 15/12/2017 SOPD Sales - Ramesh

11 Sales Ganeshan MRL/6P 15/12/2017 15/12/2017 SOPD Sales - Ramesh

12 Sales Sri Ayyan Associates MRL/6P 15/12/2017 15/12/2017 IFG Sales - Anburathinam

CABIN RECHECK & CONFIRMATION


1 3229 Geetha Raju MRL/6P 14/12/2017 Cabin Dwg ( Checking ) Design - Suresh

2 3237 Sai Ramakrishnan MRL/6P 14/12/2017 Cabin Dwg ( Checking ) Design - Suresh

3 3225 Shri Janani Homes Traction/6P 14/12/2017 Cabin Dwg ( Checking ) Design - Suresh

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3244 C. Manoharan Traction/ 6P 9/12/2017 11/12/2017 GAD(NEW) Design - Suresh

2 3246 Vijay Jothi Builders Traction/ 6P 14/12/2017 15/12/2017 GAD(NEW) Design - Suresh

3 3245 Vijay Jothi Builders Traction/ 6P 14/12/2017 15/12/2017 GAD(NEW) Design - Suresh

4 3250 KCEE Properties Traction/ 6P 16/12/2017 16/12/2017 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3239 Sumangali Homes Traction / 6P 13/12/2017 CABIN, BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 18.12.2017 to 23.12.2017
SITE DETAIL
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Ravi MRL/10P 18/12/2017 18/12/2017 COPD Sales - Sivakumar

2 Sales Vasudevan Traction/6P 18/12/2017 18/12/2017 SOPD,MOSD Sales - Sivakumar

3 Sales Sanjeevebakyam Traction/6P 18/12/2017 18/12/2017 MOSD Sales - Sivakumar

4 Sales Narasimman (1) Traction/6P 18/12/2017 18/12/2017 COPD, IFG Sales -Harshavardhana

5 Sales Narasimman (2) Traction/6P 18/12/2017 18/12/2017 COPD, IFG Sales -Harshavardhana
6 Sales Selvaganesh Constructions (1) MRL/6P 18/12/2017 18/12/2017 SOPD,IFG Sales - Anburathinam

7 Sales Selvaganesh Constructions (2) MRL/6P 18/12/2017 18/12/2017 SOPD,IFG Sales - Anburathinam

8 Sales Sri Sabari Builders Traction/6P 19/12/2017 19/12/2017 SOPD Sales - Sivakumar

9 Sales R.R.Homes Traction/6P 20/12/2017 20/12/2017 SOPD Sales - Ramesh Babu

10 Sales Cavin Constructions MRL/6P 20/12/2017 20/12/2017 SOPD Sales - Ramesh Babu

11 Sales Akash Builders MRL/6P 20/12/2017 20/12/2017 SOPD Sales -Harshavardhana

12 Sales Asithya Estates Traction/6P 20/12/2017 20/12/2017 IFG,SOPD Sales -Harshavardhana

13 Sales Akash Builders Traction/6P 20/12/2017 20/12/2017 COPD,IFG Sales -Harshavardhana

14 Sales Maha Vignesh Constructions Traction/6P 22/12/2017 22/12/2017 SOPD Sales - Ramesh Babu

15 Sales Akash Builders MRL/6P 22/12/2017 22/12/2017 SOPD Sales - Ramesh Babu

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3247 Bhuvaneshwari Constructions Traction/ 6P 16/12/2017 19/12/2017 GAD(NEW) Design - Suresh

2 3249 Jayaswathy Constructions Traction/ 6P 16/12/2017 19/12/2017 GAD(NEW) Design - Suresh

3 3253 Rite Choice Traction/ 6P 19/12/2017 20/12/2017 GAD(NEW) Design - Suresh

4 3252 Rite Choice Traction/ 6P 19/12/2017 23/12/2017 GAD(NEW) Design - Suresh

5 3255 Sonne Infrastructure MRL/ 6P 19/12/2017 22/12/2017 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3226 Nutech Associates Traction / 6P 19/12/2017 CABIN, BOM Design - Suresh
2 3195/01 Sai Anand Properties MRL/6P 23/12/2017 PreProduction (Cabin) Design - Suresh

3 3250 KCEE Properties Traction / 6P 23/12/2017 PreProduction (Cabin) Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 26.12.2017 to 30.12.2017
SITE DETAIL
RECEIVING RECEIVING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Beavers Construction Traction/6P 26/12/2017 26/12/2017 MOSD Sales - Sivakumar

2 Sales Beavers Construction Traction/6P 26/12/2017 26/12/2017 MOSD Sales - Sivakumar

3 Sales Venkatesh Traction/8P 26/12/2017 26/12/2017 COPD Sales - Sivakumar

4 Sales Arumugam MRL/6P 30/12/2017 30/12/2017 SOPD Sales - Anburathinam

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3206 Anandaguru Infrastructure MRL/ 6P 22/12/2017 27/12/2017 GAD(NEW) Design - Suresh

2 3258 Selvaganesh Constructions MRL/ 6P 28/12/2017 30/12/2017 GAD(NEW) Design - Suresh

3 3259 Sri Sabari Builders Traction/ 6P 28/12/2017 30/12/2017 GAD(NEW) Design - Suresh
PRODUCTION DRAWING DETAILINGS RELEASED
1 3245 Vijay Jothi Builders Traction / 6P 26/12/2017 CABIN, BOM Design - Suresh

2 3246 Vijay Jothi Builders Traction / 6P 26/12/2017 CABIN, BOM Design - Suresh

3 3100 India Nest Traction / 6P 26/12/2017 CABIN, BOM Design - Suresh

4 3252 Rite Choice Foundations Traction / 6P 27/12/2017 CABIN, BOM Design - Suresh

5 3253 Rite Choice Foundations Traction / 6P 27/12/2017 CABIN, BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 02.01.2018 to 06.01.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales S3 Construction Traction/6P 4/1/2018 4/1/2018 MOSD Sales - Sivakumar

2 Sales SG Homing Traction/6P 4/1/2018 4/1/2018 SOPD Sales - Sivakumar

3 Sales Senthil Kumar Traction/6P 4/1/2018 4/1/2018 MOSD,IFG Sales - Sivakumar

4 Sales Banu Construction MRL/10P 4/1/2018 4/1/2018 COPD Sales - Sivakumar


5 Sales RMR Building Construction Traction/6P 4/1/2018 4/1/2018 MOSD Sales - Sivakumar

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3257 Selvaganesh Constructions MRL/ 6P 28/12/2017 2/1/2018 GAD(NEW) Design - Suresh

2 3260 Shri Vinoth Builders Traction/ 6P 30/12/2017 4/1/2018 GAD(NEW) Design - Suresh

3 3266 TG Properties Traction/ 6P 5/1/2018 6/1/2018 GAD(NEW) Design - Suresh

CABIN RECHECK & CONFIRMATION


1 3252 Rite Choice Traction/6P 3/1/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3253 Rite Choice Traction/6P 3/1/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3226 Nutech Associates Traction/6P 3/1/2018 Cabin Dwg ( Checking ) Mail - Lens

4 3188 Sristi MRL/6P 3/1/2018 Cabin Dwg ( Checking ) Mail - Lens

5 3100 India Nest Traction/6P 4/1/2018 Cabin Dwg ( Checking ) Mail - Lens

6 3245 Vijay Jothi Builders Traction/6P 4/1/2018 Cabin Dwg ( Checking ) Mail - Lens

7 3246 Vijay Jothi Builders Traction/6P 5/1/2018 Cabin Dwg ( Checking ) Mail - Lens

8 3250 KCEE Properties Traction/6P 5/1/2018 Cabin Dwg ( Checking ) Mail - Lens

LINE DRAWINGS RELEASED


1 Anmol Sristi Traction/6P 2/1/2018 Plan Drawing Sales - Anburathinam

2 Anmol Sristi Hydraulic/6P 2/1/2018 Plan Drawing Sales - Anburathinam


3 Anmol Sristi Cantilever MRL/6P 2/1/2018 Plan Drawing Sales - Anburathinam

PRODUCTION DRAWING DETAILINGS RELEASED


1 3170 Firm Foundations Traction / 6P 5/1/2018 CABIN, BOM Design - Suresh

2 3251 Krishna Constructions MRL / 6P 5/1/2018 CABIN Design - Suresh

3 3244 Manoharan Traction / 6P 6/1/2018 CABIN, BOM Design - Suresh

4 3230 Balaji MRL / 6P 6/1/2018 CABIN Design - Suresh

5 3231 District 324A6 Lions Fondation MRL / 6P 6/1/2018 CABIN Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 08.01.2018 to 13.01.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Vintage Foundation Traction/6P 8/1/2018 8/1/2018 MOSD Sales - Prabu

2 Sales Vintage Foundation MRL/6P 8/1/2018 8/1/2018 SOPD Sales - Prabu

3 Sales Priya Construction Traction/16P 8/1/2018 8/1/2018 SOPD Sales - Prabu


4 Sales Priya Construction MRL/16P 8/1/2018 8/1/2018 SOPD Sales - Prabu

5 Sales SGP Construction Traction/6P 8/1/2018 8/1/2018 MOSD Sales - Prabu

6 Sales Prabhakar Traction/6P 8/1/2018 8/1/2018 COPD,SOPD Sales - Anburathinam

7 Sales Prabhakar MRL/6P 8/1/2018 8/1/2018 SOPD Sales - Anburathinam

8 Sales Prabakar Traction/6P 8/1/2018 8/1/2018 SOPD Sales - Anburathinam

9 Sales Prabakar MRL/6P 8/1/2018 8/1/2018 SOPD Sales - Anburathinam

10 Sales Ponraj Traction/6P 8/1/2018 8/1/2018 COPD Sales - Sivakumar

11 Sales Concrete Architects MRL/6P 8/1/2018 8/1/2018 SOPD Sales - Sivakumar

12 Sales Mahesh Traction/8P 8/1/2018 8/1/2018 SOPD Sales - Sivakumar

13 Sales Mahesh MRL/6P 8/1/2018 8/1/2018 SOPD Sales - Sivakumar

14 Sales Sanjana Constructions Traction/6P 8/1/2018 8/1/2018 MOSD Peter - G.M.

15 Sales Selvam MRL/6P 13/1/2018 13/1/2018 COPD Sales -Harshavardhana

16 Sales Logu Traction/6P 13/1/2018 13/1/2018 COPD Sales -Harshavardhana

17 Sales Guru MRL/6P 13/1/2018 13/1/2018 SOPD Sales -Harshavardhana

18 Sales Arch. Anitha Traction/6P 13/1/2018 13/1/2018 IFG Sales - Anburathinam

19 Sales Arch. Anitha MRL/6P 13/1/2018 13/1/2018 IFG Sales - Anburathinam

20 Sales Padmanaban Associates Traction/6P 13/1/2018 13/1/2018 IFG Sales - Anburathinam

21 Sales Padmanaban Associates MRL/6P 13/1/2018 13/1/2018 IFG Sales - Anburathinam

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3264 Shanthi Tamilarasan Traction/ 6P 6/1/2018 8/1/2018 GAD(NEW) Design - Suresh

2 3263 Sri Builders Traction/ 6P 6/1/2018 9/1/2018 GAD(NEW) Design - Suresh

3 3236 Sri Builders Traction/ 6P 9/1/2018 9/1/2018 GAD(Revised) Design - Suresh

4 BEL - 216 Chandregowda MRL/ 6P 9/1/2018 10/1/2018 GAD(Revised) Design - Suresh

5 3265 Velkumaran Traction/ 6P 10/1/2018 11/1/2018 GAD(NEW) Design - Suresh

6 3267 Subramaniam foundation Traction/ 6P 11/1/2018 12/1/2018 GAD(NEW) Design - Suresh

7 3268 Chetan Kumar MRL/ 6P 11/1/2018 12/1/2018 GAD(NEW) Design - Suresh

8 BEL - 219 Srikanth Construction Traction/ 8P 11/1/2018 12/1/2018 GAD(Revised) Design - Suresh

9 3271 Lucky Mercantile Traction/ 6P 12/1/2018 13/1/2018 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3266 TG Properties Traction / 6P 9/1/2018 CABIN, BOM Design - Suresh

2 3223 N.K. Prabhakaran MRL / 6P 10/1/2018 CABIN Design - Suresh

3 3268 Chetan Kumar MRL / 6P 13/1/2018 CABIN Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 17.01.2018 to 20.01.2018
SITE DETAIL PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Golden Castle MRL/6P 18/1/2018 18/1/2018 SOPD Sales - Sivakumar

2 Sales Golden Castle Traction/6P 18/1/2018 18/1/2018 COPD Sales - Sivakumar

3 Sales Reliance Builders MRL/6P 18/1/2018 18/1/2018 COPD Sales - Sivakumar

4 Sales Vijay Radha Krishnan MRL/8P 18/1/2018 18/1/2018 COPD Sales - Sivakumar

5 Sales JK Constructions Traction/6P 18/1/2018 18/1/2018 IFG,COPD Sales -Harshavardhana

6 Sales JK Constructions MRL/6P 18/1/2018 18/1/2018 COPD Sales -Harshavardhana

7 Sales AGS Enterprises MRL/13P 19/1/2018 19/1/2018 SOPD Sales - Sivakumar

8 Sales Mayilarasan Traction/6P 19/1/2018 19/1/2018 COPD Sales - Prabu

9 Sales Sathya Traction/6P 19/1/2018 19/1/2018 COPD,MOSD Sales - Prabu

10 Sales Blue Stone MRL/6P 19/1/2018 19/1/2018 COPD,MOSD Sales - Prabu

11 Sales Real Foods MRL/1000Kg Goods 20/1/2018 20/1/2018 IFG Sales - Anburathinam

12 Sales Sree Hitech Traction/6P 20/1/2018 20/1/2018 COPD,MOSD Sales - Ramesh

13 Sales Kasim Mohamed Traction/6P 20/1/2018 20/1/2018 COPD Sales - Sivakumar

14 Sales Siva Kumar MRL/6P 20/1/2018 20/1/2018 SOPD Sales - Sivakumar

15 Sales Siva Kumar HYD/6P 20/1/2018 20/1/2018 SOPD Sales - Sivakumar


GENERAL ARRANGEMENT DRAWINGS RELEASED
1 3269 Munuswamy MRL/ 6P 12/1/2018 17/1/2018 GAD(NEW) Design - Suresh

2 3270 Sanjana Constructions Traction/ 6P 17/1/2018 18/1/2018 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3203 Star Haven Builders Traction / 6P 20/1/2018 CABIN, BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 22.01.2018 to 27.01.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Apache Footwear MRL/1.5Ton 22/1/2018 22/1/2018 IFG Sales - Virender

2 Sales Navaneeth Jain MRL/6P 23/1/2018 23/1/2018 SOPD Sales - Peter (G.M.)

3 Sales Navaneeth Jain MRL/6P 23/1/2018 23/1/2018 SOPD Sales - Peter (G.M.)

4 Sales Navaneeth Jain MRL/6P 23/1/2018 23/1/2018 SOPD Sales - Peter (G.M.)
5 Sales Sri Adithya Holdings Traction/6P 23/1/2018 23/1/2018 MOSD Sales - Sivakumar

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3272 Esvaran Traction/ 6P 22/1/2018 22/1/2018 GAD(NEW) Design - Suresh

2 3273 Rajalingaraja Traction/ 6P 22/1/2018 23/1/2018 GAD(NEW) Design - Suresh

3 BEL - 223 Karnataka Sengundhar Sangam Traction/ 6P 24/1/2018 24/1/2018 GAD(NEW) Design - Suresh

4 3274 Bhargavi MRL/ 6P 23/1/2018 25/1/2018 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3203 Star Haven Builders Traction / 6P 25/1/2018 CABIN, BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 29.01.2018 to 03.02.2018
SITE DETAIL
RECEIVING RECEIVING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Babulal jain HYD/6P 29/1/2018 29/1/2018 IFG Sales - Virender

2 Sales Gunaseelan MRL/6P 30/1/2018 30/1/2018 COPD Sales - Sivakumar

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3261/01 Ravisanthi Builders MRL/ 13P 30/1/2018 30/1/2018 GAD(Revised) Design - Suresh

2 3276 Rajalakshmi Traction/ 6P 30/1/2018 31/2/2018 GAD(NEW) Design - Suresh

3 3283 Empire Precast Traction/ 6P 1/2/2018 1/2/2018 GAD(NEW) Design - Suresh

4 3284 Sri Jeyam Constructions Traction/ 6P 1/2/2018 3/2/2018 GAD(NEW) Design - Suresh

5 3276 Rajalakshmi Traction/ 6P 30/1/2018 3/2/2018 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3255 Sonne Infrastructure MRL/6P 29/1/2018 CABIN Design - Suresh

2 3217 Daffodils Traction/ 6P 29/1/2018 CABIN Design - Suresh

3 3261 Ravisanthi Builders MRL/ 13P 30/1/2018 CABIN Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 05.02.2018 to 10.02.2018
SITE DETAIL PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Manoharan MRL/6P 6/2/2018 6/2/2018 COPD Sales - Anburathinam

2 Sales Pacific tools Pvt ltd MRL/8P 6/2/2018 6/2/2018 COPD Sales - Peter (G.M.)

3 Sales Praveen Kumar Traction/ 6P 9/2/2018 9/2/2018 COPD Sales - Anburathinam

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3277 Hotel Blue Diamond MRL/ 8P 5/2/2018 5/2/2018 GAD(NEW) Design - Suresh

2 2868 Rajalakshmi Traction/ 6P 5/2/2018 5/2/2018 GAD(Revised) Design - Suresh

3 3279 Venkatramana MRL/ 8P 1/2/2018 5/2/2018 GAD(NEW) Design - Suresh

4 3283 Empire Precast Traction/ 6P 7/2/2018 7/2/2018 GAD(Revised) Design - Suresh

5 3288 Senthil Kumar Traction/ 6P 7/2/2018 8/2/2018 GAD(NEW) Design - Suresh

6 3289 Ethirajulu Traction/ 8P 7/2/2018 8/2/2018 GAD(NEW) Design - Suresh

7 3292 Ken Home Properties Traction/ 6P 9/2/2018 9/2/2018 GAD(NEW) Design - Suresh

8 3281 Kannan MRL/ 6P 5/2/2018 10/2/2018 GAD(NEW) Design - Suresh

9 3282 Kannan MRL/ 6P 5/2/2018 10/2/2018 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3255 Sonne Infrastructure MRL/ 6P 5/2/2017 CABIN Design - Suresh

2 3274 Bhargavi MRL/ 6P 6/2/2018 CABIN Design - Suresh

3 3267 Subamanian Foundation Traction/ 6P 6/2/2018 CABIN,BOM Design - Suresh

4 2868 Rajalakshmi Traction/ 6P 7/2/2018 CABIN,BOM Design - Suresh

5 3279 Venkatramana MRL/ 8P 10/2/2018 CABIN Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 12.02.2018 to 17.02.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SUBMITTED REMARKS
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Pranav Properties Traction/ 6P 12/2/2018 12/2/2018 SOPD,MOSD Sales - Sivakumar

2 Sales Senthilnathan Traction/ 6P 12/2/2018 12/2/2018 IFG Sales - Sivakumar

3 Sales Tharini Estates MRL/6P 12/2/2018 12/2/2018 COPD,SOPD Sales - Sivakumar

4 Sales Tharini Estates Traction/ 6P 12/2/2018 12/2/2018 COPD Sales - Sivakumar

5 Sales Vijay Kumar Traction/ 6P 12/2/2018 12/2/2018 SOPD,MOSD Sales - Sivakumar


6 Sales Vijay Kumar MRL/6P 12/2/2018 12/2/2018 COPD Sales - Sivakumar

7 Sales Swans (C) Traction/ 6P 14/2/2018 14/2/2018 COPD Sales - Sivakumar

8 Sales Swans (C) MRL/6P 14/2/2018 14/2/2018 COPD Sales - Sivakumar

9 Sales GKS Industries MRL/6P 14/2/2018 14/2/2018 COPD Sales - Anburathinam

10 Sales GKS Industries Traction/ 6P 14/2/2018 14/2/2018 COPD Sales - Anburathinam

11 Sales GKS Industries Traction/ 8P 14/2/2018 14/2/2018 COPD Sales - Anburathinam

12 Sales Sri Builders Traction/ 6P 14/2/2018 14/2/2018 SOPD,COPD Sales - Anburathinam

13 Sales Sri Promoters MRL/6P 16/2/2018 16/2/2018 COPD Sales - Sivakumar

14 Sales Sri Promoters Traction/ 6P 16/2/2018 16/2/2018 SOPD Sales - Sivakumar

15 Sales Gaylord Traction/ 6P 16/2/2018 16/2/2018 COPD Sales - Sivakumar

16 Sales Gaylord MRL/6P 16/2/2018 16/2/2018 SOPD Sales - Sivakumar

17 Sales PNB Builders Traction/ 6P 16/2/2018 16/2/2018 MOSD Sales - Sivakumar

18 Sales Rajni Raghuraj Cantilever MRL/ 6P 16/2/2018 16/2/2018 SOPD Sales - Sivakumar

19 Sales Ratnam Heights Traction/ 6P 17/2/2018 17/2/2018 COPD Sales -Harshavardhana

CABIN RECHECK & CONFIRMATION


1 3271 Lucky Mercantile Traction/6P 12/2/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3230 Balaji MRL/6P 12/2/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3268 Chetan Kumar MRL/6P 12/2/2018 Cabin Dwg ( Checking ) Mail - Lens

4 3261 Ravisanthi Builders MRL/13P 13/2/2018 Cabin Dwg ( Checking ) Mail - Lens
5 3267 Subramanian Foundation Traction/6P 13/2/2018 Cabin Dwg ( Checking ) Mail - Lens

6 2868 Rajalakshmi Traction/6P 16/2/2018 Cabin Dwg ( Checking ) Mail - Lens

7 3274 Bhargavi MRL/6P 16/2/2018 Cabin Dwg ( Checking ) Mail - Lens

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3291 RAMS developers Traction/ 6P 12/2/2018 13/2/2018 GAD(NEW) Design - Suresh

2 3293 Urbane Promoters Traction/ 6P 14/2/2018 14/2/2018 GAD(NEW) Design - Suresh

3 3294 Guru Builders Traction/ 6P 15/2/2018 15/2/2018 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3206 Anandaguru Infrastructure MRL/ 6P 17/2/2017 CABIN Design - Suresh

2 3092 Lakshmikantham & Sons Traction/ 6P 17/2/2018 CABIN,BOM Design - Suresh

3 3293 Urbane Promoters Traction/ 6P 17/2/2018 CABIN,BOM Design - Suresh

4 3258 Selvaganesh Constructions MRL/ 6P 17/2/2018 CABIN Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 19.02.2018 to 24.02.2018
SITE DETAIL PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Natarajan Traction/ 6P 19/2/2018 19/2/2018 COPD,SOPD,MOSD Sales - Sivakumar

2 Sales Varshini Homes Traction/ 6P 20/2/2018 20/2/2018 SOPD Sales - Virender

3 Sales Sivagami Flats MRL/6P 20/2/2018 20/2/2018 SOPD Sales - Anburathinam

4 Sales Sivagami Flats Traction/ 6P 20/2/2018 20/2/2018 COPD,SOPD,MOSD Sales - Anburathinam

5 Sales Poongothai Traction/ 6P 20/2/2018 20/2/2018 SOPD,MOSD Sales -Harshavardhana

6 Sales Vijay Builders Traction/ 6P 22/2/2018 22/2/2018 COPD,MOSD Sales - Sivakumar

7 Sales Sri Vaishnavi Homes Traction/ 6P 22/2/2018 22/2/2018 SOPD Sales - Virender

8 Sales Jaganathan Traction/ 6P 23/2/2018 23/2/2018 COPD,IFG Sales - Virender

9 Sales Jaganathan MRL/6P 23/2/2018 23/2/2018 SOPD,IFG Sales - Virender

10 Sales Kumar Builders (1) MRL/ 6P 23/2/2018 23/2/2018 MOSD Sales - Anburathinam

11 Sales Kumar Builders (2) MRL/ 6P 23/2/2018 23/2/2018 MOSD Sales - Anburathinam

12 Sales Kamalesh Traction/ 6P 24/2/2018 24/2/2018 SOPD Sales -Harshavardhana

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 BEL - 212 Mallesh TR Traction/ 6P 22/2/2018 22/2/2018 GAD (Revised) Design - Suresh

2 BEL - 220 Srikanth Constructions Traction/ 6P 23/2/2018 23/2/2018 GAD (Revised) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3138 S.L.Anandhan Developers Traction/ 6P 19/2/2018 CABIN,BOM Design - Suresh

2 3257 Selvaganesh Constructions MRL/ 6P 20/2/2018 CABIN Design - Suresh

3 3259 Sri Sabari builders Traction/ 6P 20/2/2018 CABIN,BOM Design - Suresh

4 3288 Senthil Kumar Traction/ 6P 21/2/2018 CABIN,BOM Design - Suresh

5 3289 Ethirajulu Traction/ 8P 22/2/2018 CABIN,BOM Design - Suresh

6 3294 Guru Builders Traction/ 6P 22/2/2018 CABIN,BOM Design - Suresh

7 3276 Rajalakshmi Traction/ 6P 23/2/2018 CABIN,BOM Design - Suresh

8 3181 Vignesh Properties Traction/ 6P 24/2/2018 CABIN,BOM Design - Suresh

9 3180 Vignesh Properties Traction/ 6P 24/2/2018 CABIN,BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 26.02.2018 to 03.03.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Kamalesh Traction/ 6P 27/2/2018 27/2/2018 SOPD Sales -Harshavardhana

2 Sales MRL/6P 28/2/2018 28/2/2018 MOSD Sales - Anburathinam


3 Sales Palaniyappa Constructions Traction/ 6P 28/2/2018 28/2/2018 MOSD Sales - Anburathinam

CABIN RECHECK & CONFIRMATION


1 3290 Vanitha MRL/6P 27/2/2018 Cabin Dwg ( Checking ) Mail - Lens

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 BEL - 221 G.Shanmugam Traction/ 6P 28/2/2018 28/2/2018 GAD(Revised) Design - Suresh

2 3300 Sumangali Residences Traction/ 6P 28/2/2018 1/3/2018 GAD(NEW) Design - Suresh

3 3301 Sumangali Residences Traction/ 6P 28/2/2018 1/3/2018 GAD(NEW) Design - Suresh

4 3297 Sri Builders Traction/ 6P 28/2/2018 2/3/2018 GAD(NEW) Design - Suresh

5 3309 Zion Architectre Traction/ 6P 2/3/2018 2/3/2018 GAD(NEW) Design - Suresh

6 3302 GKS Constructions Traction/ 6P 3/3/2018 3/3/2018 GAD(NEW) Design - Suresh

7 3302(1) GKS Constructions Traction/ 6P 3/3/2018 3/3/2018 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3270 Sanjana Constructions Traction/ 6P 2/3/2017 CABIN,BOM Design - Suresh
WEEKLY PROGRESS REPORT
MURALI.M DATE: 05.03.2018 to 10.03.2018
SITE DETAIL PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Gee Tee Bee Traction/ 6P 10/3/2018 10/3/2018 COPD,MOSD Sales - Sivakumar

CABIN RECHECK & CONFIRMATION


1 2942 Atandra Foundation Traction/ 6P 8/3/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3138 S.L.Anandhan Traction/ 6P 8/3/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3293 Urbane Promoters Traction/ 6P 8/3/2018 Cabin Dwg ( Checking ) Mail - Lens

4 3092 Lakshmikantham & Sons Traction/ 6P 8/3/2018 Cabin Dwg ( Checking ) Mail - Lens

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3242/01 Divya Foundations MRL/ 6P 3/3/2018 6/3/2018 GAD(REVISED) Design - Suresh

2 3299 Sarada Agencies MRL/ 6P 24/2/2018 6/3/2018 GAD(NEW) Design - Suresh

3 3306 Balaji Abodes MRL/ 6P 1/3/2018 7/3/2018 GAD(NEW) Design - Suresh

4 3307 PNP Builders Traction/ 6P 3/3/2018 7/3/2018 GAD(NEW) Design - Suresh

5 3308 Palaniyappa Constructions Traction/ 6P 3/3/2018 8/3/2018 GAD(NEW) Design - Suresh

6 3301 Sumangali Residences Traction/ 6P 8/3/2018 9/3/2018 GAD(NEW) Design - Suresh

7 3310 Dhanakula Vasudeva Rao MRL/ 10P 7/3/2018 9/3/2018 GAD(NEW) Design - Suresh
8 3304 Sundar Traction/ 6P 7/3/2018 10/3/2018 GAD(NEW) Design - Suresh

9 3305 Sundar Traction/ 6P 7/3/2018 10/3/2018 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3242 Divya Foundations MRL/ 6P 10/3/2018 CABIN Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 12.03.2018 to 17.03.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Arul Ganapathy MRL/ 6P 13/3/2018 13/3/2018 COPD Sales - Anburathinam

2 Sales Lakshmikantham sons Traction/ 6P 14/3/2018 14/3/2018 MOSD Sales - Anburathinam

3 Sales Venkatapathi Asset Traction/ 6P 14/3/2018 14/3/2018 SOPD Sales - Anburathinam

4 Sales Venkatapathi Asset Traction/ 8P 14/3/2018 14/3/2018 COPD Sales - Anburathinam

5 Sales Mohideen Ismail Traction/ 6P 14/3/2018 14/3/2018 COPD Sales - Anburathinam

6 Sales Dileep Kumar MRL/ 6P 14/3/2018 14/3/2018 SOPD Sales - Sivakumar


7 Sales Dileep Kumar MRL/ 6P 14/3/2018 14/3/2018 COPD Sales - Sivakumar

8 Sales Amesh Foundation MRL/ 6P 15/3/2018 15/3/2018 COPD Sales - Sivakumar

CABIN RECHECK & CONFIRMATION


1 3180 Vignesh properties Traction/ 6P 12/3/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3181 Vignesh properties Traction/ 6P 12/3/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3276 Rajalakshmi Traction/ 6P 12/3/2018 Cabin Dwg ( Checking ) Mail - Lens

4 3259 Sri Sabari builders Traction/ 6P 12/3/2018 Cabin Dwg ( Checking ) Mail - Lens

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3289 Ethirajulu Traction/ 8P 12/3/2018 12/3/2018 GAD(REVISED) Design - Suresh

2 3307 Sai Homes Traction/ 6P 13/3/2018 13/3/2018 GAD(NEW) Design - Suresh

3 3311 Kumar Builders MRL/ 6P 14/3/2018 14/3/2018 GAD(NEW) Design - Suresh

4 3313 SM Enterprises MRL/ 6P 14/3/2018 15/3/2018 GAD(NEW) Design - Suresh

5 3306 Balaji Abodes MRL/ 6P 15/3/2018 15/3/2018 GAD(REVISED) Design - Suresh

6 3308 Sri Abiraami Constructions Traction/ 6P 15/3/2018 16/3/2018 GAD(NEW) Design - Suresh

7 3316 Parvathi Devi MRL/ 6P 15/3/2018 17/3/2018 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 BEL-220 Somashekar Traction/ 6P 13/3/2018 CABIN,BOM Design - Suresh

2 3269 Munuswamy MRL/ 6P 14/3/2018 CABIN Design - Suresh


WEEKLY PROGRESS REPORT
MURALI.M DATE: 19.03.2018 to 24.03.2018

SITE DETAIL PRODUCTION


RECEIVING RECEIVING SUBMITTED
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING REMARKS
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Taha Developers MRL/ 6P 19/3/2018 19/3/2018 SOPD Sales -Virender Chopra

2 Sales Lalitha Traction/ 6P 19/3/2018 19/3/2018 IFG Sales - Sivakumar

3 Sales Jai Lani Traction/ 6P 22/3/2018 22/3/2018 MOSD Sales -Virender Chopra

4 Sales Rao MRL/ 6P 22/3/2018 22/3/2018 COPD/SOPD Sales -Virender Chopra

5 Sales Vaanam Constructions (1) MRL/ 6P 22/3/2018 22/3/2018 COPD Sales - Sivakumar

6 Sales Vaanam Constructions (2) MRL/ 6P 22/3/2018 22/3/2018 COPD Sales - Sivakumar

7 Sales Vaanam Constructions (3) MRL/ 6P 22/3/2018 22/3/2018 COPD Sales - Sivakumar

8 Sales Raj (Sugumar) MRL/ 6P 22/3/2018 22/3/2018 IFG Sales -Harshavardhana

9 Sales Manikandan MRL/ 6P 22/3/2018 22/3/2018 IFG/SOPD Sales -Harshavardhana

10 Sales Venkatesh MRL/ 6P 22/3/2018 22/3/2018 SOPD Sales - Anburathinam

CABIN RECHECK & CONFIRMATION


1 3270 Sanjana Constructions Traction/ 6P 19/3/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3288 Senthil Kumar Traction/ 6P 19/3/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3289 Ethirajulu Traction/ 8P 19/3/2018 Cabin Dwg ( Checking ) Mail - Lens

4 3257 Selvaganesh Constructions MRL/ 6P 20/3/2018 Cabin Dwg ( Checking ) Mail - Lens

5 3258 Selvaganesh Constructions MRL/ 6P 20/3/2018 Cabin Dwg ( Checking ) Mail - Lens

6 0075 Silver Castle Traction/ 6P 20/3/2018 Cabin Dwg ( Checking ) Mail - Lens

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3317 Associated Engineers MRL/ 6P 21/3/2018 21/3/2018 GAD(NEW) Design - Suresh

2 3321 Anwar Nawaz Traction/ 6P 21/3/2018 23/3/2018 GAD(NEW) Design - Suresh

3 3320 Mohideen Ismail Traction/ 6P 21/3/2018 24/3/2018 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3287 Raghunathan & others Traction/ 6P 22/3/2018 CABIN,BOM Design - Suresh

2 3309 C Zion Architecture Traction/ 6P 23/3/2018 CABIN,BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 26.03.2018 to 31.03.2018

SITE DETAIL PRODUCTION


RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Beaver Consructions (1) Traction/ 6P 28/3/2018 28/3/2018 SOPD Sales - Sivakumar

2 Sales Beaver Consructions (2) Traction/ 6P 28/3/2018 28/3/2018 MOSD Sales - Sivakumar

3 Sales Sree hitech Traction/ 6P 28/3/2018 28/3/2018 COPD,MOSD Sales -Virender Chopra

4 Sales Beaver Constructions Traction/ 6P 29/3/2018 29/3/2018 MOSD,IFG Sales - Sivakumar

5 Sales Dhinakaran MRL/ 6P 30/3/2018 30/3/2018 SOPD Sales - Anburathinam

6 Sales Surendra Genetic lab Traction/ 10P 30/3/2018 30/3/2018 COPD Sales - Anburathinam

CABIN RECHECK & CONFIRMATION


1 3300 Sumangali residencies Traction/ 6P 26/3/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3301 Sumangali residencies Traction/ 6P 26/3/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3255 Sonne Infrastructure MRL/ 6P 27/3/2018 Cabin Dwg ( Checking ) Mail - Lens

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3322 Panneer Ramachandran MRL/ 8P 21/3/2018 26/3/2018 GAD(NEW) Design - Suresh

2 3323 Gee Tee Bee Foundations Traction/ 6P 24/3/2018 27/3/2018 GAD(NEW) Design - Suresh

3 3329 Zakir MRL/ 6P 27/3/2018 28/3/2018 GAD(NEW) Design - Suresh


4 3327 AGS Enterprises MRL/ 6P 29/3/2018 29/3/2018 GAD(NEW) Design - Suresh

5 3325 Lalitha Traction/ 6P 26/3/2018 30/3/2018 GAD(NEW) Design - Suresh

6 3330 Beaver Constructions MRL/ 6P 29/3/2018 31/3/2018 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3263 Sri Builders Traction/ 6P 31/3/2018 CABIN,BOM Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 02.04.2018 to 07.04.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Hotel Ponnusway Traction/ 6P 2/4/2018 2/4/2018 SOPD Sales

2 Sales Daniel MRL/ 6P 4/4/2018 4/4/2018 SOPD Sales -Virender Chopra

3 Sales Vignesh Traction/ 6P 4/4/2018 4/4/2018 COPD Sales -Harshavardhana

4 Sales Vignesh MRL/ 6P 4/4/2018 4/4/2018 COPD Sales -Harshavardhana


5 Sales Mahindaran MRL/ 6P 5/4/2018 5/4/2018 MOSD,IFG Sales -Virender Chopra

CABIN RECHECK & CONFIRMATION


1 3206 Anandaguru Infrastructure MRL/ 6P 5/4/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3242 Divya Foundations MRL/ 6P 5/4/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3279 Venkatramana MRL/ 6P 5/4/2018 Cabin Dwg ( Checking ) Mail - Lens

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3322/01 Panneer Ramachandran MRL/ 8P 31/3/2018 2/4/2018 GAD(REVISED) Design - Suresh

2 3303 Viji Ramaswamy Traction/ 6P 24/3/2018 4/3/2018 GAD(NEW) Design - Suresh

3 3328 Harish Kumar MRL/ 6P 27/3/2018 5/4/2018 GAD(NEW) Design - Suresh

4 3331 Swanag Infrastructures Traction/ 6P 31/3/2018 6/4/2018 GAD(NEW) Design - Suresh

5 3332 Swanag Infrastructures Traction/ 6P 31/3/2018 7/4/2018 GAD(NEW) Design - Suresh

PRODUCTION DRAWING DETAILINGS RELEASED


1 3247 Bhuvaneshwari constructions Traction/ 6P 3/4/2018 CABIN,BOM Design - Suresh

2 3248 Shanmugam & Others Traction/ 6P 3/4/2018 CABIN,BOM Design - Suresh

3 3106 Greenwich Constructions Traction/ 6P 6/4/2018 CABIN,BOM Design - Suresh


WEEKLY PROGRESS REPORT
MURALI.M DATE: 09.04.2018 to 13.04.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SUBMITTED REMARKS
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Stephen Traction/ 6P 10/4/2018 10/4/2018 SOPD Sales -Harshavardhana

2 Sales Balaji MRL/ 6P 10/4/2018 10/4/2018 COPD Sales - Anburathinam

3 Sales Umadevi Traction/ 6P 11/4/2018 11/4/2018 COPD Sales -Harshavardhana

4 Sales Umadevi MRL/ 6P 11/4/2018 11/4/2018 COPD Sales -Harshavardhana

5 Sales Sakthidharan MRL/ 6P 11/4/2018 11/4/2018 COPD,SOPD Sales -Sivakumar

6 Sales Velmurugan MRL/ 6P 12/4/2018 12/4/2018 SOPD Sales -MD

CABIN RECHECK & CONFIRMATION


1 3206 Anandaguru Infrastructure MRL/ 6P 9/4/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3242 Divya Foundations MRL/ 6P 9/4/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3279 Venkatramana MRL/ 6P 9/4/2018 Cabin Dwg ( Checking ) Mail - Lens

4 BEL-215 Lohitha hospital MRL/ 13P 11/4/2018 Cabin Dwg ( Checking ) Mail - Lens
GENERAL ARRANGEMENT DRAWINGS RELEASED
1 3333 Swanag Infrastructures Traction/ 6P 31/3/2018 9/4/2018 GAD(NEW) Design - Suresh

2 3277/03 Hotel Blue Diamond MRL/ 8P 10/4/2018 10/4/2018 GAD(REVISED) Design - Suresh

3 3347 Raghuraman MRL/ 6P 12/4/2018 12/4/2018 GAD(NEW) Design - Suresh

4 3345 Shabana Begum MRL/ 6P 5/4/2018 13/4/2018 GAD(NEW) Design - Suresh

WEEKLY PROGRESS REPORT


MURALI.M DATE: 16.04.2018 to 21.04.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Nahar Foundations MRL/ 6P 16/4/2018 16/4/2018 SOPD Sales - MD

2 Sales Ganesh Traction/ 6P 16/4/2018 16/4/2018 COPD Sales - Chopra

3 Sales Aram Foundation MRL/ 6P 17/4/2018 17/4/2018 COPD Sales - Chopra

4 Sales Aram Foundation Traction/ 6P 17/4/2018 17/4/2018 COPD Sales - Chopra


5 Sales SV Constructions Hydraulic 18/4/2018 18/4/2018 COPD Sales - Anburathinam

6 Sales Yeekay Builders Traction/ 6P 18/4/2018 18/4/2018 MOSD Sales - Sivakumar

7 Sales Ponraj Traction/ 6P 20/4/2018 20/4/2018 MOSD,IFG Sales - Anburathinam

8 Sales Southern India Traction/ 6P 21/4/2018 21/4/2018 COPD Sales - Chopra

CABIN RECHECK & CONFIRMATION


1 3324 Shri Uttradi Mutt Traction/ 6P 18/4/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3287 Raghunathan MRL/ 6P 18/4/2018 Cabin Dwg ( Checking ) Mail - Lens

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3277/03 Hotel Blue Diamond MRL/ 8P 20/4/2018 20/4/2018 GAD(REVISED) Erection

PRODUCTION DRAWING DETAILINGS RELEASED


1 3263 Sri Builders Traction/6P 16/4/2018 CABIN,BOM Purchase - Prakash

2 3348 Santha Kumar MRL/ 10P 18/4/2018 CABIN,BOM Purchase - Prakash

3 3243 Theresa MRL/ 8P 18/4/2018 CABIN,BOM Purchase - Prakash

4 3347 Raghuraman MRL/ 6P 18/4/2018 CABIN,BOM Purchase - Prakash

5 3330 Beaver Constructions MRL/ 8P 19/4/2018 CABIN,BOM Purchase - Prakash

6 3316 Parvathi Devi MRL/ 6P 19/4/2018 CABIN,BOM Purchase - Prakash


7 3183 S.K. Foundations Traction/6P 20/4/2018 CABIN,BOM Purchase - Prakash

WEEKLY PROGRESS REPORT


MURALI.M DATE: 23.04.2018 to 28.04.2018

SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Bhagiyam builders MRL/ 6P 23/4/2018 23/4/2018 COPD Sales - Chopra

2 Sales Thirunavukkarasan MRL/ 6P 23/4/2018 23/4/2018 COPD Sales - Chopra

3 Sales Kaniga Gas Agency MRL/ 6P / 8P 23/4/2018 23/4/2018 COPD Sales - Sivakumar

4 Sales Kaniga Gas Agency Traction/ 6P / 8P 23/4/2018 23/4/2018 COPD Sales - Sivakumar

5 Sales Suresh Kumar MRL/ 6P 24/4/2018 24/4/2018 SOPD Sales - Sivakumar

6 Sales Suresh Kumar Traction/ 6P 24/4/2018 24/4/2018 SOPD Sales - Sivakumar


7 Sales E Suresh Traction/ 6P 25/4/2018 25/4/2018 MOSD Sales - Chopra

8 Sales R.R. Builders MRL/ 6P 25/4/2018 25/4/2018 MOSD Sales - Chopra

9 Sales Venu MRL/ 6P 26/4/2018 26/4/2018 IFG Sales -Harshavardhana

10 Sales Nahar Foundation MRL/ 6P 26/4/2018 26/4/2018 MOSD,IFG Sales - MD

11 Sales GV Construction Traction/ 6P 27/4/2018 27/4/2018 MOSD Sales - Chopra

12 Sales Harvee Foundation MRL/ 6P 27/4/2018 27/4/2018 COPD Sales - MD / Anbu

13 Sales Manavalan Traction/ 6P 28/4/2018 28/4/2018 COPD Sales - Sivakumar

14 Sales Sri Ganesh Homes Traction/ 6P 28/4/2018 28/4/2018 COPD Sales - Chopra

CABIN RECHECK & CONFIRMATION


1 3263 Sri Builders Traction/ 6P 24/4/2018 Cabin Dwg ( Checking ) Mail - Mass

2 3106 Greeniwich Constructions Traction/ 6P 24/4/2018 Cabin Dwg ( Checking ) Mail - Mass

3 3348 Santha Kumar MRL/ 10P 24/4/2018 Cabin Dwg ( Checking ) Mail - Mass

4 3299 Sarada Agencies MRL/ 6P 24/4/2018 Cabin Dwg ( Checking ) Mail - Mass

5 3247 Bhuvaneshwari Traction/ 6P 24/4/2018 Cabin Dwg ( Checking ) Mail - Lens

6 3277 Hotel Blue Diamonod MRL/ 8P 24/4/2018 Cabin Dwg ( Checking ) Mail - Lens

7 3283 Empire Precast Traction/ 6P 24/4/2018 Cabin Dwg ( Checking ) Mail - Lens

8 3347 Raghuraman MRL/ 6P 25/4/2018 Cabin Dwg ( Checking ) Mail - Mass

9 3316 Parvathi Devi MRL/ 6P 25/4/2018 Cabin Dwg ( Checking ) Mail - Mass
GENERAL ARRANGEMENT DRAWINGS RELEASED
1 3342 Lakshmikantham & Sons Traction/ 6P 17/4/2018 23/4/2018 GAD(NEW) Erection

2 3352 Rathinam MRL/ 6P 18/4/2018 24/4/2018 GAD(NEW) Erection

3 3343 Venkatapathy Asset MRL/ 6P 7/4/2018 27/4/2018 GAD(NEW) Erection

WEEKLY PROGRESS REPORT


MURALI.M DATE: 30.04.2018 to 05.05.2018

SITE DETAIL
PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Salim Traction/ 6P 30/4/2018 30/4/2018 MOSD, COPD Sales - Sivakumar
2 Sales Manikandan Traction/ 8P 30/4/2018 30/4/2018 COPD Sales - Chopra

3 Sales R.R. Builders MRL/ 6P 30/4/2018 30/4/2018 MOSD Sales - Chopra

4 Sales Edifice Constructions Traction/ 6P 30/4/2018 30/4/2018 SOPD Sales - Sivakumar

5 Sales Rangarajan Traction/ 8P 3/5/2018 3/5/2018 COPD Sales - Sivakumar

6 Sales Sivakumar Traction/ 6P 3/5/2018 3/5/2018 MOSD Sales - Sivakumar

7 Sales Nila associates Traction/ 8P 3/5/2018 3/5/2018 COPD Sales - Sivakumar

8 Sales Yousuf Traction/ 6P 3/5/2018 3/5/2018 IFG Sales - Anburathinam

9 Sales Akshaya Foundation Traction/ 6P 4/5/2018 4/5/2018 SOPD,MOSD Sales - Sivakumar

10 Sales STS Associates MRL/ 6P 4/5/2018 4/5/2018 COPD, SOPD, IFG Sales - Sivakumar

11 Sales Anand ( Matrix ) MRL/ 6P 4/5/2018 4/5/2018 COPD Sales - MD/ Sivakumar

12 Sales S.Balaji Traction/ 6P 4/5/2018 4/5/2018 SOPD Sales - Sivakumar

13 Sales Four Square Properties Traction/ 6P 4/5/2018 4/5/2018 COPD, MOSD Sales - Sivakumar

14 Sales Nila associates MRL/ 8P 5/5/2018 5/5/2018 SOPD Sales - Sivakumar

15 Sales Sundarapandiyan MRL/ 10P 5/5/2018 5/5/2018 COPD Sales - MD

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3349 Diamond foundation Traction/ 6P 18/4/2018 2/5/2018 GAD(NEW) Erection

2 3350 Diamond foundation Traction/ 6P 18/4/2018 2/5/2018 GAD(NEW) Erection

3 3351 Diamond foundation Traction/ 6P 18/4/2018 2/5/2018 GAD(NEW) Erection


4 3204 Star Haven Builders Traction/ 6P 18/4/2018 2/5/2018 GAD(NEW) Erection

5 3346 Ilango MRL/ 6P 3/5/2018 3/5/2018 GAD(NEW) Erection

PRODUCTION DRAWING DETAILINGS RELEASED


1 3247 Harish Kumar & Others MRL/ 6P 5/5/2018 CABIN,BOM Purchase - Prakash

2 3248 Shanmugam & Others MRL/ 16P Bedlift 5/5/2018 CABIN,BOM Purchase - Prakash

WEEKLY PROGRESS REPORT


MURALI.M DATE: 07.05.2018 to 12.05.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Royal lands Traction/ 6P 7/5/2018 7/5/2018 COPD Sales -Sivakumar

2 Sales Sri Sai builders Traction/ 6P 7/5/2018 7/5/2018 COPD Sales -Harshavardhana

3 Sales Jirawala house MRL/ 6P 7/5/2018 7/5/2018 COPD Sales -Harshavardhana


4 Sales Grid Foundation Traction/ 6P 7/5/2018 7/5/2018 COPD Sales - Anburathinam

5 Sales Balaji (1) MRL/ 6P 8/5/2018 8/5/2018 COPD,SOPD Sales - Chopra

6 Sales Balaji (2) MRL/ 6P 8/5/2018 8/5/2018 SOPD Sales - Chopra

7 Sales Maheshwaran MRL/ 6P 8/5/2018 8/5/2018 COPD,SOPD Sales - Anburathinam

8 Sales Rukmani Traction/ 6P 9/5/2018 9/5/2018 COPD,SOPD Sales -Harshavardhana

9 Sales Prabhu MRL/ 8P 9/5/2018 9/5/2018 COPD Sales - Chopra

10 Sales Prabhu Traction/ 8P 9/5/2018 9/5/2018 COPD Sales - Chopra

11 Sales RS Constructions MRL/ 6P 10/5/2018 10/5/2018 COPD Sales - Chopra

12 Sales ISP infrastructure MRL/ 6P 10/5/2018 10/5/2018 SOPD Sales - Anburathinam

13 Sales MRL/ 6P 11/5/2018 11/5/2018 SOPD Sales - Anburathinam

14 Sales Aarthi Scans MRL/ 8P 11/5/2018 11/5/2018 SOPD Sales - Sivakumar

15 Sales Shabana Begum MRL/ 6P 11/5/2018 11/5/2018 COPD Sales - Anburathinam

CABIN RECHECK & CONFIRMATION


1 3183 SK Foundation Traction/ 6P 8/5/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3243 Theresa MRL/ 6P 8/5/2018 Cabin Dwg ( Checking ) Mail - Lens

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3295 Guru Builders Traction/ 6P 17/4/2018 7/5/2018 GAD(NEW) Erection
2 3111 Vijaya Traction/ 6P 18/4/2018 8/5/2018 GAD(NEW) Erection

3 3340 Beaver Constructions Traction/ 6P 18/4/2018 8/5/2018 GAD(NEW) Erection

4 3356 Greenpeace Constructions Traction/ 6P 2/5/2018 10/5/2018 GAD(NEW) Erection

5 3357 Sandhya MRL/ 6P 4/5/2018 11/5/2018 GAD(NEW) Erection

6 3278 Hotel Blue Diamond MRL/ 15P 26/4/2018 12/5/2018 GAD(NEW) Erection

PRODUCTION DRAWING DETAILINGS RELEASED


1 3327 AGS Enterprises MRL/ 6P 8/5/2018 CABIN,BOM Purchase - Prakash

2 3205 SKL Infrastructure Traction/6P 8/5/2018 CABIN,BOM Purchase - Prakash

3 3292 Ken Homes Traction/6P 9/5/2018 CABIN,BOM Purchase - Prakash

4 3350 Diamond Foundation Traction/6P 9/5/2018 CABIN,BOM Purchase - Prakash

5 3260 Shri Vinoth Builders Traction/6P 9/5/2018 CABIN,BOM Purchase - Prakash


WEEKLY PROGRESS REPORT
MURALI.M DATE: 14.05.2018 to 19.05.2018

SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED

1 Sales Thamarai Selvan MRL/ 6P 16/5/2018 16/5/2018 COPD Sales -Sivakumar

2 Sales Harini Homes Traction/ 6P 16/5/2018 16/5/2018 COPD Sales -Harshavardhana

3 Sales Harini Homes MRL/ 6P 16/5/2018 16/5/2018 SOPD Sales -Harshavardhana

4 Sales Kailash Jain MRL/ 6P 17/5/2018 17/5/2018 COPD,SOPD Sales -Virender Chopra

5 Sales Rukmani MRL/ 6P 17/5/2018 17/5/2018 COPD Sales -Harshavardhana

6 Sales RMP Lodge Traction/ 8P 17/5/2018 17/5/2018 COPD Sales -Sivakumar

7 Sales Aesthetic Designs Traction/ 6P 18/5/2018 18/5/2018 COPD Sales -Sivakumar

CABIN RECHECK & CONFIRMATION

1 3260 Shri Vinoth Builders Traction/ 6P 14/5/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3292 Ken Homes Traction/ 6P 14/5/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3350 Diamond Constructions Traction/ 6P 14/5/2018 Cabin Dwg ( Checking ) Mail - Lens
GENERAL ARRANGEMENT DRAWINGS RELEASED

1 3346/01 Ilango MRL/ 6P 12/5/2018 15/5/2018 GAD(REVISED) Erection

2 3362 Globe Components Traction/ 6P 14/5/2018 17/5/2018 GAD(NEW) Erection

3 3340 Grid Foundation MRL/ 6P 17/5/2018 19/5/2018 GAD(NEW) Erection

PRODUCTION DRAWING DETAILINGS RELEASED

1 3320 Mohideen Ismail Traction/6P 16/5/2018 CABIN,BOM Purchase - Prakash

2 3336 Beaver Constructions Traction/6P 17/5/2018 CABIN,BOM Purchase - Prakash

3 3314 Sai Homes Traction/6P 17/5/2018 CABIN,BOM Purchase - Prakash

CABIN DRAWING, BOM,


4 3357 Sandhya MRL/ 6P 18/5/2018 Purchase - Prakash
PRODUCTION DRAWINGS

CABIN DRAWING, BOM,


5 3346 Ilango MRL/ 6P 19/5/2018 Purchase - Prakash
PRODUCTION DRAWINGS
WEEKLY PROGRESS REPORT
MURALI.M DATE: 21.05.2018 to 25.05.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED

1 Sales Geetha CANTILEVER MRL/ 6P 21/5/2018 21/5/2018 SOPD Sales -Harshavardhana

2 Sales Aarthi Scans Traction/ 8P 22/5/2018 22/5/2018 SOPD Sales -Sivakumar

3 Sales Rohini constructions Traction/ 1TON 22/5/2018 22/5/2018 SOPD Sales -Anburathinam

4 Sales Rohini constructions Traction/ 1TON 22/5/2018 22/5/2018 IFG Sales -Anburathinam

5 Sales Sri Raghavendra Constructions Traction/ 6P 22/5/2018 22/5/2018 COPD Sales -Anburathinam

6 Sales Harmony MRL/ 8P 23/5/2018 23/5/2018 COPD Sales -Sivakumar

7 Sales Harmony MRL/ 8P 23/5/2018 23/5/2018 SOPD Sales -Sivakumar

8 Sales Harmony MRL/ 8P 23/5/2018 23/5/2018 COPD Sales -Sivakumar

9 Sales Krishna Builders Traction/ 6P 23/5/2018 23/5/2018 COPD Sales -Sivakumar

10 Sales Krishna Builders MRL/ 6P 23/5/2018 23/5/2018 COPD Sales -Sivakumar

11 Sales K.T. Hospital BEDLIFT/Traction 24/5/2018 24/5/2018 SOPD Sales -Anburathinam

BEDLIFT/MRL/
12 Sales Erode city municipal corporation MODULATION 24/5/2018 24/5/2018 SOPD Sales -Peter (G.M.)
13 Sales Sahara express courier MRL/1 TON 24/5/2018 24/5/2018 IFG Sales -Anburathinam

14 Sales Sahara express courier MRL/1.5 TON 24/5/2018 24/5/2018 IFG Sales -Anburathinam

15 Sales GR Promoters MRL/ 6P 25/5/2018 25/5/2018 COPD Sales -Sivakumar

GENERAL ARRANGEMENT DRAWINGS RELEASED

1 3340 Grid Foundation MRL/ 6P 17/5/2018 21/5/2018 GAD(NEW) Erection

CABIN RECHECK & CONFIRMATION

1 3320 Mohideen Ismail Traction/ 6P 23/5/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3328 Harish kumar & others MRL/6P 23/5/2018 Cabin Dwg ( Checking ) Mail - Mass

3 3327 AGS Enterprises MRL/6P 23/5/2018 Cabin Dwg ( Checking ) Mail - Mass

4 3205 SKL infra Traction/ 6P 23/5/2018 Cabin Dwg ( Checking ) Mail - Mass

5 BEL - 212 Mallesh Traction/ 6P 24/5/2018 Cabin Dwg ( Checking ) Mail - Mass

6 3256 Visa hospital Bedlift/ 16P 24/5/2018 Cabin Dwg ( Checking ) Mail - Mass

7 3314 Sai homes Traction/ 6P 25/5/2018 Cabin Dwg ( Checking ) Mail - Mass

8 3336 Beaver Constructions Traction/ 6P 25/5/2018 Cabin Dwg ( Checking ) Mail - Mass
WEEKLY PROGRESS REPORT
MURALI.M DATE: 28.05.2018 to 02.06.2018
SITE DETAIL PRODUCTION
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED

1 Sales Balaji MRL/ 6P 28/5/2018 28/5/2018 MOSD Sales -Sivakumar

2 Sales Sugasini Traction/ 6P 29/5/2018 29/5/2018 COPD Sales -Harshavardhana

3 Sales Sugasini MRL/ 6P 29/5/2018 29/5/2018 COPD Sales -Harshavardhana

CABIN RECHECK & CONFIRMATION

1 3281 V.A. Kannan MRL/ 6P 2/6/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3282 V.A. Kannan MRL/ 6P 2/6/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3362 Globe components Traction/ 6P 2/6/2018 Cabin Dwg ( Checking ) Mail - Lens
4 3368 Dhanam Apartments Traction/ 6P 2/6/2018 Cabin Dwg ( Checking ) Mail - Lens

5 3366 Vasan properties Traction/ 6P 2/6/2018 Cabin Dwg ( Checking ) Mail - Lens

6 3323 GEE TEE BEE Traction/ 6P 2/6/2018 Cabin Dwg ( Checking ) Mail - Lens

7 3346 Elango MRL/ 6P 2/6/2018 Cabin Dwg ( Checking ) Mail - Lens

GENERAL ARRANGEMENT DRAWINGS RELEASED

1 3365 Vasan Properties (A) Traction/ 6P 23/5/2018 30/5/2018 GAD(NEW) Erection

2 3119 Venkatasubramaniam Traction/ 6P 30/5/2018 31/5/2018 GAD(NEW) Erection

3 3360 Tharani estates MRL/ 6P 30/5/2018 1/6/2018 GAD(NEW) Erection

PRODUCTION DRAWING DETAILINGS RELEASED

1 3368 Dhanam Apartments Traction/6P 28/5/2018 CABIN,BOM Purchase - Prakash

2 3366 Vasan Properties Traction/6P 28/5/2018 CABIN,BOM Purchase - Prakash

CABIN DRAWING, BOM,


3 3281 V.A. Kannan Traction/6P 30/5/2018 PRODUCTION DRAWINGS Purchase - Prakash

4 3282 V.A. Kannan MRL/ 6P 30/5/2018 CABIN DRAWING, BOM, Purchase - Prakash
PRODUCTION DRAWINGS
WEEKLY PROGRESS REPORT
MURALI.M DATE: 04.06.2018 to 09.06.2018
SITE DETAIL PRODUCTION
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED

CABIN RECHECK & CONFIRMATION


1 3327 AGS enterprises Traction/ 6P 4/6/2018 Cabin Dwg ( Checking ) Mail - Mass

2 3328 Harish kumar MRL / 6P 4/6/2018 Cabin Dwg ( Checking ) Mail - Mass

3 3205 SKL Infra Traction/ 6P 4/6/2018 Cabin Dwg ( Checking ) Mail - Mass

4 BEL-212 Mallesh.T.R Traction/ 6P 4/6/2018 Cabin Dwg ( Checking ) Mail - Mass

5 3131 Vista Traction/ 6P 5/6/2018 Cabin Dwg ( Checking ) Mail - Lens

6 3352 Rathinam MRL / 6P 6/6/2018 Cabin Dwg ( Checking ) Mail - Lens


GENERAL ARRANGEMENT DRAWINGS RELEASED
1 3359 Krishnaveni MRL/ 6P 5/6/2018 5/6/2018 GAD(NEW) Erection

PRODUCTION DRAWING DETAILINGS RELEASED


CABIN DRAWING, BOM,
1 3313 S.M. Enterprises Traction/6P 6/6/2018 Purchase - Prakash
PRODUCTION DRAWINGS

2 3360 Tharani estates Traction/6P 8/6/2018 CABIN DRAWING, BOM, Purchase - Prakash
PRODUCTION DRAWINGS

WEEKLY PROGRESS REPORT


MURALI.M DATE: 11.06.2018 to 16.06.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SUBMITTED REMARKS
DATE
ERECTION

SALES ENQUIRY RELEASED

1 Sales Ilakiyan Builders MRL/ 8P 15/6/2018 15/6/2018 COPD Sales - Sivakumar

2 Sales Nathan Adithya Traction/ 6P 16/6/2018 16/6/2018 COPD Service - Giri


CABIN RECHECK & CONFIRMATION

1 3313 S.M. Enterprises MRL/ 6P 11/6/2018 Cabin Dwg ( Checking ) Mail - Unison

2 BEL-220 Srikanth Constructions Traction/ 6P 12/6/2018 Cabin Dwg ( Checking ) Mail - Unison

3 3297 Sri Builders Traction/ 6P 12/6/2018 Cabin Dwg ( Checking ) Mail - Unison

4 3363 Dignity Hardwares Traction/ 1000kg 16/6/2018 Cabin Dwg ( Checking ) Mail - Unison

5 3367 Hotel Ponnusamy Traction/ 6P 16/6/2018 Cabin Dwg ( Checking ) Mail - Unison

6 3325 Lalitha Traction/ 6P 16/6/2018 Cabin Dwg ( Checking ) Mail - Unison

GENERAL ARRANGEMENT DRAWINGS RELEASED

1 3298 Prabha Homes Traction/ 6P 12/5/2018 15/5/2018 GAD(NEW) Erection

2 3082 Aswini Apartments (A) Traction/ 6P 14/6/2018 14/6/2018 GAD(NEW) Erection

3 3083 Aswini Apartments (B) Traction/ 6P 14/6/2018 14/6/2018 GAD(NEW) Erection

PRODUCTION DRAWING DETAILINGS RELEASED

1 3325 Lalitha Traction/6P 12/6/2018 CABIN DRAWING, BOM Purchase - Prakash

2 BEL-224 Charan's public school Traction/6P 15/6/2018 CABIN DRAWING, BOM Purchase - Prakash
WEEKLY PROGRESS REPORT
MURALI.M DATE: 18.06.2018 to 23.06.2018
SITE DETAIL
RECEIVING RECEIVING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
ERECTION DATE

SALES ENQUIRY RELEASED


Sales - Virendar
1 Sales MRL/ 6P 18/6/2018 18/6/2018 COPD,SOPD Chopra

2 Sales Traction/ 6P 18/6/2018 18/6/2018 COPD Sales - Anburathinam

3 Sales Maran Constructions MRL/ 6P 18/6/2018 18/6/2018 SOPD,MOSD Sales - Arjun

4 Sales Grace Super Market Goods/ 1.5 Ton 19/6/2018 19/6/2018 Collapsible Sales - Peter (G.M.)

5 Sales Krishnamurthy Traction/ 6P 19/6/2018 19/6/2018 MOWS,IFGWS Testing - Venkat

6 Sales Blue Star Builders MRL/ 6P 20/6/2018 20/6/2018 MOSD Sales - Sivakumar

7 Sales Surekha Homes MRL/ 6P 20/6/2018 20/6/2018 MOSD Sales - Sivakumar

8 Sales Surekha Homes Traction/ 6P 20/6/2018 20/6/2018 MOSD Sales - Sivakumar


Sales - Virendar
9 Sales KCP Limited Goods/ 500 kg 20/6/2018 20/6/2018 Collapsible, IFG
Chopra
10 Sales Basanth Kumar Traction/ 10P 20/6/2018 20/6/2018 COPD Sales - MD

11 Sales Traction/ 6P 23/6/2018 23/6/2018 COPD Sales - Anburathinam


CABIN RECHECK & CONFIRMATION
1 3327 AGS Enterprises MRL/ 6P 22/6/2018 Cabin Dwg ( Checking ) Mail - Unison

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3379 AR. PM. Traders MRL/ 6P 14/6/2018 18/6/2018 GAD(NEW) Erection

2 3373 Grid Foundation Traction/ 6P 7/6/2018 18/6/2018 GAD(NEW) Erection

3 3369 SB Adithya housing pvt. Ltd Traction/ 6P 8/6/2018 19/6/2018 GAD(NEW) Erection

4 3381 Firm foundations Traction/ 6P 15/6/2018 19/6/2018 GAD(NEW) Erection

5 3385 Velmurugan MRL/ 6P 16/6/2018 19/6/2018 GAD(NEW) Erection

6 3384 Viswanathan Traction/ 6P 16/6/2018 20/6/2018 GAD(NEW) Erection

7 3375 Neelaveni MRL/ 6P 8/6/2018 21/6/2018 GAD(NEW) Erection

8 3374 Gopi Damodaran MRL/ 8P 8/6/2018 21/6/2018 GAD(NEW) Erection

9 3382 K.K. Builders Traction/ 6P 16/6/2018 23/6/2018 GAD(NEW) Erection

PRODUCTION DRAWING DETAILINGS RELEASED


1 3308 Palaniyappa Constructions Traction/6P 23/6/2018 CABIN DRAWING, BOM Purchase - Prakash

WEEKLY PROGRESS REPORT


MURALI.M DATE: 25.06.2018 to 30.06.2018
SITE DETAIL PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales MRL/ 6P 26/6/2018 26/6/2018 COPD Sales - Anburathinam

2 Sales Universal mobiles MRL/ 6P 26/6/2018 26/6/2018 COPD Sales - Anburathinam

3 Sales Sri builders MRL/ 6P 26/6/2018 26/6/2018 COPD Sales - Anburathinam

4 Sales Simpson developers (1) Traction/ 6P 28/6/2018 28/6/2018 IFGWS Sales -


Harshavardhana
Sales -
5 Sales Simpson developers (2) Traction/ 6P 28/6/2018 28/6/2018 IFGWS
Harshavardhana
Sales -
6 Sales Simpson developers (3) Traction/ 6P 28/6/2018 28/6/2018 IFGWS
Harshavardhana
Sales -
7 Sales Simpson developers (4) Traction/ 6P 28/6/2018 28/6/2018 IFGWS
Harshavardhana

8 Sales Jeyaramasamy Traction/ 6P 30/6/2018 30/6/2018 SOPD Sales - Virendar


Chopra

CABIN RECHECK & CONFIRMATION


1 3291 Rams developers Traction/ 6P 25/6/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3294 Guru builders Traction/ 6P 25/6/2018 Cabin Dwg ( Checking ) Mail - Lens

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3377 Raghavendhra Constructions Traction/ 6P 14/6/2018 26/6/2018 GAD(NEW) Erection

2 3392 Kcee properties MRL/ 6P 22/6/2018 27/6/2018 GAD(NEW) Erection

3 3318 The Nest Traction/ 6P 14/6/2018 27/6/2018 GAD(NEW) Erection


4 3319 The Nest Traction/ 6P 14/6/2018 27/6/2018 GAD(NEW) Erection

5 3387 Ravichandran & Sukumar MRL/ 6P 20/6/2018 29/6/2018 GAD(NEW) Erection

6 3340 Beaver Constructions Traction/ 6P 25/6/2018 29/6/2018 GAD(Revised) Erection

7 3390 Sree Hi-Tech Traction/ 6P 25/6/2018 30/6/2018 GAD(NEW) Erection

8 3344 Ravichandran Traction/ 6P 23/6/2018 30/6/2018 GAD(NEW) Erection

PRODUCTION DRAWING DETAILINGS RELEASED


1 3381 Firm Foundations Traction/6P 28/6/2018 CABIN DRAWING, BOM Purchase - Prakash

2 3302 GKS constructions Traction/8P 29/6/2018 CABIN DRAWING, BOM Purchase - Prakash

WEEKLY PROGRESS REPORT


MURALI.M DATE: 02.07.2018 to 07.07.2018
SITE DETAIL
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


Sales - Virendar
1 Sales Ashok MRL/ 6P 3/7/2018 3/7/2018 COPD
Chopra

2 Sales Maha flats Traction/ 6P 3/7/2018 3/7/2018 MOSD Sales - Nebish


3 Sales Mega miracle foundation Traction/ 6P 3/7/2018 3/7/2018 COPD Sales - Nebish

4 Sales Baskaran Traction/ 6P 3/7/2018 3/7/2018 SOPD Sales - Virendar


Chopra

5 Sales Aravind Traction/ 6P 3/7/2018 3/7/2018 MOSD Sales - Sivakumar

Sales - Virendar
6 Sales Sadiq MRL/ 6P 4/7/2018 4/7/2018 COPD Chopra

7 Sales Sadiq Traction/ 6P 4/7/2018 4/7/2018 COPD Sales - Virendar


Chopra
Sales - Virendar
8 Sales VS constructions Traction/ 6P 4/7/2018 4/7/2018 MOWS
Chopra

9 Sales Dronacharya Traction/ 6P 4/7/2018 4/7/2018 COPD Sales - Anburathinam

10 Sales Sampath Traction/ 6P 4/7/2018 4/7/2018 MOSD Sales - Anburathinam

11 Sales Geetha Traction/ 6P 4/7/2018 4/7/2018 COPD Sales - Anburathinam

12 Sales KPP Hospital Bedlift/ 16P 4/7/2018 4/7/2018 SOPD Sales - Nebish

13 Sales SRJ padaraja Mutt Traction/ 6P 5/7/2018 5/7/2018 COPD, MOSD Sales - Sivakumar

14 Sales Patson Builders (1) MRL/ 6P 5/7/2018 5/7/2018 SOPD Sales - Nebish

15 Sales Patson Builders (2) MRL/ 6P 5/7/2018 5/7/2018 SOPD Sales - Nebish

16 Sales Sham kumar Traction/ 6P 5/7/2018 5/7/2018 SOPD Sales - Nebish

17 Sales Sham kumar MRL/ 6P 5/7/2018 5/7/2018 SOPD Sales - Nebish

18 Sales Jetta builders Traction/ 6P 5/7/2018 5/7/2018 MOSD Sales - Nebish

19 Sales Doddappanna MRL/ 6P 6/7/2018 6/7/2018 SOPD Sales - Bangalore

20 Sales Doddappanna Traction/ 6P 6/7/2018 6/7/2018 COPD Sales - Bangalore

21 Sales Lamere Constructions MRL/ 6P 6/7/2018 6/7/2018 SOPD Sales - Anburathinam


CABIN RECHECK & CONFIRMATION
1 3308 Palaniyappa Constructions Traction/ 6P 2/7/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3381 Firm foundations Traction/ 6P 6/7/2018 Cabin Dwg ( Checking ) Mail - Unison

3 2961 Udhaya Kumar MRL/ 8P 6/7/2018 Cabin Dwg ( Checking ) Mail - Unison

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3393 Arul Selvi & Dana Jyothi Traction/ 8P 22/6/2018 2/7/2018 GAD(NEW) Erection

2 3380 JK constructions MRL/ 6P 19/6/2018 2/7/2018 GAD(NEW) Erection

3 3337 Beaver Constructions Traction/ 6P 21/6/2018 3/7/2018 GAD(NEW) Erection

4 3388 V. Umapathi Traction/ 6P 23/6/2018 3/7/2018 GAD(NEW) Erection

5 3389 Jagan Sebastian MRL/ 6P 25/6/2018 4/7/2018 GAD(NEW) Erection

6 3391 Sree Hi-Tech Traction/ 6P 25/6/2018 5/7/2018 GAD(NEW) Erection

7 3082 Aswini apartments (A) Traction/ 6P 3/7/2018 6/7/2018 GAD(Revised) Erection

8 3083 Aswini apartments (B) Traction/ 6P 3/7/2018 6/7/2018 GAD(Revised) Erection

9 3084 Aswini apartments (C) Traction/ 6P 3/7/2018 6/7/2018 GAD(Revised) Erection

10 3085 Aswini apartments (D) Traction/ 6P 3/7/2018 6/7/2018 GAD(Revised) Erection


WEEKLY PROGRESS REPORT
MURALI.M DATE: 09.07.2018 to 14.07.2018
SITE DETAIL
RECEIVING RECEIVING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Mohi Foundation(1) MRL/ 10P 9/7/2018 9/7/2018 COPD Sales - Nebish

2 Sales Mohi Foundation(1) Traction/ 10P 9/7/2018 9/7/2018 COPD Sales - Nebish

3 Sales Mohi Foundation(2) MRL/ 6P 9/7/2018 9/7/2018 SOPD Sales - Nebish

4 Sales Mohi Foundation(2) Traction/ 6P 9/7/2018 9/7/2018 COPD Sales - Nebish

5 Sales Mohi Foundation(3) MRL/ 6P 9/7/2018 9/7/2018 COPD Sales - Nebish

6 Sales Mohi Foundation(3) Traction/ 6P 9/7/2018 9/7/2018 COPD Sales - Nebish

7 Sales Rakesh MRL/ 6P 9/7/2018 9/7/2018 SOPD Sales - Nebish

8 Sales Everstar Associates Traction/ 6P 9/7/2018 9/7/2018 MOSD Sales - Nebish

9 Sales Our Atria MRL/ 6P 9/7/2018 9/7/2018 COPD Sales - Sivakumar

10 Sales Akash builders MRL/ 6P 9/7/2018 9/7/2018 SOPD,MOSD Sales - Sivakumar

11 Sales Srikanth constructions MRL/ 6P 9/7/2018 9/7/2018 MOSD Sales - Sivakumar

12 Sales Vaitheeswaran MRL/ 6P 10/7/2018 10/7/2018 SOPD Sales - MD

13 Sales Sri anandham builders Traction/ 6P 11/7/2018 11/7/2018 MOSD Sales - Nebish

14 Sales Shirdi shelters MRL/ 10P 11/7/2018 11/7/2018 COPD Sales - Nebish

15 Sales Shirdi shelters Traction/ 10P 11/7/2018 11/7/2018 COPD Sales - Nebish
Sales - Virendar
16 Sales Rajesh & associates Traction/ 6P 11/7/2018 11/7/2018 MOSD Chopra

17 Sales Gunalan MRL/ 6P 11/7/2018 11/7/2018 SOPD Sales - Sivakumar

18 Sales Gunalan Traction/ 6P 11/7/2018 11/7/2018 COPD Sales - Sivakumar

19 Sales Sendhur pari MRL/ 6P 11/7/2018 11/7/2018 SOPD Sales - Sivakumar

20 Sales Sadhani & company Traction/ 6P 11/7/2018 11/7/2018 COPD Sales - Anburathinam

21 Sales Audisheshaiah MRL/ 6P/ Belt drive 11/7/2018 11/7/2018 SOPD Sales - Anburathinam

Sales - Virendar
22 Sales Safi Traction/ 6P 11/7/2018 11/7/2018 SOPD
Chopra

23 Sales Bharathi Traction/ 6P 11/7/2018 11/7/2018 COPD Sales - Nebish

24 Sales Kumar velu MRL/ 6P 11/7/2018 11/7/2018 SOPD Sales - Bangalore

25 Sales BHL builders / Mr. Prasad(A) MRL/ 6P 11/7/2018 11/7/2018 SOPD Sales - Bangalore

26 Sales BHL builders / Mr. Prasad(B) MRL/ 8P 11/7/2018 11/7/2018 SOPD Sales - Bangalore

27 Sales BHL builders / Mr. Prasad(C) MRL/ 8P 11/7/2018 11/7/2018 SOPD Sales - Bangalore

28 Sales BHL builders / Mr. Prasad(D) MRL/ 6P 11/7/2018 11/7/2018 SOPD Sales - Bangalore

29 Sales BHL builders / Mr. Prasad(E) MRL/ 6P 11/7/2018 11/7/2018 SOPD Sales - Bangalore

30 Sales Raju shet Bedlift/ 16P 11/7/2018 11/7/2018 SOPD Sales - Bangalore

31 Sales Mohi Foundation Traction/ 6P 12/7/2018 12/7/2018 COPD Sales - Nebish

32 Sales Annai Fathima Traction/ 6P 13/7/2018 13/7/2018 COPD Sales - Sivakumar

33 Sales Annai Fathima MRL/ 6P 13/7/2018 13/7/2018 SOPD Sales - Sivakumar

34 Sales Ruby Builders Bedlift/ 16P 14/7/2018 14/7/2018 SOPD Sales - Anburathinam

35 Sales Ruby Builders Bedlift/ 13P 14/7/2018 14/7/2018 SOPD Sales - Anburathinam
36 Sales Guruprasad MRL/ 6P 14/7/2018 14/7/2018 SOPD Sales - Bangalore

37 Sales Raju MRL/ 6P 14/7/2018 14/7/2018 SOPD Sales - Bangalore

38 Sales Ramachandraiah MRL/ 6P 14/7/2018 14/7/2018 COP,SOPD Sales - Bangalore

39 Sales Nithin G Reddy MRL/ 6P 14/7/2018 14/7/2018 SOPD Sales - Bangalore

CABIN RECHECK & CONFIRMATION


1 3345 A.B. Rubber MRL/ 6P 10/7/2018 Cabin Dwg ( Checking ) Mail - Unison

2 3123 Jayadave MRL/ 6P 10/7/2018 Cabin Dwg ( Checking ) Mail - Unison

3 3392 KCEE properties MRL/ 6P 13/7/2018 Cabin Dwg ( Checking ) Mail - Unison

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3395 Aarthi scans Traction/ 6P 25/6/2018 9/7/2018 GAD (NEW) Erection

2 3394/01 Aarthi scans MRL/ 8P 10/7/2018 12/7/2018 GAD (Revised) Erection

3 3392/01 KCEE properties MRL/ 6P 11/7/2018 14/7/2018 GAD (Revised) Erection

PRODUCTION DRAWING DETAILINGS RELEASED


1 2721 Nahar Foundation Traction/6P 11/7/2018 CABIN DRAWING, BOM Purchase - Prakash
WEEKLY PROGRESS REPORT
MURALI.M DATE: 16.07.2018 to 21.07.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Rite choice MRL/ 6P 16/7/2018 16/7/2018 COPD Sales - Anburathinam

2 Sales Rite choice Traction/ 6P 16/7/2018 16/7/2018 COPD Sales - Anburathinam

3 Sales Bhuvaneshwari Constructions Traction/ 6P 16/7/2018 16/7/2018 MOSD Sales - Anburathinam

4 Sales MRL/ 1 Ton 16/7/2018 16/7/2018 IFG Sales - MD

5 Sales Baskar MRL/ 6P 17/7/2018 17/7/2018 COPD Sales - Bangalore

6 Sales Suresh Rai MRL/ 6P 17/7/2018 17/7/2018 SOPD Sales - Bangalore

7 Sales Suresh Rai Traction/ 6P 17/7/2018 17/7/2018 SOPD Sales - Bangalore

8 Sales Venkat Estates MRL/ 6P 17/7/2018 17/7/2018 COPD Sales - Bangalore

9 Sales Venkat Estates Traction/ 6P 17/7/2018 17/7/2018 COPD Sales - Bangalore

10 Sales Bhader Eblise MRL/ 6P 17/7/2018 17/7/2018 SOPD Sales - Bangalore

11 Sales ESP Homes Traction/ 6P 19/7/2018 19/7/2018 MOSD Sales - Nebish

12 Sales Bavani Singh Traction/ 6P 19/7/2018 19/7/2018 SOPD Sales - MD

13 Sales Esp Homes Traction/ 6P 19/7/2018 19/7/2018 MOSD Sales - Nebish

14 Sales ESP Homes Traction/ 6P 19/7/2018 19/7/2018 MOSD Sales - Nebish

15 Sales ESP Homes Traction/ 6P 19/7/2018 19/7/2018 MOSD Sales - Nebish


16 Sales Kareem MRL/ 6P 19/7/2018 19/7/2018 COPD Sales - Nebish

17 Sales Sri Anandham builders Traction/ 6P 19/7/2018 19/7/2018 MOSD Sales - Nebish

18 Sales Ashiq Mohamed MRL/ 6P /Cantilever 20/7/2018 20/7/2018 COPD Sales - Sivakumar

Sales - Virendar
19 Sales Shafi MRL/ 6P/ Belt drive 20/7/2018 20/7/2018 SOPD
Chopra

20 Sales Ruby Builders MRL/ Bedlift/ 16P 20/7/2018 20/7/2018 COPD Sales - Anburathinam

21 Sales Santhosh MRL/ 6P 20/7/2018 20/7/2018 SOPD Sales - Bangalore

22 Sales Santhosh Traction/ 6P 20/7/2018 20/7/2018 COPD Sales - Bangalore

23 Sales Nagaraj Reddy MRL/ 6P 20/7/2018 20/7/2018 SOPD Sales - Bangalore

24 Sales Sampath Kumar MRL/ 6P 20/7/2018 20/7/2018 SOPD Sales - Bangalore

25 Sales Nutech Plaza Traction/ 6P 21/7/2018 21/7/2018 SOPD Sales - MD

CABIN RECHECK & CONFIRMATION


1 3390 Sree Hi Tech Traction/ 6P 17/7/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3342 Lakshmikantham Sons Traction/ 6P 17/7/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3315 Sri abirami Constructions Traction/ 6P 17/7/2018 Cabin Dwg ( Checking ) Mail - Lens

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3398 Girija Raman MRL/ 6P 9/7/2018 18/7/2018 GAD (NEW) Erection

2 3411 Nahar foundation MRL/ 6P 19/7/2018 19/7/2018 GAD (NEW) Erection

3 3334 Ratnam heights Traction/ 6P 26/6/2018 20/7/2018 GAD (NEW) Erection

PRODUCTION DRAWING DETAILINGS RELEASED


1 BEL - 225 Guru Krishnamoorthi Traction/ 6P 16/7/2018 CABIN DRAWING, BOM Purchase - Prakash

2 3394 Aarthi Scans MRL/ 8P 16/7/2018 CABIN DRAWING, BOM Purchase - Prakash

SLAB MARKING DETAILS


1 Sivakumar Traction/ 6P 17/7/2018 Plan drawing Erection

2 Firm Foundations Traction/ 6P 19/7/2018 Plan drawing Erection

WEEKLY PROGRESS REPORT


MURALI.M DATE: 23.07.2018 to 27.07.2018
SITE DETAIL PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Madhav associates(1) Traction/ 6P 23/7/2018 23/7/2018 COPD Sales - Nebish

2 Sales Madhav associates(2) Traction/ 6P 23/7/2018 23/7/2018 COPD Sales - Nebish

3 Sales Madhav associates(3) Traction/ 6P 23/7/2018 23/7/2018 COPD Sales - Nebish

4 Sales Arhan heritage MRL/ 6P 23/7/2017 23/7/2017 SOPD Sales - Bangalore

5 Sales Muzammil ahmd shariff MRL/ 6P 23/7/2017 23/7/2017 COPD Sales - Bangalore
6 Sales Aola ventures MRL/ 6P 23/7/2017 23/7/2017 SOPD Sales - Bangalore

7 Sales Aola ventures MRL/ 6P 23/7/2017 23/7/2017 SOPD Sales - Bangalore

8 Sales Aola ventures MRL/ 6P 23/7/2017 23/7/2017 SOPD Sales - Bangalore

9 Sales Aola ventures MRL/ 6P 23/7/2017 23/7/2017 SOPD Sales - Bangalore

10 Sales Aola ventures MRL/ 10P 24/7/2017 24/7/2017 SOPD Sales - Bangalore

11 Sales Aola ventures MRL/ 10P 24/7/2017 24/7/2017 SOPD Sales - Bangalore

12 Sales Praveen MRL/ 6P 24/7/2017 24/7/2017 SOPD Sales - Bangalore

13 Sales Vijayalakshmi MRL/ 6P 24/7/2017 24/7/2017 COPD Sales - Bangalore

14 Sales Bala obulu MRL/ 6P 24/7/2017 24/7/2017 MOWS Sales - Bangalore

15 Sales Edwin arputharaj Traction/ 6P 25/7/2018 25/7/2018 SOPD,SOPD Sales - Sivakumar

16 Sales Shri varalakshmi agencies Traction/ 6P 25/7/2018 25/7/2018 COPD Sales - Sivakumar

17 Sales Mainland constructions MRL/ 8P 25/7/2018 25/7/2018 COPD Sales - Virendar


Chopra

18 Sales MRL/ 6P 25/7/2018 25/7/2018 COPD

19 Sales King Frazer Traction/ 13P 26/7/2017 26/7/2017 COPD Sales - Bangalore

20 Sales King Frazer MRL/ 13P 26/7/2017 26/7/2017 COPD Sales - Bangalore

21 Sales Ashtol MRL/ 10P 26/7/2017 26/7/2017 COPD Sales - Bangalore

22 Sales Ashtol MRL/ 13P 26/7/2017 26/7/2017 COPD Sales - Bangalore

23 Sales Arka projects MRL/ 6P 26/7/2017 26/7/2017 COPD Sales - Bangalore

24 Sales Ramachandrappa MRL/ 6P 26/7/2017 26/7/2017 SOPD Sales - Bangalore

25 Sales Balaji builders MRL/ 6P 26/7/2017 26/7/2017 COPD Sales - Bangalore


26 Sales Padmasena MRL/ 6P 26/7/2017 26/7/2017 SOPD Sales - Bangalore

27 Sales SSVR builders MRL/ 6P 26/7/2017 26/7/2017 SOPD Sales - Bangalore

28 Sales Global grees builders Traction/ 6P 26/7/2017 26/7/2017 COPD Sales - Bangalore

29 Sales Global grees builders MRL/ 6P 26/7/2017 26/7/2017 COPD Sales - Bangalore

30 Sales Optima housing Traction/ 6P 26/7/2018 26/7/2018 COPD,MOSD Sales - Sivakumar

31 Sales Pachabi Kesan Traction/ 6P 26/7/2018 26/7/2018 COPD Sales - Sivakumar

32 Sales Senthil kumar Traction/ 6P 26/7/2018 26/7/2018 COPD,MOSD Sales - Nebish

33 Sales Arka projects Traction/ 8P 27/7/2017 27/7/2017 COPD Sales - Bangalore

34 Sales Ravi MRL/ 6P 27/7/2017 27/7/2017 SOPD Sales - Bangalore

35 Sales Arka projects MRL/ 8P 27/7/2017 27/7/2017 SOPD Sales - Bangalore

36 Sales Sri raghavendra foundation Traction/ 6P 27/7/2018 27/7/2018 SOPD Sales - Sivakumar

37 Sales Krishnan Traction/ 6P 27/7/2018 27/7/2018 COPD Sales - Virendar


Chopra
Sales - Virendar
38 Sales Supreme builders Traction/ 6P 27/7/2018 27/7/2018 MOSD
Chopra

CABIN RECHECK & CONFIRMATION


1 3317 Associate engineers MRL/ 6P 25/7/2018 Cabin Dwg ( Checking ) Mail - Unison

2 2721 Nahar foundations Traction/ 6P 25/7/2018 Cabin Dwg ( Checking ) Mail - Unison

3 3364 Grid foundation MRL/ 6P 25/7/2018 Cabin Dwg ( Checking ) Mail - Unison

4 3384 Viswanathan Traction/ 6P 25/7/2018 Cabin Dwg ( Checking ) Mail - Unison

5 3394 Aarthi scans MRL/ 8P 25/7/2018 Cabin Dwg ( Checking ) Mail - Unison
6 3372 Geetha raj MRL/ 6P 25/7/2018 Cabin Dwg ( Checking ) Mail - Unison

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3386 Padma Subramania bala bhavan MRL/ 10P 6/7/2018 27/7/2018 GAD (NEW) Erection

PRODUCTION DRAWING DETAILINGS RELEASED


PRODUCTION DRAWINGS,
1 3326 AGS Enterprises MRL/ 13P 23/7/2018 Purchase - Prakash
CABIN DRAWING, BOM
PRODUCTION DRAWINGS,
2 3358 Nahar Foundations MRL/ 6P 26/7/2018 Purchase - Prakash
CABIN DRAWING, BOM

SLAB MARKING DETAILS


Plan drawing / Entrance wall
1 3409 Vikaan shelters Traction/ 6P 26/7/2018 details Erection

WEEKLY PROGRESS REPORT


MURALI.M DATE: 30.07.2018 to 04.08.2018
SITE DETAIL
PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Moorthy Traction/ 6P 31/7/2018 31/7/2018 COPD Sales -
Harshavardhana
Sales -
2 Sales Moorthy MRL/ 6P 31/7/2018 31/7/2018 COPD
Harshavardhana

3 Sales Selvakumar Traction/ 6P 31/7/2018 31/7/2018 COPD Sales - Nebish / MD

4 Sales Selvakumar MRL/ 6P 31/7/2018 31/7/2018 COPD Sales - Nebish / MD

5 Sales Manickavasagan MRL/ 6P 31/7/2018 31/7/2018 SOPD Sales - Sivakumar / MD

6 Sales Manickavasagan MRL/ 6P 31/7/2018 31/7/2018 SOPD Sales - Sivakumar / MD

7 Sales Sri Sai Sathya Constructions MRL/ 6P 31/7/2018 31/7/2018 SOPD Sales - Nebish

8 Sales Suhasini MRL/ 6P 1/8/2018 1/8/2018 SOPD

9 Sales Sundaram MRL/ 6P 2/8/2018 2/8/2018 SOPD Sales - Anburathinam /


MD

10 Sales Firm foundations Traction/ 6P 2/8/2018 2/8/2018 COPD Sales - MD

11 Sales Firm foundations Traction/ 6P 2/8/2018 2/8/2018 COPD Sales - MD

12 Sales Suresh MRL/ 8P 2/8/2018 2/8/2018 COPD Sales - Anburathinam

13 Sales Suresh Hydraulic/ 8P 2/8/2018 2/8/2018 COPD Sales - Anburathinam

14 Sales Mohammed Traction/ 6P 2/8/2018 2/8/2018 COPD Sales - Bangalore

15 Sales Sridharan Traction/ 6P 3/8/2018 3/8/2018 COPD/MOSD Sales - Anburathinam

16 Sales Sridharan MRL/ 6P 3/8/2018 3/8/2018 SOPD/MOSD Sales - Anburathinam

17 Sales Vijaykumar MRL/ 6P 3/8/2018 3/8/2018 SOPD Sales - Virendar


Chopra

18 Sales Namaskar Blue metals MRL/ 8P 3/8/2018 3/8/2018 COPD Sales - Nebish

Sales - Virendar
19 Sales GJ Builders MRL/ 6P 3/8/2018 3/8/2018 SOPD
Chopra

20 Sales ARK line MRL/ 6P 3/8/2018 3/8/2018 SOPD Sales - Bangalore

21 Sales ARK line Traction/ 6P 3/8/2018 3/8/2018 COPD Sales - Bangalore

22 Sales Antony Traction/ 6P 3/8/2018 3/8/2018 SOPD Sales - Bangalore


23 Sales Harshavardhana MRL/ 6P 3/8/2018 3/8/2018 SOPD Sales - Bangalore

24 Sales Harshavardhana Traction/ 6P 3/8/2018 3/8/2018 SOPD Sales - Bangalore

25 Sales Harshavardhana MRL/ 6P 3/8/2018 3/8/2018 SOPD Sales - Bangalore

26 Sales Harshavardhana Traction/ 6P 3/8/2018 3/8/2018 SOPD Sales - Bangalore

27 Sales Harshavardhana MRL/ 6P 3/8/2018 3/8/2018 SOPD Sales - Bangalore

28 Sales Harshavardhana Traction/ 6P 3/8/2018 3/8/2018 SOPD Sales - Bangalore

29 Sales Anandh Kumar MRL/ 6P 4/8/2018 4/8/2018 COPD Sales - Bangalore

30 Sales Prabhu MRL/ 8P 4/8/2018 4/8/2018 SOPD Sales - Nebish / MD

31 Sales Niranjan Kumar Traction/ 6P 4/8/2018 4/8/2018 COPD Sales - Anburathinam /


Service - Giri

CABIN RECHECK & CONFIRMATION


1 3387 Ravichandran MRL/ 6P 30/7/2018 Cabin Dwg ( Checking ) Mail - Unison

2 3389 Jagan Sebastian Traction/ 6P 30/7/2018 Cabin Dwg ( Checking ) Mail - Unison

3 3358 Nahar Foundation MRL/ 6P 31/7/2018 Cabin Dwg ( Checking ) Mail - Unison

4 3275 Ravishankar MRL/ 6P 31/7/2018 Cabin Dwg ( Checking ) Mail - Unison

5 BEL-222 Amm builders Traction/ 6P 2/8/2018 Cabin Dwg ( Checking ) Mail - Unison

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3296 Guru Builders Traction/ 6P 26/7/2018 30/7/2018 GAD (NEW) Erection

2 3383 G.R. Promoters Traction/ 6P 5/7/2018 31/7/2018 GAD (NEW) Erection

3 3423 Mohi's Infrastructure MRL/ 6P 1/8/2018 1/8/2018 GAD (NEW) Erection

4 3424 Mohi's Infrastructure Traction/ 6P 1/8/2018 2/8/2018 GAD (NEW) Erection


5 3426 Ramesh Shanmugasundaram MRL/ 6P 2/8/2018 2/8/2018 GAD (NEW) Erection

SLAB MARKINGS RELEASED


1 Surekha Homes Traction/ 6P 2/8/2018 Plan drawing Erection

2 Thilagar Traction/ 6P 3/8/2018 Plan drawing Erection

3 Dhronacharya Traction/ 6P 4/8/2018 Plan drawing Erection

WEEKLY PROGRESS REPORT


MURALI.M DATE: 06.08.2018 to 11.08.2018
SITE DETAIL
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Aditya birla group Goods/ 1000Kg 6/8/2018 6/8/2018 COPD Sales - Peter (G.M.)

2 Sales Aditya birla group Goods/ 2000Kg 6/8/2018 6/8/2018 COPD Sales - Peter (G.M.)

3 Sales Srinath MRL/ 6P 6/8/2018 6/8/2018 MOSD Sales - Anburathinam

4 Sales Srinath Traction/ 6P 6/8/2018 6/8/2018 MOSD Sales - Anburathinam

5 Sales Giritech MRL/ 6P 6/8/2018 6/8/2018 SOPD/IFG Sales - Virendar


Chopra

6 Sales Balaji marriage hall MRL/ 10P 7/8/2018 7/8/2018 SOPD Sales - Anburathinam
7 Sales Rajagopalan MRL/ 8P 7/8/2018 7/8/2018 SOPD Sales - Anburathinam

8 Sales Balasubramaniam MRL/ 6P 7/8/2018 7/8/2018 SOPD Sales - Sivakumar

Sales - Virendar
9 Sales Devon Machines Goods/ 1000Kg 10/8/2018 10/8/2018 IFG
Chopra

10 Sales Zulfikar Hydraulic/ 6P 11/8/2018 11/8/2018 SOPD Sales - Bangalore

11 Sales Ganesh Traction/ 6P 11/8/2018 11/8/2018 COPD Sales - Bangalore

12 Sales Venkatesh Traction/ 6P 11/8/2018 11/8/2018 SOPD Sales - Bangalore

13 Sales Mahadevi Traction/ 6P 11/8/2018 11/8/2018 SOPD Sales - Bangalore

14 Sales Mahadevi MRL/ 6P 11/8/2018 11/8/2018 SOPD Sales - Bangalore

15 Sales Narasimha Murthy MRL/ 6P 11/8/2018 11/8/2018 SOPD Sales - Bangalore

16 Sales Rajesh Traction/ 6P 11/8/2018 11/8/2018 SOPD Sales - Bangalore

17 Sales Rajesh MRL/ 6P 11/8/2018 11/8/2018 SOPD Sales - Bangalore

18 Sales Govindraj MRL/ 6P 11/8/2018 11/8/2018 COPD Sales - Bangalore

19 Sales Venkatalakshmi Hydraulic/ 6P 11/8/2018 11/8/2018 SOPD Sales - Bangalore

20 Sales Dilip Traction/ 6P 11/8/2018 11/8/2018 SOPD Sales - Bangalore

CABIN RECHECK & CONFIRMATION


1 213 Trishala devi Traction/ 6P 7/8/2018 Cabin Dwg ( Checking ) Mail - Unison

2 3319 The Nest Traction/ 6P 10/8/2018 Cabin Dwg ( Checking ) Mail - Unison

3 3318 The Nest Traction/ 6P 10/8/2018 Cabin Dwg ( Checking ) Mail - Unison

4 3326 Ags Properties MRL/13P 11/8/2018 Cabin Dwg ( Checking ) Mail - Unison
5 3045 Virat corporation Traction/ 6P 11/8/2018 Cabin Dwg ( Checking ) Mail - Unison

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3405 Anush foundation MRL/ 6P 17/7/2018 7/8/2018 GAD (NEW) Erection

2 3430 Bhuvaneshwari constructions Traction/ 6P 3/8/2018 9/8/2018 GAD (NEW) Erection

3 3409 Vikaan shelters MRL/ 6P 21/7/2018 10/8/2018 GAD (NEW) Erection

4 3424/01 Arumugapriya & Senthil kumar Traction/ 6P 6/8/2018 10/8/2018 GAD (REVISED) Erection

WEEKLY PROGRESS REPORT


MURALI.M DATE: 13.08.2018 to 18.08.2018
SITE DETAIL
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Venugopal Traction/ 6P 16/8/2018 16/8/2018 SOPD Sales - Bangalore

2 Sales Maragowda MRL/ 6P 16/8/2018 16/8/2018 SOPD Sales - Bangalore

3 Sales Veera MRL/ 6P 16/8/2018 16/8/2018 SOPD Sales - Bangalore

4 Sales Veera Belt/ 6P 16/8/2018 16/8/2018 SOPD Sales - Bangalore

5 Sales St.Peters church MRL/ 8P 17/8/2018 17/8/2018 SOPD Sales - Anburathinam


6 Sales Nilotec Belt/ 6P 17/8/2018 17/8/2018 SOPD Sales - Nebish

Sales - Virender
7 Sales Krishna group Traction/ 10P 17/8/2018 17/8/2018 COPD
Chopra
Sales - Virender
8 Sales Krishna group Traction/ 13P 17/8/2018 17/8/2018 COPD
Chopra

9 Sales Rajendran MRL/ 6P 17/8/2018 17/8/2018 SOPD Sales - Bangalore

10 Sales Chandra raj Traction/ 6P 17/8/2018 17/8/2018 SOPD Sales - Bangalore

11 Sales Ravikumar Traction/ 6P 17/8/2018 17/8/2018 SOPD Sales - Bangalore

12 Sales Shivakumar Traction/ 6P 17/8/2018 17/8/2018 IFG Sales - Bangalore

13 Sales Chennakeshwa Traction/ 6P 17/8/2018 17/8/2018 SOPD Sales - Bangalore

14 Sales Chennakeshwa MRL/ 6P 17/8/2018 17/8/2018 SOPD Sales - Bangalore

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3393 Balasubramaniam MRL/ 6P 10/8/2018 13/8/2018 GAD (NEW) Erection

2 2863 Suhasini MRL/ 6P 11/8/2018 14/8/2018 GAD (NEW) Erection

3 3406 Guru builders Traction/ 6P 24/7/2018 14/8/2018 GAD (NEW) Erection

4 3331/01 Swanag Infrastructures Traction/ 6P 13/8/2018 16/8/2018 GAD (Revised) Erection

5 3332/01 Swanag Infrastructures Traction/ 6P 13/8/2018 16/8/2018 GAD (Revised) Erection

6 3333/01 Swanag Infrastructures Traction/ 6P 13/8/2018 16/8/2018 GAD (Revised) Erection

7 3340/02 Beaver constructions Traction/ 6P 10/8/2018 18/8/2018 GAD (Revised) Erection

8 3367/01 Dinakar Traction/ 6P 28/7/2018 18/8/2018 GAD (Revised) Erection


WEEKLY PROGRESS REPORT
MURALI.M DATE: 20.08.2018 to 25.08.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Traction/ 6P 21/8/2018 21/8/2018 MOSD Sales - Anburathinam

2 Sales Traction/ 6P 21/8/2018 21/8/2018 MOSD Sales - Anburathinam

3 Sales C Y Lakshmi Belt/ 6P 21/8/2018 21/8/2018 SOPD Sales - Bangalore

4 Sales Bhaskar reddy MRL/ 6P 22/8/2018 22/8/2018 SOPD Sales - Bangalore

5 Sales Bhaskar reddy Traction/ 6P 22/8/2018 22/8/2018 COPD Sales - Bangalore

6 Sales Ravi Traction/ 6P 22/8/2018 22/8/2018 COPD Sales - Bangalore

7 Sales Ample group Traction/ 6P 22/8/2018 22/8/2018 COPD Sales - Bangalore

8 Sales Jayaram Traction/ 6P 22/8/2018 22/8/2018 COPD Sales - Bangalore

9 Sales Nisar Ahamed MRL/ 6P 22/8/2018 22/8/2018 COPD Sales - Bangalore

10 Sales Subramanya Traction/ 6P 22/8/2018 22/8/2018 SOPD Sales - Bangalore

11 Sales Subramanya MRL/ 6P 22/8/2018 22/8/2018 SOPD Sales - Bangalore

12 Sales Madanraj MRL/ 6P 22/8/2018 22/8/2018 SOPD Sales - Bangalore

13 Sales Tele logic Traction/ 6P 22/8/2018 22/8/2018 COPD Sales - Bangalore

14 Sales Uber coorp MRL/ 6P 22/8/2018 22/8/2018 SOPD Sales - Bangalore


15 Sales Haruni Constructions MRL/ 6P 22/8/2018 22/8/2018 SOPD Sales - Bangalore

16 Sales Amjad Traction/ 6P 23/8/2018 23/8/2018 COPD Sales - Bangalore

17 Sales Agarwal Traction/ 6P 25/8/2018 25/8/2018 COPD Sales - Bangalore

18 Sales Santhosh MRL/ 6P 25/8/2018 25/8/2018 SOPD Sales - Bangalore

19 Sales Amar Traction/ 6P 25/8/2018 25/8/2018 SOPD Sales - Bangalore

20 Sales Gopal MRL/ 6P 25/8/2018 25/8/2018 SOPD Sales - Bangalore

21 Sales Gopal Traction/ 6P 25/8/2018 25/8/2018 SOPD Sales - Bangalore

22 Sales Somashekar MRL/ 6P 25/8/2018 25/8/2018 COPD Sales - Bangalore

23 Sales Somashekar MRL/ 6P 25/8/2018 25/8/2018 COPD Sales - Bangalore

24 Sales Ramesh reddy MRL/ 6P 25/8/2018 25/8/2018 SOPD Sales - Bangalore

25 Sales Ramesh reddy Traction/ 6P 25/8/2018 25/8/2018 SOPD Sales - Bangalore

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3422 Surekha homes Traction/ 6P 10/8/2018 21/8/2018 GAD (NEW) Erection

2 3437 Ken homes Traction/ 6P 11/8/2018 21/8/2018 GAD (NEW) Erection

3 3436 Antan's Constructions MRL/ 6P 14/8/2018 22/8/2018 GAD (NEW) Erection

4 3298/01 Prabha homes Traction/ 6P 21/8/2018 22/8/2018 GAD (Revised) Erection

5 3386/01 Padma Subramania bala bhavan MRL/ 10P 21/8/2018 23/8/2018 GAD (Revised) Erection

6 3435 Dronacharya Infrastructure Traction/ 6P 10/8/2018 23/8/2018 GAD (NEW) Erection

7 3371 SB Adithya housing Traction/ 6P 6/8/2018 25/8/2018 GAD (NEW) Erection


8 3370 SB Adithya housing Traction/ 6P 6/8/2018 25/8/2018 GAD (NEW) Erection

SLAB MARKING DETAILS


1 KG Homes Traction/ 6P 23/8/2018 Plan drawing Erection

WEEKLY PROGRESS REPORT


MURALI.M DATE: 27.08.2018 to 01.09.2018
SITE DETAIL
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Vivekanandan Traction/ 6P 27/8/2018 27/8/2018 SOPD Sales - Nebish

2 Sales Sai sundari shelters Traction/ 6P 27/8/2018 27/8/2018 MOSD Sales - Nebish

3 Sales Annai Arul builders Traction/ 6P 27/8/2018 27/8/2018 COPD Sales - Nebish

4 Sales Rajalakshmi MRL/ 8P 27/8/2018 27/8/2018 SOPD/COPD Sales - Sivakumar

5 Sales Manju MRL/ 6P 27/8/2018 27/8/2018 SOPD Sales - Bangalore

6 Sales Agarwal Traction/ 6P 27/8/2018 27/8/2018 COPD Sales - Bangalore

7 Sales M R Constructions MRL/ 6P 27/8/2018 27/8/2018 SOPD Sales - Bangalore


8 Sales Somashekar MRL/ 8P 28/8/2018 28/8/2018 SOPD Sales - Bangalore

9 Sales Somashekar MRL/ 8P 28/8/2018 28/8/2018 SOPD Sales - Bangalore

10 Sales New motherland MRL/ 6P 29/8/2018 29/8/2018 SOPD Sales - Nebish

11 Sales New motherland Traction/ 6P 29/8/2018 29/8/2018 SOPD Sales - Nebish

12 Sales Naval constructions MRL/ 6P 30/8/2018 30/8/2018 COPD Sales - Nebish

13 Sales Naval constructions Traction/ 6P 30/8/2018 30/8/2018 COPD Sales - Bangalore

14 Sales Zuber Ahmed MRL/ 6P 1/9/2018 1/9/2018 SOPD Sales - Nebish

15 Sales Zuber Ahmed Traction/ 6P 1/9/2018 1/9/2018 COPD Sales - Bangalore

16 Sales Sridevi MRL/ 6P 1/9/2018 1/9/2018 SOPD Sales - Bangalore

17 Sales Chinnaswamy MRL/ 6P 1/9/2018 1/9/2018 SOPD Sales - Bangalore

18 Sales Jayanth kumar Traction/ 6P 1/9/2018 1/9/2018 COPD Sales - Bangalore

19 Sales Raju MRL/ 6P 1/9/2018 1/9/2018 SOPD Sales - Bangalore

20 Sales Raju Traction/ 6P 1/9/2018 1/9/2018 COPD Sales - Bangalore

21 Sales RR Constructions MRL/ 8P 1/9/2018 1/9/2018 SOPD Sales - Bangalore

22 Sales RR Constructions Traction/ 8P 1/9/2018 1/9/2018 COPD Sales - Bangalore

23 Sales Harsha Traction/ 6P 1/9/2018 1/9/2018 SOPD Sales - Bangalore

24 Sales Surrendran Traction/ 6P 1/9/2018 1/9/2018 SOPD Sales - Bangalore

25 Sales Praveen Traction/ 6P 1/9/2018 1/9/2018 SOPD Sales - Bangalore

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3438 Manickavasakan MRL/ 8P 27/8/2018 27/8/2018 GAD (Revised) Erection

2 3439 Manickavasakan MRL/ 8P 27/8/2018 27/8/2018 GAD (Revised) Erection

3 2986 DNC Chit funds Traction/ 6P 27/8/2018 28/8/2018 GAD (NEW) Erection

4 3451 Mohi's Infrastructure Traction/ 6P 30/8/2018 31/8/2018 GAD (NEW) Erection

5 3433 Rite Choice foundations Traction/ 6P 17/8/2018 1/9/2018 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3409 Vikaan Shelters Traction/ 6P 27/8/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3361 Srinivasan Traction/ 6P 27/8/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3434 Annai velankanni MRL/ belt / 6P 27/8/2018 Cabin Dwg ( Checking ) Mail - Lens

4 3382 KK builders Traction/ 6P 27/8/2018 Cabin Dwg ( Checking ) Mail - Lens

5 3408 Indo French Traction/ 6P 29/8/2018 Cabin Dwg ( Checking ) Mail - Unison

6 3407 Sampath Traction/ 6P 29/8/2018 Cabin Dwg ( Checking ) Mail - Unison

7 3204 Star Haven Traction/ 6P 29/8/2018 Cabin Dwg ( Checking ) Mail - Unison

8 3311 Kumar Builders MRL/ 6P 29/8/2018 Cabin Dwg ( Checking ) Mail - Unison

9 3404 Indrani MRL/ 6P 30/8/2018 Cabin Dwg ( Checking ) Mail - Unison

10 3376 Venkateswara Insulation MRL/ 6P 30/8/2018 Cabin Dwg ( Checking ) Mail - Unison

11 3410 Grace Super market Traction/ Goods 30/8/2018 Cabin Dwg ( Checking ) Mail - Unison

PRODUCTION DRAWING DETAILINGS RELEASED


1 3437 KEN homes Traction/ 6P 29/8/2018 Cabin drawing,BOM Purchase

2 2986 DNC chit funds Traction/ 6P 30/8/2018 BOM Purchase

WEEKLY PROGRESS REPORT


MURALI.M DATE: 03.09.2018 to 08.09.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Sathish MRL/ 6P 6/9/2018 6/9/2018 SOPD Sales - Bangalore

2 Sales Ramesh Traction/ 6P 7/9/2018 7/9/2018 SOPD Sales - Bangalore

3 Sales Shashi Traction/ 6P 7/9/2018 7/9/2018 COPD Sales - Bangalore

4 Sales Chandrashekar Traction/ 6P 7/9/2018 7/9/2018 SOPD Sales - Bangalore

5 Sales Raju Traction/ 6P 7/9/2018 7/9/2018 COPD Sales - Bangalore

6 Sales Raju MRL/ 6P 7/9/2018 7/9/2018 SOPD Sales - Bangalore

7 Sales Akhbar bhasha MRL/ 6P 7/9/2018 7/9/2018 SOPD Sales - Bangalore

8 Sales Khan Traction/ 6P 7/9/2018 7/9/2018 COPD Sales - Bangalore

9 Sales Lohitha Traction/ 6P 7/9/2018 7/9/2018 SOPD Sales - Bangalore


10 Sales Lohitha MRL/ 6P 7/9/2018 7/9/2018 SOPD Sales - Bangalore

11 Sales Lakshmana Traction/ 6P 7/9/2018 7/9/2018 SOPD Sales - Bangalore

12 Sales Swamy Traction/ 6P 7/9/2018 7/9/2018 COPD Sales - Bangalore

13 Sales Swamy MRL/ 6P 7/9/2018 7/9/2018 SOPD Sales - Bangalore

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3443 Dillibabu MRL/ 6P 24/8/2018 4/9/2018 GAD (NEW) Erection

2 3442 Caasa Foundation MRL/ 6P 24/8/2018 7/9/2018 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3398 Girija Raman MRL/ 6P 4/9/2018 Cabin Dwg ( Checking ) Mail - Unison

2 3402 Arumugapriya & Senthil kumar MRL/ 6P 5/9/2018 Cabin Dwg ( Checking ) Mail - Unison

3 3397 Aravind MRL/ 6P 5/9/2018 Cabin Dwg ( Checking ) Mail - Unison

PRODUCTION DRAWING DETAILINGS RELEASED


1 BEL-226 Mallika Bhanu Traction/ 6P 4/9/2018 Cabin drawing,BOM Purchase

2 3340 Beaver Constructions Traction/ 6P 6/9/2018 Cabin drawing,BOM Purchase

3 3337 Beaver Constructions Traction/ 6P 8/9/2018 Cabin drawing,BOM Purchase

Cabin drawing,Production
4 3375 Neelaveni MRL/6P 8/9/2018 Purchase
drawings
WEEKLY PROGRESS REPORT
MURALI.M DATE: 10.09.2018 to 15.09.2018
SITE DETAIL
PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Rajendran MRL/ 6P 10/9/2018 10/9/2018 SOPD Sales - Bangalore

2 Sales Savitha Traction/ 6P 10/9/2018 10/9/2018 IFG Sales - Bangalore

3 Sales Silicon Constructions Traction/ 6P / 8P 10/9/2018 10/9/2018 COPD Sales - Bangalore

4 Sales Chamraj Reddy MRL/ 6P / 8P 10/9/2018 10/9/2018 SOPD Sales - Bangalore

5 Sales Mohamed Ayub saleem MRL/ 6P 10/9/2018 10/9/2018 SOPD Sales - Bangalore

6 Sales Mohamed Ayub saleem Traction/ 6P 10/9/2018 10/9/2018 SOPD Sales - Bangalore

7 Sales Sukanth MRL/ 6P 10/9/2018 10/9/2018 COPD Sales - Bangalore

8 Sales Fine Home Engineers MRL/ 6P 10/9/2018 10/9/2018 SOPD Sales - Bangalore

9 Sales Fine Home Engineers Traction/ 6P 10/9/2018 10/9/2018 SOPD Sales - Bangalore

10 Sales Narayanaswamy Traction/ 6P 10/9/2018 10/9/2018 SOPD Sales - Bangalore

PRODUCTION DRAWING DETAILINGS RELEASED


Cabin drawing,Production
1 3375 Neelaveni MRL/6P 10/9/2018 Purchase
drawings
WEEKLY PROGRESS REPORT
MURALI.M DATE: 17.09.2018 to 22.09.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales The Marshalls Traction/ 6P 17/9/2018 17/9/2018 SOPD Sales - Nebish

2 Sales Rohini MRL/ 6P 17/9/2018 17/9/2018 SOPD Sales - Sivakumar

3 Sales Subramanya Traction/ 16P 18/9/2018 18/9/2018 SOPD Sales - Bangalore

4 Sales Fresco developers Traction/ 6P 19/9/2018 19/9/2018 SOPD Sales - Bangalore

5 Sales Ravishankar MRL/ 6P 19/9/2018 19/9/2018 COPD Sales - Bangalore

6 Sales Ranganath Traction/ 6P 19/9/2018 19/9/2018 COPD Sales - Bangalore

7 Sales Zameer Azad Traction/ 6P 19/9/2018 19/9/2018 SOPD Sales - Bangalore

8 Sales Sumadhura Shangrilla Traction/ 6P 21/9/2018 21/9/2018 SOPD Sales - Bangalore

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3353 Thilagar Traction/ 6P 27/9/2018 17/9/2018 GAD (NEW) Erection

2 3446 Om Muruga Traction/ 6P 25/9/2018 17/9/2018 GAD (NEW) Erection


3 3463 Ravi MRL/ 6P 17/9/2018 18/9/2018 GAD (NEW) Erection

4 3456 Rajesh & associates Traction/ 6P 8/9/2018 18/9/2018 GAD (NEW) Erection

5 3457 Sri Naga Builders Traction/ 6P 8/9/2018 19/9/2018 GAD (NEW) Erection

6 3455 Sri Builders Traction/ 6P 6/9/2018 20/9/2018 GAD (NEW) Erection

7 3464 Banumathi MRL/ 6P 17/9/2018 20/9/2018 GAD (NEW) Erection

8 3338 Beaver Constructions Traction/ 6P 12/9/2018 21/9/2018 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3295 Guru Builders Traction/ 6P 21/9/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3462 Saravana Builders Traction/ 6P 21/9/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3421 Aakash builders MRL/ 6P 21/9/2018 Cabin Dwg ( Checking ) Mail - Lens

4 3460 Sumangali Properties Traction/ 6P 22/9/2018 Cabin Dwg ( Checking ) Mail - Lens

5 3459 Sumangali Properties Traction/ 6P 22/9/2018 Cabin Dwg ( Checking ) Mail - Lens

6 3296 Guru Builders Traction/ 6P 22/9/2018 Cabin Dwg ( Checking ) Mail - Lens

PRODUCTION DRAWING DETAILINGS RELEASED


1 3456 Rajesh & associates Traction/ 6P 21/9/2018 Cabin drawing,Production Purchase
details
WEEKLY PROGRESS REPORT
MURALI.M DATE: 24.09.2018 to 29.09.2018
SITE DETAIL PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Prema MRL/ 10P 24/9/2018 24/9/2018 SOPD Sales - Nebish

2 Sales Kalai arasu Traction/ 6P 24/9/2018 24/9/2018 COPD Sales -


Harshavardhana
Sales -
3 Sales Kalai arasu MRL/ 6P 24/9/2018 24/9/2018 SOPD
Harshavardhana
Sales -
4 Sales Meenakshi sundaram Traction/ 6P 26/9/2018 26/9/2018 IFG
Harshavardhana

5 Sales Venkatesh Traction/ 6P 27/9/2018 27/9/2018 COPD Sales - Bangalore

6 Sales Narendra Reddy MRL/ 6P 27/9/2018 27/9/2018 SOPD Sales - Bangalore

7 Sales Narendra Reddy MRL/ 6P 27/9/2018 27/9/2018 SOPD Sales - Bangalore

8 Sales Narendra Reddy MRL/ 6P 27/9/2018 27/9/2018 SOPD Sales - Bangalore

9 Sales Vasavi Construction MRL/ 6P 27/9/2018 27/9/2018 SOPD Sales - Bangalore

10 Sales Vijayalakshmi MRL/ 8P 27/9/2018 27/9/2018 COPD/SOPD Sales - Bangalore

11 Sales Vijayalakshmi MRL/ 10P 27/9/2018 27/9/2018 COPD/SOPD Sales - Bangalore

Sales - Virender
12 Sales Prabhu Traction/ 8P 29/9/2018 29/9/2018 SOPD Chopra

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3466 Suganthi Traction/ 6P 18/9/2018 24/9/2018 GAD (NEW) Erection
2 3465 Mylarasu Traction/ 6P 18/9/2018 24/9/2018 GAD (NEW) Erection

3 3467 Sampath kumar Traction/ 6P 21/9/2018 25/9/2018 GAD (NEW) Erection

4 3470 Sugantha Nandhakumar Traction/ 6P 24/9/2018 27/9/2018 GAD (NEW) Erection

5 3468 Sai Sundari shelters Traction/ 6P 21/9/2018 26/9/2018 GAD (NEW) Erection

6 PEL-049 Bharani Enterprises MRL/ 6P 26/9/2018 28/9/2018 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3334 Ratnam Heights Traction/ 6P 25/9/2018 Cabin Dwg ( Checking ) Mail - Unison

2 3403 Kathirvel Constructions Traction/ 6P 25/9/2018 Cabin Dwg ( Checking ) Mail - Unison

3 3435 Dronacharya Traction/ 6P 25/9/2018 Cabin Dwg ( Checking ) Mail - Unison

4 3461 Rajalakshmi MRL/ 8P 26/9/2018 Cabin Dwg ( Checking ) Mail - Unison

5 3272 Esvaran Traction/ 6P 28/9/2018 Cabin Dwg ( Checking ) Mail - Lens

6 3419 Jayaswathy Traction/ 6P 28/9/2018 Cabin Dwg ( Checking ) Mail - Lens

7 3420 Jayaswathy Traction/ 6P 28/9/2018 Cabin Dwg ( Checking ) Mail - Lens

8 3369 SB Adithya housing Traction/ 6P 28/9/2018 Cabin Dwg ( Checking ) Mail - Lens

9 3456 Rajesh & Associates Traction/ 6P 29/9/2018 Cabin Dwg ( Checking ) Mail - Lens

10 3375 Neelaveni MRL/ 6P 29/9/2018 Cabin Dwg ( Checking ) Mail - Lens

11 2863 Suhasini MRL/ 6P 29/9/2018 Cabin Dwg ( Checking ) Mail - Unison

SLAB MARKING DONE


1 Vijayjothi Builders Traction/ 6P 24/9/2018 Plan Dwg Erection

WEEKLY PROGRESS REPORT


MURALI.M DATE: 01.10.2018 to 06.10.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SUBMITTED REMARKS
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Chandrasekar Traction/ 6P 4/10/2018 4/10/2018 COPD Sales - Bangalore

2 Sales Chandrasekar MRL/ 6P 4/10/2018 4/10/2018 SOPD Sales - Bangalore

3 Sales Platinum rouale MRL/ 6P 4/10/2018 4/10/2018 COPD Sales - Bangalore

4 Sales Platinum rouale MRL/ 6P 4/10/2018 4/10/2018 COPD Sales - Bangalore

5 Sales Dwaraja builders MRL/ 6P 4/10/2018 4/10/2018 SOPD Sales - Bangalore

6 Sales Sai developers MRL/ 6P 4/10/2018 4/10/2018 COPD Sales - Bangalore

7 Sales Liyakath Traction/ 6P 4/10/2018 4/10/2018 COPD Sales - Bangalore

8 Sales Deepak Srinivasu Traction/ 6P 4/10/2018 4/10/2018 SOPD Sales - Bangalore

9 Sales Ramachandraya Traction/ 6P 4/10/2018 4/10/2018 IFG Sales - Bangalore


10 Sales Sainath Iyer BELT/Structural 5/10/2018 5/10/2018 SOPD Sales - Bangalore

11 Sales Fathelal Traction/ 6P 5/10/2018 5/10/2018 SOPD Sales - Bangalore

12 Sales Fathelal MRL/ 6P 5/10/2018 5/10/2018 SOPD Sales - Bangalore

13 Sales Apoorva Constructions MRL/ 6P 6/10/2018 6/10/2018 SOPD Sales - Nebish

14 Sales Ram Foundations Traction/ 8P 6/10/2018 6/10/2018 COPD/MOSD Sales - Nebish

15 Sales Hotel Sarada Traction/ 8P 6/10/2018 6/10/2018 COPD Sales - MD

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3476 Firm Foundation Traction/ 6P 25/9/2018 1/10/2018 GAD (NEW) Erection

2 3477 Firm Foundation Traction/ 6P 25/9/2018 1/10/2018 GAD (NEW) Erection

3 3478 Firm Foundation Traction/ 6P 25/9/2018 1/10/2018 GAD (NEW) Erection

4 3474 Ravikumar Traction/ 6P 25/9/2018 4/10/2018 GAD (NEW) Erection

5 3469 Haridass Traction/ 6P 22/9/2018 4/10/2018 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3082 Aswini Apartments Traction/ 6P 6/10/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3083 Aswini Apartments Traction/ 6P 6/10/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3084 Aswini Apartments Traction/ 6P 6/10/2018 Cabin Dwg ( Checking ) Mail - Lens

4 3085 Aswini Apartments Traction/ 6P 6/10/2018 Cabin Dwg ( Checking ) Mail - Lens
PRODUCTION DRAWING DETAILINGS RELEASED
1 3343 Venkatapathy assets MRL / 6P 5/10/2018 Cabin drawing,Production Purchase
details
Cabin drawing,Production
2 3464 Bhanumathi MRL / 6P 5/10/2018 Purchase
details
Cabin drawing,Production
3 3393 Balasubramaniam MRL / 6P 6/10/2018 details Purchase

WEEKLY PROGRESS REPORT


MURALI.M DATE: 08.10.2018 to 13.10.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Vaazhga Valamudan MRL/ 6P 8/10/2018 8/10/2018 SOPD Sales - Sivakumar

2 Sales Deivasikamani MRL/ 6P 9/10/2018 9/10/2018 SOPD Sales - Bangalore

3 Sales Ramaswamy Reddy Traction/ 6P 9/10/2018 9/10/2018 COPD Sales - Bangalore

4 Sales Ramaswamy Reddy MRL/ 6P 9/10/2018 9/10/2018 SOPD Sales - Bangalore

5 Sales Srinivasa Reddy MRL/ 6P 9/10/2018 9/10/2018 SOPD Sales - Bangalore

6 Sales Anantha Krishna MRL/ 6P 9/10/2018 9/10/2018 SOPD Sales - Bangalore


7 Sales Subramaniyam naidu MRL/ 6P 9/10/2018 9/10/2018 SOPD Sales - Bangalore

8 Sales Subramaniyam naidu Traction/ 6P 9/10/2018 9/10/2018 COPD Sales - Bangalore

9 Sales Mahantesh Traction/ 6P 9/10/2018 9/10/2018 SOPD Sales - Bangalore

10 Sales Mahantesh Traction/ 6P 9/10/2018 9/10/2018 SOPD Sales - Bangalore

11 Sales Thammana Gowda MRL/ 6P 9/10/2018 9/10/2018 COPD Sales - Bangalore

12 Sales Shivaram Traction/ 6P 9/10/2018 9/10/2018 SOPD Sales - Bangalore

13 Sales Krishnamurthy babu gowda Traction/ 6P 9/10/2018 9/10/2018 SOPD Sales - Bangalore

14 Sales Suresh babu gowda Traction/ 6P 9/10/2018 9/10/2018 SOPD Sales - Bangalore

15 Sales Anto MRL/ 6P 9/10/2018 9/10/2018 SOPD Sales - Bangalore

16 Sales Anto Traction/ 6P 9/10/2018 9/10/2018 COPD Sales - Bangalore

17 Sales Gopu Traction/ 6P 11/10/2018 11/10/2018 SOPD Sales-Harshavardhana

18 Sales Gopu Traction/ 6P 11/10/2018 11/10/2018 SOPD Sales-Harshavardhana

19 Sales Gopu MRL/ 6P 11/10/2018 11/10/2018 SOPD Sales-Harshavardhana

20 Sales Mohammad MRL/ 6P 11/10/2018 11/10/2018 SOPD Sales-Harshavardhana

21 Sales Mohammad Traction/ 6P 11/10/2018 11/10/2018 SOPD Sales-Harshavardhana

22 Sales Jayram Traction/ 6P 12/10/2018 12/10/2018 COPD Sales - Bangalore

23 Sales Jayram MRL/ 6P 12/10/2018 12/10/2018 SOPD Sales - Bangalore

24 Sales Rajesh MRL/ 6P 12/10/2018 12/10/2018 SOPD Sales - Bangalore

25 Sales RK Constructions MRL/ 13P 13/10/2018 13/10/2018 COPD Sales - Peter (G.M.)

26 Sales Ram mohan MRL/ 6P 13/10/2018 13/10/2018 SOPD Sales -Anburathinam


GENERAL ARRANGEMENT DRAWINGS RELEASED
1 3483 TG Properties Traction/ 6P 5/10/2018 12/10/2018 GAD (NEW) Erection

2 3490 Thapovanam Traction/ 6P 12/10/2018 12/10/2018 GAD (NEW) Erection

3 3481 Vijay Builders Traction/ 6P 5/10/2018 13/10/2018 GAD (NEW) Erection

PRODUCTION DRAWING DETAILINGS RELEASED


Cabin drawing,Production
1 3399 Raj Nahata MRL / 6P 8/10/2018 Purchase
details

2 3476 Firm Foundation Traction / 6P 10/10/2018 Cabin drawing,Production Purchase


details
Cabin drawing,Production
3 3478 Firm Foundation Traction / 6P 10/10/2018 Purchase
details
Cabin drawing,Production
4 3474 Ravikumar Traction / 6P 11/10/2018 details Purchase

5 3383 G.R. Promoters MRL / 6P 11/10/2018 Cabin drawing,Production Purchase


details
Cabin drawing,Production
6 3423 Mohi's Infrastructure MRL / 6P 12/10/2018 Purchase
details

WEEKLY PROGRESS REPORT


MURALI.M DATE: 15.10.2018 to 20.10.2018
SITE DETAIL PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Sai developers MRL/ 8P 19/10/2018 19/10/2018 COPD Sales - Bangalore

2 Sales Muniratnam Naidu MRL/ 6P 19/10/2018 19/10/2018 SOPD Sales - Bangalore

3 Sales Sivashankar (A) MRL/ 6P 19/10/2018 19/10/2018 SOPD Sales - Bangalore

4 Sales Sivashankar (B) MRL/ 6P 19/10/2018 19/10/2018 SOPD Sales - Bangalore

5 Sales Khan MRL/ 6P 19/10/2018 19/10/2018 SOPD Sales - Bangalore

6 Sales Fathelal Belt Drive/ 6P 19/10/2018 19/10/2018 SOPD Sales - Bangalore

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3480 Sri Rajalakshmi Mahal MRL/ 8P 5/10/2018 15/10/2018 GAD (NEW) Erection

2 3339 Beaver Constructions Traction/ 6P 12/10/2018 16/10/2018 GAD (NEW) Erection

3 3497 Firm Foundations MRL/ 6P 16/10/2018 17/10/2018 GAD (NEW) Erection

4 3489 Dhanalakshmi Shelters Traction/ 6P 15/10/2018 20/10/2018 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3465 Vasan Properties 17/10/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3445 Om muruga constructions 17/10/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3466 Suganthi 17/10/2018 Cabin Dwg ( Checking ) Mail - Lens


4 3467 Sampath Kumar 17/10/2018 Cabin Dwg ( Checking ) Mail - Lens

PRODUCTION DRAWING DETAILINGS RELEASED


Cabin drawing,Production
1 3497 Firm Foundations MRL / 6P 20/10/2018 details Purchase

WEEKLY PROGRESS REPORT


MURALI.M DATE: 22.10.2018 to 27.10.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Durgamath MRL/ 6P 23/10/2018 23/10/2018 SOPD Sales - Bangalore

2 Sales Azhar Khan MRL/ 6P 23/10/2018 23/10/2018 SOPD Sales - Bangalore

3 Sales Mallikarjun Traction/ 6P 23/10/2018 23/10/2018 COPD Sales - Bangalore

4 Sales Sohail Traction/ 6P 23/10/2018 23/10/2018 SOPD Sales - Bangalore

5 Sales Sohail MRL/ 6P 23/10/2018 23/10/2018 SOPD Sales - Bangalore

6 Sales Shastri MRL/ 6P 23/10/2018 23/10/2018 COPD Sales - Bangalore


7 Sales Jothi Architect MRL/ 8P 25/10/2018 25/10/2018 COPD,SOPD Sales-Harshavardhana

8 Sales Sundhar Traction/ 6P 26/10/2018 26/10/2018 SOPD Sales - Bangalore

9 Sales Sundhar Belt Drive/ 6P 26/10/2018 26/10/2018 SOPD Sales - Bangalore

10 Sales Phani Kumar Traction/ 6P 26/10/2018 26/10/2018 SOPD Sales - Bangalore

11 Sales Narayan Reddy MRL/ 6P 26/10/2018 26/10/2018 SOPD Sales - Bangalore

12 Sales Venkat Reddy Traction/ 6P 26/10/2018 26/10/2018 COPD Sales - Bangalore

13 Sales Mumtaza Ali Traction/ 6P 26/10/2018 26/10/2018 COPD Sales - Bangalore

14 Sales Mumtaza Ali MRL/ 6P 26/10/2018 26/10/2018 COPD Sales - Bangalore

15 Sales Muniyappa Traction/ 6P 26/10/2018 26/10/2018 COPD Sales - Bangalore

16 Sales Sai Sagar Catering Traction/ 6P 26/10/2018 26/10/2018 SOPD Sales - Bangalore

17 Sales Sri Sai Manjunatha Constructions MRL/ 6P 26/10/2018 26/10/2018 SOPD Sales - Bangalore

18 Sales Rubis Construction MRL/ 6P 26/10/2018 26/10/2018 SOPD Sales - Bangalore

19 Sales Rubis Construction MRL/ 8P 26/10/2018 26/10/2018 SOPD Sales - Bangalore

20 Sales Priya Constructions MRL/ 6P 26/10/2018 26/10/2018 SOPD Sales - Bangalore

21 Sales Jagadish Hotels (A) MRL/ 6P 26/10/2018 26/10/2018 COPD Sales - Bangalore

22 Sales Jagadish Hotels (B) MRL/ 6P 26/10/2018 26/10/2018 COPD Sales - Bangalore

23 Sales Jagadish Hotels (C) MRL/ 6P 26/10/2018 26/10/2018 COPD Sales - Bangalore

24 Sales Jagadish Hotels (D) MRL/ 6P 26/10/2018 26/10/2018 COPD Sales - Bangalore

25 Sales Ahmad Traction/ MRL/ 1000kg 26/10/2018 26/10/2018 IFG Sales - Bangalore
GENERAL ARRANGEMENT DRAWINGS RELEASED
1 3486 Gangadharan MRL/ 6P 9/10/2018 24/10/2018 GAD (NEW) Erection

2 3485 Rina Homes Traction/ 6P 9/10/2018 25/10/2018 GAD (NEW) Erection

3 3491 The Nest Traction/ 6P 16/10/2018 25/10/2018 GAD (NEW) Erection

4 3495 Aakkash Builders MRL/ 6P 15/10/2018 26/10/2018 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3424 Mohi's Infrastructure 22/10/2018 Cabin Dwg ( Checking ) Mail - Lens

2 3478 Firm Foundations 23/10/2018 Cabin Dwg ( Checking ) Mail - Lens

3 3476 Firm Foundations 23/10/2018 Cabin Dwg ( Checking ) Mail - Lens

4 3441 Megha Promoters 23/10/2018 Cabin Dwg ( Checking ) Mail - Lens

5 3218 Tasneem Kapasi 24/10/2018 Cabin Dwg ( Checking ) Mail - Lens

6 BEL-226 Mallika Bhanu 27/10/2018 Cabin Dwg ( Checking ) Mail-Stalwart

7 BEL-224 Charan's Public school 27/10/2018 Cabin Dwg ( Checking ) Mail-Stalwart

PRODUCTION DRAWING DETAILINGS RELEASED


Cabin drawing,Production
1 3119 Venkatasubramaniam MRL / 6P 22/10/2018 Purchase
details
Cabin drawing,Production
2 3120 M F Vruksha foundations MRL / 6P 23/10/2018 details Purchase

3 3490 Thapovanam Traction / 6P 24/10/2018 Cabin drawing Purchase

Cabin drawing,Production
4 PEL-049 Bharani Enterprises MRL / 6P 25/10/2018 Purchase
details
WEEKLY PROGRESS REPORT
MURALI.M DATE: 29.10.2018 to 03.11.2018

SITE DETAIL
RECEIVING RECEIVING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Ahmad Traction/ 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore

2 Sales Ahmad MRL/ 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore

3 Sales SKEN MRL/ 6P 30/10/2018 30/10/2018 SOPD Sales - Bangalore

4 Sales SKEN BELT DRIVE/ 6P 30/10/2018 30/10/2018 SOPD Sales - Bangalore

5 Sales Hari (1) Traction/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore

6 Sales Hari (1) MRL/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore

7 Sales Hari (2) Traction/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore

8 Sales Hari (2) MRL/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore

9 Sales Magesh Babu MRL / 8P / 10P 2/11/2018 2/11/2018 COPD Sales - Arjun

10 Sales Magesh Babu Traction / 8P / 10P 2/11/2018 2/11/2018 COPD Sales - Arjun
11 Sales Sankalp Builders MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore

12 Sales Prasad MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore

13 Sales Muniraj MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore

14 Sales Srinivas Reddy MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore

15 Sales Moula Sahib MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore

16 Sales Kushal MRL/ 6P 3/11/2018 3/11/2018 COPD Sales - Bangalore

17 Sales Lakshmana MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore

18 Sales Nalini Devi MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore

19 Sales Shekhar Reddy (A) Traction/ MRL/ 6P 3/11/2018 3/11/2018 SOPD,SOPD Sales - Bangalore

20 Sales Shekhar Reddy (B) Traction/ MRL/ 6P 3/11/2018 3/11/2018 SOPD,SOPD Sales - Bangalore

21 Sales Shekhar Reddy (C) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore

22 Sales Shekhar Reddy (D) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore

23 Sales Shekhar Reddy (E) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore

24 Sales Shekhar Reddy (F) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3378 Raghavendra Constructions Traction/ 6P 16/10/2018 29/10/2018 GAD (NEW) Erection

2 3492 The Nest Traction/ 6P 16/10/2018 30/10/2018 GAD (NEW) Erection

3 3498 Moorthy Traction/ 6P 13/10/2018 30/10/2018 GAD (NEW) Erection

4 3496 Balasubramaniam MRL/ 6P 17/10/2018 31/10/2018 GAD (NEW) Erection


5 3500 Dhayanithi Traction/ 6P 29/10/2018 1/11/18 GAD (NEW) Erection

6 3499 Paneer Selvam Traction/ 6P 27/10/2018 1/11/18 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3393 Balasubramaniam 31/10/2018 Cabin Dwg ( Checking ) Mail - Unison

2 3399 Raj Nahata 31/10/2018 Cabin Dwg ( Checking ) Mail - Unison

3 PEL-049 Bharani Enterprises 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison

4 3385 Velmurugan 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison

5 3482 K2 Engineering 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison

6 3475 Srivatsan 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison

7 3438 Manickavasakam 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison

8 3383 G R Promoters 1/11/2018 Cabin Dwg ( Checking ) Mail - Lens

9 3406 Guru Builders 1/11/2018 Cabin Dwg ( Checking ) Mail - Lens

10 3374 Gopi Damodaran 3/11/2018 Cabin Dwg ( Checking ) Mail - Unison

WEEKLY PROGRESS REPORT


MURALI.M DATE: 05.11.2018 to 10.11.2018
SITE DETAIL PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE
ERECTION
SALES ENQUIRY RELEASED
1 Sales Ahmad Traction/ 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
2 Sales Ahmad MRL/ 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
3 Sales SKEN MRL/ 6P 30/10/2018 30/10/2018 SOPD Sales - Bangalore
4 Sales SKEN BELT DRIVE/ 6P 30/10/2018 30/10/2018 SOPD Sales - Bangalore
5 Sales Hari (1) Traction/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
6 Sales Hari (1) MRL/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
7 Sales Hari (2) Traction/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
8 Sales Hari (2) MRL/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
9 Sales Magesh Babu MRL / 8P / 10P 2/11/2018 2/11/2018 COPD Sales - Arjun
10 Sales Magesh Babu Traction / 8P / 10P 2/11/2018 2/11/2018 COPD Sales - Arjun
11 Sales Sankalp Builders MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
12 Sales Prasad MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
13 Sales Muniraj MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
14 Sales Srinivas Reddy MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
15 Sales Moula Sahib MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
16 Sales Kushal MRL/ 6P 3/11/2018 3/11/2018 COPD Sales - Bangalore
17 Sales Lakshmana MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
18 Sales Nalini Devi MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
19 Sales Shekhar Reddy (A) Traction/ MRL/ 6P 3/11/2018 3/11/2018 SOPD,SOPD Sales - Bangalore
20 Sales Shekhar Reddy (B) Traction/ MRL/ 6P 3/11/2018 3/11/2018 SOPD,SOPD Sales - Bangalore
21 Sales Shekhar Reddy (C) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore
22 Sales Shekhar Reddy (D) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore
23 Sales Shekhar Reddy (E) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore
24 Sales Shekhar Reddy (F) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3378 Raghavendra Constructions Traction/ 6P 16/10/2018 29/10/2018 GAD (NEW) Erection
2 3492 The Nest Traction/ 6P 16/10/2018 30/10/2018 GAD (NEW) Erection
3 3498 Moorthy Traction/ 6P 13/10/2018 30/10/2018 GAD (NEW) Erection
4 3496 Balasubramaniam MRL/ 6P 17/10/2018 31/10/2018 GAD (NEW) Erection
5 3500 Dhayanithi Traction/ 6P 29/10/2018 1/11/2018 GAD (NEW) Erection
6 3499 Paneer Selvam Traction/ 6P 27/10/2018 1/11/2018 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3393 Balasubramaniam 31/10/2018 Cabin Dwg ( Checking ) Mail - Unison
2 3399 Raj Nahata 31/10/2018 Cabin Dwg ( Checking ) Mail - Unison
3 PEL-049 Bharani Enterprises 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison
4 3385 Velmurugan 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison
5 3482 K2 Engineering 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison
6 3475 Srivatsan 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison
7 3438 Manickavasakam 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison
8 3383 G R Promoters 1/11/2018 Cabin Dwg ( Checking ) Mail - Lens
9 3406 Guru Builders 1/11/2018 Cabin Dwg ( Checking ) Mail - Lens
10 3374 Gopi Damodaran 3/11/2018 Cabin Dwg ( Checking ) Mail - Unison

WEEKLY PROGRESS REPORT


MURALI.M DATE: 12.11.2018 to 17.11.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION
SALES ENQUIRY RELEASED
1 Sales Ahmad Traction/ 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
2 Sales Ahmad MRL/ 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
3 Sales SKEN MRL/ 6P 30/10/2018 30/10/2018 SOPD Sales - Bangalore
4 Sales SKEN BELT DRIVE/ 6P 30/10/2018 30/10/2018 SOPD Sales - Bangalore
5 Sales Hari (1) Traction/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
6 Sales Hari (1) MRL/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
7 Sales Hari (2) Traction/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
8 Sales Hari (2) MRL/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
9 Sales Magesh Babu MRL / 8P / 10P 2/11/2018 2/11/2018 COPD Sales - Arjun
10 Sales Magesh Babu Traction / 8P / 10P 2/11/2018 2/11/2018 COPD Sales - Arjun
11 Sales Sankalp Builders MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
12 Sales Prasad MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
13 Sales Muniraj MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
14 Sales Srinivas Reddy MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
15 Sales Moula Sahib MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
16 Sales Kushal MRL/ 6P 3/11/2018 3/11/2018 COPD Sales - Bangalore
17 Sales Lakshmana MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
18 Sales Nalini Devi MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
19 Sales Shekhar Reddy (A) Traction/ MRL/ 6P 3/11/2018 3/11/2018 SOPD,SOPD Sales - Bangalore
20 Sales Shekhar Reddy (B) Traction/ MRL/ 6P 3/11/2018 3/11/2018 SOPD,SOPD Sales - Bangalore
21 Sales Shekhar Reddy (C) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore
22 Sales Shekhar Reddy (D) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore
23 Sales Shekhar Reddy (E) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore
24 Sales Shekhar Reddy (F) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3378 Raghavendra Constructions Traction/ 6P 16/10/2018 29/10/2018 GAD (NEW) Erection
2 3492 The Nest Traction/ 6P 16/10/2018 30/10/2018 GAD (NEW) Erection
3 3498 Moorthy Traction/ 6P 13/10/2018 30/10/2018 GAD (NEW) Erection
4 3496 Balasubramaniam MRL/ 6P 17/10/2018 31/10/2018 GAD (NEW) Erection
5 3500 Dhayanithi Traction/ 6P 29/10/2018 1/11/2018 GAD (NEW) Erection
6 3499 Paneer Selvam Traction/ 6P 27/10/2018 1/11/2018 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3393 Balasubramaniam 31/10/2018 Cabin Dwg ( Checking ) Mail - Unison
2 3399 Raj Nahata 31/10/2018 Cabin Dwg ( Checking ) Mail - Unison
3 PEL-049 Bharani Enterprises 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison
4 3385 Velmurugan 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison
5 3482 K2 Engineering 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison
6 3475 Srivatsan 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison
7 3438 Manickavasakam 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison
8 3383 G R Promoters 1/11/2018 Cabin Dwg ( Checking ) Mail - Lens
9 3406 Guru Builders 1/11/2018 Cabin Dwg ( Checking ) Mail - Lens
10 3374 Gopi Damodaran 3/11/2018 Cabin Dwg ( Checking ) Mail - Unison

WEEKLY PROGRESS REPORT


MURALI.M DATE: 19.11.2018 to 24.11.2018
SITE DETAIL
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION
SALES ENQUIRY RELEASED
1 Sales Ahmad Traction/ 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
2 Sales Ahmad MRL/ 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
3 Sales SKEN MRL/ 6P 30/10/2018 30/10/2018 SOPD Sales - Bangalore
4 Sales SKEN BELT DRIVE/ 6P 30/10/2018 30/10/2018 SOPD Sales - Bangalore
5 Sales Hari (1) Traction/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
6 Sales Hari (1) MRL/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
7 Sales Hari (2) Traction/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
8 Sales Hari (2) MRL/ 6P / 8P 30/10/2018 30/10/2018 COPD Sales - Bangalore
9 Sales Magesh Babu MRL / 8P / 10P 2/11/2018 2/11/2018 COPD Sales - Arjun
10 Sales Magesh Babu Traction / 8P / 10P 2/11/2018 2/11/2018 COPD Sales - Arjun
11 Sales Sankalp Builders MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
12 Sales Prasad MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
13 Sales Muniraj MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
14 Sales Srinivas Reddy MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
15 Sales Moula Sahib MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
16 Sales Kushal MRL/ 6P 3/11/2018 3/11/2018 COPD Sales - Bangalore
17 Sales Lakshmana MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
18 Sales Nalini Devi MRL/ 6P 3/11/2018 3/11/2018 SOPD Sales - Bangalore
19 Sales Shekhar Reddy (A) Traction/ MRL/ 6P 3/11/2018 3/11/2018 SOPD,SOPD Sales - Bangalore
20 Sales Shekhar Reddy (B) Traction/ MRL/ 6P 3/11/2018 3/11/2018 SOPD,SOPD Sales - Bangalore
21 Sales Shekhar Reddy (C) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore
22 Sales Shekhar Reddy (D) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore
23 Sales Shekhar Reddy (E) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore
24 Sales Shekhar Reddy (F) Traction/ MRL/ 6P 3/11/2018 3/11/2018 COPD,SOPD Sales - Bangalore

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3378 Raghavendra Constructions Traction/ 6P 16/10/2018 29/10/2018 GAD (NEW) Erection
2 3492 The Nest Traction/ 6P 16/10/2018 30/10/2018 GAD (NEW) Erection
3 3498 Moorthy Traction/ 6P 13/10/2018 30/10/2018 GAD (NEW) Erection
4 3496 Balasubramaniam MRL/ 6P 17/10/2018 31/10/2018 GAD (NEW) Erection
5 3500 Dhayanithi Traction/ 6P 29/10/2018 1/11/2018 GAD (NEW) Erection
6 3499 Paneer Selvam Traction/ 6P 27/10/2018 1/11/2018 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3393 Balasubramaniam 31/10/2018 Cabin Dwg ( Checking ) Mail - Unison
2 3399 Raj Nahata 31/10/2018 Cabin Dwg ( Checking ) Mail - Unison
3 PEL-049 Bharani Enterprises 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison
4 3385 Velmurugan 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison
5 3482 K2 Engineering 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison
6 3475 Srivatsan 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison
7 3438 Manickavasakam 1/11/2018 Cabin Dwg ( Checking ) Mail - Unison
8 3383 G R Promoters 1/11/2018 Cabin Dwg ( Checking ) Mail - Lens
9 3406 Guru Builders 1/11/2018 Cabin Dwg ( Checking ) Mail - Lens
10 3374 Gopi Damodaran 3/11/2018 Cabin Dwg ( Checking ) Mail - Unison
WEEKLY PROGRESS REPORT
MURALI.M DATE: 26.11.2018 to 01.12.2018
SITE DETAIL PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Hotel Sangeetha Dumbwaiter/ 300kg 11/26/2018 11/26/2018 IFG Sales - Sivakumar

Sales - Virender
2 Sales Dr. Raman MRL/ 6P 11/27/2018 11/27/2018 SOPD
Chopra

3 Sales Prop Shell MRL/ 6P 11/27/2018 11/27/2018 SOPD Sales - Sivakumar

4 Sales Prop Shell Traction/ 6P 11/27/2018 11/27/2018 SOPD Sales - Sivakumar

5 Sales Pandian MRL/ 6P 11/28/2018 11/28/2018 SOPD Sales - Bangalore

6 Sales Sandhya MRL/ 6P 11/28/2018 11/28/2018 SOPD Sales - Bangalore

7 Sales Baskar Sakunthala MRL/ 6P 11/27/2018 11/27/2018 SOPD Sales - Sivakumar

8 Sales Venkatesan Traction/ 6P 11/28/2018 11/28/2018 SOPD Sales - Sivakumar

9 Sales Lakshmi apartments (1) MRL/ 6P 11/29/2018 11/29/2018 COPD Sales - Sivakumar

10 Sales Lakshmi apartments (2) MRL/ 6P 11/29/2018 11/29/2018 COPD Sales - Sivakumar

11 Sales Lakshmi apartments (3) MRL/ 6P 11/29/2018 11/29/2018 COPD Sales - Sivakumar

12 Sales Firm foundation MRL/ Traction / 6P 11/30/2018 11/30/2018 COPD Sales - MD

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3513 Venkatapathy Asset MRL/ 6P 11/24/2018 11/26/2018 GAD (NEW) Erection

2 3507 Sundeep builders MRL/ 6P 11/16/2018 11/26/2018 GAD (NEW) Erection

3 3506 Saraswathi MRL/ 6P 11/17/2018 11/27/2018 GAD (NEW) Erection

4 3512 Adithya Builders Traction/ 6P 11/22/2018 11/28/2018 GAD (NEW) Erection

5 3472 Empire estates MRL/ 6P 10/21/2018 12/1/2018 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3473 Suresh Kumar 11/27/2018 Cabin Dwg ( Checking ) Mail - Unison

2 3469 Haridoss 11/27/2018 Cabin Dwg ( Checking ) Mail - Unison

3 3499 Paneer Selvam 11/27/2018 Cabin Dwg ( Checking ) Mail - Unison

4 3471 Loganathan Agarbathigal 11/27/2018 Cabin Dwg ( Checking ) Mail - Unison

5 3430 Bhuvaneshwari Constructions 11/28/2018 Cabin Dwg ( Checking ) Mail - Lens

6 3380 JK constructions 11/28/2018 Cabin Dwg ( Checking ) Mail - Lens

7 3451 Mohi Foundations 11/28/2018 Cabin Dwg ( Checking ) Mail - Lens

WEEKLY PROGRESS REPORT


MURALI.M DATE: 03.12.2018 to 08.12.2018
SITE DETAIL PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales P.S.Dhanunjaya MRL/ 6P 12/3/2018 12/3/2018 SOPD Sales - Bangalore

2 Sales Srinivasreddy MRL/6P 12/3/2018 12/3/2018 SOPD Sales - Bangalore

3 Sales Siddegowda Traction/ 6P 12/5/2018 12/5/2018 SOPD Sales - Bangalore

4 Sales Siddegowda MRL/ 6P 12/5/2018 12/5/2018 SOPD Sales - Bangalore

5 Sales Rajashekar MRL/ 6P 12/5/2018 12/5/2018 SOPD Sales - Bangalore

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3514 Rahul associates Traction/ 6P 11/29/2018 12/3/2018 GAD (NEW) Erection

2 3515 V P Sengottuvel MRL/ 6P 11/29/2018 12/4/2018 GAD (NEW) Erection

3 3339/01 Beaver Constructions MRL/ 6P 11/3/2018 12/5/2018 GAD (NEW) Erection

PRODUCTION DRAWING DETAILINGS RELEASED


Cabin drawing,Production
1 3414 Nahar Foundation MRL/ 6P 12/3/2018 details Purchase

2 3468 Sai Sundari Shelters Traction/ 6P 12/6/2018 Cabin drawing Purchase


WEEKLY PROGRESS REPORT
MURALI.M DATE: 10.12.2018 to 15.12.2018
SITE DETAIL
RECEIVING RECEIVING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Lakshminarasimman Traction/ 6P 12/13/2018 12/13/2018 MOSD Sales - Sivakumar

2 Sales Sri Vinoth builders Traction/ 6P 12/13/2018 12/13/2018 MOMS Sales - Sivakumar

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3517 Vaibhav homes Traction/ 6P 12/7/2018 12/11/2018 GAD (NEW) Erection

2 3518 Vaibhav homes Traction/ 6P 12/7/2018 12/12/2018 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3433 Rite choice Foundation 12/10/2018 Cabin Dwg ( Checking ) Mail - Unison

2 3463 Ravi 12/13/2018 Cabin Dwg ( Checking ) Mail - Lens

PRODUCTION DRAWING DETAILING RELEASED


1 BEL-228 Ramachandraiah Traction/ 6P 12/11/2018 Cabin drawing Purchase
Cabin drawing,Production
2 3442 Caasa Foundation MRL/ 6P 12/14/2018 details Purchase

WEEKLY PROGRESS REPORT


MURALI.M DATE: 17.12.2018 to 22.12.2018
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SUBMITTED REMARKS
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Inderchaji MRL/ 1TON 12/17/2018 12/17/2018 SOPD Sales - Bangalore
2 Sales Sri Vinoth builders Traction/ 6P 12/13/2018 12/13/2018 MOMS Sales - Sivakumar

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3517 Vaibhav homes Traction/ 6P 12/7/2018 12/11/2018 GAD (NEW) Erection
2 3518 Vaibhav homes Traction/ 6P 12/7/2018 12/12/2018 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3481 Vijay Builders 12/17/2018 Cabin Dwg ( Checking ) Mail - Lens
2 3455 Sri Builders 12/17/2018 Cabin Dwg ( Checking ) Mail - Lens
3 3468 Sai Sundari Shelters 12/17/2018 Cabin Dwg ( Checking ) Mail - Lens
4 3426 Ramesh Shanmuga Sundaram 12/18/2018 Cabin Dwg ( Checking ) Mail - Lens
5 3120 MF Vruksha Foundation 12/18/2018 Cabin Dwg ( Checking ) Mail - Lens
6 3495 Aakkash Builders 12/18/2018 Cabin Dwg ( Checking ) Mail - Lens
7 3491 The Nest 12/19/2018 Cabin Dwg ( Checking ) Mail - Stalwart
8 3414 Nahar Foundations 12/19/2018 Cabin Dwg ( Checking ) Mail - Stalwart
9 3480 Rajalakshmi Mahal 12/20/2018 Cabin Dwg ( Checking ) Mail - Unison
10 3498 Moorthy 12/20/2018 Cabin Dwg ( Checking ) Mail - Unison

PRODUCTION DRAWING DETAILING RELEASED


1 BEL-228 Ramachandraiah Traction/ 6P 12/11/2018 Cabin drawing Purchase
2 3442 Caasa Foundation MRL/ 6P 12/14/2018 Cabin drawing,Production Purchase
details
WEEKLY PROGRESS REPORT
MURALI.M DATE: 07.01.2019 to 12.01.2019

SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

SALES ENQUIRY RELEASED


1 Sales Anjan Ashok kumar MRL/ 8P 1/7/2019 1/7/2019 COPD Sales - Bangalore

2 Sales Anjan Ashok kumar MRL/ 6P 1/7/2019 1/7/2019 COPD Sales - Bangalore

3 Sales Eshas Enterprises MRL/ 8P 1/7/2019 1/7/2019 COPD Sales - Bangalore

4 Sales Eshas Enterprises MRL/ 6P 1/7/2019 1/7/2019 COPD Sales - Bangalore

5 Sales Thimmappa MRL/ 6P 1/7/2019 1/7/2019 SOPD Sales - Bangalore

6 Sales Maheshwar MRL/ 6P 1/7/2019 1/7/2019 SOPD Sales - Bangalore

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3525 Gunasekaran MRL/6P 12/27/2018 1/7/2019 GAD (NEW) Erection
2 3529 Malathy constructions Traction/ 6P 12/28/2018 1/8/2019 GAD (NEW) Erection

3 3530 Malathy constructions Traction/ 6P 12/28/2018 1/8/2019 GAD (NEW) Erection

4 3531 Usha Varatharjan MRL/6P 12/29/2018 1/9/2019 GAD (NEW) Erection

5 3535 Gangadharan Traction/ 6P 12/29/2018 1/9/2019 GAD (NEW) Erection

6 BEL-225 Vidhya K Murthi Traction/ 6P 1/8/2019 1/10/2019 GAD (REVISED) Bangalore

CABIN RECHECK & CONFIRMATION


1 3454 Ashok 1/10/2019 Cabin Dwg ( Checking ) Mail - Unison

2 3444 Sankaranarayanan 1/10/2019 Cabin Dwg ( Checking ) Mail - Lens

3 3442 Caasa Foundation 1/10/2019 Cabin Dwg ( Checking ) Mail - Lens

4 3377 Sri raghavendra 1/10/2019 Cabin Dwg ( Checking ) Mail - Lens

5 3378 Sri raghavendra 1/10/2019 Cabin Dwg ( Checking ) Mail - Lens

6 3483 TG Properties 1/10/2019 Cabin Dwg ( Checking ) Mail - Lens

7 BEL-228 Ramachandraiah 1/11/2019 Cabin Dwg ( Checking ) Mail - Stalwart

PRODUCTION DRAWING DETAILING RELEASED


Cabin drawing,Production
1 3511 Mohan Kumar BELT/ 6P 1/11/2019 Purchase
details

2 3539 T J Anandhi Traction/ 6P 1/11/2019 Cabin drawing Purchase

3 3500 Dhayanithi Traction/ 6P 1/11/2019 Cabin drawing Purchase

Cabin drawing,Production
4 3339 Beaver Constructions MRL/ 6P 1/12/2019 Purchase
details
5 3504 Mabel Builders Traction/ 6P 1/12/2019 Cabin drawing Purchase

WEEKLY PROGRESS REPORT


MURALI.M DATE: 14.01.2019 to 19.01.2019
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SUBMITTED REMARKS
DATE
ERECTION

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3542 KAY EM Hotel BELT/8P 1/7/2019 1/14/2019 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3539 T J Anandhi 1/18/2019 Cabin Dwg ( Checking ) Mail - Unison

2 3511 Mohan Kumar 1/18/2019 Cabin Dwg ( Checking ) Mail - Unison

3 3500 Dhayanithi 1/18/2019 Cabin Dwg ( Checking ) Mail - Unison

4 3503 J P Homes 1/19/2019 Cabin Dwg ( Checking ) Mail - Unison


PRODUCTION DRAWING DETAILING RELEASED
1 3395 Aarthi Scans Traction/ 6P 1/19/2019 Cabin drawing Purchase

2 3425 Fourcee Housing Traction/ 6P 1/19/2019 Cabin drawing Purchase

Cabin drawing,Production
3 3496 Balasubramanian MRL/ 6P 1/19/2019 details Purchase

WEEKLY PROGRESS REPORT


MURALI.M DATE: 21.01.2019 to 26.01.2019

SITE DETAIL PRODUCTION


RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

SALES ENQUIRY RELEASED


1 Sales Medway Hospital MRL/ 6P 1/21/2019 1/21/2019 SOPD, MOSD Sales - Anburathinam

2 Sales Salai MRL/ 6P 1/21/2019 1/21/2019 SOPD Sales - Anburathinam

3 Sales Subramani MRL/ 8P 1/22/2019 1/22/2019 SOPD Sales - Nebish

4 Sales Bhargav Group Traction/ 6P 1/22/2019 1/22/2019 SOPD Sales - Sivakumar

5 Sales Siddarth Home Lift 1/23/2019 1/23/2019 SOPD Sales - Sivakumar


6 Sales Srikanth Home Lift 1/23/2019 1/23/2019 Swing Sales - Virender

7 Sales Ramar Anith BEDLIFT/ 16P 1/24/2019 1/24/2019 SOPD Sales - Sivakumar

8 Sales Urban Dot MRL/ 6P 1/24/2019 1/24/2019 SOPD Sales - Arjun

9 Sales Keshavan MRL/ 16P 1/24/2019 1/24/2019 COPD Sales - Sivakumar

10 Sales Canberra House MRL/ 10P 1/24/2019 1/24/2019 SOPD Sales - Sivakumar

11 Sales VB Consultancy Home Lift 1/25/2019 1/25/2019 SOPD Sales - Sivakumar

12 Sales ESP Engineering components Dumbwaiter/ 300kg 1/25/2019 1/25/2019 Vertical Biparting Sales - Sivakumar

13 Sales Vignesh Polymers GOODS/ 1TON 1/26/2019 1/26/2019 IFG Sales - Nebish

14 Sales Firm Foundations BELT/ 6P 1/26/2019 1/26/2019 SOPD Sales - MD

15 Sales Cholan Constructions Traction/ 6P 1/26/2019 1/26/2019 COPD, MOSD Sales - Sivakumar

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3544 Brakes India GOODS/5 TON 1/9/2019 1/23/2019 GAD (NEW) Erection

2 3545 Brakes India GOODS/5 TON 1/9/2019 1/23/2019 GAD (NEW) Erection

2 3545 Brakes India MRL/13P 1/9/2019 1/23/2019 GAD (NEW) Erection

3 3354 Thilagar Traction/ 6P 12/7/2018 1/21/2019 GAD (CHECKING) Erection

4 3547 Dhilip Kumar MRL/6P 12/28/2018 1/24/2019 GAD (CHECKING) Erection

5 3543 Vijay Kumar MRL/6P 12/28/2018 1/25/2019 GAD (CHECKING) Erection

6 3528 Janaki Srinivas Seshan BELT/6P 12/29/2018 1/25/2019 GAD (NEW) Erection
PRODUCTION DRAWING DETAILING RELEASED
1 3525 Gunasekaran MRL/ 6P 1/21/2019 Cabin drawing,Production Purchase
details (CHECKING)
Cabin drawing,Production
2 3513 Venkatapathy Asset MRL/ 6P 1/21/2019 Purchase
details

3 3492 The Nest Traction/ 6P 1/21/2019 Cabin drawing Purchase

4 3477 Firm Foundations Traction/ 6P 1/21/2019 Cabin drawing,Production Purchase


details (CHECKING)
Cabin drawing,Production
5 3542 KAY EM Luxury hotels BELT/ 8P 1/24/2019 Purchase
details

6 3470 Sugantha Nandakumar Traction/ 6P 1/26/2019 Cabin drawing (CHECKING) Purchase

WEEKLY PROGRESS REPORT


MURALI.M DATE: 28.01.2019 to 02.02.2019
SITE DETAIL PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

1 Sales Mobismart GOODS/ 1TON 1/28/2019 1/28/2019 COPD Sales - Anburathinam

2 Sales Venkatesan Traction/ 6P 1/28/2019 1/28/2019 COPD Sales - Sivakumar

3 Sales Raja MRL/ 6P 1/28/2019 1/28/2019 SOPD Sales-Harshavardhana


4 Sales Raja Home Lift 1/28/2019 1/28/2019 SOPD Sales-Harshavardhana

5 Sales Raja MRL/ 6P 1/28/2019 1/28/2019 SOPD Sales-Harshavardhana

6 Sales Natesan Institute Traction/ 6P 1/29/2019 1/29/2019 COPD Sales - Sivakumar

7 Sales Creations Home Lift 1/29/2019 1/29/2019 Swing Sales - Virender

8 Sales Sudha Home Lift 1/30/2019 1/30/2019 Swing Sales - Virender

9 Sales Himalaya Builders Traction/ 6P 1/30/2019 1/30/2019 IFG, COPD Sales-Harshavardhana

10 Sales Prime life space MRL/ 16P 1/31/2019 1/31/2019 COPD Sales - MD

11 Sales Prime life space MRL/ 10P 1/31/2019 1/31/2019 COPD Sales - MD

12 Sales Prime life space MRL/ 10P 1/31/2019 1/31/2019 SOPD Sales - MD

13 Sales Prime life space Dumbwaiter/ 550Kg 1/31/2019 1/31/2019 Vertical Biparting Sales - MD

14 Sales Yuva Homes MRL/ 10P 2/1/2019 2/1/2019 COPD Sales - MD

15 Sales Yuva Homes Bedlift/ 16P 2/1/2019 2/1/2019 SOPD Sales - MD

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3524 Usha Traction/ 6P 1/8/2019 1/28/2019 GAD (CHECKING) Erection

2 3533 Ponnurangam MRL/8P 1/8/2019 1/28/2019 GAD (CHECKING) Erection

3 3532 Ponnurangam &others Traction/ 6P 1/9/2019 1/29/2019 GAD (CHECKING) Erection

4 3537 Ponnurangam & Gangadharan Traction/ 6P 1/8/2019 1/29/2019 GAD (CHECKING) Erection

5 3538 Ponnurangam & Gangadharan Traction/ 6P 1/8/2019 1/30/2019 GAD (CHECKING) Erection

6 3548 Greenwich Constructions Traction/ 6P 1/18/2019 1/30/2019 GAD (CHECKING) Erection


7 3541 Sri Abirami Constructions Traction/ 6P 1/13/2019 1/30/2019 GAD (CHECKING) Erection

8 3551 Shivaa Homes Traction/ 6P 1/25/2019 31-02-2019 GAD (CHECKING) Erection

9 3553 Arun Kumar Traction/ 6P 1/25/2019 2/1/2019 GAD (CHECKING) Erection

10 3484 Venkateshwaran Traction/ 6P 1/25/2019 2/2/2019 GAD (CHECKING) Erection

CABIN RECHECK & CONFIRMATION


1 3395 Aarthi Scans 1/29/2019 Cabin Dwg ( Checking ) Mail - Stalwart

2 3496 Balasubramanian 1/30/2019 Cabin Dwg ( Checking ) Mail - Stalwart

3 3425 Fourcee 1/30/2019 Cabin Dwg ( Checking ) Mail - Stalwart

4 3477 Firm Foundations 1/30/2019 Cabin Dwg ( Checking ) Mail - Stalwart

5 3492 The Nest 1/30/2019 Cabin Dwg ( Checking ) Mail - Stalwart

PRODUCTION DRAWING DETAILING RELEASED


1 3344 Ravichandran Traction/ 6P 1/28/2019 Cabin drawing (CHECKING) Purchase

2 BEL-225 Vidya K Murthi Traction/ 6P 1/29/2019 Cabin drawing (CHECKING) Purchase

3 3520 Eeshani Builders MRL/ 6P 1/29/2019 Cabin drawing (CHECKING) Purchase

4 3338 Beaver Constructions Traction/ 6P 1/30/2019 Cabin drawing (CHECKING) Purchase

5 3458 Sumangali Properties Traction/ 6P 1/30/2019 Cabin drawing (CHECKING) Purchase

6 3331 Swanag Enterprises Traction/ 6P 1/31/2019 Cabin drawing (CHECKING) Purchase

7 3332 Swanag Enterprises Traction/ 6P 1/31/2019 Cabin drawing (CHECKING) Purchase


8 3333 Swanag Enterprises Traction/ 6P 1/31/2019 Cabin drawing (CHECKING) Purchase

9 3453 Bhavam Engineering GOODS/ 1TON 2/1/2019 Cabin drawing,Production Purchase


details
Cabin drawing,Production
10 3515 V P Sengottuvel MRL/ 6P 2/1/2019 Purchase
details (CHECKING)

11 3529 Malathy Constructions Traction/ 6P 2/2/2019 Cabin drawing (CHECKING) Purchase

WEEKLY PROGRESS REPORT


MURALI.M DATE: 04.02.2019 to 09.02.2019

SITE DETAIL PRODUCTION


RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

1 Sales Vasudeva Enterprises Traction/ 6P 2/4/2019 2/4/2019 SOPD Sales - MD

2 Sales Vignesh Polymers GOODS/ 1TON 2/4/2019 2/4/2019 IFG Sales - Nebish

3 Sales Arunachalapuram Nadar MRL/ 10P 2/4/2019 2/4/2019 COPD Sales - Anburathinam

4 Sales Vivekanandan Traction/ 6P 2/5/2019 2/5/2019 COPD Sales - Anburathinam

5 Sales Kumar Builders (1) (2) MRL/ 6P 2/5/2019 2/5/2019 SOPD Sales -Sivakumar

6 Sales Navkar metals Traction/ 10P 2/5/2019 2/5/2019 MOSD Sales - Virender
7 Sales Divya Construction MRL/ 8P 2/5/2019 2/5/2019 SOPD Sales - Anburathinam

8 Sales Sathish MRL/ 6P 2/6/2019 2/6/2019 SOPD Sales - MD

9 Sales Arunachalapuram Nadar MRL/ 16P 2/6/2019 2/6/2019 SOPD Sales-Anburathinam

10 Sales Aarthi scans Gearless/ 13P 2/6/2019 2/6/2019 SOPD Sales -Sivakumar

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3528/01 Greenwich Constructions Traction/ 6P 1/31/2019 2/8/2019 GAD (CHECKING) Erection

2 3549 Gani Traction/ 6P 1/30/2019 2/8/2019 GAD (CHECKING) Erection

3 3564 Kasturi Raj & Mala Raj Traction/ 6P 2/7/2019 2/9/2019 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3520 Eeshani Builders 2/6/2019 Cabin Dwg ( Checking ) Mail - Stalwart

2 3529 Malathy Constructions 2/6/2019 Cabin Dwg ( Checking ) Mail - Stalwart

3 3458 Sumangali Properties 2/6/2019 Cabin Dwg ( Checking ) Mail - Stalwart

4 3331 Swanag 2/8/2019 Cabin Dwg ( Checking ) Mail - Stalwart

5 3332 Swanag 2/8/2019 Cabin Dwg ( Checking ) Mail - Stalwart

6 3333 Swanag 2/8/2019 Cabin Dwg ( Checking ) Mail - Stalwart

PRODUCTION DRAWING DETAILING RELEASED


1 3305 Sri Abirami Foundation Traction/ 6P 2/4/2019 Cabin drawing (CHECKING) Purchase

2 3526 New Chennai Turret Traction/ 6P 2/4/2019 Cabin drawing (CHECKING) Purchase

Cabin drawing,Production
3 3510 Kumar Gandhi MRL/ 6P 2/6/2019 details (CHECKING) Purchase
4 3502 Ram Builders MRL/ 8P 2/9/2019 Cabin drawing,Production Purchase
details (CHECKING)

5 3514 Rahul Associates Traction/ 6P 2/9/2019 Cabin drawing (CHECKING) Purchase

6 3537 Ponnurangam & Gangadharan MRL/ 6P 2/9/2019 Cabin drawing (CHECKING) Purchase

WEEKLY PROGRESS REPORT


MURALI.M DATE: 11.02.2019 to 16.02.2019

SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

1 Sales Gayathri Construction Traction/ 6P 2/11/2019 2/11/2019 MOSD Sales - Nebish

2 Sales ECI church Traction/ 8P 2/11/2019 2/11/2019 COPD Sales - Anburathinam

3 Sales Mahalakshmi marketing MRL/ 10P 2/11/2019 2/11/2019 IFG Sales - Sivakumar

4 Sales Rep print service Traction/ 6P 2/13/2019 2/13/2019 SOPD,COPD Sales - Virender

5 Sales Gajasaraj Traction/ 10P 2/16/2019 2/16/2019 SOPD,IFG Sales - Virender

6 Sales Sethuraman Home Lift 2/16/2019 2/16/2019 MOSD Sales - Sivakumar

7 Sales Brindha MRL/ 13P 2/16/2019 2/16/2019 IFG Sales - Anburathinam


GENERAL ARRANGEMENT DRAWINGS RELEASED
1 3550 Sumangali Properties Traction/ 6P 1/28/2019 2/11/2019 GAD (CHECKING) Erection

2 3556 4 Sqr Properties Traction/ 6P 1/30/2019 2/12/2019 GAD (CHECKING) Erection

3 3558 Khyrunisa Begum Wakf Traction/ 6P 2/7/2019 2/12/2019 GAD (CHECKING) Erection

4 3493 The Nest Traction/Cantilever/ 6P 1/25/2019 2/13/2019 GAD (NEW) Erection

5 2928 Kumar Builders Traction/ 6P 2/11/2019 2/13/2019 GAD (CHECKING) Erection

6 2929 Kumar Builders Traction/ 6P 2/11/2019 2/13/2019 GAD (CHECKING) Erection

7 3494 The Nest Traction/Cantilever/ 6P 1/25/2019 2/14/2019 GAD (NEW) Erection

8 3519/01 Saravana Kumar MRL/ 6P 2/15/2019 2/16/2019 GAD (CHECKING) Erection

9 3552 Venkatesh BELT / 6P 1/25/2019 2/16/2019 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3344 Ravichandran 2/15/2019 Cabin Dwg ( Checking ) Mail - Stalwart

PRODUCTION DRAWING DETAILING RELEASED


1 3517 Vaibhav Reality Traction/ 6P 2/12/2019 Cabin drawing (CHECKING) Purchase

2 3518 Vaibhav Reality Traction/ 6P 2/12/2019 Cabin drawing (CHECKING) Purchase

3 3512 Aadithya Builders Traction/ 6P 2/12/2019 Cabin drawing (CHECKING) Purchase

4 3550 Sumangali Properties Traction/ 6P 2/12/2019 Cabin drawing (CHECKING) Purchase

5 2928 Kumar Builders Traction/ 6P 2/13/2019 Cabin drawing (CHECKING) Purchase

6 2928 Kumar Builders Traction/ 6P 2/13/2019 Cabin drawing (CHECKING) Purchase

Cabin drawing,Production
7 3449 SRP Construction GEARLESS/ 13P 2/14/2019 details Purchase
8 3284 Sri Jeyam Construction Traction/ 6P 2/14/2019 Cabin drawing (CHECKING) Purchase

Cabin drawing,Production
9 3450 SRP Construction GEARLESS/ 13P 2/14/2019 Purchase
details

10 BEL-229 Ample Group Traction/ 6P 2/15/2019 Cabin drawing (CHECKING) Purchase

Cabin drawing,Production
11 3531 Usha Varatharajan MRL/ 6P 2/16/2019 Purchase
details (CHECKING)

WEEKLY PROGRESS REPORT


MURALI.M DATE: 19.02.2019 to 23.02.2019
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

1 Sales JVA groups Traction/ 1TON 2/19/2019 2/19/2019 IFG Sales - Nebish

2 Sales Rajesh MRL/ 8P 2/19/2019 2/19/2019 COPD Sales - Virender

3 Sales United Industries MRL/ 6P 2/19/2019 2/19/2019 IFG Sales - MD

4 Sales CSI church MRL/ 16P Bedlift 2/20/2019 2/20/2019 SOPD Sales - Virender

5 Sales Pradeep Architect MRL/ 6P 2/20/2019 2/20/2019 SOPD Sales - MD

6 Sales Prime life space Dumbwaiter/ 300Kg 2/20/2019 2/20/2019 Vertical Biparting Sales - MD
7 Sales Sakthidharan MRL/ 10P 2/21/2019 2/21/2019 COPD Sales - Sivakumar

8 Sales Isha Homes Bedlift/ 16P 2/21/2019 2/21/2019 SOPD Sales - Anburathinam

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3554 SRK associates GEARLESS/ 13P 1/28/2019 2/19/2019 GAD (NEW) Erection

2 3555 Janaki Mohan MRL/ 6P 1/31/2019 2/19/2019 GAD (CHECKING) Erection

3 3559 Venkatesan Traction/ 6P 2/8/2019 2/20/2019 GAD (CHECKING) Erection

4 3565 Vivid Constructions Traction/ 6P 2/15/2019 2/20/2019 GAD (CHECKING) Erection

5 3557 Unic Associates GEARLESS/ 8P 1/8/2019 2/21/2019 GAD (NEW) Erection

6 3563 Palaniappan Traction/ 6P 2/15/2019 2/22/2019 GAD (CHECKING) Erection

CABIN RECHECK & CONFIRMATION


1 3453 Bhavam Engineering 2/19/2019 Cabin Dwg ( Checking ) Mail - Stalwart

2 3514 Rahul Associates 2/20/2019 Cabin Dwg ( Checking ) Mail - Stalwart

3 3537 Ponnurangam & Others 2/20/2019 Cabin Dwg ( Checking ) Mail - Stalwart

4 2928 Kumar Builders 2/20/2019 Cabin Dwg ( Checking ) Mail - Stalwart

5 2929 Kumar Builders 2/20/2019 Cabin Dwg ( Checking ) Mail - Stalwart

6 3550 Sumangali Properties 2/20/2019 Cabin Dwg ( Checking ) Mail - Stalwart

7 3449 SRP Construction 2/20/2019 Cabin Dwg ( Checking ) Mail - Stalwart

8 3450 SRP Construction 2/20/2019 Cabin Dwg ( Checking ) Mail - Stalwart

9 3542 KAY EM 2/22/2019 Cabin Dwg ( Checking ) Mail - Stalwart


PRODUCTION DRAWING DETAILING RELEASED
1 3524 P.Usha Traction/ 6P 2/18/2019 Cabin drawing (CHECKING) Purchase

2 3457 Sri Naga Builders Traction/ 6P 2/18/2019 Cabin drawing (CHECKING) Purchase

Cabin drawing,Production
3 3443 Dillibabu MRL/ 6P 2/18/2019 Purchase
details (CHECKING)
Cabin drawing,Production
4 3554 SRK Associates GEARLESS/ 13P 2/19/2019 details Purchase

Cabin drawing,Production
5 3557 UNIC Associates GEARLESS/ 8P 2/21/2019 details Purchase

WEEKLY PROGRESS REPORT


MURALI.M DATE: 25.02.2019 to 02.03.2019

SITE DETAIL PRODUCTION


RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

1 Sales Vinoth Kumar Homelift 2/25/2019 2/25/2019 Swing Sales - Anburathinam

2 Sales Narendiran MRL/ 6P 2/25/2019 2/25/2019 COPD Sales - Anburathinam

3 Sales Priya MRL/ 10P 2/25/2019 2/25/2019 COPD Sales - Anburathinam

4 Sales Sadhguru Hotel Traction/ 8P 2/26/2019 2/26/2019 COPD Sales

5 Sales Venkatraman MRL/ 16P 2/28/2019 2/28/2019 COPD Sales - Sivakumar


6 Sales Venkatraman Dumbwaiter/ 500Kg 2/28/2019 2/28/2019 IFG Sales - Sivakumar

7 Sales Shree Nirmaan Infra MRL/ 6P 3/1/2019 3/1/2019 SOPD,MOSD Sales - Anburathinam

8 Sales Balaji MRL/ 10P 3/2/2019 3/2/2019 SOPD Sales - Nebish

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3566 Poongothai Traction/ 6P 1/20/2019 2/25/2019 GAD (CHECKING) Erection

2 3570 Divya MRL/ 6P 2/20/2019 2/25/2019 GAD (CHECKING) Erection

3 3567 Suyambu Traction/ 6P 2/20/2019 2/25/2019 GAD (CHECKING) Erection

4 3569 Usha MRL/ 6P /Homelift 2/22/2019 3/2/2019 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3526 Chennai Turret 2/25/2019 Cabin Dwg ( Checking ) Mail - Stalwart

2 3284 Sri Jeyam Constructions 2/25/2019 Cabin Dwg ( Checking ) Mail - Stalwart

3 3510 Kumar Gandhi 2/25/2019 Cabin Dwg ( Checking ) Mail - Stalwart

4 3518 Vaibhav Reality 3/1/2019 Cabin Dwg ( Checking ) Mail - Lens

5 3517 Vaibhav Reality 3/1/2019 Cabin Dwg ( Checking ) Mail - Lens

6 3457 Sri Naga Builders 3/1/2019 Cabin Dwg ( Checking ) Mail - Lens

7 3305 Sri Abirami Constructions 3/1/2019 Cabin Dwg ( Checking ) Mail - Lens

8 3512 Adithya Builders 3/1/2019 Cabin Dwg ( Checking ) Mail - Lens

9 3502 Ram Builders 3/1/2019 Cabin Dwg ( Checking ) Mail - Lens

PRODUCTION DRAWING DETAILING RELEASED


1 3507 Sundeep Builders MRL/ 6P 2/26/2019 Cabin drawing,Production Purchase
details (CHECKING)

2 3422 Surekha Homes Traction/ 6P 2/26/2019 Cabin drawing (CHECKING) Purchase

3 3341 Beaver Constructions Traction/ 6P 2/27/2019 Cabin drawing (CHECKING) Purchase

4 3558 Khyrunisa Begum Wakf Traction/ 6P 2/28/2019 Cabin drawing (CHECKING) Purchase

WEEKLY PROGRESS REPORT


MURALI.M DATE: 04.03.2019 to 09.03.2019
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

1 Sales Four Square Hydraulic/ 6P 3/4/2019 3/4/2019 SOPD Sales - Nebish

2 Sales MAV constructions Traction/ 6P 3/4/2019 3/4/2019 SOPD Sales - Nebish

3 Sales Prathap Traction/ 6P 3/4/2019 3/4/2019 MOSD Sales - Virender

4 Sales Shankar MRL/ 6P 3/4/2019 3/4/2019 SOPD Sales - Sivakumar

5 Sales Arvia Constructions MRL/ 6P 3/4/2019 3/4/2019 MOSD Sales - Sivakumar

6 Sales Thiruthangal Nadar Arangam Traction/ 500Kg 3/5/2019 3/5/2019 IFG Sales - Virender

7 Sales Anush Foundations MRL/ 8P 3/5/2019 3/5/2019 COPD Sales - Sivakumar


8 Sales Kaaviya Properties MRL/ 6P 3/7/2019 3/7/2019 SOPD Sales - Anburathinam

9 Sales BLT stores MRL/ 6P 3/7/2019 3/7/2019 COPD Sales - Anburathinam

10 Sales Nithyasree Apartments Traction/ 6P 3/9/2019 3/9/2019 COPD Sales

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3521 Mala Structure/Belt/6P 2/25/2019 3/5/2019 GAD (NEW) Erection

2 3564 Kasturi Raj & Mala Raj Structure/Belt/6P 3/2/2019 3/6/2019 GAD (REVISED) Erection

3 3505/01 Arasu arts MRL/ 6P 2/28/2019 3/8/2019 GAD (REVISED) Erection

4 3561 Naghappa Shelters Traction/ 6P 2/28/2019 3/9/2019 GAD (CHECKING) Erection

5 3562 Naghappa Shelters Traction/ 6P 2/28/2019 3/9/2019 GAD (CHECKING) Erection

CABIN RECHECK & CONFIRMATION


1 3470 Sugantha Nandhakumar 3/6/2019 Cabin Dwg ( Checking ) Mail - Lens

2 3525 Gunasekar 3/6/2019 Cabin Dwg ( Checking ) Mail - Lens

3 3542 Kay EM hotel 3/6/2019 Cabin Dwg ( Checking ) Mail - Lens

PRODUCTION DRAWING DETAILING RELEASED


Cabin drawing,Production
1 3521 Mala Structure/Belt/6P 3/7/2019 Purchase
details
Cabin drawing,Production
2 3564 Mala Raj & Kasturi Raj Structure/Belt/6P 3/7/2019 Purchase
details

3 BEL-231 Mirbaah ventures Traction/ 6P 2/8/2019 Cabin drawing (CHECKING) Purchase

Cabin drawing,Production
4 3576 Victoria Arts MRL/ 8P 2/9/2019 details (CHECKING) Purchase
WEEKLY PROGRESS REPORT
MURALI.M DATE: 11.03.2019 to 16.03.2019
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

1 Sales KIA car lift Gearless/ 5Ton 3/12/2019 3/12/2019 COPD Sales - MD

2 Sales Mohan Thirumana maligai Traction/ 6P 3/13/2019 3/13/2019 COPD Sales - Virender

3 Sales Baskaran MRL/ 6P 3/13/2019 3/13/2019 MOSD Sales - Sivakumar

4 Sales Rajesh Bysani Dumbwaiter/ 300kg 3/14/2019 3/14/2019 Biparting Sales - Virender

5 Sales KCEE pro[perties MRL/ 6P 3/15/2019 3/15/2019 COPD Sales - MD

6 Sales Kaviya properties MRL/ 6P 3/15/2019 3/15/2019 SOPD Sales - Anburathinam

7 Sales Mani MRL/ 6P 3/15/2019 3/15/2019 SOPD Sales - Sivakumar

8 Sales Nithyashree Apartments Traction/ 6P 3/16/2019 3/16/2019 COPD Sales - Anburathinam

9 Sales Venkateshwaran MRL/ 6P 3/16/2019 3/16/2019 SOPD Sales - Sivakumar

10 Sales Madras Design works MRL/ 6P 3/16/2019 3/16/2019 SOPD Sales - Anburathinam

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3505 Arasu arts MRL/ 6P 3/8/2019 3/12/2019 GAD (Revised) Erection

2 3572 Deepa Vivekanandan MRL/ 6P 2/27/2019 3/13/2019 GAD (Checking) Erection

3 3573 Jesun Enterprises Goods/ 1Ton 2/28/2019 3/14/2019 GAD (NEW) Erection

4 3583 Tide water oil MRL/ 2Ton 3/12/2019 3/15/2019 GAD (NEW) Erection

5 3584 Tide water oil MRL/ 2Ton 3/12/2019 3/15/2019 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3558 Khyrunisa Begum 3/15/2019 Cabin Dwg ( Checking ) Mail - Lens

2 3341 Beaver Constructions 3/15/2019 Cabin Dwg ( Checking ) Mail - Lens

3 3422 Surekha Homes 3/15/2019 Cabin Dwg ( Checking ) Mail - Lens

4 3338 Beaver Constructions 3/15/2019 Cabin Dwg ( Checking ) Mail - Lens

PRODUCTION DRAWING DETAILING RELEASED


Cabin drawing,Production
1 3505 Arasu Arts MRL/ 6P 3/12/2019 details Purchase

2 3519 Saravana Kumar MRL/ 6P 3/13/2019 Cabin drawing,Production Purchase


details (CHECKING)

3 3543 Vijay Kumar MRL/ 6P 3/13/2019 Cabin drawing,Production Purchase


details (CHECKING)

4 3574 Cholaprakash MRL/ 6P 3/14/2019 Cabin drawing,Production Purchase


details (CHECKING)
Cabin drawing,Production
5 3312 Kumar Builders MRL/ 6P 3/14/2019 Purchase
details (CHECKING)

6 3541 Sri Abirami Constructions Traction/ 6P 3/16/2019 Cabin drawing (CHECKING) Purchase
WEEKLY PROGRESS REPORT
MURALI.M DATE: 18.03.2019 to 23.03.2019
SITE DETAIL PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

1 Sales Four Square Constructions MRL/ 6P 3/21/2019 3/21/2019 SOPD Sales - Nebish

2 Sales Four Square Constructions Hydraulic/ 6P 3/21/2019 3/21/2019 SOPD Sales - Nebish

3 Sales Creative Builders Homelift 3/21/2019 3/21/2019 Swing Sales - Anburathinam

4 Sales Elumalai Homelift 3/21/2019 3/21/2019 Swing Sales - Virender

5 Sales Tropical Reality Traction/ MRL/ 6P 3/21/2019 3/21/2019 COPD,SOPD Sales - Anburathinam

6 Sales Tropical Reality Traction/ MRL/ 6P 3/21/2019 3/21/2019 COPD,SOPD Sales - Anburathinam

7 Sales Baleshwar Auto MRL/ 6P 3/21/2019 3/21/2019 SOPD Sales - MD

8 Sales Baleshwar Auto Goods/ 1TON 3/21/2019 3/21/2019 IFG Sales - MD

9 Sales Raja Traction/ 6P 3/22/2019 3/22/2019 MOSD, SOPD Sales - Nebish

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3594 Kcee Properties MRL/ 6P 3/16/2019 3/20/2019 GAD (Checking) Erection
2 3571 Joseph & Rajaram Structure/Belt/6P 3/12/2019 3/20/2019 GAD (NEW) Erection

3 3590 Priya Shyam MRL/ 10P 3/14/2019 3/20/2019 GAD (Checking) Erection

4 3355 Stephen & Samuel Traction/ 6P 3/5/2019 3/21/2019 GAD (Checking) Erection

5 3575 Rahul Associates MRL/ 6P 3/5/2019 3/21/2019 GAD (Checking) Erection

6 3576 Thiruselvam MRL/ 6P 3/6/2019 3/22/2019 GAD (Checking) Erection

7 3587 Shree Nirmaan Infra MRL/ 6P 3/13/2019 3/23/2019 GAD (Checking) Erection

8 3588 Umamaheswari MRL/ 6P 3/13/2019 3/23/2019 GAD (Checking) Erection

9 3589 Chittibabu MRL/ 6P 3/13/2019 3/23/2019 GAD (Checking) Erection

PRODUCTION DRAWING DETAILING RELEASED


Cabin drawing,Production
1 3064 Lavanya Traction/ 6P 3/18/2019 Purchase
details

2 3554 Thilagar Traction/ 6P 3/20/2019 Cabin drawing (Checking) Purchase

3 3577 Gayathri Owners Association Traction/ 6P 3/20/2019 Cabin drawing Purchase

4 3578 Gayathri Owners Association Traction/ 6P 3/20/2019 Cabin drawing Purchase

5 BEL-230 Mahaboob Jaan MRL/ 6P 3/23/2019 Cabin drawing,Production Purchase


details (Checking)
WEEKLY PROGRESS REPORT
MURALI.M DATE: 25.03.2019 to 30.03.2019
SITE DETAIL PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE
ERECTION

1 Sales Kellogs MRL/ 2000Kg 3/25/2019 3/25/2019 COPD Sales - Peter (G.M.)

2 Sales Arulmozhi MRL/ 6P 3/25/2019 3/25/2019 COPD Sales - Peter (G.M.)

3 Sales Pawan Homelift 3/26/2019 3/26/2019 Swing Sales - Peter (G.M.)

4 Sales Victory Foundation MRL/ 6P 3/26/2019 3/26/2019 SOPD Sales

5 Sales Wintana Resources MRL/ 6P 3/27/2019 3/27/2019 SOPD Sales - Virender

6 Sales Mani MRL/ 6P 3/27/2019 3/27/2019 COPD,SOPD Sales - Virender

7 Sales Ragu Traction/ MRL/ 6P 3/27/2019 3/27/2019 COPD Sales - Sivakumar

8 Sales Vijay Homelift 3/27/2019 3/27/2019 Swing Sales

9 Sales Rajkumar MRL/ 6P 3/27/2019 3/27/2019 SOPD Sales - MD

10 Sales Indian Bank executive Flats Gearless/ 6P 3/29/2019 3/29/2019 COPD Sales - Peter (G.M.)

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3586 Anusuya MRL/ 6P 3/13/2019 3/23/2019 GAD (Checking) Erection

2 3591 Gnanaprakasam Traction/ 6P 3/16/2019 3/26/2019 GAD (Checking) Erection

3 3579 Mani MRL/ 6P 3/9/2019 3/28/2019 GAD (Checking) Erection

CABIN RECHECK & CONFIRMATION


1 3432 Ben 3/27/2019 Cabin Dwg ( Checking ) Mail - Lens
2 3564 Kasturi Raj 3/28/2019 Cabin Dwg ( Checking ) Mail - Stalwart

3 3505 Arasu Arts 3/29/2019 Cabin Dwg ( Checking ) Mail - Stalwart

PRODUCTION DRAWING DETAILING RELEASED


Cabin drawing,Production
1 3528 Janaki Srinivas Seshan Belt/ 6P 3/27/2019 details Purchase

Cabin drawing,Production
2 3570 Divya MRL/ 6P 3/27/2019 details (Checking) Purchase

3 3322 Panneer Ramachandran MRL/ 8P 3/28/2019 Cabin drawing,Production Purchase


details (Checking)

4 3587 Shree Nirmaan Infra MRL/ 6P 3/28/2019 Cabin drawing,Production Purchase


details (Checking)

5 3551 Shiva Homes Traction/ 6P 3/28/2019 Cabin drawing (Checking) Purchase

Cabin drawing,Production
6 3586 Anusuya MRL/ 6P 3/29/2019 Purchase
details (Checking)
Cabin drawing,Production
7 3594 KCEE properties MRL/ 6P 3/29/2019 Purchase
details (Checking)

8 2980 Sakthidharan Traction/ 6P 3/30/2019 Cabin drawing Purchase

9 3553 Arunkumar Traction/ 6P 3/30/2019 Cabin drawing Purchase

WEEKLY PROGRESS REPORT


MURALI.M DATE: 01.04.2019 to 06.04.2019
SITE DETAIL PRODUCTION
RECEIVING RECEIVING
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE
ERECTION

1 Sales Guru Raghavendra Cons MRL/ 8P 4/4/2019 4/4/2019 SOPD Sales - MD

2 Sales Sri Krishna Creation MRL/ 8P/ 10P 4/5/2019 4/5/2019 SOPD Sales - Sivakumar

3 Sales Badri Builders MRL/ 6P 4/5/2019 4/5/2019 COPD Sales - MD

4 Sales Kcee Properties MRL/ 6P 4/6/2019 4/6/2019 SOPD Sales - MD

5 Sales Kcee Properties MRL/ 8P 4/6/2019 4/6/2019 SOPD Sales - MD

6 Sales Kcee Properties MRL/ 8P 4/6/2019 4/6/2019 COPD Sales - MD

7 Sales Kcee Properties MRL/ 8P 4/6/2019 4/6/2019 COPD Sales - MD

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3607 Nahar Foundation MRL/ 6P 3/29/2019 4/3/2019 GAD (New) Erection

2 3592 Arunachalapuram Nadar MRL/ 16P 3/16/2019 4/4/2019 GAD (New) Erection

3 3609 Victory Foundation MRL/ 6P 3/9/2019 4/5/2019 GAD (Checking) Erection

4 3606 Vasudha Enterprises Traction/ 6P 3/29/2019 4/5/2019 GAD (Checking) Erection

CABIN RECHECK & CONFIRMATION


1 3570 Divya 4/3/2019 Cabin Dwg ( Checking ) Mail - Lens

PRODUCTION DRAWING DETAILING RELEASED


Cabin drawing,Production
1 3528 Nest Honour Traction/ 6P 4/2/2019 Purchase
details
Cabin drawing,Production
2 3570 Venkatesh Belt/ 6P 4/5/2019 Purchase
details
WEEKLY PROGRESS REPORT
MURALI.M DATE: 29.04.2019 to 04.05.2019
SITE DETAIL
PRODUCTION
RECEIVING RECEIVING SUBMITTED
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING REMARKS
ERECTION DATE

1 Sales ABM Builders Belt/ 6P 4/29/2019 4/29/2019 SOPD Sales - Anburathinam

2 Sales Indira Projects Belt/ Structural/ 6P 4/29/2019 4/29/2019 SOPD Sales - MD

3 Sales Raja Ayub Home Lift/ Civil 4/29/2019 4/29/2019 SOPD Sales - Anburathinam

4 Sales JVB Associates MRL/ 13P 4/30/2019 4/30/2019 COPD Sales - Nebish

5 Sales Hotel AGT Pak MRL/ 8P 5/2/2019 5/2/2019 IFG With Swing Sales - Arjun

6 Sales Thomas MRL/ 8P 5/2/2019 5/2/2019 MOSD Sales - Arjun

7 Sales Belliyappa Associates MRL/ 8P 5/2/2019 5/2/2019 SOPD Sales - Arjun

8 Sales Jai Air systems Belt/ Traction/ 6P 5/4/2019 5/4/2019 SOPD Sales - Anburathinam

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3633 Vasanthan MRL/ 6P 4/25/2019 4/27/2019 GAD (New) Erection
2 3626 Rajesh Kumar MRL/ 6P 4/20/2019 4/30/2019 GAD (Checking) Erection

3 3627 Krishnan MRL/ 6P 4/23/2019 5/2/2019 GAD (Checking) Erection

4 3631 Gopalakrishnan MRL/ 6P 4/26/2019 5/2/2019 GAD (Checking) Erection

PRODUCTION DRAWING DETAILING RELEASED


Cabin drawing,Production
1 3606 Vasudha Enterprises Traction/ 6P 4/29/2019 Purchase
details
Cabin drawing,Production
2 3588 Umamaheswari MRL/ 6P 5/2/2019 Purchase
details (Checking)
Cabin drawing,Production
3 3589 Chittibabu MRL/ 6P 5/2/2019 Purchase
details (Checking)

4 3548 Greenwich Constructions MRL/ 6P 4/5/2019 Cabin drawing,Production Purchase


details

WEEKLY PROGRESS REPORT


MURALI.M DATE: 06.05.2019 to 11.05.2019

SITE DETAIL
PRODUCTION
RECEIVING RECEIVING SUBMITTED
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SEND DATE SUBMITTED DRAWING REMARKS
DATE
ERECTION

1 Sales Tara Rajkumar Home Lift 5/6/2019 5/6/2019 Swing Sales - Anburathinam
2 Sales Prabhakaran (1) (2) MRL/ 8P 5/11/2019 5/11/2019 COPD Sales - Peter (G.M)

3 Sales Mani MRL/ Traction/ 6P 5/11/2019 5/11/2019 SOPD Sales - Chopra

4 Sales Donas Drugs MRL/ 1Ton 5/11/2019 5/11/2019 MOSD Sales - Peter (G.M)

5 Sales Ezhilmaran MRL/ 10P 5/11/2019 5/11/2019 COPD Sales - MD

PRODUCTION DRAWING DETAILING RELEASED


Cabin drawing,Production
1 3573 Jesun Enterprises Traction/ 1 Ton 5/7/2019 Purchase
details
Cabin drawing,Production
2 3628 A G Constructions MRL/ 6P 5/7/2019 Purchase
details (Checking)

3 3631 Gopalakrishnan MRL/ 6P 5/9/2019 Cabin drawing,Production Purchase


details (Checking)
Cabin drawing,Production
4 3623 Nutech Athulyam MRL/ 8P 5/11/2019 Purchase
details (Checking)

WEEKLY PROGRESS REPORT


MURALI.M DATE: 13.05.2019 to 18.05.2019
SITE DETAIL
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

1 Sales MRL/ 6P 5/14/2019 5/14/2019 SOPD Sales - Sivakumar

2 Sales KTLOA Mandapam MRL/ Traction/ 8P 5/14/2019 5/14/2019 IFG Sales - MD


3 Sales Anmol Srusti MRL/ 6P 5/15/2019 5/15/2019 SOPD Sales - MD

4 Sales Anmol Srusti MRL/ 8P 5/15/2019 5/15/2019 SOPD Sales - MD

Traction/ 6P/
5 Sales BEL - 99 5/15/2019 5/15/2019 SOPD Sales
Modernisation

6 Sales Guru & Company Home Lift 5/15/2019 5/15/2019 Swing Sales - MD

7 Sales Shivashakthi Home Lift 5/15/2019 5/15/2019 SOPD Sales - MD

8 Sales Associated Engineering MRL/ 1 Ton 5/16/2019 5/16/2019 IFG / SOPD Sales - Peter (G.M)

9 Sales PRS Constructions Traction/ 6P 5/18/2019 5/18/2019 SOPD Sales - Vimal

10 Sales Greenwich Constructions (1)(2)(3)( MRL/ 6P 5/18/2019 5/18/2019 IFG Sales - Anburathinam

11 Sales Raja Ayub Home Lift 5/18/2019 5/18/2019 IFG / SOPD Sales - Anburathinam

12 Sales IIT Belt/ 6P/ Structural 5/18/2019 5/18/2019 SOPD Sales - Peter (G.M)

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3629 Ravisankar MRL/ 6P 5/9/2019 5/14/2019 GAD (Checking) Erection

2 3649 Jaganathan MRL/ 6P 5/13/2019 5/16/2019 GAD (Checking) Erection

3 3484 Venkateswaran MRL/ 6P 5/14/2019 5/17/2019 GAD (Checking) Erection

CABIN RECHECK & CONFIRMATION


1 3565 Vivid Constructions 5/14/2019 Cabin Dwg ( Checking ) Mail - Lens

PRODUCTION DRAWING DETAILING RELEASED


Cabin drawing,Production
1 3620 Sai Baba Handlooms MRL/ 6P 5/14/2019 details Purchase

Cabin drawing,Production
2 3548 Nutech associates MRL/ 6P 5/15/2019 details (Checking) Purchase
Cabin drawing,Production
3 3626 Rajesh Kumar MRL/ 6P 5/18/2019 Purchase
details (Checking)

WEEKLY PROGRESS REPORT


MURALI.M DATE: 20.05.2019 to 25.05.2019
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT DATE FROM DATE SUBMITTED REMARKS
DATE
ERECTION

1 Sales Beaver Constructions(1) (2) Traction/ 10P 5/20/2019 5/20/2019 MOSD Sales - Sivakumar

2 Sales Dr. Hariharan MRL/ 6P 5/22/2019 5/22/2019 COPD Sales - Sivakumar

3 Sales KPN Homes MRL/ 6P 5/22/2019 5/22/2019 COPD Sales - Sivakumar

4 Sales Srinivasan Traction/ 6P 5/22/2019 5/22/2019 SOPD Sales - Vimal

5 Sales Ramkumar MRL/ Structural/ 6P 5/23/2019 5/23/2019 MOSD Sales - Chopra

6 Sales KTLOA Mandapam MRL/ 8P 5/24/2019 5/24/2019 IFG Sales - MD

7 Sales K Lite Industries MRL/ 13P 5/24/2019 5/24/2019 COPD Sales - MD

8 Sales KPM Constructions MRL/ 6P 5/25/2019 5/25/2019 COPD Sales - MD

PRODUCTION DRAWING DETAILING RELEASED


Cabin drawing,Production
1 3634 Arunganesh MRL/ 6P 5/22/2019 Purchase
details (Checking)
Cabin drawing,Production
2 3636 Allsai Associates MRL/ 6P 5/23/2019 details (Checking) Purchase

3 3485 Rina Homes Traction/ 6P 5/23/2019 Cabin drawing,Production Purchase


details
Cabin drawing,Production
4 3633 Vasanthan MRL/ 6P 5/24/2019 Purchase
details (Checking)

WEEKLY PROGRESS REPORT


MURALI.M DATE: 08.07.2019 to 13.07.2019
SITE DETAIL
PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
DATE
ERECTION

1 Sales KPM Constructions MRL/ 6P 7/8/2019 7/8/2019 COPD, SOPD Sales - Anburathinam

2 Sales KPM Constructions MRL/ 10P 7/8/2019 7/8/2019 IFG Sales - Anburathinam

3 Sales Siva MRL/ 6P 7/8/2019 7/8/2019 SOPD Sales - Anburathinam

4 Sales Jai air systems MRL/ 6P 7/8/2019 7/8/2019 IFG Sales - Anburathinam

5 Sales Bharat Builders MRL/ 6P 7/8/2019 7/8/2019 SOPD Sales - Virender

6 Sales Kumaravel MRL/ 6P 7/10/2019 7/10/2019 COPD Sales - Anburathinam

7 Sales Pugazhendi MRL/ 6P 7/10/2019 7/10/2019 SOPD Sales - Anburathinam

8 Sales Rams Builders MRL Belt/ 6P 7/10/2019 7/10/2019 Swing Sales - Anburathinam
9 Sales Melvin Jones Traction/ MRL/ 16P 7/11/2019 7/11/2019 SOPD Sales - Anburathinam

10 Sales Disha Constructions MRL/ 6P 7/12/2019 7/12/2019 IFG/Swing Sales - Anburathinam

11 Sales Firm Foundations MRL/ 6P 7/13/2019 7/13/2019 COPD Sales - MD

12 Sales T G Properties MRL/ 6P 7/13/2019 7/13/2019 COPD Sales - Peter (G.M)

GENERAL ARRANGEMENT DRAWINGS RELEASED


1 3676 Prabhakar MRL/ 8P 6/28/2019 7/8/2019 GAD (Checking) Erection

2 3686 Grace Super market MRL/ 13P 7/4/2019 7/10/2019 GAD (NEW) Erection

3 3677 Ilango MRL/ 6P 7/1/2019 7/11/2019 GAD (Checking) Erection

PRODUCTION DRAWING DETAILING RELEASED


1 3544 Brakes India MRL/ 5TON 7/9/2019 Production details Purchase

2 3686 Grace Super market MRL/ 13P 7/12/2019 Production details Purchase

3 3609 Victory Foundation MRL/ 8P 7/13/2019 Production details (Checking) Purchase

WEEKLY PROGRESS REPORT


MURALI.M DATE: 15.07.2019 to 20.07.2019
SITE DETAIL
PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

1 Sales T G Properties MRL/ 6P 7/16/2019 7/16/2019 SOPD Sales - MD

2 Sales Urbandots MRL/ 6P 7/16/2019 7/16/2019 SOPD Sales - By mail

3 Sales Shree Sai Constructions Traction/ 1000kg goods 7/17/2019 7/17/2019 IFG Sales - Vimal

4 Sales Axis Bank STRUCTURAL MRL/ 6P 7/17/2019 7/17/2019 SOPD Sales - Virender

5 Sales ONGC Traction/ 6P 7/19/2019 7/19/2019 COPD Sales - Peter (G.M.)

6 Sales Harikumar MRL/ 6P 7/20/2019 7/20/2019 SOPD Sales - Sivakumar

GENERAL ARRANGEMENT DRAWINGS RELEASED


STRUCTURAL MRL BELT/
1 3687 Indira Projects 6P 7/9/2019 7/16/2019 GAD (NEW) Erection

2 3679 DPS Hospital MRL/ 16P 7/1/2019 7/20/2019 GAD (NEW) Erection

CABIN RECHECK & CONFIRMATION


1 3561 Naghappa Shelters 7/19/2019 Cabin Dwg ( Checking ) Mail - Lens

2 3562 Naghappa Shelters 7/19/2019 Cabin Dwg ( Checking ) Mail - Lens


WEEKLY PROGRESS REPORT
MURALI.M DATE: 22.07.2019 to 27.07.2019
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

1 Sales Murugan MRL/ 16P 7/22/2019 7/22/2019 COPD Sales - Anburathinam

2 Sales Chandran MRL/ 2000kg goods 7/22/2019 7/22/2019 SOPD/IFG Sales - Virender

3 Sales Shankar Infra Home lift 7/22/2019 7/22/2019 Swing Sales - Vimal

4 Sales NOVA constructions STRUCTURAL MRL/ 10P 7/26/2019 7/26/2019 COPD Sales - Sivakumar

5 Sales CTC design MRL/ 1000kg goods 7/26/2019 7/26/2019 SOPD Sales - Peter (G.M.)

6 Sales Rajendra Kumar MRL/ 16P 7/26/2019 7/26/2019 SOPD Sales - Bangalore

7 Sales Rajendra Kumar MRL/ 2000kg goods 7/26/2019 7/26/2019 SOPD Sales - Bangalore

8 Sales Swetha Constructions Traction/ 13P 7/27/2019 7/27/2019 SOPD Sales - Vimal

PRODUCTION DRAWING DETAILING RELEASED


1 3670 Anmol shrusti 7/27/2019 Production details (Checking) Purchase

2 3671 Anmol shrusti 7/27/2019 Production details (Checking) Purchase


WEEKLY PROGRESS REPORT
MURALI.M DATE: 29.07.2019 to 03.08.2019
SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED REMARKS
DATE FROM DATE DATE
ERECTION

1 Sales Najul Ameen MRL/ 16P 7/29/2019 7/29/2019 COPD Sales - Sivakumar

2 Sales Krishnan BELT/ Home Lift 7/30/2019 7/30/2019 SOPD/IFG Sales - Office

3 Sales Krishnan Traction/ 10P 7/30/2019 7/30/2019 Swing Sales - Office

4 Sales GKS Estates (Dismantling) Traction/ 1000kg goods 7/31/2019 7/31/2019 COPD Sales - Virender

5 Sales Allsai Associates Traction/ 6P 7/31/2019 7/31/2019 SOPD Sales - Virender

6 Sales Sekar MRL/ 8P/ 10P 8/1/2019 8/1/2019 SOPD Sales - Sivakumar

7 Sales Shree Hayagreev homes Traction/ MRL/ 6P 8/2/2019 8/2/2019 SOPD Sales - Sivakumar

8 Sales Suvire Electricals MRL/ 2000Kg 8/2/2019 8/2/2019 Collapsible Sales - Anburathinam

CABIN RECHECK & CONFIRMATION


1 3664 GSN Enterprises 7/30/2019 Cabin Dwg ( Checking ) Mail - Lens

2 3690 Sai Kumari 8/3/2019 Cabin Dwg ( Checking ) Mail - Lens


WEEKLY PROGRESS REPORT
ALI.M DATE: 12.07.2019 to 17.08.2019
SITE DETAIL
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
SUBMITTED REMARKS
DATE FROM DATE
ERECTION DATE

1 Sales Krishna kumar MRL/ Structural 8/13/2019 8/13/2019 SOPD Sales - MD

2 Sales Agasthiyar Traction/ MRL/ 6P 8/13/2019 8/13/2019 SOPD Sales - Vimal

3 Sales Nova Star Traction/ MRL/ 6P 8/14/2019 8/14/2019 SOPD Sales - Virender

4 Sales Saveetha University MRL/ 24P 8/14/2019 8/14/2019 SOPD Sales - Peter (G.M.)

5 Sales Saveetha University MRL/ 16P 8/16/2019 8/16/2019 COPD Sales - Peter (G.M.)

PRODUCTION DRAWING DETAILING RELEASED


Production Details, Cabin
1 3600 United professional Developers Traction/ 6P 8/16/2019 Purchase
Drawing
Production Details, Cabin
2 3646 Dr. Shivan MRL/ 16P 8/17/2019 Purchase
Drawing

WEEKLY PROGRESS REPORT

MURALI.M DATE: 25.11.2019 to 30.11.2019


SITE DETAIL
PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING SUBMITTED CABIN SUBMITTED
DATE FROM DATE DATE
DATE
ERECTION

SALES ENQUIRY RELEASED

1 Sales IDEAL BUILDING COMPANY MRL/6P 11/25/2019 11/25/2019 SOPD

2 Sales VIVA HOUSING Traction/6P 11/27/2019 11/27/2019 COPD

3 Sales VIVA HOUSING MRL/6P 11/27/2019 11/27/2019 COPD

5 Sales TAMILNADU WELFARE BOARD MRL/10P 11/28/2019 11/28/2019 COPD

6 Sales ROCKY AGENCIES MRL/1000kg goods 11/28/2019 11/28/2019 IFG

7 Sales TIRUMURTHY EXPORTS MRL/6P 11/30/2019 11/30/2019 SOPD

8 Sales SRI JEYARAM AGENCY Traction/ 1000kg goods 11/30/2019 11/30/2019 IFG

GENERAL ARRANGEMENT DRAWINGS RELEASED

1 3777 SAI BHARATH BUILDERS Traction/6P 11/21/2019 11/25/2019 GAD(NEW)

2 3778 SAI BHARATH BUILDERS Traction/6P 11/21/2019 11/25/2019 GAD(NEW)


3 3762 GRAHALAYA ENGINEERS Traction/6P 11/23/2019 11/28/2019 GAD(NEW)

4 3763 GRAHALAYA ENGINEERS Traction/6P 11/23/2019 11/28/2019 GAD(NEW)

PRODUCTION DRAWING DETAILINGS RELEASED

1 3772 SHIBU ISAAC MRL/13P 11/29/2019

3 3738 SUDARSAN BUILDERS Traction/6P 11/30/2019

WEEKLY PROGRESS REPORT

MURALI.M DATE: 02.12.2019 to 07.12.2019

SITE DETAIL
RECEIVING RECEIVING SEND DATE SUBMITTED DRAWING PRODUCTION
S.NO JOB No. CLIENT NAME TYPE OF LIFT SUBMITTED CABIN SUBMITTED
DATE FROM DATE DATE
DATE
ERECTION
SALES ENQUIRY RELEASED

1 Sales ALLIANCE MRL/13P 12/2/2019 12/2/2019 SOPD

2 Sales ALLIANCE MRL/8P 12/2/2019 12/2/2019 SOPD

3 Sales PHILIP MRL/6P 12/3/2019 12/3/2019 SOPD

4 Sales ANATHAGURU MRL/6P 12/3/2019 12/3/2019 SOPD

5 Sales VEDAVILAS Traction/6P 12/3/2019 12/3/2019 COPD

6 Sales MANIKAVASAGAM MRL/6P 12/4/2019 12/4/2019 COPD

GENERAL ARRANGEMENT DRAWINGS RELEASED

1 3781 FARM BAZZAR MRL/6P 11/28/2019 12/5/2019 GAD(NEW)

2 3782 SUMANGALI HOMES Traction/6P 11/30/2019 12/6/2019 GAD(NEW)

PRODUCTION DRAWING DETAILINGS RELEASED

1 3783 FARM BAZZAR MRL/6P 12/3/2019

2 3743 GD BUILDERS MRL/6P 12/7/2019


5.11.2019 to 30.11.2019
REMARKS

Sales-Peter Sir

Sales-Sivakumar

Sales-Sivakumar

Sales-Sivakumar

Sales-Anbu

Sales-Peter Sir

Sales-Sivakumar

Design - Erection

Design - Erection
Design - Erection

Design - Erection

Purchase

Purchase

2.12.2019 to 07.12.2019

REMARKS
Sales-

Sales-

Sales-Peter Sir

Sales- MD sir

Sales-

Sales-

Design - Erection

Design - Erection

Purchase

Purchase